A kind of suspender for changing linear tension electric pole and replacing options Download PDFInfo
- Publication number
- CN106081873A CN106081873A CN201610686048.1A CN201610686048A CN106081873A CN 106081873 A CN106081873 A CN 106081873A CN 201610686048 A CN201610686048 A CN 201610686048A CN 106081873 A CN106081873 A CN 106081873A
- Authority
- CN
- China
- Prior art keywords
- rope
- electric pole
- suspender
- pedestal
- linear tension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
The invention discloses a kind of suspender for changing linear tension electric pole, rope is connected including pedestal, hoisting rope and two are symmetrically arranged, the two ends of described hoisting rope are fixing connects described pedestal, and the middle part of described hoisting rope is for being lifted on the suspension hook of crane, the one end connecting described pedestal is fixed in described one end connecting rope, the described other end connecting rope removably connects with described pedestal, and the described rope that connects can be wound around and pull up the stringing load of linear tension electric pole.The invention also discloses a kind of method changing linear tension electric pole.Simplify exchonge step, save manpower, improve work efficiency, shortened activity duration and power off time, reduce the impact on normal electricity consumption as far as possible.
Description
Technical field
The present invention relates to construction field of powering, particularly relate to a kind of suspender for changing linear tension electric pole.Additionally,
The invention still further relates to a kind of method changing linear tension electric pole.
Background technology
Linear tension electric pole is used for installing electric wiring and is powered, but when electric pole main body needs after damaging to change, by stringing
Wire whole let-down ground of load both sides, and dug temporary ground anchor, both sides wire is anchored, electric pole replacing can be carried out.
Make to need long preparation in this way, then also need to carry out resuming work of long period, expend a large amount of people
Power, considerably increases power off time and activity duration, affects normal electricity consumption.
Therefore, how providing a kind of suspender that can shorten the activity duration and replacing options is that those skilled in the art are current
The technical issues that need to address.
Summary of the invention
It is an object of the invention to provide a kind of suspender for changing linear tension electric pole, it is possible to shorten the activity duration, carry
High workload efficiency.It is a further object of the present invention to provide a kind of method changing linear tension electric pole, it is possible to shorten the activity duration,
Improve work efficiency.
For solve above-mentioned technical problem, the present invention provides a kind of suspender for changing linear tension electric pole, including pedestal,
Hoisting rope and two symmetrically arranged connections restrict, the described pedestal of the fixing connection in the two ends of described hoisting rope, and described hoisting rope
Middle part is for being lifted on the suspension hook of crane, and the one end connecting described pedestal is fixed in one end of described connection rope, described connection rope
The other end removably connects with described pedestal, and the described rope that connects can be wound around and pull up the stringing of linear tension electric pole
Load.
Preferably, the two ends of described hoisting rope connect described pedestal by fastening bolt is fixing.
Preferably, described one end connecting rope connects described pedestal by fastening bolt is fixing, another of described connection rope
Hold and removably connected described pedestal by attachment means.
Preferably, described attachment means is specially hook, and described pedestal is provided with the connecting hole mated with described hook.
Preferably, described pedestal is provided with the buckling groove for clamping spanner.
Preferably, described hoisting rope and two described rope integral types that connect are arranged.
Preferably, described pedestal is fixedly connected with pull rope.
Preferably, described hoisting rope, described connection rope and described pull rope are specially steel wire rope.
The present invention also provides for a kind of method changing linear tension electric pole, including:
The both sides of the stringing load of binding linear tension electric pole;
Separate electric pole main body and described stringing load, described stringing load of simultaneously upwards slinging;
Change electric pole main body;
Put down described stringing load, and the described stringing of fixing connection is carried on a shoulder pole and electric pole main body.
Preferably, also include after described replacing electric pole main body:
Draw described stringing load, make described stringing load alignment electric pole main body.
The suspender for changing linear tension electric pole that the present invention provides, is symmetrical arranged including pedestal, hoisting rope and two
Connection rope, the fixing pedestal that connects in the two ends of hoisting rope, and the middle part of hoisting rope is for being lifted on the suspension hook of crane, connects rope
The one end connecting pedestal is fixed in one end, and the other end connecting rope removably connects with pedestal, and connection rope can be wound around and upwards
The stringing pulling linear tension electric pole is carried on a shoulder pole.Use the replacing options that the present invention provides, the stringing load of binding linear tension electric pole
Both sides;Separate electric pole main body and stringing load, stringing load of simultaneously upwards slinging;Change electric pole main body;Put down stringing load, and the company of fixing
Connect stringing load and electric pole main body.Simplify exchonge step, save manpower, improve work efficiency, shortened the activity duration and
Power off time, reduces the impact on normal electricity consumption as far as possible.
Accompanying drawing explanation
Fig. 1 is that the structure of a kind of detailed description of the invention of the suspender for changing linear tension electric pole provided by the present invention is shown
It is intended to.
Detailed description of the invention
The core of the present invention is to provide a kind of suspender for changing linear tension electric pole, it is possible to shortens the activity duration, carries
High workload efficiency.Another core of the present invention is to provide a kind of method changing linear tension electric pole, it is possible to shorten the activity duration,
Improve work efficiency.
In order to make those skilled in the art be more fully understood that the present invention program, below in conjunction with the accompanying drawings and detailed description of the invention
The present invention is described in further detail.
Refer to a kind of specific embodiment party that Fig. 1, Fig. 1 are the suspender for changing linear tension electric pole provided by the present invention
The structural representation of formula.
The suspender that the specific embodiment of the invention provides, is used for changing linear tension electric pole, including pedestal 1, hoisting rope 2 and
Two symmetrically arranged connection ropes 3.The two ends of hoisting rope 2 are fixing connects pedestal 1, and the middle part of hoisting rope 2 is used for being lifted on
Pedestal 1 can be sling by the suspension hook of car, i.e. suspension hook by directly hooking hoisting rope 2.One the fixing connection in one end pedestal connecting rope 3
One end of 1, another connects one end also fixing other end connecting pedestal 1 of rope 3, and two other ends connecting rope 3 are all and base
Seat 1 removably connects, and connection rope 3 can be wound around and pull up the stringings load 5 of linear tension electric pole, i.e. slings tightly at needs
During cross-arm 5, the detachable end connecting rope 3 separates with pedestal 1, after being wound into stringing load 5, then is connected with pedestal 1.
The when of replacing, the both sides of the stringing load 5 of binding linear tension electric pole;Unclamp the fixed screw in the middle of stringing load 5,
Separate electric pole main body 6 and stringing load 5, stringing of simultaneously upwards slinging load 5 with crane;Change electric pole main body 6;Put down stringing load 5, and
Fixing connection stringing load 5 and electric pole main body 6 i.e. tighten screw.
Simplify exchonge step, save manpower, improve work efficiency, shortened activity duration and power off time, to the greatest extent
Amount reduces the impact on normal electricity consumption.
In the suspender that the specific embodiment of the invention provides, linker is fixed by fastening bolt in the two ends of hoisting rope 2
Seat 1.The one end connecting rope 3 connects pedestal 1 by fastening bolt is fixing, and the other end connecting rope 3 is detachable by attachment means
Connect pedestal 1.Also connection can be fixed by other means, as locked, all in protection scope of the present invention by the way of winding
Within.
Specifically, attachment means is hook, pedestal 1 is provided with and links up with the connecting hole mated, hanging over connecting hole
Interior realization removably connects, as used the mode of clamping to connect.For the ease of turning the screw in stringing load 5, use is needed to pull
Hands, therefore can be provided for the buckling groove of clamping spanner on pedestal 1.In the suspender that the specific embodiment of the invention provides,
Hoisting rope 2 and two connection rope 3 integral types are arranged, and certainly may be used without split type setting.
On the basis of the suspender that above-mentioned each detailed description of the invention provides, connection pull rope 4 can be fixed on pedestal 1, lead
Lead-in wire load 5, makes cross-arm 5 be directed at electric pole main body 6.
Wherein hoisting rope 2, connection rope 3 and pull rope 4 are specially steel wire rope, are also adopted by the rope material of other materials, as long as protecting
Card intensity, all within protection scope of the present invention.
Concrete replacing options is when 10kV circuit carries out large repairs or technology innovation project changes linear tension electric pole, operating personnel
Climbing up electric pole main body 6, first steel wire rope is bundled on the direct-connected ferrum of resistant to tension cross-arm 5 both sides, operating personnel is then transmission rope
Being bundled in any side of stringing load 5, with suspension hook, steel wire rope is being hung jail, operating personnel is by fixing in the middle of resistant to tension cross-arm 5
Screw unclamps 3 to 5 and buckles, and after unclamping, operating personnel withdraws electric pole main body 6, returns to ground, and commanding commands crane by resistant to tension
Cross-arm 5 is after head hangs out, and ground utilizes rope that resistant to tension cross-arm 5 is pulled to any side, facilitates old electric pole main body 6 with hanging
Car is extracted, and after old electric pole main body 6 is extracted and new bar hole is dug, with crane, by new electric pole main body 6, (position, new bar hole is original
About 10 to 20cm place, electric pole hole) to sling, after group is vertical, personnel's upper boom crane coordinates, by original stringing hung out
The relevant positions that load 5 falls head, and by after good for the both sides fastened by screw of fixing stringing load 5, suspension hook disengages, and removes stringing and carries on a shoulder pole 5
Both sides steel wire rope and tricing line, personnel withdraw, end-of-job, recover power transmission.
Above to the suspender for changing linear tension electric pole provided by the present invention and the side of replacing linear tension electric pole
Method is described in detail.Principle and the embodiment of the present invention are set forth by specific case used herein, above
The explanation of embodiment is only intended to help to understand method and the core concept thereof of the present invention.It should be pointed out that, for the art
Those of ordinary skill for, under the premise without departing from the principles of the invention, it is also possible to the present invention is carried out some improvement and repaiies
Decorations, these improve and modify in the protection domain also falling into the claims in the present invention.
Claims (10)
1. the suspender being used for changing linear tension electric pole, it is characterised in that include that pedestal (1), hoisting rope (2) and two are right
Claiming the connection rope (3) arranged, the two ends of described hoisting rope (2) are fixing connects described pedestal (1), and in described hoisting rope (2)
Portion is for being lifted on the suspension hook of crane, and the one end connecting described pedestal (1), described connection are fixed in one end of described connection rope (3)
The other end of rope (3) removably connects with described pedestal (1), and described connect restrict (3) can be wound around and to pull up straight line resistance to
Open stringing load (5) of electric pole.
Suspender the most according to claim 1, it is characterised in that the two ends of described hoisting rope (2) are fixed by fastening bolt
Connect described pedestal (1).
Suspender the most according to claim 2, it is characterised in that one end of described connection rope (3) is fixed by fastening bolt
Connecting described pedestal (1), the described other end connecting rope (3) is removably connected described pedestal (1) by attachment means.
Suspender the most according to claim 3, it is characterised in that described attachment means is specially hook, on described pedestal (1)
It is provided with the connecting hole mated with described hook.
Suspender the most according to claim 1, it is characterised in that described pedestal is provided with the card for clamping spanner on (1)
Access slot.
Suspender the most according to claim 1, it is characterised in that described hoisting rope (2) and two described connections restrict (3) integrally
Formula is arranged.
7. according to the suspender described in claim 1 to 6 any one, it is characterised in that be fixedly connected with on described pedestal (1) and lead
Messenger (4).
Suspender the most according to claim 7, it is characterised in that described hoisting rope (2), described connect rope (3) and described lead
Messenger (4) is specially steel wire rope.
9. the method changing linear tension electric pole, it is characterised in that including:
The both sides of stringing load (5) of binding linear tension electric pole;
Separate electric pole main body (6) and described stringing load (5), described stringing load (5) of simultaneously upwards slinging;
Change electric pole main body (6);
Put down described stringing load (5), and fixing connection described stringing load (5) and electric pole main body (6).
Method the most according to claim 9, it is characterised in that also include after described replacing electric pole main body (6):
Draw described stringing load (5), make described stringing load (5) alignment electric pole main body (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610686048.1A CN106081873B (en) | 2016-08-18 | 2016-08-18 | A method of replacement linear tension electric pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610686048.1A CN106081873B (en) | 2016-08-18 | 2016-08-18 | A method of replacement linear tension electric pole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106081873A true CN106081873A (en) | 2016-11-09 |
CN106081873B CN106081873B (en) | 2019-05-28 |
Family
ID=58070521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610686048.1A Active CN106081873B (en) | 2016-08-18 | 2016-08-18 | A method of replacement linear tension electric pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106081873B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106744540A (en) * | 2016-11-29 | 2017-05-31 | 贵州大学 | One kind lifting test system and elevating method |
CN110571702A (en) * | 2019-10-17 | 2019-12-13 | 国网山西省电力公司阳泉供电公司 | Method for transforming power distribution network in rural alley |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2759974Y (en) * | 2004-09-28 | 2006-02-22 | 天津港第三港埠公司 | Single-purpose sling for lifting packaged bag |
CN201411319Y (en) * | 2009-06-11 | 2010-02-24 | 青岛港(集团)有限公司 | Anti-scratching mesh bag hanger |
CN102684108A (en) * | 2012-05-18 | 2012-09-19 | 辽宁省电力有限公司鞍山供电公司 | Electrified repairing method for 10kV line aerial conductors and insulating wire lifter |
CN203345920U (en) * | 2013-06-20 | 2013-12-18 | 云南建工钢结构有限公司 | Multifunctional lifting hook |
CN103683098A (en) * | 2013-12-02 | 2014-03-26 | 国家电网公司 | Method of replacing strain poles without laying down lines |
CN103979396A (en) * | 2014-04-14 | 2014-08-13 | 国网浙江海盐县供电公司 | Steel wire rope knotting structure for hoisting power distribution network electric pole and electric pole hoisting method |
CN203839885U (en) * | 2014-05-27 | 2014-09-17 | 于兴利 | 10kV/35kV double-loop straight-line electrified pole replacing device |
CN203976285U (en) * | 2014-06-19 | 2014-12-03 | 国家电网公司 | With the matching used allocated radio lifting of two electric poles guide chain |
CN204030371U (en) * | 2014-05-26 | 2014-12-17 | 国家电网公司 | The vertical suspender of a kind of two electric pole group |
CN204391603U (en) * | 2014-12-12 | 2015-06-10 | 国家电网公司 | Charged insulating ceiling plate |
CN104947953A (en) * | 2015-05-21 | 2015-09-30 | 国家电网公司 | 10 kV electric transmission line concrete pole replacing method and temporary pole replacement |
CN204917648U (en) * | 2015-09-09 | 2015-12-30 | 青岛东林机械科技有限公司 | Turbine rotor lifts by crane instrument |
CN205114823U (en) * | 2015-11-12 | 2016-03-30 | 中信重工机械股份有限公司 | Auxiliary hoisting tool for head sheave or guide wheel |
CN205222445U (en) * | 2015-12-22 | 2016-05-11 | 江苏金风科技有限公司 | A hoist device for wind generating set blade |
CN205873669U (en) * | 2016-08-18 | 2017-01-11 | 国家电网公司 | A hoist for changing sharp strain insulator pole |
-
2016
- 2016-08-18 CN CN201610686048.1A patent/CN106081873B/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2759974Y (en) * | 2004-09-28 | 2006-02-22 | 天津港第三港埠公司 | Single-purpose sling for lifting packaged bag |
CN201411319Y (en) * | 2009-06-11 | 2010-02-24 | 青岛港(集团)有限公司 | Anti-scratching mesh bag hanger |
CN102684108A (en) * | 2012-05-18 | 2012-09-19 | 辽宁省电力有限公司鞍山供电公司 | Electrified repairing method for 10kV line aerial conductors and insulating wire lifter |
CN203345920U (en) * | 2013-06-20 | 2013-12-18 | 云南建工钢结构有限公司 | Multifunctional lifting hook |
CN103683098A (en) * | 2013-12-02 | 2014-03-26 | 国家电网公司 | Method of replacing strain poles without laying down lines |
CN103979396A (en) * | 2014-04-14 | 2014-08-13 | 国网浙江海盐县供电公司 | Steel wire rope knotting structure for hoisting power distribution network electric pole and electric pole hoisting method |
CN204030371U (en) * | 2014-05-26 | 2014-12-17 | 国家电网公司 | The vertical suspender of a kind of two electric pole group |
CN203839885U (en) * | 2014-05-27 | 2014-09-17 | 于兴利 | 10kV/35kV double-loop straight-line electrified pole replacing device |
CN203976285U (en) * | 2014-06-19 | 2014-12-03 | 国家电网公司 | With the matching used allocated radio lifting of two electric poles guide chain |
CN204391603U (en) * | 2014-12-12 | 2015-06-10 | 国家电网公司 | Charged insulating ceiling plate |
CN104947953A (en) * | 2015-05-21 | 2015-09-30 | 国家电网公司 | 10 kV electric transmission line concrete pole replacing method and temporary pole replacement |
CN204917648U (en) * | 2015-09-09 | 2015-12-30 | 青岛东林机械科技有限公司 | Turbine rotor lifts by crane instrument |
CN205114823U (en) * | 2015-11-12 | 2016-03-30 | 中信重工机械股份有限公司 | Auxiliary hoisting tool for head sheave or guide wheel |
CN205222445U (en) * | 2015-12-22 | 2016-05-11 | 江苏金风科技有限公司 | A hoist device for wind generating set blade |
CN205873669U (en) * | 2016-08-18 | 2017-01-11 | 国家电网公司 | A hoist for changing sharp strain insulator pole |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106744540A (en) * | 2016-11-29 | 2017-05-31 | 贵州大学 | One kind lifting test system and elevating method |
CN106744540B (en) * | 2016-11-29 | 2023-07-14 | 贵州大学 | Lifting test system and lifting method |
CN110571702A (en) * | 2019-10-17 | 2019-12-13 | 国网山西省电力公司阳泉供电公司 | Method for transforming power distribution network in rural alley |
Also Published As
Publication number | Publication date |
---|---|
CN106081873B (en) | 2019-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102358563B (en) | Sling | |
CN102856838B (en) | Tubular bus support insulator changing tool and method | |
CN102040166A (en) | Hoisting tool for equipment on pillar | |
CN207530438U (en) | Tangent tower ground wire line lifter | |
CN103269036A (en) | Tensioning resistant cross arm lifting machine | |
CN103560437B (en) | A kind of optical cable pulley based on single-wheel sister block hangs and annex installation method | |
CN106081873B (en) | A method of replacement linear tension electric pole | |
CN201517022U (en) | Hoisting tool for apparatus on column | |
CN205873669U (en) | A hoist for changing sharp strain insulator pole | |
CN203071537U (en) | Equilateral triangle fixing support for cable laid underground | |
JP2004056837A (en) | Temporary cable support | |
CN203278097U (en) | Electric pole cross arm erecting device | |
CN209210260U (en) | A kind of boom hoisting applied to electric power tower equipment | |
CN204737645U (en) | Hoisting accessory | |
CN204349336U (en) | Overhead-groundwire lifter | |
CN201952742U (en) | Suspension bridge cable changing device | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN202906291U (en) | Operation rope ladder hanging equipment | |
CN202529744U (en) | Structure of auxiliary hoist of fixed mast and crawler crane equipped with structure | |
CN210723967U (en) | Auxiliary tool for replacing 35-110kV strain single-string insulator | |
CN211018037U (en) | A overhaul hoist for iron tower is maintained | |
CN203553744U (en) | An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus | |
CN202353095U (en) | Wire lifting arrangement structure for 8-bundled conductors on straight-path tower | |
CN208516850U (en) | A kind of cement rod-type power transmission line overhead ground wire auxiliary device | |
CN205882554U (en) | Work platform on power line pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |