CN202423997U - Combined ground wire lifting mechanism - Google Patents
Combined ground wire lifting mechanism Download PDFInfo
- Publication number
- CN202423997U CN202423997U CN 201120522593 CN201120522593U CN202423997U CN 202423997 U CN202423997 U CN 202423997U CN 201120522593 CN201120522593 CN 201120522593 CN 201120522593 U CN201120522593 U CN 201120522593U CN 202423997 U CN202423997 U CN 202423997U
- Authority
- CN
- China
- Prior art keywords
- ground wire
- lifter
- combined
- main body
- wire lifter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
一种组合型地线提升器,包括地线提升器主体,主体固定在横担上,滑车吊臂通过万向节设置在地线提升器主体上端,滑车吊臂的一端设置有起重滑车,滑车吊臂另一端与滑车吊臂调节装置铰接本实用新型有以下优点:使用组合型地线提升器安装架空地线时,工作人员先将组合型地线提升器牢固的固定在地线横担上,根据工作需要通过调节装置调节角度、高度,将牵引绳索放入滑车内提升地线,至达到安装位置,把架空地线放入地线线夹内然后放松牵引,拆除牵引绳及组合型地线提升器,按施工工艺进行附件安装。通过使用组合型地线提升器对地线提升安装,可以缩短工作时间,提高工作效率,减轻劳动强度,保证了现场的施工安全。在35KV-500KV线路进行架空地线安装时安全、方便、快捷,提高工作效率,减少停电时间,加强安全可靠性。
A combined ground wire lifter, comprising a main body of the ground wire lifter, the main body is fixed on the cross arm, the trolley boom is arranged on the upper end of the ground wire lifter main body through a universal joint, and one end of the trolley boom is provided with a lifting block, The other end of the trolley boom is hinged with the trolley boom adjustment device. The utility model has the following advantages: when using the combined ground wire lifter to install the overhead ground wire, the staff first firmly fix the combined ground wire lifter on the ground wire cross arm First, adjust the angle and height through the adjustment device according to the work needs, put the traction rope into the pulley to lift the ground wire until it reaches the installation position, put the overhead ground wire into the ground wire clamp and then release the traction, remove the traction rope and combined type The ground wire lifter shall be installed as an accessory according to the construction process. By using the combined ground wire lifter to lift and install the ground wire, the working time can be shortened, the work efficiency can be improved, the labor intensity can be reduced, and the construction safety on site can be ensured. It is safe, convenient and fast to install overhead ground wires on 35KV-500KV lines, improve work efficiency, reduce power outage time, and enhance safety and reliability.
Description
技术领域 technical field
本实用新型涉及35KV-500KV输电线路架空地线的提升安装工具。 The utility model relates to a lifting installation tool for overhead ground wires of 35KV-500KV power transmission lines.
背景技术 Background technique
常年来架空地线的提升不到位都是靠人抬肩扛来完成安装,即费时费力又达不到安全要求。有时用提线器提升地线时达不到安装高度,提线器没有牢靠的固定位置常造成塔材变形。给地线的安装造成了一定的困难。 Over the years, the lifting of the overhead ground wire is not in place, and the installation is completed by lifting the shoulders, which is time-consuming and labor-intensive and fails to meet the safety requirements. Sometimes the installation height cannot be reached when lifting the ground wire with the wire lifter, and the wire lifter does not have a firm fixed position, which often causes deformation of the tower material. The installation of the ground wire has caused certain difficulties.
发明内容 Contents of the invention
本实用新型的目的在于克服上述不足提供一种组合型地线提升器。 The purpose of this utility model is to provide a combined ground wire lifter to overcome the above disadvantages.
本实用新型的目的通过以下技术方案来实现: The purpose of this utility model is achieved through the following technical solutions:
一种组合型地线提升器,包括地线提升器主体,主体固定在横担上,滑车吊臂通过万向节设置在地线提升器主体上端,滑车吊臂的一端设置有起重滑车,滑车吊臂另一端与滑车吊臂调节装置铰接。 A combined ground wire lifter, comprising a main body of the ground wire lifter, the main body is fixed on the cross arm, the trolley boom is arranged on the upper end of the ground wire lifter main body through a universal joint, and one end of the trolley boom is provided with a lifting block, The other end of the tackle boom is hinged with the tackle boom adjustment device.
上述组合型地线提升器,所述滑车吊臂调节装置包括丝杆和与丝杆相配的丝杆底座,丝杆底座通过螺栓固定在横担上。 In the aforementioned combined ground wire lifter, the trolley arm adjustment device includes a screw rod and a screw base matched with the screw rod, and the screw base is fixed on the cross arm by bolts.
采用上述技术方案,本实用新型有以下优点:使用组合型地线提升器安装架空地线时,工作人员先将组合型地线提升器牢固的固定在地线横担上,根据工作需要通过调节装置调节角度、高度,将牵引绳索放入滑车内提升地线,至达到安装位置,把架空地线放入地线线夹内然后放松牵引,拆除牵引绳及组合型地线提升器,按施工工艺进行附件安装。通过使用组合型地线提升器对地线提升安装,可以缩短工作时间,提高工作效率,减轻劳动强度,保证了现场的施工安全。在35KV-500KV线路进行架空地线安装时安全、方便、快捷,提高工作效率,减少停电时间,加强安全可靠性。 Adopting the above-mentioned technical scheme, the utility model has the following advantages: when using the combined ground wire lifter to install the overhead ground wire, the staff first firmly fix the combined ground wire lifter on the ground wire cross arm, and adjust the Adjust the angle and height of the device, put the traction rope into the pulley to lift the ground wire until it reaches the installation position, put the overhead ground wire into the ground wire clamp and then release the traction, remove the traction rope and the combined ground wire lifter, and press the construction Process for accessory installation. By using the combined ground wire lifter to lift and install the ground wire, the working time can be shortened, the work efficiency can be improved, the labor intensity can be reduced, and the construction safety on site can be ensured. It is safe, convenient and fast to install overhead ground wires on 35KV-500KV lines, improve work efficiency, reduce power outage time, and enhance safety and reliability.
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
具体实施方式 Detailed ways
如图1所示的一种组合型地线提升器,包括地线提升器主体1,主体1固定在横担上,滑车吊臂2通过万向节设置在地线提升器主体1上端,滑车吊臂2的一端设置有起重滑车3,滑车吊臂2另一端与滑车吊臂调节装置4铰接,所述滑车吊臂调节装置4包括丝杆和与丝杆相配的丝杆底座,丝杆底座通过螺栓固定在横担上。
A combined ground wire lifter as shown in Figure 1 includes a ground wire lifter main body 1, the main body 1 is fixed on the cross arm, the
高度调节通过旋拧丝杆来实现,角度调节通过调节装置的丝杆安装在横担的不同位置来实现。 The height adjustment is realized by turning the screw rod, and the angle adjustment is realized by installing the screw rod of the adjustment device on different positions of the cross arm.
本实用新型装置可以使其牢固的固定在地线横担上,灵巧方便,配合前端的滑车提升地线省时省力。解决现有检修工作中地线提升不到位,提线器无法固定的难题。 The device of the utility model can be firmly fixed on the cross arm of the ground wire, which is smart and convenient, and cooperates with the pulley at the front end to lift the ground wire to save time and effort. Solve the problem that the ground wire cannot be lifted in place and the wire lifter cannot be fixed in the existing maintenance work.
组合型地线提升器选用坚实材料制作成主体,使其牢固的固定在地线横担上。工作人员安装好组合型地线提升器后,可以利用杠杆原理调节提升器的高度和角度使地线达到安装位置。提高工作效率,加强安全可靠性。在35KV-500KV线路进行架空地线安装时安全、方便、快捷,提高工作效率,减少停电时间,加强安全可靠性。 The combined ground wire lifter is made of solid materials as the main body, so that it can be firmly fixed on the ground wire cross arm. After the staff installs the combined ground wire lifter, they can use the lever principle to adjust the height and angle of the lifter to make the ground wire reach the installation position. Improve work efficiency and enhance safety and reliability. It is safe, convenient and fast to install overhead ground wires on 35KV-500KV lines, improve work efficiency, reduce power outage time, and enhance safety and reliability.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120522593 CN202423997U (en) | 2011-12-14 | 2011-12-14 | Combined ground wire lifting mechanism |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120522593 CN202423997U (en) | 2011-12-14 | 2011-12-14 | Combined ground wire lifting mechanism |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202423997U true CN202423997U (en) | 2012-09-05 |
Family
ID=46748723
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201120522593 Expired - Fee Related CN202423997U (en) | 2011-12-14 | 2011-12-14 | Combined ground wire lifting mechanism |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202423997U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104779555A (en) * | 2015-04-22 | 2015-07-15 | 国家电网公司 | Detachable effort-saving stand for 10 KV concrete pole wiring |
| CN106025928A (en) * | 2016-07-18 | 2016-10-12 | 国网山东省电力公司栖霞市供电公司 | Cement tower overhead ground wire lifting device |
| CN112398045A (en) * | 2020-10-27 | 2021-02-23 | 广东电网能源发展有限公司 | Ground wire lifter and ground wire accessory installation method |
-
2011
- 2011-12-14 CN CN 201120522593 patent/CN202423997U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104779555A (en) * | 2015-04-22 | 2015-07-15 | 国家电网公司 | Detachable effort-saving stand for 10 KV concrete pole wiring |
| CN106025928A (en) * | 2016-07-18 | 2016-10-12 | 国网山东省电力公司栖霞市供电公司 | Cement tower overhead ground wire lifting device |
| CN112398045A (en) * | 2020-10-27 | 2021-02-23 | 广东电网能源发展有限公司 | Ground wire lifter and ground wire accessory installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101409434B (en) | ground riser | |
| CN201966539U (en) | Overhead ground wire mounting lifter of power transmission line | |
| CN202423997U (en) | Combined ground wire lifting mechanism | |
| CN201882804U (en) | Hoisting tool for maintenance of electric power line | |
| CN203173684U (en) | Component for hoisting reinforcement cage | |
| WO2016000416A1 (en) | Overhead ground wire lifter | |
| CN202103368U (en) | Overhead ground wire lifter | |
| CN202134855U (en) | Wire lifting device for overhead ground wire | |
| CN201868784U (en) | Lifter for 220KV earth wire of power transmission line | |
| CN201312084Y (en) | Ground wire raiser | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN202373939U (en) | Live-working double-conductor lifting device | |
| CN204125069U (en) | Safety of tower crane protects jacking system automatically | |
| CN202856246U (en) | Insulator replacement device | |
| CN201868786U (en) | Special repairing lifter for 220KV lightning wire of power transmission line | |
| CN201587792U (en) | A double sling hoisting rope | |
| CN202268668U (en) | Operating device of line lifter lead screw for transmission line | |
| CN202657875U (en) | Novel porcelain insulator displacement device | |
| CN203568734U (en) | Novel safe lifting gear of tower crane | |
| CN203319524U (en) | Hoisting clamp for concrete block blanks | |
| CN203319620U (en) | a portable jack | |
| CN202488035U (en) | Hoisting device for maintenance of power transmission line above concrete poles | |
| CN202474680U (en) | Ground wire lifting pulley yoke used on intermediate support of power transmission line | |
| CN202268651U (en) | Fixing device of transmission wire lifter |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 Termination date: 20121214 |