CN206962343U - A combination tool for electric equipment maintenance - Google Patents

A combination tool for electric equipment maintenance Download PDF

Info

Publication number
CN206962343U
CN206962343U CN201720377248.9U CN201720377248U CN206962343U CN 206962343 U CN206962343 U CN 206962343U CN 201720377248 U CN201720377248 U CN 201720377248U CN 206962343 U CN206962343 U CN 206962343U
Authority
CN
China
Prior art keywords
maintenance
combination tool
electric equipment
pole
equipment according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720377248.9U
Other languages
Chinese (zh)
Inventor
史宏伟
韩庆军
段学福
赵鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201720377248.9U priority Critical patent/CN206962343U/en
Application granted granted Critical
Publication of CN206962343U publication Critical patent/CN206962343U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Insulators (AREA)

Abstract

本实用新型公开了一种电力设备维修组合工具,包括用于连接绝缘子串承力挂点端联板的д形连接件和用于连接导线挂线端联板的匚形连接件,д形连接件与匚形连接件之间设置可调拉力机构,可调拉力机构由依次活动连接的拉杆、绝缘拉板和调节拉杆组成。该组合工具不仅结构简单、易操作、安全可靠、体积小、重量轻,而且在操作过程中可始终保持绝缘子串原有的水平状态,确保作业过程中的安全性、稳定性、可靠性,并可简化操作流程,提高施工效率;该组合工具特别适用于耐张双串复合绝缘子串和直线复合绝缘子串的维修、更换作业,无须采用过多的器具,也适用于其它绝缘子串的维修、更换作业。

The utility model discloses a combination tool for electric equipment maintenance, which comprises a д-shaped connecting piece used for connecting the terminal plate of the insulator string load-bearing hanging point and a gong-shaped connecting piece used for connecting the terminal plate of the hanging wire of the wire. An adjustable tension mechanism is arranged between the piece and the 匚-shaped connecting piece, and the adjustable tension mechanism is composed of a pull rod, an insulating pull plate and an adjustment pull rod that are movably connected in turn. The combination tool is not only simple in structure, easy to operate, safe and reliable, small in size and light in weight, but also can always maintain the original horizontal state of the insulator string during operation, ensuring safety, stability and reliability during operation, and can Simplify the operation process and improve the construction efficiency; this combination tool is especially suitable for the maintenance and replacement of tension-resistant double-string composite insulator strings and linear composite insulator strings, without using too many tools, and is also suitable for maintenance and replacement of other insulator strings .

Description

一种电力设备维修组合工具A combination tool for electric equipment maintenance

技术领域technical field

本实用新型属于电力设备维修技术领域,特别涉及一种电力设备维修组合工具。The utility model belongs to the technical field of electric equipment maintenance, in particular to a combination tool for electric equipment maintenance.

背景技术Background technique

为了提高输电线路的外绝缘抗污闪能力,国内大部分所辖的高压输电线路外绝缘配置已完全采用复合硅橡胶绝缘子,实现全网复合化。由于绝缘子长期处于野外使用状态,经常需要维修或更换。更换维修耐张双串绝缘子时,采取的措施大多是在主牵引工具两侧再悬挂2个3T手拉葫芦,然后一边牵引导线一边调整手拉葫芦,用以不断调整不平衡张力来保持绝缘子串的水平状态。该方法虽然行之有效,但是检修工器具结构复杂、操作繁琐,且功能单一,不能满足现有多种输电线路杆塔检修的要求,同时也不能满足在运行维护、更换、技术改造、缺陷处理等不同状态下的需求。而且依此维修绝缘子串操作时间过长安全稳定性差,同时投入人力多、效率低下,当出现异常问题和转换工作位置时,由于使用器具较多,导致施工工期延长,降低了输电线路的运行利用率,又造成资源的严重浪费。另外,在施工过程中由于牵引力方向不可避免的改变容易造成绝缘子串严重倾斜的问题,特别是耐张塔实际转角度数大的铁塔,由于两张力延长线夹角的增大,其整串绝缘子向外角倾斜的更严重。一般绝缘子串倾斜的常见原因是悬挂点和牵引点没有处在导线张力的中心线上:横担侧的挂点、承力工具、导线侧的挂点,无论是哪一种原因都会造成耐张铁塔张力不平衡,整串绝缘子倾斜。这一问题出现后不仅不能正常操作,严重时还会诱发整串绝缘子翻转、导线扭绞,造成设备损坏,施工人员高空坠落。In order to improve the anti-pollution flashover ability of the external insulation of transmission lines, the external insulation configuration of most of the high-voltage transmission lines under the jurisdiction of the country has completely adopted composite silicone rubber insulators to realize the composite of the entire network. Since insulators are used in the field for a long time, they often need to be repaired or replaced. When replacing and maintaining tension-resistant double-string insulators, most of the measures taken are to hang two 3T chain hoists on both sides of the main traction tool, and then adjust the chain hoists while pulling the wires to continuously adjust the unbalanced tension to maintain the insulator strings. level status. Although this method is effective, the maintenance tool has complex structure, cumbersome operation, and single function, which cannot meet the maintenance requirements of various existing transmission line towers, and can not meet the requirements of operation and maintenance, replacement, technical transformation, defect treatment, etc. needs in different situations. Moreover, the operation time for repairing the insulator string is too long, the safety and stability are poor, and at the same time, the investment of manpower is large and the efficiency is low. When abnormal problems occur and the working position is changed, due to the use of more appliances, the construction period is extended and the operation and utilization of the transmission line is reduced. rate, resulting in a serious waste of resources. In addition, during the construction process, due to the inevitable change of the direction of the traction force, the insulator string is likely to be seriously tilted, especially for the iron tower with a large actual rotation angle of the tension tower. The ones that slope toward the outer corners are more severe. The common reason for insulator string inclination is that the suspension point and traction point are not on the center line of the wire tension: the hanging point on the cross-arm side, the load-bearing tool, and the hanging point on the wire side, no matter what the reason is, it will cause tension The tension of the iron tower is unbalanced, and the whole string of insulators is tilted. After this problem occurs, it will not only fail to operate normally, but will also cause the whole string of insulators to turn over and the wires to twist when it is serious, resulting in equipment damage and construction workers falling from high altitude.

上述问题至今尚未得到较好的解决。The problems mentioned above have not been solved well so far.

依据规程规定在安装、维护、检测试验过程中不得攀爬复合绝缘子的规定(以避免人为损伤绝缘子)。According to the regulations, the composite insulators are not allowed to be climbed during installation, maintenance and testing (to avoid man-made damage to the insulators).

实用新型内容Utility model content

本实用新型所要解决的技术问题是提供一种输电线路更换耐张、直线复合绝缘子串组合式工具,该组合式连接工具使更换耐张双串复合绝缘子和直线复合绝缘子串无须采用过多的器具,提高施工效率、简化操作流程,确保作业过程中的安全性、稳定性、可靠性。The technical problem to be solved by the utility model is to provide a combination tool for replacing strain-resistant and linear composite insulator strings for transmission lines. , Improve construction efficiency, simplify operation process, and ensure safety, stability and reliability during operation.

实现上述目的所采取的技术方案是:一种电力设备维修组合工具,包括用于连接绝缘子串承力挂点端联板的д形连接件和用于连接导线挂线端联板的匚形连接件,д形连接件与匚形连接件之间设置可调拉力机构,可调拉力机构由依次活动连接的拉杆、绝缘拉板和调节拉杆组成。The technical solution adopted to achieve the above purpose is: a combination tool for electric equipment maintenance, including a д-shaped connector for connecting the terminal plate of the load-bearing hanging point of the insulator string and a gong-shaped connection for connecting the terminal plate of the hanging wire of the wire An adjustable tension mechanism is set between the д-shaped connector and the 匚-shaped connector, and the adjustable tension mechanism is composed of a pull rod, an insulating pull plate and an adjusting pull rod that are movably connected in sequence.

所述调节拉杆由左旋螺杆、右旋螺杆和正反螺旋连接套构成。The adjusting pull rod is composed of a left-handed screw rod, a right-handed screw rod and forward and reverse helical connecting sleeves.

所述可调拉力机构设置为2个。There are two adjustable tension mechanisms.

所述д形连接件和匚形连接件为铝合金材料制件。The д-shaped connector and the 匚-shaped connector are made of aluminum alloy.

所述绝缘拉板采用绝缘树脂制件。The insulating pull plate is made of insulating resin.

所述电力设备维修组合工具配套有用于连接塔杆横担的爬梯,该爬梯由依次连接的挂接组件、立杆和锚板构成,其中立杆上设有若干脚蹬。The combined tool for maintenance of electrical equipment is equipped with a ladder for connecting the cross-arm of the tower pole. The ladder is composed of a hook assembly, a vertical pole and an anchor plate connected in sequence, wherein the vertical pole is provided with a number of pedals.

所述立杆上设置保护绳索。A protection rope is arranged on the pole.

所述立杆连接有绝缘短节。The pole is connected with an insulating short joint.

所述挂接组件包括挂接座体、摆座和锥套,挂接座体设有挂接槽,摆座通过摆轴与挂接座体活动连接,锥套与摆座配合连接,并与所述立杆固定连接。The articulated assembly includes a articulated base body, a pendulum base and a taper sleeve, the articulated base body is provided with a articulated slot, the pendulum base is movably connected with the articulated base body through a pendulum shaft, the taper sleeve is connected with the pendulous base, and is connected with the The uprights are fixedly connected.

所述立杆上设置接地导线。A ground wire is arranged on the pole.

本实用新型液动泥浆闸阀控制装置的优点是:The advantages of the utility model hydraulic mud gate valve control device are:

1)本实用新型的电力设备维修组合工具不仅结构简单、易操作、安全可靠、体积小、重量轻,而且在操作过程中可始终保持绝缘子串原有的水平状态,确保作业过程中的安全性、稳定性、可靠性,并可简化操作流程,提高施工效率;该组合工具特别适用于耐张双串复合绝缘子串和直线复合绝缘子串的维修、更换作业,无须采用过多的器具,也适用于其它绝缘子串的维修、更换作业。1) The combined tool for electric equipment maintenance of the present utility model is not only simple in structure, easy to operate, safe and reliable, small in size and light in weight, but also can always maintain the original horizontal state of the insulator string during the operation process to ensure safety during operation. Stability, reliability, and can simplify the operation process and improve construction efficiency; this combination tool is especially suitable for the maintenance and replacement of tensile double-string composite insulator strings and linear composite insulator strings, without using too many tools, and is also suitable for Repair and replacement of other insulator strings.

2)本实用新型中可调拉力机构设置为2个,并行连接在д形连接件和匚形连接件之间。这样,当调节组合工具长短时,可一手握持其中一根可调拉力机构,一手旋动另一根可调拉力机构的旋动正反螺旋套,以便反之绝缘子串的扭动;同时减小了调节扭矩,操作更加轻松。2) In this utility model, there are two adjustable tension mechanisms, which are connected in parallel between the д-shaped connector and the 匚-shaped connector. In this way, when adjusting the length of the combined tool, one of the adjustable tension mechanisms can be held with one hand, and the rotating positive and negative helical sleeves of the other adjustable tension mechanism can be rotated with the other hand, so as to reverse the twisting of the insulator string; In addition to adjusting the torque, the operation is easier.

3)本实用新型的组合工具配套的爬梯结构简单、轻便,操作安全轻便,不仅可用于耐张双串复合绝缘子串和直线复合绝缘子串的维修、更换作业,也可用于其它塔杆作业的攀登。3) The climbing ladder matched with the combination tool of the utility model is simple in structure, light in weight, safe and light in operation, not only can be used for maintenance and replacement of strain-resistant double-string composite insulator strings and linear composite insulator strings, but also can be used for climbing other tower operations .

附图说明Description of drawings

下面结合附图对本实用新型做进一步的说明:Below in conjunction with accompanying drawing, the utility model is further described:

图1是本实用新型实施例一的结构示意图;Fig. 1 is the structural representation of the utility model embodiment one;

图2是实施例二的结构示意图;Fig. 2 is the structural representation of embodiment two;

图3是实施例三的结构示意图;Fig. 3 is the structural representation of embodiment three;

图4是实施例二中挂接组件的结构示意图;Fig. 4 is the schematic structural view of the articulated assembly in the second embodiment;

图5是实施例四的结构示意图。Fig. 5 is a schematic structural diagram of the fourth embodiment.

具体实施方式Detailed ways

实施例一Embodiment one

如图1所示,本实用新型的电力设备维修组合工具,包括位于两端的д形连接件1和匚形连接件7,д形连接件1可通过螺栓与绝缘子串承力挂点端的三角形联板8连接;匚形连接件7可与绝缘子串导线挂线端的环形联板9环套连接。在д形连接件1与匚形连接件7之间设置可调拉力机构,该可调拉力机构由依次通过螺栓活动连接的拉杆2、绝缘拉板3和调节拉杆组成,其中拉杆可根据绝缘子串的长短需要更换不同的长度规格,绝缘拉板可采用绝缘树脂制件,用于可调拉力机构两端之间的绝缘,以保证维修操作过程的安全。所述调节拉杆可采用由左旋螺杆4、右旋螺杆6和正反螺旋连接套5构成的伸缩调节结构。д形连接件1和匚形连接件7可采用铝合金材料制做,工具更加轻便。As shown in Figure 1, the combined tool for maintenance of electric equipment of the present invention includes a д-shaped connector 1 and a 匚-shaped connector 7 at both ends. The plate 8 is connected; the 匚-shaped connector 7 can be connected with the ring-shaped connecting plate 9 ring sleeves at the end of the insulator string wire hanging line. An adjustable tension mechanism is set between the д-shaped connector 1 and the 匚-shaped connector 7. The adjustable tension mechanism is composed of a pull rod 2, an insulating pull plate 3 and an adjusting pull rod that are movably connected by bolts in turn. The pull rod can be adjusted according to the insulator string. The length needs to be replaced with different length specifications. The insulating pull plate can be made of insulating resin, which is used for the insulation between the two ends of the adjustable tension mechanism to ensure the safety of the maintenance operation process. The adjustment pull rod can adopt a telescopic adjustment structure composed of a left-handed screw 4 , a right-handed screw 6 and forward and reverse helical connecting sleeves 5 . The д-shaped connector 1 and the 匚-shaped connector 7 can be made of aluminum alloy material, and the tool is more portable.

本实用新型的电力设备维修组合工具在使用时,可先根据待维修、更换绝缘子串的长短需要更换不同长度规格的拉杆2,并预先通过调整调节拉杆将组合工具调整至适当的长度,然后攀登至适当的位置,将绝缘子串承力挂点端的三角形联板8插入д形连接件1的槽内,用螺栓将二者紧固连接;再将匚形连接件7卸下环套在绝缘子串导线挂线端的环形联板9上,用螺栓与调节拉杆的尾端紧固连接。然后通过旋转正反螺旋连接套5调节组合工具的长度,使绝缘子串处于松动自由状态,即可进行绝缘子串的维修或更换。该组合工具不仅结构简单、易操作、安全可靠、体积小、重量轻,而且在操作过程中可始终保持绝缘子串原有的水平状态,确保作业过程中的安全性、稳定性、可靠性,并可简化操作流程,提高施工效率;该组合工具特别适用于耐张双串复合绝缘子串和直线复合绝缘子串的维修、更换作业,无须采用过多的器具,也同样适用于其它绝缘子串的维修、更换作业。When the combination tool for electric equipment maintenance of the utility model is in use, pull rods 2 of different length specifications can be replaced according to the length of the insulator string to be repaired and replaced, and the combination tool can be adjusted to an appropriate length by adjusting the pull rod in advance, and then climbing To the appropriate position, insert the triangular connecting plate 8 at the bearing point of the insulator string into the groove of the д-shaped connector 1, and fasten the two with bolts; then remove the ring-shaped connector 7 and put it on the insulator string On the ring joint plate 9 of wire hanging end, be fastened and connected with the tail end of adjusting pull bar with bolt. Then adjust the length of the combination tool by rotating the positive and negative spiral connection sleeve 5, so that the insulator string is in a loose and free state, and the insulator string can be repaired or replaced. The combination tool is not only simple in structure, easy to operate, safe and reliable, small in size and light in weight, but also can always maintain the original horizontal state of the insulator string during operation, ensuring safety, stability and reliability during operation, and can Simplify the operation process and improve the construction efficiency; this combined tool is especially suitable for the maintenance and replacement of tension-resistant double-string composite insulator strings and linear composite insulator strings, without using too many tools, and is also suitable for the maintenance and replacement of other insulator strings Operation.

实施例二Embodiment two

参看图2,作为进一步的改进,所述可调拉力机构设置为2个,并行连接在д形连接件1和匚形连接件7之间。这样,当调节组合工具长短时,可一手握持其中一根可调拉力机构,一手旋动另一根可调拉力机构的旋动正反螺旋连接套5,以便反之绝缘子串的扭动;同时减小了调节扭矩,操作更加轻松。Referring to FIG. 2 , as a further improvement, two adjustable tension mechanisms are provided, which are connected in parallel between the д-shaped connecting piece 1 and the gong-shaped connecting piece 7 . In this way, when adjusting the length of the combined tool, one of the adjustable tension mechanisms can be held with one hand, and the rotating positive and negative spiral connection sleeve 5 of the other adjustable tension mechanism can be rotated with the other hand, so as to reverse the twisting of the insulator string; at the same time Adjustment torque is reduced for easier operation.

实施例三Embodiment three

参看图3、图4,本实用新型的电力设备维修组合工具可配套有用于连接塔杆横担的爬梯,该爬梯可由依次连接的挂接组件、立杆15和锚板20构成,其中立杆15上设有若干脚蹬17。立杆15可采用如铝合金或其它质轻高强材质的杆材或管材制作,以减轻爬梯的重量,便于使用操作和携带。所述挂接组件包括挂接座体10、摆座12和锥套13,挂接座体10可采用铝合金铸件加工而成,其前部设有挂接槽10-1,后部一体设有带凹槽10-3的托架10-2,挂接槽10-1部位还可设置紧固螺钉11。摆座12通过摆轴12-1置放在托架10-2的凹槽10-3内,锥套13与摆座12轴心部位的锥孔配合连接,锥套13与立杆15穿装固定连接。立杆即可通过摆轴12-1摆动,也可在摆座12内自由转动。为了安全起见,立杆15两端部位可连接绝缘短节14、18;立杆15上还可设置保护绳索16,保护绳索16上下两端可与立杆15固定连接,可采用链索,也可采用带有结节的尼龙绳,方便攀登人员的安全绳挂接即可。立杆15的下部可设置扶正手柄19,操作时通过扶正手柄19可防止攀爬时立杆15的转动,更加安全。Referring to Fig. 3 and Fig. 4, the electric equipment maintenance combination tool of the present utility model can be equipped with a climbing ladder for connecting the cross-arm of the tower rod, and the climbing ladder can be composed of a articulated assembly, a vertical rod 15 and an anchor plate 20 connected in sequence, wherein the vertical rod 15 is provided with some pedals 17. The vertical rod 15 can be made of aluminum alloy or other light and high-strength rods or pipes to reduce the weight of the ladder and facilitate operation and portability. The articulated assembly includes a articulated base 10, a swing base 12 and a taper sleeve 13. The articulated base 10 can be processed from an aluminum alloy casting. The front part is provided with a articulated groove 10-1, and the rear part is integrally provided with There is a bracket 10-2 with a groove 10-3, and a fastening screw 11 can also be arranged at the articulated groove 10-1. The pendulum seat 12 is placed in the groove 10-3 of the bracket 10-2 through the pendulum shaft 12-1, the taper sleeve 13 is connected with the tapered hole at the center of the pendulum seat 12, and the taper sleeve 13 is fitted with the vertical rod 15 Fixed connection. The upright rod can swing by the pendulum shaft 12-1, and also can rotate freely in the pendulum seat 12. For the sake of safety, the insulation nipples 14, 18 can be connected to the two ends of the pole 15; the protection rope 16 can also be set on the pole 15, and the upper and lower ends of the protection rope 16 can be fixedly connected with the pole 15, and a chain rope can be used, or Nylon ropes with nodules can be used to facilitate the hooking of the safety ropes of climbers. The bottom of upright bar 15 can be provided with righting handle 19, can prevent the rotation of upright bar 15 when climbing by uprighting handle 19 during operation, safer.

该爬梯使用时,可将挂接座体10的挂接槽10-1卡接在输电线路塔杆维修作业点近处的横担上,并通过紧固螺钉11将挂接座体牢固的固定在横担上,立杆15下端通过绳索将锚板20固定,操作者即可沿立杆15攀爬至顶部,攀爬的过程中,可将安全绳的挂钩逐次卡接在保护绳索16的链环内或结节上,以防止失足坠落,到达顶部后即可进行绝缘子串的维修作业。该爬梯结构简单、轻便,因此操作安全轻便,不仅可用于耐张双串复合绝缘子串和直线复合绝缘子串的维修、更换作业,也可用于其它塔杆作业的攀登。When the ladder is in use, the hooking slot 10-1 of the hooking base 10 can be clamped on the cross arm near the maintenance operation point of the tower rod of the transmission line, and the hooking base can be firmly fixed by the fastening screw 11. On the cross arm, the lower end of the vertical pole 15 fixes the anchor plate 20 with a rope, and the operator can climb to the top along the vertical pole 15. During the climbing process, the hook of the safety rope can be connected to the safety rope 16 successively. In the chain link or on the nodules to prevent falling, after reaching the top, the maintenance work of the insulator string can be carried out. The ladder has a simple structure and is light, so it is safe and easy to operate. It can not only be used for maintenance and replacement of tension-resistant double-string composite insulator strings and linear composite insulator strings, but also can be used for climbing other tower operations.

实施例四Embodiment Four

参看图5,为了确保操作安全,可在所述立杆15上设置接地导线21。具体设置方式可将立杆15及绝缘短节14、18制成中空的管状结构,将接地导线21穿装在立杆15及绝缘短节14、18的中心通孔内,利于保护接地导线21不受损坏,并减轻爬梯的重量。接地导线21宜采用铜绞线内芯,并在内芯外部设置绝缘防护层。接地导线21上端可连接挂钩式弹性接线夹22,在接线夹22一侧可一体设置挂接操作环。本方案的爬梯使用时,可采用绝缘操作杆将接线夹22挂接在输电导线上,接地导线21的下端可通过常规的接地构件安全接地。由此,可以避免感应电场对操作人员的不利影响,可靠地保证攀爬操作过程的安全。Referring to FIG. 5 , in order to ensure safe operation, a ground wire 21 may be provided on the pole 15 . The specific setting method can make the vertical pole 15 and the insulating short joints 14, 18 into a hollow tubular structure, and the grounding wire 21 is worn in the central through hole of the vertical pole 15 and the insulating short joints 14, 18, which is beneficial to the protection of the grounding wire 21. Free from damage and reduce the weight of the ladder. The grounding wire 21 should adopt the inner core of copper stranded wire, and an insulating protective layer is arranged outside the inner core. The upper end of the ground wire 21 can be connected with a hook-type elastic clamp 22, and a hook operation ring can be integrally arranged on one side of the clamp 22. When the climbing ladder of this scheme is used, the connecting clamp 22 can be hooked on the power transmission wire by using an insulating operating rod, and the lower end of the grounding wire 21 can be safely grounded through a conventional grounding member. Thereby, the adverse effect of the induced electric field on the operator can be avoided, and the safety of the climbing operation process can be reliably ensured.

最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,本领域普通技术人员对本实用新型的技术方案所做的其他修改或者等同替换,只要不脱离本实用新型技术方案的精神和范围,均应涵盖在本实用新型的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model without limitation, other modifications or equivalent replacements made by those of ordinary skill in the art to the technical solution of the utility model, as long as they do not depart from the technical solution of the utility model The spirit and scope should be included in the claims of the present utility model.

Claims (11)

1.一种电力设备维修组合工具,其特征在于:包括用于连接绝缘子串承力挂点端联板的д形连接件和用于连接导线挂线端联板的匚形连接件,д形连接件与匚形连接件之间设置可调拉力机构,可调拉力机构由依次活动连接的拉杆、绝缘拉板和调节拉杆组成。1. A combination tool for electric equipment maintenance, characterized in that: it includes a д-shaped connector for connecting the terminal plate of the load-bearing hanging point of the insulator string and a gong-shaped connector for connecting the wire-hanging terminal plate, the д-shaped connector An adjustable tension mechanism is arranged between the connecting piece and the 匚-shaped connecting piece, and the adjustable tension mechanism is composed of a pull rod, an insulating pull plate and an adjusting pull rod which are movably connected in sequence. 2.如权利要求1所述的电力设备维修组合工具,其特征在于:所述调节拉杆由左旋螺杆、右旋螺杆和正反螺旋连接套构成。2. The combination tool for maintenance of electrical equipment according to claim 1, wherein the adjusting rod is composed of a left-handed screw rod, a right-handed screw rod, and a positive and negative screw connecting sleeve. 3.如权利要求1所述的电力设备维修组合工具,其特征在于:所述可调拉力机构设置为2个。3. The combination tool for electric equipment maintenance according to claim 1, characterized in that there are two adjustable tension mechanisms. 4.如权利要求1所述的电力设备维修组合工具,其特征在于:所述д形连接件和匚形连接件为铝合金材料制件。4. The combination tool for maintenance of electric equipment according to claim 1, characterized in that: the д-shaped connector and the gong-shaped connector are made of aluminum alloy. 5.如权利要求1所述的电力设备维修组合工具,其特征在于:所述绝缘拉板采用绝缘树脂制件。5. The combination tool for maintenance of electric equipment according to claim 1, characterized in that: said insulating pull plate is made of insulating resin. 6.如权利要求1所述的电力设备维修组合工具,其特征在于:所述电力设备维修组合工具配套有用于连接塔杆横担的爬梯,该爬梯由依次连接的挂接组件、立杆和锚板构成,其中立杆上设有若干脚蹬。6. The combined tool for maintenance of electric equipment according to claim 1, characterized in that: the combined tool for maintenance of electric equipment is equipped with a ladder for connecting the cross arm of the tower pole, and the ladder is composed of a connecting assembly, a vertical pole and An anchor plate is formed, wherein the pole is provided with several pedals. 7.如权利要求6所述的电力设备维修组合工具,其特征在于:所述立杆上设置保护绳索。7. The combination tool for maintenance of electrical equipment according to claim 6, wherein a protection rope is arranged on the pole. 8.如权利要求6或7所述的电力设备维修组合工具,其特征在于:所述立杆连接有绝缘短节。8. The combination tool for maintenance of electrical equipment according to claim 6 or 7, characterized in that: the pole is connected with an insulating short joint. 9.如权利要求6所述的电力设备维修组合工具,其特征在于:所述挂接组件包括挂接座体、摆座和锥套,挂接座体设有挂接槽,摆座通过摆轴与挂接座体活动连接,锥套与摆座配合连接,并与所述立杆固定连接。9. The combination tool for maintenance of electric equipment according to claim 6, wherein the hitch assembly includes a hitch body, a swing seat and a taper sleeve, the hitch body is provided with a hook slot, and the swing seat passes through the swing seat. The shaft is movably connected with the articulated seat body, the taper sleeve is matched with the swing seat, and is fixedly connected with the vertical rod. 10.如权利要求7或9所述的电力设备维修组合工具,其特征在于:所述立杆上设置接地导线。10. The combination tool for electric equipment maintenance according to claim 7 or 9, characterized in that: a ground wire is arranged on the pole. 11.如权利要求8所述的电力设备维修组合工具,其特征在于:所述立杆上设置接地导线。11. The combination tool for maintenance of electrical equipment according to claim 8, wherein a ground wire is arranged on the pole.
CN201720377248.9U 2017-04-12 2017-04-12 A combination tool for electric equipment maintenance Expired - Fee Related CN206962343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720377248.9U CN206962343U (en) 2017-04-12 2017-04-12 A combination tool for electric equipment maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720377248.9U CN206962343U (en) 2017-04-12 2017-04-12 A combination tool for electric equipment maintenance

Publications (1)

Publication Number Publication Date
CN206962343U true CN206962343U (en) 2018-02-02

Family

ID=61373536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720377248.9U Expired - Fee Related CN206962343U (en) 2017-04-12 2017-04-12 A combination tool for electric equipment maintenance

Country Status (1)

Country Link
CN (1) CN206962343U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108808553A (en) * 2018-06-25 2018-11-13 国网浙江省电力有限公司检修分公司 A kind of hand steered device of UHVDC Transmission Lines hardware string
CN112864939A (en) * 2021-01-07 2021-05-28 国网安徽省电力有限公司淮北供电公司 Tool for replacing damper of power transmission line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108808553A (en) * 2018-06-25 2018-11-13 国网浙江省电力有限公司检修分公司 A kind of hand steered device of UHVDC Transmission Lines hardware string
CN108808553B (en) * 2018-06-25 2024-03-08 国网浙江省电力有限公司检修分公司 A kind of UHV DC line hardware string handheld device
CN112864939A (en) * 2021-01-07 2021-05-28 国网安徽省电力有限公司淮北供电公司 Tool for replacing damper of power transmission line

Similar Documents

Publication Publication Date Title
CN201705192U (en) Dedicated extension ladder for replacing insulator
CN102570372B (en) Electrified lead deicer
CN104953507A (en) Device and method for lifting wire during distribution line construction
CN102882157B (en) Portable shockproof hammer tool for replacing tension wire in power cut
CN206309110U (en) Electric Pole Corrector
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN104538887B (en) A kind of lightning conducter lifts converter
CN206962343U (en) A combination tool for electric equipment maintenance
CN101026291A (en) Foldable synthetic insulator special ladder
CN209200516U (en) Unmanned plane hang take flexible ladder arrangement
CN201038652Y (en) Single-leg insulated combination hanging ladder
CN203352053U (en) Chain-type ladder used for maintenance of straight line tower of power transmission line
CN207353753U (en) Phase transfer current potential power tool in dry font anchor support
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN107605394A (en) A kind of livewire work single pendulum adjustable type rope ladder head device and its application method
CN103779809B (en) The two oidiospore wire pitch operational method of charged adjustment
CN205565515U (en) Overhead OPGW composite optical cable ground wire riser
CN110707599B (en) A special tool for live adjustment of 220kv vertically arranged double-split conductor sag
CN205314654U (en) Reinforcement iron tower of power transmission sequence
CN203398638U (en) Operation ladder for painting insulator string in power transmission line
CN218862516U (en) Lifting ladder for insulators under 500kV transmission line
CN206442059U (en) A kind of insulated gin
CN209388514U (en) A kind of live wire repairing real training tool
CN108545645A (en) A kind of lifting auxiliary threader
CN212376393U (en) Transmission line iron tower protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202