CN103956679B - Steel tube tower upkeep operation platform and using method thereof - Google Patents
Steel tube tower upkeep operation platform and using method thereof Download PDFInfo
- Publication number
- CN103956679B CN103956679B CN201410181441.6A CN201410181441A CN103956679B CN 103956679 B CN103956679 B CN 103956679B CN 201410181441 A CN201410181441 A CN 201410181441A CN 103956679 B CN103956679 B CN 103956679B
- Authority
- CN
- China
- Prior art keywords
- quadra
- polyamide fibre
- suspension cord
- steel tube
- link plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Revetment (AREA)
Abstract
The invention discloses steel tube tower upkeep operation platform and using method thereof. Steel tube tower upkeep operation platform is made up of quadra, suspension cord, the assembling of hanging point link plate, and quadra adopts aluminium alloy extrusions to make, and the bottom surface of quadra is provided with polyamide fibre netting, quadra to be provided with polyamide fibre netting be below support net; Horizontal soft rope is by the waist set before quadra; The both sides of quadra are provided with the kit bag that canvas is made; The top of quadra is provided for connecting the link of suspension cord; Suspension cord is the polyamide fibre cable of segmentation, and the polyamide fibre cable of segmentation connects by latch closure, and latch closure can be used as and regulates buckling a little of polyamide fibre cable length; The end of suspension cord is provided with opening and closing type clasp; U-shaped ring is equipped with in hanging point link plate upper end, and two hanging holes for being connected with suspension cord are set on hanging point link plate. The present invention is simple in structure, light firm, safety and comfort, and easy to use, handling are quick.
Description
Technical field
The present invention relates to a kind of upkeep operation platform and using method thereof of steel tube tower in electric transmission line.
Background technology
Along with UHV transmission networking constantly advances, common-tower double-return or many back transmission lines constantly build up throwingFortune. Because circuit returns, number is many, wire division quantity is many, tower load is required to improve constantly, to tower structureIntensity is had higher requirement, and conventional angular head tower can not meet the demands. Therefore, 1000kV extra-high voltageCommon-tower double-return circuit has generally adopted steel tube tower structure.
After circuit puts into operation, because of circuit mounting rod number plate, phase place board, warning caution board, on-Line Monitor Device withAnd the need of work such as line maintenance, maintainer often need to carry out corresponding operation on shaft tower. At conventional angle steelOn tower, operating personnel climbs to job position by angle iron component conventionally, and stand or ride on angle iron component,Can, by holding up, keeping homeostasis by angle iron component, carry out events in operation. Because steel tube tower main body is circular steelPipe, diameter is many more than 180mm, and distance between structural member is larger, cannot sit or hold up, leans on by ridingSteel tube component keeps homeostasis, therefore cannot carry out operation.
In order to meet extra-high voltage steel tube tower service work needs, need a kind of steel tube tower job platform of development, will doIndustry platform is suspended near the steel pipe of setting, and operating personnel, taking job platform as foothold, carries out maintenance and doesIndustry. Meanwhile, because line maintenance mostly is single-point operation, personnel amount is few, Work tool is simple, and needs continuously specially, therefore require job platform have simple in structure, volume is little, the feature such as lightweight, easy and simple to handle.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of maintenance of the 1000kV of being suitable for extra-high voltage steel tube tower and doesIndustry platform, and require that platform structure is simple, volume is little, lightweight, easy and simple to handle.
The another one technical problem that the present invention will solve is to provide making of a kind of steel tube tower upkeep operation platformUse method.
For steel tube tower upkeep operation platform, the technical solution used in the present invention is: steel tube tower upkeep operation is flatPlatform, is made up of quadra, suspension cord, the assembling of hanging point link plate, and quadra adopts aluminium alloy extrusions systemBecome, the bottom surface of quadra is provided with polyamide fibre netting, quadra to be below provided with polyamide fibre netting be support net;Before quadra, horizontal soft rope is by the waist set, frame above can be opened and be fastened on to rope by the waistOn; The both sides of quadra are provided with the kit bag that canvas is made; The top of quadra is provided for connecting and connectsConnect the link of suspension cord;
Suspension cord is the polyamide fibre cable of segmentation, and the polyamide fibre cable of segmentation connects by latch closure, and latch closure can be used asRegulate buckling a little of polyamide fibre cable length; The end of suspension cord is provided with opening and closing type clasp;
U-shaped ring is equipped with in hanging point link plate upper end, and two extensions for being connected with suspension cord are set on hanging point link plateHole.
As preferably, the frame of quadra is provided with connecting hole, and connecting hole is lined with abrasionproof packing ring; Polyamide fibre nettingBe connected with the frame of quadra through abrasionproof packing ring.
As preferably, the length of suspension cord is according to the position of setting and distance and operating personnel's bodyHeight regulates.
For the using method of steel tube tower upkeep operation platform, the technical solution used in the present invention is: comprise withLower step:
(1) in the time that setting is steel pipe, adopt rope to be directly wound around and to hang, by suspension cord on steel pipeWind with one circuit or after two weeks, use clasp to be directly buckled on rope;
(2) when having construction, setting adopt hanging point link plate to hang when hole, by hanging point link plate upper endU-shaped ring is connected with construction hole.
The invention has the beneficial effects as follows:
Steel tube tower job platform provided by the invention is for 1000kV extra-high voltage steel tube tower upkeep operation, operationIn time, hangs on job platform near setting by suspension cord or hanging point link plate, can pass through latch closure, foldingFormula clasp regulates suspension cord length, meets different work distance, different height operating personnel's operation needs.When operation, personnel can be seated on platform, ensure operating personnel's safety by rope by the waist, meet operation needs.
Job platform adopts aluminum alloy frame, and bottom surface adopts caprone cable web frame, and this structure makes platform and integrallyWeight is lighter; Bottom surface is soft netting support personnel operation comfortableness, has increased bottom surface coefficient of friction simultaneously,Ensure that operating personnel can arbitrarily not slide. On frame, connecting hole connects by abrasionproof packing ring and bottom surface polyamide fibre nettingConnect, ensure that netting is not easy to wear, guarantee safety. Framework both sides are provided with canvas bag, can storing name utensilAnd repair materials. Suspension cord adopts sectionally assembled caprone cable, adopts latch closure, open-close type clasp to connect,Be beneficial to and regulate platform suspension height, be convenient to the convenience of installing, removing.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is the front view of steel tube tower upkeep operation platform embodiment of the present invention.
Fig. 2 is the top view of steel tube tower upkeep operation platform embodiment of the present invention.
Fig. 3 is the left view of steel tube tower upkeep operation platform embodiment of the present invention.
In figure, 1-connecting ring, 2-abrasionproof packing ring, 3-kit bag, 4-quadra, the 5-netting that insulate, 6-Rope by the waist, 7-connection cord, 8-latch closure, 9-open-close type latch closure, 10-hanging point link plate.
Detailed description of the invention
For a upkeep operation platform for 1000kV extra-high voltage steel tube tower, be applicable to steel tube tower circuit, forPersonnel's upkeep operation provides job platform.
As shown in Figure 1, the main body of job platform is the quadra 4 made from aluminium alloy extrusions, squareBottom surface, side and the frame below of framework are provided with the connecting hole for netting is installed, at each connecting holeOn be all lined with the abrasionproof packing ring 2 for preventing rope wear fracture, the insulation netting 5 that polyamide fibre is made fills respectivelyIn the bottom surface of quadra 4, side and below. And the outside, both sides at quadra 4 is provided with canvas systemThe kit bag 3 becoming fixedly mounts a soft rope by the waist 6 before quadra 4, and rope can by the waistTo open and to be fastened on frame above, be fixed with connecting ring 1 on the top of 4 four columns of quadra,Form thus job platform support body. In addition connection cord 7 and latch closure 8, open-close type clasp 9 are connected to form outstandingLanyard rope. Hanging point link plate 10 is for subsequent use.
Before operation, the job platform support body that assembling is completed, then the suspension cord that connection is combined is connected toConnecting ring 1, forms job platform.
When operation, in the time that setting top is steel pipe, job platform is promoted to steel pipe place, by suspension cordOn steel pipe, be wound around one to twice, according to setting height and operating personnel's height needs, by open-close type buttonRing 9 is buckled on connection cord 7 or latch closure 8, the last assembling of the platform that fulfils assignment.
Operating personnel, on job platform, is seated on the polyamide fibre netting 5 of job platform upper bottom surface, will be by the waistRope 6 is buckled well, and can carry out operation.
While having construction hole as setting top, as above-mentioned steps completes platform and suspension cord assembling, will hangRope is buckled on hanging point link plate 10 hanging holes, the more U-shaped ring of hanging point link plate 10 is connected with construction hole, completeBecome the assembling of job platform, then carry out corresponding operation.
Above-described embodiment of the present invention, does not form limiting the scope of the present invention. AnyThe amendment done within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included in the present inventionClaim protection domain within.
Claims (4)
1. steel tube tower upkeep operation platform, formed by quadra, suspension cord, the assembling of hanging point link plate, it is characterized in that: described quadra adopts aluminium alloy extrusions to make, and the bottom surface of quadra is provided with polyamide fibre netting, quadra to be provided with polyamide fibre netting be below support net; Before quadra, horizontal soft rope is by the waist set, rope can be opened and be fastened on frame above by the waist; The both sides of described quadra are provided with the kit bag that canvas is made; The top of quadra is provided for connecting the link of suspension cord;
Described suspension cord is the polyamide fibre cable of segmentation, and the polyamide fibre cable of segmentation connects by latch closure, and described latch closure can be used as and regulates buckling a little of polyamide fibre cable length; The end of suspension cord is provided with opening and closing type clasp;
U-shaped ring is equipped with in described hanging point link plate upper end, and two hanging holes for being connected with suspension cord are set on hanging point link plate.
2. steel tube tower upkeep operation platform as claimed in claim 1, is characterized in that: the frame of described quadra is provided with connecting hole, and described connecting hole is lined with abrasionproof packing ring; Described polyamide fibre netting is connected with the frame of quadra through abrasionproof packing ring.
3. steel tube tower upkeep operation platform as claimed in claim 1, is characterized in that: the length of described suspension cord regulates according to the position of setting and distance and operating personnel's height.
4. the using method of steel tube tower upkeep operation platform as claimed in claim 1, is characterized in that comprising the following steps:
(1) in the time that setting is steel pipe, adopt rope to be directly wound around and to hang, wind with one circuit on steel pipe by suspension cord or after two weeks, use clasp to be directly buckled on rope;
(2) in the time that setting has construction hole, adopt hanging point link plate to hang, be connected with construction hole by the U-shaped ring of hanging point link plate upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410181441.6A CN103956679B (en) | 2014-04-30 | 2014-04-30 | Steel tube tower upkeep operation platform and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410181441.6A CN103956679B (en) | 2014-04-30 | 2014-04-30 | Steel tube tower upkeep operation platform and using method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103956679A CN103956679A (en) | 2014-07-30 |
CN103956679B true CN103956679B (en) | 2016-05-11 |
Family
ID=51333927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410181441.6A Expired - Fee Related CN103956679B (en) | 2014-04-30 | 2014-04-30 | Steel tube tower upkeep operation platform and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103956679B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104134949A (en) * | 2014-08-14 | 2014-11-05 | 国家电网公司 | 10kV line switch frame operating platform |
CN105071298B (en) * | 2015-09-17 | 2018-01-23 | 国网上海市电力公司 | A kind of collapsible operating platform of manned operation of high-tension line |
CN114156777A (en) * | 2021-12-09 | 2022-03-08 | 国网冀北电力有限公司检修分公司 | A operation platform for changing six ally oneself with strain insulator |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2485283Y (en) * | 2001-02-28 | 2002-04-10 | 曹振邦 | Manned hanging basket |
CN201838934U (en) * | 2010-08-20 | 2011-05-18 | 胜利石油管理局电力管理总公司东区供电公司 | Novel portable adjustable rod upper platform |
CN202689493U (en) * | 2012-06-09 | 2013-01-23 | 吕军杰 | Steel pole overhaul platform |
CN103437540A (en) * | 2013-08-13 | 2013-12-11 | 国家电网公司 | Adjustable inclined pipe type hanging basket |
CN203826847U (en) * | 2014-04-30 | 2014-09-10 | 国家电网公司 | A steel tube tower unkeep working platform |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6234424B1 (en) * | 1999-08-06 | 2001-05-22 | LES HéLICOPTèRES CANADIENS LIMITéE | Basket for suspension from overhead cables |
-
2014
- 2014-04-30 CN CN201410181441.6A patent/CN103956679B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2485283Y (en) * | 2001-02-28 | 2002-04-10 | 曹振邦 | Manned hanging basket |
CN201838934U (en) * | 2010-08-20 | 2011-05-18 | 胜利石油管理局电力管理总公司东区供电公司 | Novel portable adjustable rod upper platform |
CN202689493U (en) * | 2012-06-09 | 2013-01-23 | 吕军杰 | Steel pole overhaul platform |
CN103437540A (en) * | 2013-08-13 | 2013-12-11 | 国家电网公司 | Adjustable inclined pipe type hanging basket |
CN203826847U (en) * | 2014-04-30 | 2014-09-10 | 国家电网公司 | A steel tube tower unkeep working platform |
Also Published As
Publication number | Publication date |
---|---|
CN103956679A (en) | 2014-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103956679B (en) | Steel tube tower upkeep operation platform and using method thereof | |
CN204024005U (en) | Assembly type suspension platform | |
CN106761363A (en) | A kind of steel tube tower in electric transmission line aids in climbing tool | |
CN106368493A (en) | Two-arm hydraulic drive-in type hard capping lattice type crossing frame | |
CN202550405U (en) | Special ladder for maintenance of strain insulator | |
CN203826847U (en) | A steel tube tower unkeep working platform | |
CN108035532A (en) | Combined wall connecting piece device and installation method thereof | |
CN203520573U (en) | High-voltage transmission line aviation warning ball | |
CN110251858A (en) | A kind of transmission line of electricity pole ascending operation safety anti-falling device | |
CN207110428U (en) | A kind of positive sheet chain block mounting structure of climbing frame | |
CN103236659A (en) | Near-pole maintenance hanging rack for power transmission line | |
CN108775196A (en) | Lifting and self-climbing combined mechanism for erecting power transmission tower | |
CN105113415B (en) | Hydraulic pressure sliding sash climbing frame | |
CN203352045U (en) | Drainage wiring ladder | |
CN104001279A (en) | Hydraulic relay jack-up type high-rise firefighting bridge | |
CN207098443U (en) | A kind of helicopter live-line maintenance operation hanging basket | |
CN206319825U (en) | Steel tube tower in electric transmission line aids in climbing tool | |
CN207200123U (en) | A kind of four line march-past wire lifting devices | |
CN104410009A (en) | Climbing type steel wire rope ladder | |
CN206962343U (en) | A kind of electric equipment maintenance combination tool | |
CN201908907U (en) | Rope stick | |
CN203944042U (en) | Hydraulic relay jacking type tall-building fire fighting bridge | |
CN208445196U (en) | It is a kind of for lead wire and earth wire in transmission line and the Multifunctional hanging line device of optical cable | |
CN208749208U (en) | Communicate shaft tower | |
CN208072927U (en) | Combined wall connecting piece device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |