CN103956679B - Steel tube tower upkeep operation platform and using method thereof - Google Patents

Steel tube tower upkeep operation platform and using method thereof Download PDF

Info

Publication number
CN103956679B
CN103956679B CN201410181441.6A CN201410181441A CN103956679B CN 103956679 B CN103956679 B CN 103956679B CN 201410181441 A CN201410181441 A CN 201410181441A CN 103956679 B CN103956679 B CN 103956679B
Authority
CN
China
Prior art keywords
quadra
polyamide fibre
suspension cord
steel tube
link plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410181441.6A
Other languages
Chinese (zh)
Other versions
CN103956679A (en
Inventor
林世忠
操松元
聂立新
吴维国
苏灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410181441.6A priority Critical patent/CN103956679B/en
Publication of CN103956679A publication Critical patent/CN103956679A/en
Application granted granted Critical
Publication of CN103956679B publication Critical patent/CN103956679B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Revetment (AREA)

Abstract

The invention discloses steel tube tower upkeep operation platform and using method thereof. Steel tube tower upkeep operation platform is made up of quadra, suspension cord, the assembling of hanging point link plate, and quadra adopts aluminium alloy extrusions to make, and the bottom surface of quadra is provided with polyamide fibre netting, quadra to be provided with polyamide fibre netting be below support net; Horizontal soft rope is by the waist set before quadra; The both sides of quadra are provided with the kit bag that canvas is made; The top of quadra is provided for connecting the link of suspension cord; Suspension cord is the polyamide fibre cable of segmentation, and the polyamide fibre cable of segmentation connects by latch closure, and latch closure can be used as and regulates buckling a little of polyamide fibre cable length; The end of suspension cord is provided with opening and closing type clasp; U-shaped ring is equipped with in hanging point link plate upper end, and two hanging holes for being connected with suspension cord are set on hanging point link plate. The present invention is simple in structure, light firm, safety and comfort, and easy to use, handling are quick.

Description

Steel tube tower upkeep operation platform and using method thereof
Technical field
The present invention relates to a kind of upkeep operation platform and using method thereof of steel tube tower in electric transmission line.
Background technology
Along with UHV transmission networking constantly advances, common-tower double-return or many back transmission lines constantly build up throwingFortune. Because circuit returns, number is many, wire division quantity is many, tower load is required to improve constantly, to tower structureIntensity is had higher requirement, and conventional angular head tower can not meet the demands. Therefore, 1000kV extra-high voltageCommon-tower double-return circuit has generally adopted steel tube tower structure.
After circuit puts into operation, because of circuit mounting rod number plate, phase place board, warning caution board, on-Line Monitor Device withAnd the need of work such as line maintenance, maintainer often need to carry out corresponding operation on shaft tower. At conventional angle steelOn tower, operating personnel climbs to job position by angle iron component conventionally, and stand or ride on angle iron component,Can, by holding up, keeping homeostasis by angle iron component, carry out events in operation. Because steel tube tower main body is circular steelPipe, diameter is many more than 180mm, and distance between structural member is larger, cannot sit or hold up, leans on by ridingSteel tube component keeps homeostasis, therefore cannot carry out operation.
In order to meet extra-high voltage steel tube tower service work needs, need a kind of steel tube tower job platform of development, will doIndustry platform is suspended near the steel pipe of setting, and operating personnel, taking job platform as foothold, carries out maintenance and doesIndustry. Meanwhile, because line maintenance mostly is single-point operation, personnel amount is few, Work tool is simple, and needs continuously specially, therefore require job platform have simple in structure, volume is little, the feature such as lightweight, easy and simple to handle.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of maintenance of the 1000kV of being suitable for extra-high voltage steel tube tower and doesIndustry platform, and require that platform structure is simple, volume is little, lightweight, easy and simple to handle.
The another one technical problem that the present invention will solve is to provide making of a kind of steel tube tower upkeep operation platformUse method.
For steel tube tower upkeep operation platform, the technical solution used in the present invention is: steel tube tower upkeep operation is flatPlatform, is made up of quadra, suspension cord, the assembling of hanging point link plate, and quadra adopts aluminium alloy extrusions systemBecome, the bottom surface of quadra is provided with polyamide fibre netting, quadra to be below provided with polyamide fibre netting be support net;Before quadra, horizontal soft rope is by the waist set, frame above can be opened and be fastened on to rope by the waistOn; The both sides of quadra are provided with the kit bag that canvas is made; The top of quadra is provided for connecting and connectsConnect the link of suspension cord;
Suspension cord is the polyamide fibre cable of segmentation, and the polyamide fibre cable of segmentation connects by latch closure, and latch closure can be used asRegulate buckling a little of polyamide fibre cable length; The end of suspension cord is provided with opening and closing type clasp;
U-shaped ring is equipped with in hanging point link plate upper end, and two extensions for being connected with suspension cord are set on hanging point link plateHole.
As preferably, the frame of quadra is provided with connecting hole, and connecting hole is lined with abrasionproof packing ring; Polyamide fibre nettingBe connected with the frame of quadra through abrasionproof packing ring.
As preferably, the length of suspension cord is according to the position of setting and distance and operating personnel's bodyHeight regulates.
For the using method of steel tube tower upkeep operation platform, the technical solution used in the present invention is: comprise withLower step:
(1) in the time that setting is steel pipe, adopt rope to be directly wound around and to hang, by suspension cord on steel pipeWind with one circuit or after two weeks, use clasp to be directly buckled on rope;
(2) when having construction, setting adopt hanging point link plate to hang when hole, by hanging point link plate upper endU-shaped ring is connected with construction hole.
The invention has the beneficial effects as follows:
Steel tube tower job platform provided by the invention is for 1000kV extra-high voltage steel tube tower upkeep operation, operationIn time, hangs on job platform near setting by suspension cord or hanging point link plate, can pass through latch closure, foldingFormula clasp regulates suspension cord length, meets different work distance, different height operating personnel's operation needs.When operation, personnel can be seated on platform, ensure operating personnel's safety by rope by the waist, meet operation needs.
Job platform adopts aluminum alloy frame, and bottom surface adopts caprone cable web frame, and this structure makes platform and integrallyWeight is lighter; Bottom surface is soft netting support personnel operation comfortableness, has increased bottom surface coefficient of friction simultaneously,Ensure that operating personnel can arbitrarily not slide. On frame, connecting hole connects by abrasionproof packing ring and bottom surface polyamide fibre nettingConnect, ensure that netting is not easy to wear, guarantee safety. Framework both sides are provided with canvas bag, can storing name utensilAnd repair materials. Suspension cord adopts sectionally assembled caprone cable, adopts latch closure, open-close type clasp to connect,Be beneficial to and regulate platform suspension height, be convenient to the convenience of installing, removing.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is the front view of steel tube tower upkeep operation platform embodiment of the present invention.
Fig. 2 is the top view of steel tube tower upkeep operation platform embodiment of the present invention.
Fig. 3 is the left view of steel tube tower upkeep operation platform embodiment of the present invention.
In figure, 1-connecting ring, 2-abrasionproof packing ring, 3-kit bag, 4-quadra, the 5-netting that insulate, 6-Rope by the waist, 7-connection cord, 8-latch closure, 9-open-close type latch closure, 10-hanging point link plate.
Detailed description of the invention
For a upkeep operation platform for 1000kV extra-high voltage steel tube tower, be applicable to steel tube tower circuit, forPersonnel's upkeep operation provides job platform.
As shown in Figure 1, the main body of job platform is the quadra 4 made from aluminium alloy extrusions, squareBottom surface, side and the frame below of framework are provided with the connecting hole for netting is installed, at each connecting holeOn be all lined with the abrasionproof packing ring 2 for preventing rope wear fracture, the insulation netting 5 that polyamide fibre is made fills respectivelyIn the bottom surface of quadra 4, side and below. And the outside, both sides at quadra 4 is provided with canvas systemThe kit bag 3 becoming fixedly mounts a soft rope by the waist 6 before quadra 4, and rope can by the waistTo open and to be fastened on frame above, be fixed with connecting ring 1 on the top of 4 four columns of quadra,Form thus job platform support body. In addition connection cord 7 and latch closure 8, open-close type clasp 9 are connected to form outstandingLanyard rope. Hanging point link plate 10 is for subsequent use.
Before operation, the job platform support body that assembling is completed, then the suspension cord that connection is combined is connected toConnecting ring 1, forms job platform.
When operation, in the time that setting top is steel pipe, job platform is promoted to steel pipe place, by suspension cordOn steel pipe, be wound around one to twice, according to setting height and operating personnel's height needs, by open-close type buttonRing 9 is buckled on connection cord 7 or latch closure 8, the last assembling of the platform that fulfils assignment.
Operating personnel, on job platform, is seated on the polyamide fibre netting 5 of job platform upper bottom surface, will be by the waistRope 6 is buckled well, and can carry out operation.
While having construction hole as setting top, as above-mentioned steps completes platform and suspension cord assembling, will hangRope is buckled on hanging point link plate 10 hanging holes, the more U-shaped ring of hanging point link plate 10 is connected with construction hole, completeBecome the assembling of job platform, then carry out corresponding operation.
Above-described embodiment of the present invention, does not form limiting the scope of the present invention. AnyThe amendment done within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included in the present inventionClaim protection domain within.

Claims (4)

1. steel tube tower upkeep operation platform, formed by quadra, suspension cord, the assembling of hanging point link plate, it is characterized in that: described quadra adopts aluminium alloy extrusions to make, and the bottom surface of quadra is provided with polyamide fibre netting, quadra to be provided with polyamide fibre netting be below support net; Before quadra, horizontal soft rope is by the waist set, rope can be opened and be fastened on frame above by the waist; The both sides of described quadra are provided with the kit bag that canvas is made; The top of quadra is provided for connecting the link of suspension cord;
Described suspension cord is the polyamide fibre cable of segmentation, and the polyamide fibre cable of segmentation connects by latch closure, and described latch closure can be used as and regulates buckling a little of polyamide fibre cable length; The end of suspension cord is provided with opening and closing type clasp;
U-shaped ring is equipped with in described hanging point link plate upper end, and two hanging holes for being connected with suspension cord are set on hanging point link plate.
2. steel tube tower upkeep operation platform as claimed in claim 1, is characterized in that: the frame of described quadra is provided with connecting hole, and described connecting hole is lined with abrasionproof packing ring; Described polyamide fibre netting is connected with the frame of quadra through abrasionproof packing ring.
3. steel tube tower upkeep operation platform as claimed in claim 1, is characterized in that: the length of described suspension cord regulates according to the position of setting and distance and operating personnel's height.
4. the using method of steel tube tower upkeep operation platform as claimed in claim 1, is characterized in that comprising the following steps:
(1) in the time that setting is steel pipe, adopt rope to be directly wound around and to hang, wind with one circuit on steel pipe by suspension cord or after two weeks, use clasp to be directly buckled on rope;
(2) in the time that setting has construction hole, adopt hanging point link plate to hang, be connected with construction hole by the U-shaped ring of hanging point link plate upper end.
CN201410181441.6A 2014-04-30 2014-04-30 Steel tube tower upkeep operation platform and using method thereof Expired - Fee Related CN103956679B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410181441.6A CN103956679B (en) 2014-04-30 2014-04-30 Steel tube tower upkeep operation platform and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410181441.6A CN103956679B (en) 2014-04-30 2014-04-30 Steel tube tower upkeep operation platform and using method thereof

Publications (2)

Publication Number Publication Date
CN103956679A CN103956679A (en) 2014-07-30
CN103956679B true CN103956679B (en) 2016-05-11

Family

ID=51333927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410181441.6A Expired - Fee Related CN103956679B (en) 2014-04-30 2014-04-30 Steel tube tower upkeep operation platform and using method thereof

Country Status (1)

Country Link
CN (1) CN103956679B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104134949A (en) * 2014-08-14 2014-11-05 国家电网公司 10kV line switch frame operating platform
CN105071298B (en) * 2015-09-17 2018-01-23 国网上海市电力公司 A kind of collapsible operating platform of manned operation of high-tension line
CN114156777A (en) * 2021-12-09 2022-03-08 国网冀北电力有限公司检修分公司 A operation platform for changing six ally oneself with strain insulator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2485283Y (en) * 2001-02-28 2002-04-10 曹振邦 Manned hanging basket
CN201838934U (en) * 2010-08-20 2011-05-18 胜利石油管理局电力管理总公司东区供电公司 Novel portable adjustable rod upper platform
CN202689493U (en) * 2012-06-09 2013-01-23 吕军杰 Steel pole overhaul platform
CN103437540A (en) * 2013-08-13 2013-12-11 国家电网公司 Adjustable inclined pipe type hanging basket
CN203826847U (en) * 2014-04-30 2014-09-10 国家电网公司 A steel tube tower unkeep working platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6234424B1 (en) * 1999-08-06 2001-05-22 LES HéLICOPTèRES CANADIENS LIMITéE Basket for suspension from overhead cables

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2485283Y (en) * 2001-02-28 2002-04-10 曹振邦 Manned hanging basket
CN201838934U (en) * 2010-08-20 2011-05-18 胜利石油管理局电力管理总公司东区供电公司 Novel portable adjustable rod upper platform
CN202689493U (en) * 2012-06-09 2013-01-23 吕军杰 Steel pole overhaul platform
CN103437540A (en) * 2013-08-13 2013-12-11 国家电网公司 Adjustable inclined pipe type hanging basket
CN203826847U (en) * 2014-04-30 2014-09-10 国家电网公司 A steel tube tower unkeep working platform

Also Published As

Publication number Publication date
CN103956679A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN103956679B (en) Steel tube tower upkeep operation platform and using method thereof
CN204024005U (en) Assembly type suspension platform
CN106761363A (en) A kind of steel tube tower in electric transmission line aids in climbing tool
CN106368493A (en) Two-arm hydraulic drive-in type hard capping lattice type crossing frame
CN202550405U (en) Special ladder for maintenance of strain insulator
CN203826847U (en) A steel tube tower unkeep working platform
CN108035532A (en) Combined wall connecting piece device and installation method thereof
CN203520573U (en) High-voltage transmission line aviation warning ball
CN110251858A (en) A kind of transmission line of electricity pole ascending operation safety anti-falling device
CN207110428U (en) A kind of positive sheet chain block mounting structure of climbing frame
CN103236659A (en) Near-pole maintenance hanging rack for power transmission line
CN108775196A (en) Lifting and self-climbing combined mechanism for erecting power transmission tower
CN105113415B (en) Hydraulic pressure sliding sash climbing frame
CN203352045U (en) Drainage wiring ladder
CN104001279A (en) Hydraulic relay jack-up type high-rise firefighting bridge
CN207098443U (en) A kind of helicopter live-line maintenance operation hanging basket
CN206319825U (en) Steel tube tower in electric transmission line aids in climbing tool
CN207200123U (en) A kind of four line march-past wire lifting devices
CN104410009A (en) Climbing type steel wire rope ladder
CN206962343U (en) A kind of electric equipment maintenance combination tool
CN201908907U (en) Rope stick
CN203944042U (en) Hydraulic relay jacking type tall-building fire fighting bridge
CN208445196U (en) It is a kind of for lead wire and earth wire in transmission line and the Multifunctional hanging line device of optical cable
CN208749208U (en) Communicate shaft tower
CN208072927U (en) Combined wall connecting piece device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

CF01 Termination of patent right due to non-payment of annual fee