KR20090129249A - Electric wire tension method using portable motor operated winch - Google Patents

Electric wire tension method using portable motor operated winch Download PDF

Info

Publication number
KR20090129249A
KR20090129249A KR1020080055420A KR20080055420A KR20090129249A KR 20090129249 A KR20090129249 A KR 20090129249A KR 1020080055420 A KR1020080055420 A KR 1020080055420A KR 20080055420 A KR20080055420 A KR 20080055420A KR 20090129249 A KR20090129249 A KR 20090129249A
Authority
KR
South Korea
Prior art keywords
wire
winch
power line
electric
pylon
Prior art date
Application number
KR1020080055420A
Other languages
Korean (ko)
Other versions
KR100974321B1 (en
Inventor
황철욱
복기용
Original Assignee
(자)자유이엔씨
현대건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (자)자유이엔씨, 현대건설주식회사 filed Critical (자)자유이엔씨
Priority to KR1020080055420A priority Critical patent/KR100974321B1/en
Publication of KR20090129249A publication Critical patent/KR20090129249A/en
Application granted granted Critical
Publication of KR100974321B1 publication Critical patent/KR100974321B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • B66D1/40Control devices
    • B66D1/48Control devices automatic
    • B66D1/50Control devices automatic for maintaining predetermined rope, cable, or chain tension, e.g. in ropes or cables for towing craft, in chains for anchors; Warping or mooring winch-cable tension control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/006Power actuated devices operating on ropes, cables, or chains for hauling in a mainly horizontal direction
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

PURPOSE: A stringing method using a portable operation winch is provided to operate a first operation winch and a second operation winch by installing the first and second operation winches within an operation range. CONSTITUTION: A first direction changeover pulley(11) is installed in a lower side of a pylon arm. A second direction changeover pulley(12) is installed in the lower side of the pylon arm to face the first direction changeover pulley. A first operation winch(21) is fixed in a front rest area of a pylon. A second operation winch(22) is fixed in a rear rest area of the pylon. A third direction changeover pulley(13) is installed in the front rest area of the pylon in order to locate on the first operation winch. A fourth direction changeover pulley(14) is installed in the rear rest area of the pylon to locate on the second operation winch. A first power line(1) is mounted on an insulator string(5). A second power line(2) is mounted on the insulator string.

Description

휴대용 전동윈치를 활용한 긴선공법{Electric wire tension method using portable motor operated winch}Electric wire tension method using portable motor operated winch}

본 발명은 휴대용 전동윈치를 활용한 긴선공법에 관한 것으로, 더욱 상세하게는 철탑의 전, 후방휴게소에 경량의 제1, 2전동윈치를 작업자의 작업반경 내에 설치하여 이 제1, 2전동윈치로 1, 2전력선을 끌어당겨 긴선작업을 실시함으로써, 작업자가 작업하고자 하는 의도대로 전동윈치를 조작할 수 있도록 함은 물론, 다른 작업자의 긴선작업과정을 육안으로 확인하거나 의사 소통을 하면서 긴선작업을 할 수 있도록 한 휴대용 전동윈치를 활용한 긴선공법에 관한 것이다.The present invention relates to a long wire method using a portable electric winch, and more particularly to the first and second electric winch by installing light weight first and second electric winches in the working radius of the operator at the front and rear rest areas of the steel tower. By pulling the 1, 2 power lines and carrying out the long wire work, the operator can operate the electric winch as intended, as well as check the communication of other workers with the naked eye or communicate with them. It relates to a long wire method using a portable electric winch that allows.

일반적으로 긴선작업이란, 연선된 전력선을 내장철탑 간에서 소정의 장력으로 인상하여 내장애자장치에 취부하고 현수철탑은 전력선을 현수애자장치에 고정하는 작업을 말한다.In general, the long wire work refers to a task of pulling a stranded power line to a predetermined tension between built-in steel towers and attaching it to a barrier-free device, and a suspended steel tower fixing power lines to a suspension insulator device.

이러한 긴선작업은 도 1에 도시된 바와 같이, 전력선(100)을 애자련(101)과 취부시키기 위해서는 전력선(100)에 캄아롱(CAM-A-LONG)을 위부한 다음 방향전환활차(102)를 거쳐 지상 윈치(103)에서 와이어(104) 당김작업을 하여 이도조정후 전선전달을 하고 애자련(101)에 전력선을 취부하였다.This long-line operation, as shown in Figure 1, in order to mount the power line 100 with the insulator 101, the camber (CAM-A-LONG) on the power line 100 and then turning direction pulley 102 The wire 104 was pulled from the ground winch 103 via the ear canal, and the electric wire was attached to the insulator 101.

그러나 기존의 긴선작업 방법은, 철탑 부지 내 윈치 자리를 선정하여 백호우(Backhoe) 및 인력으로 정지 작업을 한 후 지선근가를 파묻고 원치를 사용하므로 많은 작업시간이 소요됨을 물론, 윈치를 조작하는 1명의 운전원과 인부는 윈치에 감기는 와이어가 엉키지 않게 정리하는 2명의 와이어 정리 인부 등 총 3명의 작업인원이 항시 지상에 상주하면서 와이어 인상작업을 하므로 작업의 효율성이 떨어지는 문제점이 있었다.However, the existing long-line work method selects the winch seat in the site of the steel tower, stops the work by the backhoe and manpower, burys the ground near the ground, and uses the original tool, which takes much time. The operator and the worker has a problem that the efficiency of the work is lowered because a total of three workers, such as two wire cleaning workers to clean up the wires on the winch, always work on the ground and raise the wire.

또한, 윈치 운전원과 송전탑 위에서 긴선작업을 하는 작업자의 거리가 원거리로 있으므로 윈치 조작시 무전기로 교신을 하면서 작업을 해야 하기 때문에 철탑위의 작업자의 안전을 확보하기 어려우며, 윈치의 부피와 무게가 크므로 작업장 부근까지 별도의 윈치 운반차량이 필요하고 윈치 운반에 따른 고가의 비용이 소요되는 문제점이 있었다.In addition, since the distance between the winch operator and the worker who is working on the wireline on the transmission tower is far, it is difficult to secure the safety of the worker on the pylon because the work must be performed while communicating with the radio when operating the winch, and the volume and weight of the winch are large. There is a problem in that a separate winch carrying vehicle is required until the vicinity of the work site, and a high cost of carrying the winch is required.

본 발명은 상기와 같은 문제점을 해결하기 위해 발명한 것으로, 본 발명의 목적은 전력선을 끌어당길 수 있는 전동위치를 긴선작업을 실시하는 철탑 휴게소에 설치함으로써, 긴선작업 과정에서 작업자들간에 작업하는 과정을 육안으로 확인하거나 작업자 서로 간에 긴밀한 의사소통을 해가면서 긴선작업을 하므로 작업기간을 대폭 단축할 수 있도록 한 휴대용 전동윈치를 활용한 긴선공법을 제공함에 그 목적이 있다.The present invention has been invented to solve the above problems, an object of the present invention is to install the electric position that can pull the power line in the steel tower rest area to perform the long-line work, the process of working between workers in the long-line work process The purpose is to provide a long wire method using a portable electric winch that can significantly shorten the working period because of the long wire work while visually checking or communicating closely with each other.

본 발명은 상기와 같은 기술적 과제를 해결하기 위해, 애자련이 설치된 철탑암의 하단에 제1전력선을 끌어당기는 당김와이어가 경유하는 제1방향전환활차를 설치하는 제1단계와; 상기 애자련이 설치된 철탑암의 하단에 제2전력선을 끌어당기는 당김와이어가 경유하는 제2방향전환활차를 제1방향전환활차와 마주보도록 나란히 설치하는 제2단계와; 상기 애자련이 설치된 철탑암 부근의 철탑 네 귀퉁이 중 상기 제1방향전환활차와 대각방향의 전방철탑휴게소에 제1전동윈치를 고정와이어로 고정설치하는 제3단계와; 상기 제1전동윈치가 설치된 대각방향으로 마주보는 후방철탑휴게소에 제2전동윈치를 고정와이어로 고정설치하는 제4단계와; 상기 제1방향전환활차와 대응하여 제1전력선을 당기는 당김와이어가 경유하는 제3방향전환활차를 제1전동윈치 위쪽에 위치하도록 상기 제1전동윈치가 설치된 철탑의 귀퉁이에 설치하 는 제5단계와; 상기 제2방향전환활차와 대응하여 제2전력선을 당기는 당김와이어가 경유하는 제4방향전환활차를 제2전동윈치 위쪽에 위치하도록 상기 제2전동윈치가 설치된 철탑의 귀퉁이에 설치하는 제6단계와; 상기 제1전력선을 애자련과 취부시키기 위해 제1전력선에 캄아롱을 취부하고, 제1전력선을 끌어당기는 당김와이어를 제1, 3방향전환활차를 경유하도록 제2전동윈치에 연결하여 제2전동윈치로 당김와이어를 끌어당겨 이도조정 후 전선절단을 하고 애자련에 제1전력선을 취부하는 제7단계; 상기 제2전력선을 애자련과 취부시키기 위해 제2전력선에 캄아롱을 취부하고, 제2전력선을 끌어당기는 당김와이어를 제2, 4방향전환활차를 경유하도록 제1전동윈치에 연결하여 제1전동윈치로 당김와이어를 끌어당겨 이도조정 후 전선절단을 하고 애자련에 제2전력선을 취부하는 제8단계를; 포함하여 이루어짐을 특징으로 한다.The present invention to solve the above technical problem, the first step of installing the first turning pulley pulled by the pull wire to pull the first power line on the lower end of the pylon arm is equipped with a child-child; A second step of installing a second turning pulley which is pulled by a pulling wire that pulls a second power line at a lower end of the pylon arm in which the insulator drill is installed to face the first turning pulley; A third step of fixing the first electric winch with a fixed wire at the front pylon rest area in the diagonal direction with the first turning pulley among four corners of the pylon near the pylon arm in which the insulator is installed; A fourth step of fixing the second electric winch with a fixing wire at a rear pylon rest area facing the diagonal direction in which the first electric winch is installed; A fifth step of installing a third turning pulley, which is pulled by a pulling wire corresponding to the first turning pulley, at a corner of a steel tower in which the first driving winch is installed so as to be positioned above the first driving winch; Wow; A sixth step of installing a fourth turning pulley through the pull wire corresponding to the second turning pulley at a corner of a steel tower in which the second driving winch is disposed so as to be positioned above the second driving winch; ; In order to install the first power line with the insulator connection, the cam power is attached to the first power line, and the second electric winch is connected to the second electric winch via the first and the three-way switching pulleys through the pull wire that pulls the first power line. A seventh step of pulling the pulling wire with the winch to cut the wire after adjusting the ear canal and attaching the first power line to the insulator; In order to mount the second power line with the insulator connection, the cam power is attached to the second power line, and the first electric winch is connected to the first electric power winch so as to pass through the second and four-way pulleys to pull the wire that pulls the second power line. An eighth step of pulling the pulling wire with the winch to adjust the ear canal, cutting the wire, and attaching the second power line to the insulator; It is characterized by including the.

또한, 상기 제1, 2전동윈치의 저면에는, 와이어고리를 설치하여 이 와이어고리에 고정와이어의 한쪽을 연결하고 고정와이어의 다른 한쪽은 전, 후방철탑휴게소에 연결함으로써, 제1, 2전동윈치를 안정적으로 설치할 수 있도록 함을 특징으로 한다.Further, the first and second electric winches are provided on the bottom of the first and second electric winches by attaching a wire ring to connect one of the fixed wires to the wire ring and the other of the fixed wires to the front and rear steel tower rest areas. Characterized in that it can be installed stably.

또한, 상기 제1, 2전동윈치는, 지상에 설치된 발전기로부터 공급된 전기로 작동이 이루어짐을 특징으로 한다.In addition, the first and second electric winch, characterized in that the operation is made of electricity supplied from the generator installed on the ground.

본 발명의 휴대용 전동윈치를 활용한 긴선공법은, 송전철탑암부분의 휴게소에 설치되어 윈동윈치 조작원과 긴선 작업원이 송전철탑 위의 근거리에서 서로 간 에 말을 하거나 눈으로 보면서 작업을 하므로 긴선작업을 보다 쉽고 안전하게 할 수 있다.The long wire method utilizing the portable electric winch of the present invention is installed in the rest area of the transmission tower arm part, so that the Windong winch operator and the long-line worker work with each other at a close distance on the transmission tower or by looking at each other. Makes it easier and safer.

또한, 작업자들 간에 육안이나 의사소통을 하면서 전동윈치를 조작하므로 작업시간을 대폭 단축할 수 있고, 종래 지상에 설치되는 대형 윈치에 비해 소형의 전동윈치를 사용하므로 윈치의 운반비용을 절감할 수 있다.In addition, the operator can operate the electric winch while visually communicating or communicating with each other, greatly reducing the work time, and using a small electric winch compared to a large winch installed on the ground, thus reducing the transportation cost of the winch. .

본 발명은, 애자련이 설치된 철탑암의 하단에 제1전력선을 끌어당기는 당김와이어가 경유하는 제1방향전환활차를 설치하는 제1단계와; 상기 애자련이 설치된 철탑암의 하단에 제2전력선을 끌어당기는 당김와이어가 경유하는 제2방향전환활차를 제1방향전환활차와 마주보도록 나란히 설치하는 제2단계와; 상기 애자련이 설치된 철탑암 부근의 철탑 네 귀퉁이 중 상기 제1방향전환활차와 대각방향의 전방철탑휴게소에 제1전동윈치를 고정와이어로 고정설치하는 제3단계와; 상기 제1전동윈치가 설치된 대각방향으로 마주보는 후방철탑휴게소에 제2전동윈치를 고정와이어로 고정설치하는 제4단계와; 상기 제1방향전환활차와 대응하여 제1전력선을 당기는 당김와이어가 경유하는 제3방향전환활차를 제1전동윈치 위쪽에 위치하도록 상기 제1전동윈치가 설치된 철탑의 귀퉁이에 설치하는 제5단계와; 상기 제2방향전환활차와 대응하여 제2전력선을 당기는 당김와이어가 경유하는 제4방향전환활차를 제2전동윈치 위쪽에 위치하도록 상기 제2전동윈치가 설치된 철탑의 귀퉁이에 설치하는 제6단계와; 상기 제1전력선을 애자련과 취부시키기 위해 제1전력선에 캄아롱을 취부하 고, 제1전력선을 끌어당기는 당김와이어를 제1, 3방향전환활차를 경유하도록 제2전동윈치에 연결하여 제2전동윈치로 당김와이어를 끌어당겨 이도조정 후 전선절단을 하고 애자련에 제1전력선을 취부하는 제7단계; 상기 제2전력선을 애자련과 취부시키기 위해 제2전력선에 캄아롱을 취부하고, 제2전력선을 끌어당기는 당김와이어를 제2, 4방향전환활차를 경유하도록 제1전동윈치에 연결하여 제1전동윈치로 당김와이어를 끌어당겨 이도조정 후 전선절단을 하고 애자련에 제2전력선을 취부하는 제8단계를; 포함하여 이루어짐을 특징으로 한다.The present invention includes a first step of installing a first turn pulley pulled by a pulling wire that pulls a first power line at a lower end of a pylon arm in which a self-study is installed; A second step of installing a second turning pulley which is pulled by a pulling wire that pulls a second power line at a lower end of the pylon arm in which the insulator drill is installed to face the first turning pulley; A third step of fixing the first electric winch with a fixed wire at the front pylon rest area in the diagonal direction with the first turning pulley among four corners of the pylon near the pylon arm in which the insulator is installed; A fourth step of fixing the second electric winch with a fixing wire at a rear pylon rest area facing the diagonal direction in which the first electric winch is installed; A fifth step of installing a third turning pulley, which is pulled by a pulling wire corresponding to the first turning pulley, at a corner of a steel tower in which the first driving winch is installed so as to be positioned above the first driving winch; ; A sixth step of installing a fourth turning pulley through the pull wire corresponding to the second turning pulley at a corner of a steel tower in which the second driving winch is disposed so as to be positioned above the second driving winch; ; In order to install the first power line with the insulator connection, the cam power is attached to the first power line, and the pull wire which pulls the first power line is connected to the second electric winch via the first and third turning pulleys to connect the second electric winch. A seventh step of pulling the pulling wire with the electric winch to cut the electric wire after adjusting the ear canal and attaching the first power line to the insulator; In order to mount the second power line with the insulator connection, the cam power is attached to the second power line, and the first electric winch is connected to the first electric power winch so as to pass through the second and four-way pulleys to pull the wire that pulls the second power line. An eighth step of pulling the pulling wire with the winch to adjust the ear canal, cutting the wire, and attaching the second power line to the insulator; It is characterized by including the.

또한, 상기 제1, 2전동윈치의 저면에는, 와이어고리를 설치하여 이 와이어고리에 고정와이어의 한쪽을 연결하고 고정와이어의 다른 한쪽은 전, 후방철탑휴게소에 연결함으로써, 제1, 2전동윈치를 안정적으로 설치할 수 있도록 함을 특징으로 한다.Further, the first and second electric winches are provided on the bottom of the first and second electric winches by attaching a wire ring to connect one of the fixed wires to the wire ring and the other of the fixed wires to the front and rear steel tower rest areas. Characterized in that it can be installed stably.

또한, 상기 제1, 2전동윈치는, 지상에 설치된 발전기로부터 공급된 전기로 작동이 이루어짐을 특징으로 한다.In addition, the first and second electric winch, characterized in that the operation is made of electricity supplied from the generator installed on the ground.

도 3은 본 발명의 실시예에 따른 긴선작업을 도시한 측면도이고, 도 4는 본 발명의 실시예에 따른 긴선작업을 도시한 평면도이며, 도 5는 본 발명의 실시예에 따른 전동윈치의 설치상태 확대도를 각각 도시한 것으로서, 이하 첨부되는 도면을 참조하여 본 발명의 구성을 설명하면 다음과 같다.Figure 3 is a side view showing a long wire work according to an embodiment of the present invention, Figure 4 is a plan view showing a long wire work according to an embodiment of the present invention, Figure 5 is an installation of the electric winch according to an embodiment of the present invention As an enlarged state of the state, respectively, a configuration of the present invention will be described below with reference to the accompanying drawings.

본 발명의 휴대용 전동윈치를 활용한 긴선공법은, 도 3, 4에 도시된 바와 같 이 제1방향전환활차(11)를 설치하는 제1단계와, 제2방향전환활차(12)을 설치하는 제2단계와, 철탑(3)의 전방휴게소(7)에 제1전동윈치(21)를 설치하는 제3단계와, 철탑(3)의 후방휴게소(8)에 제2전동윈치(22)를 설치하는 제4단계와, 제3방향전환활차(13)를 설치하는 제5단계와, 제4방향전환활차(14)를 설치하는 제6단계와, 제1전력선(1)에 캄아롱(30)을 취부하고 제2전동윈치(22)로 제1전력선(1)을 끌어당겨 이도조정을 한 후 전선절단을 하고 애자련(5)에 제1전력선(1)을 취부하는 제7단계와, 제2전력선(2)에 캄아롱(30)을 취부하고 제1전동윈치(21)로 제2전력선(2)을 끌어당겨 이도조정을 한 후 전선절단을 하고 애자련(5)에 제2전력선(2)을 취부하는 제8단계로 이루어지는 것으로서, 이를 구체적으로 살펴보면 다음과 같다.In the long wire method using the portable electric winch of the present invention, as shown in Figures 3 and 4, the first step of installing the first turning pulley 11 and the second turning pulley 12 to install In the second step, the third step of installing the first electric winch (21) in the front rest area (7) of the steel tower (3), and the second electric winch (22) in the rear rest area (8) of the steel tower (3). The fourth step of installing, the fifth step of installing the third turning pulley 13, the sixth step of installing the fourth turning pulley 14, and the cam along (30) on the first power line (1) 7) step of attaching the first power line (1) to the second electric winch (22) to adjust the ear canal, and then cutting the wire and attaching the first power line (1) to the insulator (5); Mount Cam Along (30) on the second power line (2), pull the second power line (2) with the first electric winch (21) to adjust the degree of cut and cut the wire and the second power line to the insulator (5) It consists of the eighth step of attaching (2), specifically When spread as follows:

즉, 제1단계는, 제1방향전환활차(11)를 설치하는 단계로서, 애자련(5)이 위치하는 철탑암(4) 하단에 제1전력선(1)을 끝어당기는 당김와이어(6)가 경유하는 제1방향전환활차(11)를 설치하는 단계이다.That is, the first step is to install the first turning pulley 11, the pulling wire (6) to pull the first power line (1) to the lower end of the pylon arm (4) in which the child training 5 is located It is a step of installing the first direction change pulley (11) via.

상기 제2단계는, 제2방향전환활차(12)를 설치하는 단계로서, 애자련(5)이 위치하는 철탑암(4) 하단에 제2전력선(1)을 끝어당기는 당김와이어(6)가 경유하는 제2방향전환활차(12)를 제1방향전환활차(11)와 마주보도록 나란하게 설치하는 단계이다.The second step is to install the second turning pulley 12, the pulling wire (6) for pulling the second power line (1) to the lower end of the pylon arm (4) in which the child training 5 is located The second turning pulley 12 passing through is a step of installing side by side to face the first turning pulley 11.

상기 제3단계는, 제1전동윈치(21)를 설치하는 단계로서, 애자련(5)이 위치하는 철탑(3)의 네 귀퉁이 중 제1방향전환활차(11)와 대각 방향의 전방철탑휴게소(7) 에 제1전동윈치(21)를 설치하는 단계이다.The third step is the step of installing the first electric winch 21, the front of the iron tower rest of the four corners of the pylon (3) where the child-ryeon (5) is located in front of the iron pylon 11 (7) is the step of installing the first electric winch (21).

이때, 제1전동윈치(21)는 긴선작업 완료 후 다른 작업장소로 이동할 수 있도록 탈부착 가능한 형태로 전방철탑휴게소(7)에 설치한다.At this time, the first electric winch 21 is installed in the front tower rest area (7) in a removable form to move to another work place after the completion of the long wire work.

즉, 전방철탑휴게소(7)에 제1전동윈치(21)를 설치시 고정와이어(9)를 사용하여 제1전동윈치(21)의 후방은 철탑(3)의 귀퉁이 쪽에 설치하고, 고정와이어(9)를 사용하여 당김와이어(6)을 끌어당기는 제1전동윈치(21)의 후방은 철탑(3) 안쪽을 향하도록 설치한다.That is, when the first electric winch 21 is installed at the front pylon resting place 7, the fixed electric wire 9 is used to install the rear of the first electric winch 21 at the corner of the steel tower 3, and the fixed wire ( 9) the rear of the first electric winch 21 for pulling the pull wire 6 is installed to face the inside of the steel tower (3).

물론, 긴선작업이 완료되면 철탑(3)에 결합된 고정와이어(9)를 풀어서 제1전동윈치(21)를 전방철탑휴게소(7)에서 분리한 다음 제1전동윈치(21)를 다른 긴선작업 장소로 운반하면 된다.Of course, when the long wire work is completed, the fixed wire (9) coupled to the iron tower (3) to remove the first electric winch 21 from the front tower rest area (7) and then the first electric power winch (21) another long wire work You can transport it to a place.

상기 제4단계는, 제2전동윈치(22)를 설치하는 단계로서, 애자련(5)이 위치하는 철탑(3)의 네 귀퉁이 중 제2방향전환활차(12)와 대각 방향의 후방철탑휴게소(8)에 제2전동윈치(22)를 설치하는 단계이다.The fourth step is a step of installing the second electric winch 22, the rear of the tower pylon rest diagonally opposite the second turning pulley 12 of the four corners of the pylon (3) where the child-ryeon (5) is located It is a step of installing the 2nd electric winch 22 in (8).

여기서, 제2전동윈치(22)의 설치위치는 구체적으로 제1전동윈치(21)를 기준으로 제1전동윈치(21) 대각방향으로 마주보는 철탑(3)의 귀퉁이 즉 후방철탑휴게소(8)에 설치된다.Here, the installation position of the second electric winch 22 is specifically the corner of the pylon 3 facing the first electric winch 21 in the diagonal direction with respect to the first electric winch 21, that is, the rear pylon rest area (8) Is installed on.

상기 제2전동윈치(22)는 전방철탑휴게소(8)에 설치된 제1방향전환활차(11)와 마찬가지로 긴선작업 완료 후 다른 작업장소로 이동할 수 있도록 탈부착 가능한 형태로 후방철탑휴게소(8)에 설치한다.The second electric winch 22 is installed on the rear pylon rest area 8 in a detachable form so as to move to another work place after completion of the long-line work, similar to the first turning pulley 11 installed on the front pylon rest area 8. do.

즉, 후방철탑휴게소(8)에 제2전동윈치(22)를 설치시 고정와이어(9)를 사용하여 제2전동윈치(22)의 후방은 철탑(3)의 귀퉁이 쪽에 설치하고, 고정와이어(9)를 사용하여 당김와이어(66)를 끌어당기는 제2전동윈치(22)의 전방은 철탑(3) 안쪽을 향하도록 설치한다.That is, when the second electric winch 22 is installed at the rear pylon resting place 8, the fixed electric wire 9 is used to install the rear of the second electric winch 22 at the corner of the steel tower 3, and the fixed wire ( 9) the front of the second electric winch 22 that pulls the pull wire 66 is installed to face the inside of the steel tower (3).

물론, 긴선작업이 완료되면 철탑(3)에 결합된 고정와이어(9)를 풀어서 제1전동윈치(21)를 전방철탑휴게소(7)에서 분리한 다음 제1전동윈치(21)를 다른 긴선작업 장소로 운반하면 된다.Of course, when the long wire work is completed, the fixed wire (9) coupled to the iron tower (3) to remove the first electric winch 21 from the front tower rest area (7) and then the first electric power winch (21) another long wire work You can transport it to a place.

제5단계는, 제3방향전환활차(13)를 설치하는 단계로서, 제1방향전환활차(11)와 대응하여 제1전력선(1)을 끌어당기는 당김와이어(6)가 경유하는 제3방향전환활차(13)를 상기 제1전동윈치(21)의 위쪽에 위치하도록 제1전동윈치(21)가 설치된 철탑(3)의 귀퉁이에 설치하는 단계이다.The fifth step is to install the third turning pulley 13, the third direction via the pull wire (6) that pulls the first power line (1) corresponding to the first turning pulley (11) It is a step of installing the switching pulley 13 in the corner of the pylon (3) in which the first electric winch 21 is installed so as to be located above the first electric winch (21).

제6단계는, 제4방향전환활차(14)를 설치하는 단계로서, 제2방향전환활차(12)와 대응하여 제2전력선(2)을 끌어당기는 당김와이어(6)가 경유하는 제4방향전환활차(14)를 상기 제2전동윈치(22)의 위쪽에 위치하도록 제2전동윈치(22)가 설치된 철탑(3)의 귀퉁이에 설치하는 단계이다.The sixth step is to install the fourth turning pulley 14, the fourth direction through the pull wire (6) for pulling the second power line (2) corresponding to the second turning pulley (12). It is a step of installing the switching pulley 14 in the corner of the pylon (3) in which the second electric winch 22 is installed so as to be located above the second electric winch (22).

제7단계는, 제1전력선(1)을 애자련(5)과 취부시키기 위해 제1전력선(1)에 현수애자교체, 장주변경, 완금교체, 이동조정 등 전선의 장력을 잡아 주기 위하여 사 용하는 캄아롱(30)을 취부하고, 제1전력선(1)을 끌어당기는 당김와이어(6)를 제1, 3방향전환활차(11, 13)를 경유하도록 제2전동윈치(22)에 연결하여 제2전동위치(22)로 당김와이어(6)를 끝어당겨 이동조정 후 전선절단을 하고 애자련(5)에 제1전력선(1)을 취부하는 단계이다.In the seventh step, the first power line 1 is used to fix the tension of the wire such as replacing the suspension insulator, changing the landlord, replacing the completion, and adjusting the movement of the first power line 1 with the insulator 5. Attaching the cam long (30), and connecting the pull wire (6) that pulls the first power line (1) to the second electric winch (22) via the first and third turning pulleys (11, 13) After pulling the pull wire 6 to the second electric position 22, the wire is cut after the movement adjustment, and the first power line 1 is attached to the insulator 5.

제8단계는, 제2전력선(2)을 애자련(5)과 취부시키기 위해 제2전력선(2)에 현수애자교체, 장주변경, 완금교체, 이동조정 등 전선의 장력을 잡아 주기 위하여 사용하는 캄아롱(30)을 취부하고, 제2전력선(2)을 끌어당기는 당김와이어(6)를 제2, 4방향전환활차(12, 14)를 경유하도록 제1전동윈치(21)에 연결하여 제1전동위치(21)로 당김와이어(6)를 끝어당겨 이동조정 후 전선절단을 하고 애자련(5)에 제2전력선(2)을 취부하는 단계이다.In the eighth step, the second power line 2 is used to tension the wires such as replacing the suspension insulator, changing the landlord, replacing the payoff, and adjusting the movement of the second power line 2 with the insulator 5. Attaching the Cam Along (30), the pulling wire (6) for pulling the second power line (2) is connected to the first electric winch (21) via the second, four-way pulleys (12, 14) Step 1 is the step of pulling the pull wire (6) to the electric transmission position 21 to cut the wire after the movement adjustment and attaching the second power line (2) to the self-training (5).

한편, 도 5는 본 발명의 실시예에 따른 전동윈치의 설치상태 확대도로서 도시된 바와 같이 제1, 2전동윈치(21, 22)의 저면 네 귀퉁이에 고정와이어(9)의 한쪽 끝단과 연결되는 와이어고리(23)를 형성한 것이다.On the other hand, Figure 5 is an enlarged view of the installation state of the electric winch according to an embodiment of the present invention as shown in the four corners of the bottom of the first, second electric winch (21, 22) connected to one end of the fixed wire (9) The wire ring 23 is formed.

제1, 2전동윈치(21, 22)의 설치시 상기 와이어고리(23)에 고정와이어(9)의 한쪽 끝단을 연결한 다음 고정와이어(9)의 다른 쪽 끝단을 철탑(3)에 연결하여 제1, 2전동윈치(21, 22)의 안정적인 결합이 이루어지게 한다.When installing the first and second electric winch (21, 22) by connecting one end of the fixed wire (9) to the wire ring (23), then the other end of the fixed wire (9) by connecting to the pylon (3) Stable coupling of the first and second electric winches (21, 22) is made.

상기 제1, 2전동윈치(21, 22)는 지상에 설치되는 발전기(40)로부터 전기를 공급받아 작동이 이루어진다.The first and second electric winches 21 and 22 are operated by receiving electricity from the generator 40 installed on the ground.

이상에서 살펴본 바와 같이 본 발명의 휴대용 전동윈치를 활용한 긴선공법은, 철탑(3)의 전, 후방철탑휴게소(7, 8)에 제1, 2전동윈치(21, 22)를 설치하여 긴선작업을 용이하게 실시할 수 있도록 한 것으로서, 이하 첨부되는 도면을 참조하여 본 발명의 작용을 살펴보면 다음과 같다.As described above, in the long wire method utilizing the portable electric winch of the present invention, the first and second electric winches 21 and 22 are installed on the front and rear steel tower rest areas 7 and 8 of the steel tower 3 to perform the long wire work. In order to facilitate the implementation, the operation of the present invention will be described below with reference to the accompanying drawings.

도 3 내지 5에 도시된 바와 같이, 작업자가 철탑에 올라가 애자련(5)이 위치하는 철탑암(4) 하단에 제1, 2방향전환활차(11, 12)를 설치한 다음, 제1방향전환활차(11)와 대각방향으로 마주보는 철탑(3)의 네 귀퉁이 중 앞쪽에 위치하는 전방 전방철탑휴게소(7)에는 제1전동윈치(21)을 설치하고, 제2방향전환활차(12)와 대각방향으로 마주보는 철탑(3)의 네 귀퉁이 중 뒤쪽에 위치하는 후방철탑휴게소(8)에는 제2전동윈치(22)를 설치한다.As shown in FIGS. 3 to 5, the worker climbs the pylon and installs the first and second turning pulleys 11 and 12 at the bottom of the pylon arm 4 where the child drill 5 is located, and then the first direction. The first electric winch 21 is installed in the front front pylon rest area 7 located at the front of the four corners of the pylon 3 facing diagonally with the switching pulley 11 and the second turning pulley 12 is provided. A second electric winch 22 is installed at the rear pylon rest area 8 located at the rear of four corners of the pylon 3 facing in the diagonal direction.

그리고 제1방향전환활차(11)와 대응하면서 제1전력선(1)을 끌어당기는 당김와이어(6)가 경유하는 제3방향전환활차(13)는 제1전동윈치(21)의 바로 위에 위치하도록 제1전동윈치(21)가 설치된 철탑(3)의 귀퉁이에 고정설치하고, 제2방향전환활차(12)와 대응하면서 제2전력선(2)을 끌어당기는 당김와이어(6)가 경유하는 제4방향전환활차(14)는 제2전동윈치(22)의 바로 위에 위치하도록 제2전동윈치(22)가 설치된 철탑(3)의 귀퉁이에 고정설치한다.In addition, the third turning pulley 13 through the pull wire 6 that pulls the first power line 1 while corresponding to the first turning pulley 11 is positioned so as to be directly above the first electric winch 21. A fourth, which is fixedly installed at the corner of the steel tower 3 on which the first electric winch 21 is installed, and which is pulled by the pulling wire 6 that pulls the second power line 2 while corresponding to the second turning pulley 12. Directional pulley 14 is fixed to the corner of the pylon (3) in which the second electric winch 22 is installed so as to be located directly above the second electric winch (22).

또한, 제1전력선(1)에 캄아롱(30)을 취부하고 제1전력선(1)을 끌어당기는 당 김와이어(6)를 제1, 3방향전환활차(11, 13)를 경유하도록 제1전동윈치(21)에 연결하며, 제2전력선(2)에도 역시 캄아롱(30)을 취부하고 제2전력선(2)을 끌어당기는 당김와이어(6)를 제2, 4방향전환활차(12, 14)를 경유하도록 제2전동윈치(22)에 연결한다.In addition, the first wire to install the cam long (30) on the first power line (1) to pull the first power line (1) through the first and third turning pulleys (11, 13) The pull wire 6, which is connected to the electric winch 21 and also attaches the cam along 30 to the second power line 2 and pulls the second power line 2, turns the second and fourth turning pulleys 12, 14) to the second electric winch (22) via.

이 상태에서 제1전력선(1)을 끌어당길 때에는 제2전동윈치(22)를 작동시키고 제2전력선(2)을 끌어당기고 싶을 경우에는 제1전동윈치(21)를 작동시키면 된다.In this state, when the first electric power winch 1 is pulled, the second electric winch 22 is operated, and when the second electric power winch 2 is desired, the first electric winch 21 may be operated.

즉, 제1전력선(1)을 끌어당기고 싶을 경우에는, 지상에 설치된 발전기(40)에서 공급된 전기가 제2전동윈치(22)로 공급되어 제2전동기(22)에 전원이 인가된 상태에서 작업자가 긴선작업을 위해 리모컨이나 제2전동윈치(22)에 연결된 작동스위치를 조작하여 제2전동윈치(22)를 작동시키면 제2전동윈치(22)는 제1전력선(1)과 연결된 당김와이어(6)를 끌어당겨 제1전력선(1)을 애자련(5)에 취부할 수 있는 상태가 된다.That is, when the first power line 1 is to be pulled, the electricity supplied from the generator 40 installed on the ground is supplied to the second electric winch 22 and the power is applied to the second electric motor 22. When the operator operates the second electric winch 22 by operating the operation switch connected to the remote controller or the second electric winch 22 for the long-line work, the second electric winch 22 is a pull wire connected to the first power line 1. (6) is pulled into a state in which the first power line 1 can be attached to the inertia 5.

이와 같이 제1전력선(1)이 애자련(5)에 취부할 수 있도록 끌어 당겨지면 작업자는 이도조정 후 전선절단을 하고 제1전력선(1)을 애자련(5)에 취부한다.As such, when the first power line 1 is pulled to be attached to the insulator 5, the worker cuts the wire after adjusting the ear canal and attaches the first power line 1 to the insulator 5.

또한, 제1전력선(1) 반대편의 제2전력선(2)을 끌어당기고 싶을 경우에는 지상에 설치된 발전기(40)에서 공급된 전기가 제1전동윈치(21)로 공급되어 제1전동기(21)에 전원이 인가된 상태에서 작업자가 긴선작업을 위해 리모컨이나 제1전동윈치(21)에 연결된 작동스위치를 조작하여 제1전동윈치(21)를 작동시키면 제1전동윈 치(21)는 제2전력선(2)과 연결된 당김와이어(6)를 끌어당겨 제2전력선(2)을 애자련(5)에 취부할 수 있는 상태가 된다.In addition, when it is desired to pull the second power line 2 opposite to the first power line 1, the electricity supplied from the generator 40 installed on the ground is supplied to the first electric winch 21 and the first electric motor 21. When the operator operates the operation switch connected to the remote controller or the first electric winch 21 for long-line work while the power is applied, the first electric winch 21 operates the second electric winch 21. By pulling the pull wire 6 connected to the power line 2, the second power line 2 can be attached to the insulator 5.

이와 같이 제2전력선(2)이 애자련(5)에 취부할 수 있도록 끌어 당겨지면 작업자는 이도조정 후 전선절단을 하고 제2전력선(2)을 애자련(5)에 취부하여 긴선작업을 완료한다.As such, when the second power line 2 is pulled to be attached to the insulator 5, the operator cuts the wire after adjusting the ear canal and attaches the second power line 2 to the insulator 5 to complete the long wire work. do.

한편, 긴선작업이 완료되면 고정와이어(9)를 풀어 철탑(3) 설치된 제1, 2전동위치(21, 22)를 분리한 다음 제1, 2전동윈치(21, 22)를 다른 작업장소로 이동하여 또 다른 긴선작업을 하면 된다.On the other hand, when the long wire work is completed, loosen the fixing wire (9), separate the first and second transmission positions (21, 22) installed in the steel tower (3), and then move the first and second transmission winches (21, 22) to another work place. Go and do another long line work.

도 1은 종래의 긴선작업을 도시한 측면도.1 is a side view showing a conventional long-line operation.

도 2는 종래의 긴선작업을 도시한 평면도.Figure 2 is a plan view showing a conventional long line work.

도 3은 본 발명의 실시예에 따른 긴선작업을 도시한 측면도.Figure 3 is a side view showing a long line work according to an embodiment of the present invention.

도 4는 본 발명의 실시예에 따른 긴선작업을 도시한 평면도.Figure 4 is a plan view showing a long wire work according to an embodiment of the present invention.

도 5는 본 발명의 실시예에 따른 전동윈치의 설치상태 확대도.5 is an enlarged view of the installation state of the electric winch according to the embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1:제1전력선 2:제2전력선 3:철탑1: first power line 2: second power line 3: steel tower

4:철탑암 5:애자련 6:당김와이어4: pylon arm 5: child relationship 6: pull wire

7:전방철탑휴게소 8:후방철탑휴게소 9:고정와이어7: Front pylon rest area 8: Rear pylon rest area 9: Fixed wire

11:제1방향전환활차 12:제2방향전환활차 13:제3방향전환활차11: first turn pulley 12: second turn pulley 13: third turn pulley

14:제4방향전환활차 21:제1전동윈치 22:제2전동윈치 14: 4th direction pulley 21: 1st electric winch 22: 2nd electric winch

23:와이어고리 30:캄아롱 40:발전기23: wire ring 30: Kam Along 40: generator

Claims (3)

애자련이 설치된 철탑암의 하단에 제1전력선을 끌어당기는 당김와이어가 경유하는 제1방향전환활차를 설치하는 제1단계와;A first step of installing a first turning pulley that is pulled by a pulling wire that pulls the first power line at the bottom of the pylon arm in which the insulator is installed; 상기 애자련이 설치된 철탑암의 하단에 제2전력선을 끌어당기는 당김와이어가 경유하는 제2방향전환활차를 제1방향전환활차와 마주보도록 나란히 설치하는 제2단계와;A second step of installing a second turning pulley which is pulled by a pulling wire that pulls a second power line at a lower end of the pylon arm in which the insulator drill is installed to face the first turning pulley; 상기 애자련이 설치된 철탑암 부근의 철탑 네 귀퉁이 중 상기 제1방향전환활차와 대각방향의 전방철탑휴게소에 제1전동윈치를 고정와이어로 고정설치하는 제3단계와;A third step of fixing the first electric winch with a fixed wire at the front pylon rest area in the diagonal direction with the first turning pulley among four corners of the pylon near the pylon arm in which the insulator is installed; 상기 제1전동윈치가 설치된 대각방향으로 마주보는 후방철탑휴게소에 제2전동윈치를 고정와이어로 고정설치하는 제4단계와;A fourth step of fixing the second electric winch with a fixing wire at a rear pylon rest area facing the diagonal direction in which the first electric winch is installed; 상기 제1방향전환활차와 대응하여 제1전력선을 당기는 당김와이어가 경유하는 제3방향전환활차를 제1전동윈치 위쪽에 위치하도록 상기 제1전동윈치가 설치된 철탑의 귀퉁이에 설치하는 제5단계와;A fifth step of installing a third turning pulley, which is pulled by a pulling wire corresponding to the first turning pulley, at a corner of a steel tower in which the first driving winch is installed so as to be positioned above the first driving winch; ; 상기 제2방향전환활차와 대응하여 제2전력선을 당기는 당김와이어가 경유하는 제4방향전환활차를 제2전동윈치 위쪽에 위치하도록 상기 제2전동윈치가 설치된 철탑의 귀퉁이에 설치하는 제6단계와;A sixth step of installing a fourth turning pulley through the pull wire corresponding to the second turning pulley at a corner of a steel tower in which the second driving winch is disposed so as to be positioned above the second driving winch; ; 상기 제1전력선을 애자련과 취부시키기 위해 제1전력선에 캄아롱을 취부하고, 제1전력선을 끌어당기는 당김와이어를 제1, 3방향전환활차를 경유하도록 제2전 동윈치에 연결하여 제2전동윈치로 당김와이어를 끌어당겨 이도조정 후 전선절단을 하고 애자련에 제1전력선을 취부하는 제7단계; In order to install the first power line with the insulator connection, the cam power is attached to the first power line, and the pull wire which pulls the first power line is connected to the second electric winch via the first and third turning pulleys to connect the second electric winch. A seventh step of pulling the pulling wire with the electric winch to cut the electric wire after adjusting the ear canal and attaching the first power line to the insulator; 상기 제2전력선을 애자련과 취부시키기 위해 제2전력선에 캄아롱을 취부하고, 제2전력선을 끌어당기는 당김와이어를 제2, 4방향전환활차를 경유하도록 제1전동윈치에 연결하여 제1전동윈치로 당김와이어를 끌어당겨 이도조정 후 전선절단을 하고 애자련에 제2전력선을 취부하는 제8단계를; 포함하여 이루어짐을 특징으로 하는 휴대용 전동윈치를 활용한 긴선공법.In order to mount the second power line with the insulator connection, the cam power is attached to the second power line, and the first electric winch is connected to the first electric power winch so as to pass through the second and four-way pulleys to pull the wire that pulls the second power line. An eighth step of pulling the pulling wire with the winch to adjust the ear canal, cutting the wire, and attaching the second power line to the insulator; Long line method using a portable electric winch, characterized in that made. 제 1항에 있어서,The method of claim 1, 상기 제1, 2전동윈치의 저면에는, 와이어고리를 설치하여 이 와이어고리에 고정와이어의 한쪽을 연결하고 고정와이어의 다른 한쪽은 전, 후방철탑휴게소에 연결함으로써, 제1, 2전동윈치를 안정적으로 설치할 수 있도록 함을 특징으로 하는 휴대용 전동윈치를 활용한 긴선공법.On the bottom of the first and second electric winches, the first and second electric winches are stable by installing a wire loop and connecting one of the fixed wires to the wire ring and the other of the fixed wires to the front and rear steel tower rest areas. Long line method using a portable electric winch, characterized in that the installation can be. 제 1항에 있어서,The method of claim 1, 상기 제1, 2전동윈치는, 지상에 설치된 발전기로부터 공급된 전기로 작동이 이루어짐을 특징으로 하는 휴대용 전동윈치를 활용한 긴선공법.The first and second electric winch is a long wire method using a portable electric winch, characterized in that the operation of the electric power supplied from the generator installed on the ground is made.
KR1020080055420A 2008-06-12 2008-06-12 Electric wire tension method using portable motor operated winch KR100974321B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080055420A KR100974321B1 (en) 2008-06-12 2008-06-12 Electric wire tension method using portable motor operated winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080055420A KR100974321B1 (en) 2008-06-12 2008-06-12 Electric wire tension method using portable motor operated winch

Publications (2)

Publication Number Publication Date
KR20090129249A true KR20090129249A (en) 2009-12-16
KR100974321B1 KR100974321B1 (en) 2010-08-05

Family

ID=41689362

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080055420A KR100974321B1 (en) 2008-06-12 2008-06-12 Electric wire tension method using portable motor operated winch

Country Status (1)

Country Link
KR (1) KR100974321B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103594976A (en) * 2013-11-25 2014-02-19 国家电网公司 Combined stringing tool used for line conductor stringing
CN108336691A (en) * 2018-05-14 2018-07-27 国网黑龙江省电力有限公司牡丹江供电公司 A kind of tight hanging wire clamp device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101328378B1 (en) * 2013-04-16 2013-11-13 (주)한백 Tension measurement-type portable winches
KR102300644B1 (en) 2021-04-14 2021-09-09 (주)쌍용리프트 Portable winch

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0232845B2 (en) * 1985-07-15 1990-07-24 Ngk Insulators Ltd TAICHOGAISHIRENJOHENOSOKOTAISOCHAKUSOCHI
JPH05155587A (en) * 1991-12-09 1993-06-22 Mitsubishi Heavy Ind Ltd Simply installed winch
JPH0662514A (en) * 1992-08-05 1994-03-04 Toenec Corp Wire stretching method for transmission line
JPH10285735A (en) 1997-04-09 1998-10-23 Hokuriku Kasen Kogyo Kk Wire tension for overhead wire to steel tower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103594976A (en) * 2013-11-25 2014-02-19 国家电网公司 Combined stringing tool used for line conductor stringing
CN103594976B (en) * 2013-11-25 2016-06-29 国家电网公司 Combination stringing instrument for line conductor stringing
CN108336691A (en) * 2018-05-14 2018-07-27 国网黑龙江省电力有限公司牡丹江供电公司 A kind of tight hanging wire clamp device

Also Published As

Publication number Publication date
KR100974321B1 (en) 2010-08-05

Similar Documents

Publication Publication Date Title
KR100974321B1 (en) Electric wire tension method using portable motor operated winch
WO2017041090A1 (en) Wind turbine blade removal and installation system and method
CN105186378A (en) Power transmission line channel crossing protection mechanism
KR101132845B1 (en) Opening and shutting apparatus of manhole cover
KR101972405B1 (en) Tension measuring method for transmission line isotope method and its apparatus
CN202693884U (en) Flexible cross bridging frame of road
JP7126739B1 (en) Sliding lifting device for prefabricated diaphragm walls
KR100673426B1 (en) Disposal apparatus of extra optical cable
CN202423997U (en) Combined ground wire lifting mechanism
KR100618523B1 (en) Disposal apparatus of extra optical cable
CN112323796B (en) Inclined precast pile construction device and construction method thereof
JP4789462B2 (en) Electric equipment lifting device
CN211393618U (en) Turning gear for overhauling or installing water turbine
CN103683132B (en) The damaged insulating barrier restorative procedure of transmission pressure
KR102253069B1 (en) Ocean obsservation to moving winch
CN204216485U (en) A kind of transmission line show line device
KR101471867B1 (en) Log-skidding apparatus using excavating equipment
KR101328378B1 (en) Tension measurement-type portable winches
KR101328379B1 (en) Tension measurement-type portable winches
CN106081873A (en) A kind of suspender for changing linear tension electric pole and replacing options
KR100632056B1 (en) Self-driving machine to install overhead wire
CN205141515U (en) Protection mechanism is strideed across to transmission line passageway
CN104358467A (en) Auxiliary mounting tool for concrete pole cross arm
CN203112382U (en) Upper bracket control platform of tower crane
CN208820364U (en) Lifting device

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130604

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140515

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180724

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190612

Year of fee payment: 10