CN206442059U - A kind of insulated gin - Google Patents
A kind of insulated gin Download PDFInfo
- Publication number
- CN206442059U CN206442059U CN201720080350.2U CN201720080350U CN206442059U CN 206442059 U CN206442059 U CN 206442059U CN 201720080350 U CN201720080350 U CN 201720080350U CN 206442059 U CN206442059 U CN 206442059U
- Authority
- CN
- China
- Prior art keywords
- insulating
- support frame
- sides
- alloy support
- insulated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
- Insulators (AREA)
Abstract
一种绝缘吊架,包括横向的长条形绝缘拉板(5)、两两对称设置且顶端套装于绝缘拉板两边的四根底端带有铝合金支撑架(1)的绝缘杆(2),分别安装于绝缘拉板两边并位于铝合金支撑架外的止挡防坠绝缘螺钉(4)、套在绝缘拉板上并位于两边铝合金支撑架之间的自塞式绝缘滑车(6);所述铝合金支撑架(1)为由上下两半对扣的圆弧架及两边的可调式连接螺杆(7)连接组成的环状结构。
An insulating hanger, comprising horizontally elongated insulating pull plates (5), four insulating rods (2) with aluminum alloy support frames (1) at the bottom, arranged symmetrically in pairs and topped on both sides of the insulating pull plates , the stopper and anti-drop insulating screws (4) installed on both sides of the insulating pull plate and outside the aluminum alloy support frame, and the self-plugging insulating tackle (6) set on the insulating pull plate and located between the aluminum alloy support frames on both sides ; The aluminum alloy support frame (1) is a circular structure composed of upper and lower halves of the circular arc frame and adjustable connecting screw rods (7) on both sides.
Description
技术领域technical field
本实用新型属于输电网带电检修更换±500kV、±800kV耐张单片绝缘子时使用的绝缘吊架技术领域。The utility model belongs to the technical field of an insulating hanger used for live inspection and replacement of ±500kV and ±800kV tension single-chip insulators.
背景技术Background technique
在高电压等级输电线路上带电更换耐张单片绝缘子作业中,目前采用绝缘绳套与绝缘滑车连接方式,通过绝缘绳上下传递作业工器具及材料。在传递卡具过程中由于绳套本身具有弹性,在受力时发生弹性伸长使吊点向下移动,并且由于电压等级的升高,作业工器具重量急剧增加,作业人员提起、安装卡具、绝缘子的难度增大,使整个工作用时增加,作业效率降低,一定程度上影响了供电可靠性和作业的安全性。如果绝缘绳套在绝缘子串上缠绕过松,吊点下移距离更大,作业人员采取下趴姿势伸手抓取卡具或绝缘子过程中由于工器具重量大,单手提升过程中身体可能失去平衡,甚至出现高空坠落,造成与引流线组合间隙不足,引发触电事故。In the operation of live replacement of tension-resistant single-piece insulators on high-voltage transmission lines, the connection method of insulating rope sleeves and insulating pulleys is currently used to transfer working tools and materials up and down through insulating ropes. In the process of transferring the fixture, due to the elasticity of the rope sleeve itself, the elastic elongation occurs when the force is applied to move the lifting point downward, and due to the increase in the voltage level, the weight of the operating tool increases sharply, and the operator lifts and installs the fixture. 1. The difficulty of the insulator increases, which increases the time spent on the whole work and reduces the work efficiency, which affects the reliability of power supply and the safety of work to a certain extent. If the insulating rope is too loosely wound on the insulator string, the lifting point will move down a greater distance, and the operator may lose balance during lifting with one hand due to the heavy weight of the tools and insulators in the process of taking a prone position and reaching out to grab the fixture or insulator , or even fall from a high altitude, resulting in insufficient clearance with the drainage wire combination, causing electric shock accidents.
发明内容Contents of the invention
本实用新型的目的是为了解决上述现有技术的问题,提供一种能提高吊点,且不使用绳套,依靠地面人员配合就可提起卡具和绝缘子,降低塔上人员劳动强度和作业风险的的绝缘吊架。The purpose of this utility model is to solve the above-mentioned problems of the prior art, to provide a lifting point that can improve the lifting point, and without the use of a rope sleeve, the clamp and insulator can be lifted by the cooperation of the ground personnel, and the labor intensity and operation risk of the personnel on the tower can be reduced. insulated hangers.
本实用新型的目的通过如下技术方案实现。The purpose of this utility model is achieved through the following technical solutions.
一种绝缘吊架,包括横向的长条形绝缘拉板、两两对称设置且顶端套装于绝缘拉板两边的四根底端带有铝合金支撑架的绝缘杆,分别安装于绝缘拉板两边并位于铝合金支撑架外的止挡防坠绝缘螺钉、套在绝缘拉板上并位于两边铝合金支撑架之间的自塞式绝缘滑车;所述铝合金支撑架为由上下两半对扣的圆弧架及两边的可调式连接螺杆连接组成的环状结构。An insulating hanger, comprising a long horizontal insulating pull plate, symmetrically arranged in pairs and four insulating rods with aluminum alloy support frames at the bottom, which are installed on both sides of the insulating pull plate and The stopper and anti-drop insulating screws located outside the aluminum alloy support frame, the self-plugging insulating pulleys that are set on the insulating pull plate and located between the aluminum alloy support frames on both sides; The circular structure formed by the circular arc frame and the adjustable connecting screw on both sides.
本实用新型在绝缘杆上端安装有带套环的绝缘旋转支撑头,通过绝缘旋转支撑头的套环将绝缘杆套装在绝缘拉板上。所述铝合金支撑架的上半圆弧板通过顶部的套管段插装或旋装于绝缘杆上。In the utility model, an insulating rotating support head with a collar is installed on the upper end of the insulating rod, and the insulating rod is set on the insulating pull plate through the collar of the insulating rotating supporting head. The upper semi-arc plate of the aluminum alloy support frame is inserted or screwed onto the insulating rod through the sleeve section at the top.
本实用新型组装完成后,整体起吊给作业人员,作业人员将四个铝合金支撑架的可调式连接螺杆松开,把上下两半对扣的圆弧架扣在耐张双串绝缘子左右对称的四片耐张绝缘子的圆弧型钢帽上,拧紧可调式连接螺杆,将该实用新型固定在耐张双串绝缘子串上,起吊作业工器具的起吊位置便从原来绝缘子下方提高到绝缘吊架的滑车上。作业时,作业人员只需如上所述安装好绝缘吊架,将起吊作业工器具(卡具)的起吊绳穿在绝缘吊架的滑车上,地面人员通过穿在绝缘吊架上的起吊绳将作业工器具(卡具)传递给作业人员,由于起吊位置的提高,作业人员无需像传统作业方式那样俯下身子将作业工器具(卡具)提到安装位置,只需指挥地面人员将作业工器具提升到所需安装高度,直接安装便可。本实用新型结构简单轻巧,安装简便。采用本实用新型更换耐张单片绝缘子时,可轻松安装作业工器具(卡具),降低作业人员劳动强度,降低作业风险。After the utility model is assembled, it is hoisted to the operator as a whole, and the operator loosens the adjustable connecting screws of the four aluminum alloy support frames, and buckles the upper and lower halves of the circular arc frame on the left and right symmetrical sides of the tension-resistant double-string insulator. On the arc-shaped steel caps of the four tension insulators, tighten the adjustable connecting screw, and fix the utility model on the tension double-string insulator strings, and the hoisting position of the lifting equipment will be raised from the bottom of the original insulators to the height of the insulation hanger. on the tackle. During operation, the operator only needs to install the insulating hanger as described above, and put the hoisting rope of the lifting operation tool (fixture) on the pulley of the insulating hanger, and the ground personnel will pass the hoisting rope on the insulating hanger. The operating tool (fixture) is passed to the operator. Due to the improvement of the lifting position, the operator does not need to bend down to lift the operating tool (fixture) to the installation position like the traditional operation method, and only needs to direct the ground personnel to lift the operating tool. The appliance is raised to the required installation height and can be installed directly. The utility model is simple and light in structure and easy to install. When the utility model is used to replace the tension-resistant single-chip insulator, the operating tools (clamps) can be easily installed, reducing the labor intensity of operating personnel and reducing operating risks.
本实用新型可以采用现有绝缘拉板和绝缘杆加工,安装过程简单,只需将可调式连接螺杆的螺丝松开,打开上下两半支撑架,套装在绝缘子上,拧紧螺丝即可。The utility model can be processed by using existing insulating pull plates and insulating rods, and the installation process is simple. It only needs to loosen the screws of the adjustable connecting screw rod, open the upper and lower halves of the support frames, fit them on the insulators, and tighten the screws.
附图说明Description of drawings
图1为本实用新型起吊作业的示意图;Fig. 1 is the schematic diagram of the lifting operation of the utility model;
图2为本实用新型安装在耐张双串绝缘子串上起吊作业工器具(卡具)的正视图;Fig. 2 is the front view of the utility model installed on the tension-resistant double-string insulator strings for hoisting work tools (fixtures);
图3为本实用新型安装在耐张双串绝缘子串上起吊作业工器具(卡具)的俯视图。Fig. 3 is a top view of the utility model installed on the tension-resistant double string insulator strings for hoisting work tools (fixtures).
具体实施方式detailed description
下面结合附图和具体实施例对本实用新型作进一步详细的说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail.
如图1所示,绝缘吊架包括横向的长条形绝缘拉板5、两两对称设置且顶端套装于绝缘拉板两边的四根底端带有铝合金支撑架1的绝缘杆2,分别安装于绝缘拉板两边并位于铝合金支撑架外的止挡防坠绝缘螺钉4、套在绝缘拉板上并位于两边铝合金支撑架之间的自塞式绝缘滑车6;所述铝合金支撑架1为由上下两半对扣的圆弧架及两边的可调式连接螺杆7连接组成的环状结构。在绝缘杆2上端安装有带套环的绝缘旋转支撑头3,通过绝缘旋转支撑头的套环将绝缘杆套装在绝缘拉板5上。所述铝合金支撑架1的上半圆弧板通过顶部的套管段插装或旋装于绝缘杆2上。绝缘吊架的部件多采用环氧树脂材料制做,重量轻,强度大,不会增加作业人员额外负担。As shown in Figure 1, the insulating hanger includes a horizontal strip-shaped insulating pull plate 5, and four insulating rods 2 with aluminum alloy support brackets 1 at the bottom, which are arranged symmetrically in pairs and whose top ends are set on both sides of the insulating pull plate. The stopper and anti-drop insulating screws 4 on both sides of the insulating pull plate and outside the aluminum alloy support frame, the self-plugging insulating pulley 6 that is sleeved on the insulation pull plate and positioned between the aluminum alloy support frames on both sides; the aluminum alloy support frame 1 is a circular structure formed by connecting the upper and lower two halves of the circular arc frame and the adjustable connecting screw rod 7 on both sides. An insulating rotating support head 3 with a collar is installed on the upper end of the insulating rod 2, and the insulating rod is set on the insulating pull plate 5 through the collar of the insulating rotating supporting head. The upper semi-arc plate of the aluminum alloy support frame 1 is inserted or screwed onto the insulating rod 2 through the sleeve section at the top. The parts of the insulating hanger are mostly made of epoxy resin material, which is light in weight and high in strength, and will not increase the extra burden on the operators.
本实用新型在输电网带电更换耐张单片绝缘子作业工器具(卡具)提升安装工作中,如图1、图2、图3所示,操作步骤如下:The utility model is used in the lifting and installation work of the tension-resistant single-chip insulator operating tool (clamp) for live replacement in the transmission network, as shown in Figure 1, Figure 2, and Figure 3. The operation steps are as follows:
1)作业人员将绝缘吊架提起立在耐张双串绝缘子串10上,松开可调式连接螺杆7,将铝合金支撑架1上下两半卡在绝缘子钢帽上,并上紧螺丝;1) The operator lifts the insulating hanger and stands it on the tension-resistant double-string insulator string 10, loosens the adjustable connecting screw 7, clamps the upper and lower halves of the aluminum alloy support frame 1 on the steel cap of the insulator, and tightens the screws;
2)作业人员将起吊绳9穿于自塞式绝缘滑车6的滑轮8上;2) The operator puts the lifting rope 9 on the pulley 8 of the self-plugging insulating tackle 6;
3)地面人员拉动吊绳,起吊整个作业工器具(卡具)。3) The ground personnel pull the sling to lift the entire operating tool (fixture).
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720080350.2U CN206442059U (en) | 2017-01-19 | 2017-01-19 | A kind of insulated gin |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720080350.2U CN206442059U (en) | 2017-01-19 | 2017-01-19 | A kind of insulated gin |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206442059U true CN206442059U (en) | 2017-08-25 |
Family
ID=59635458
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720080350.2U Expired - Fee Related CN206442059U (en) | 2017-01-19 | 2017-01-19 | A kind of insulated gin |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206442059U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108988248A (en) * | 2018-09-10 | 2018-12-11 | 贵州西南制造产业园有限公司 | A kind of cable based on Multiple Protective Structure |
| CN110011221A (en) * | 2019-04-25 | 2019-07-12 | 国网河南省电力公司检修公司 | One kind ± 1100kV extra high voltage direct current transmission line strain insulator more changing device |
-
2017
- 2017-01-19 CN CN201720080350.2U patent/CN206442059U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108988248A (en) * | 2018-09-10 | 2018-12-11 | 贵州西南制造产业园有限公司 | A kind of cable based on Multiple Protective Structure |
| CN110011221A (en) * | 2019-04-25 | 2019-07-12 | 国网河南省电力公司检修公司 | One kind ± 1100kV extra high voltage direct current transmission line strain insulator more changing device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
| CN201323409Y (en) | Tool for live line replacing of high voltage transmission line V-shaped insulator chain | |
| CN204230769U (en) | Climb type steel cable ladder | |
| CN203760908U (en) | Cement pole crossarm installation tool | |
| CN206442059U (en) | A kind of insulated gin | |
| CN203536860U (en) | A Hanger for Replacing Tension Insulators | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN204927971U (en) | A embrace pole for electrified insulator chain that changes of transmission line | |
| CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
| CN204012451U (en) | A kind of double bundle conductor conductor spacer is changed setting tool | |
| CN106786314A (en) | A kind of cement pole ground wire resetting means | |
| CN208337014U (en) | A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device | |
| CN113809683A (en) | Method and system for replacing insulator string | |
| CN104410009A (en) | Climbing type steel wire rope ladder | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN106384964A (en) | V-type insulator-chain electrified replacing operation method | |
| CN104836156A (en) | Synthetic insulator simple ladder | |
| CN201118144Y (en) | 500 kV tension insulator drop-in replacement | |
| CN204068045U (en) | Transmission line wire conductor spacer maintenance aid | |
| CN217555571U (en) | Multifunctional hoisting device for hoisting materials on electric pole | |
| CN203813330U (en) | Tool for live-line replacement of 500 kV strain insulator strings | |
| CN202190023U (en) | Overhead conductor puller | |
| CN207166026U (en) | A kind of ground wire for being used in UHV transmission line is special to carry the Line tool | |
| CN208015234U (en) | A kind of novel line apparatus | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170825 |