CN107425475A - A kind of overhead earth wire lifter and its lifting installation method - Google Patents

A kind of overhead earth wire lifter and its lifting installation method Download PDF

Info

Publication number
CN107425475A
CN107425475A CN201710822157.6A CN201710822157A CN107425475A CN 107425475 A CN107425475 A CN 107425475A CN 201710822157 A CN201710822157 A CN 201710822157A CN 107425475 A CN107425475 A CN 107425475A
Authority
CN
China
Prior art keywords
earth wire
lifter
overhead
elevator belt
aerial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710822157.6A
Other languages
Chinese (zh)
Other versions
CN107425475B (en
Inventor
符绍朋
佟明
刘向东
张德伟
韩啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710822157.6A priority Critical patent/CN107425475B/en
Publication of CN107425475A publication Critical patent/CN107425475A/en
Application granted granted Critical
Publication of CN107425475B publication Critical patent/CN107425475B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
    • B66C23/166Simple cranes with jibs which may be fixed or can slew or luff
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/78Supports, e.g. outriggers, for mobile cranes

Abstract

The present invention relates to overhead transmission line maintenance technique field, particularly to a kind of overhead earth wire lifter and its lifting installation method.The overhead earth wire lifter is made up of electric capstan and foot stool, a kind of overhead earth wire lifter and its lifting installation method are provided, too low for the capstan winch Heave Here of lifting aerial earth wire, lifting is difficult, and overhead earth wire lifter deadweight is larger, the problem of lifting is in place inconvenient, improves winch configurations, optimizes method for improving, solves the difficult problem of current aerial earth wire lifting maintenance, improve the convenience operated on tower, reduce labor intensity, improve the overhaul efficiency of aerial earth wire.

Description

A kind of overhead earth wire lifter and its lifting installation method
Technical field
The present invention relates to overhead transmission line maintenance technique field, particularly to a kind of overhead earth wire lifter and It lifts installation method.
Background technology
Aerial earth wire is the device for protecting overhead transmission line to exempt from lightning attack.In order to improve the safety of circuit operation Property, aerial earth wire is typically all to be erected above protected wire.When there is thundercloud to ground discharge in side on the line, lightning Passage easily hits aerial earth wire first, lightning current is entered the earth, to protect the normal power transmission of wire.Meanwhile aerial earth wire is also There is electromagnetic shielding action, when thundercloud is to ground discharge near circuit, it is excessively electric that the caused lightning induction on wire can be reduced Pressure.Therefore aerial earth wire must firmly be connected with tower grounding device, to ensure reliably lead lightning current after being struck by lightning Enter the earth.Important transmission line of electricity typically uses two aerial earth wires that protected wire is all placed in its protection domain It is interior.
Function of the aerial earth wire due to not bearing conveying electric current, so being formed more using steel strand wires.Also some transmission lines of electricity Using good conductor ground wire, i.e., the aerial earth wire made of aluminium alloy or aluminium Baogang wire.This ground wire electric conductivity is preferable, can be with Improve multi-line power transmission performance, mitigate the interference to adjacent communication line.
Power transmission line overhead ground wire defect happens occasionally, when stranded needs replacing occurs in aerial earth wire or is inspecting periodically ground During line wire clamp, workmen needs to lift by crane aerial earth wire, unclamps ground wire wire clamp, is changed or Inspection.Due to shaft tower knot Structure limits, and lifting by crane the capstan winch of aerial earth wire does not have suitable hanging point, and generally existing Heave Here is too low, lifts by crane the problem of difficult.
China Patent No. is that " 2014103248189 " disclose a kind of " overhead earth wire lifter ", the tray in scheme Upper setting bobbin, bobbin spanner is connected on bobbin, rope is wrapped on bobbin, the exit connection thread-lifting hook of rope, tray Upper one end for being flexibly connected shrinking connecting-rod, the other end connection deck of shrinking connecting-rod, deck are provided with governor motion.Tray is Regular polygon.Bobbin is square shaft.It is flexibly connected between tray and shrinking connecting-rod by bolt and nut.Deck is right-angled U.Adjust Saving mechanism is:Pad I and pad II is symmetricly set on the inner surface of deck, pad I connection set screws.The program aims to solve the problem that The artificial line efficiency that carries is low, the problem of potential safety hazard be present.
When overhead earth wire lifter works, more than ten meters of height need to be lifted with insulating cord by staff on tower, be then mounted to On aerial earth wire support, because line lifter deadweight is larger, whole erection & lift process is also hidden in the presence of surprisingly coming off than relatively time-consuming Suffer from.
The content of the invention
It is an object of the invention to provide a kind of overhead earth wire lifter and its lifting installation method, for lifting by crane aerial earth wire Capstan winch Heave Here it is too low, the problem of lifting is difficult, and overhead earth wire lifter deadweight is larger, and lifting is in place inconvenient, improve Winch configurations, optimize method for improving, solve the difficult problem of current aerial earth wire lifting maintenance, improve the facility operated on tower Property, reduce labor intensity, improve the overhaul efficiency of aerial earth wire.
To achieve these goals, it is the technical scheme is that such:
A kind of lifting installation method of overhead earth wire lifter, it is dynamic using itself of elevator belt and overhead earth wire lifter Power, make overhead earth wire lifter along elevator belt automatic lifting to earth wire support, finally overturn in place by operating personnel on tower, will The overhead earth wire lifter is fixed on earth wire support, and its concrete operation step is as follows:
1) the loop aerial condutor is breaking, operating personnel climb up earth wire support with one end of elevator belt on tower;
2) both ends of the elevator belt are Bifurcation Structure, and operating personnel take the lead jail by two of elevator belt one end respectively on tower It is connected and is connected on the bolt of earth wire support angle steel both sides;
3) overhead earth wire lifter is moved into ground below aerial earth wire support, the other end of elevator belt is passed through into institute On the rope sheave for stating the electric capstan that the notch on the foot stool of overhead earth wire lifter is fixed to the overhead earth wire lifter, make institute State elevator belt and surround the outside of steel wire rope and suspension hook on rope sheave;
4) direct current generator on overhead earth wire lifter is opened, as elevator belt is constantly by rope sheave, aerial earth wire Line lifter constantly rises along elevator belt, edges down upon aerial earth wire support;
5) when overhead earth wire lifter is risen to below aerial earth wire support termination, direct current generator stops;
6) operating personnel hold the electric capstan on tower, and electric capstan is flipped up pulling, until the notch from Earth wire support angle steel termination introduces;
7) nut on connecting rod one and connecting rod two is fastened, together with foot stool is tightly attached to aerial earth wire support;
8) direct current generator is reversely rotated, one end of the elevator belt is taken off from the rope sheave, you can on operation rope sheave Suspension hook, carry out upkeep operation;
9) after aerial earth wire service work terminates, the other end of elevator belt is fixed on rope sheave again, and opened straight Stream motor is by the elevator belt on the rope sheave;
10) nut on the connecting rod one and the connecting rod two is unclamped, shifts the electric capstan onto aerial earth wire support End, until electric capstan and the disengaging of aerial earth wire support, suspend in midair on elevator belt;
11) direct current generator is reversely rotated, the electric capstan slowly drops down onto ground;
12) operating personnel pull down one end of elevator belt on tower, under throwing;
13) end of job.
The electric capstan, including capstan winch seat, rope sheave, steel wire rope, suspension hook, axle one and direct current generator, the axle one are placed in In the endoporus of rope sheave, the both ends of axle one are connected with capstan winch seat respectively, it is characterised in that the side connection worm gear of the rope sheave, The worm screw being meshed with the worm gear is on axle two, one end connection umbrella tooth one of axle two, the umbrella tooth engaged with umbrella tooth one two In on axle three, one end of the axle three is provided with direct current generator.
The foot stool includes upper bearing, leg one, leg two, end plate one, end plate two, connecting rod one and connecting rod two, the upper bearing The same side end of leg one and leg two is connected to, the end plate one is connected to the end side of leg one, and the end plate two is connected to The end side of leg two, the both ends of the connecting rod one are bolted end plate one and end plate two respectively, the connecting rod two Both ends connect end plate one and end plate two by bolt and nut respectively, surrounded between the leg one, leg two and connecting rod one, connecting rod two with The notch of aerial earth wire support angle steel form fit.
The leg one and leg two are 90 ° of made buckling structures of square steel tube, and support bar is provided with 90 ° of flexings.
After the notch and aerial earth wire support Bolted angle connection, the rope sheave center be higher by notch base H for 350~ 550mm。
Compared with prior art, the beneficial effects of the invention are as follows:
1) conduct oneself with dignity for electric capstan larger, lift the problem of in place inconvenient, by optimizing method for improving, solve at present The difficult problem of aerial earth wire lifting maintenance, improves the convenience operated on tower.
2) turbine and worm decelerator is used, simple in construction, compact in design, stable performance, is entirely capable of meeting aerial earth wire Carry line operation require, it is easy to operate, it is time saving and energy saving.
3) lifting point height is effectively increased, grasps the people of the tower operator one as hanging point by aerial earth wire support Work can complete aerial earth wire lifting work, reduce labor intensity, improve job safety coefficient and efficiency.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is overhead earth wire lifter example structure schematic diagram of the present invention;
Fig. 2 is Fig. 1 A direction views;
Fig. 3 is aerial earth wire cable clamp structure schematic diagram;
Fig. 4 is overhead earth wire lifter embodiment automatic lifting position schematic diagram of the present invention;
Fig. 5 is elevator belt embodiment end structure schematic diagram of the present invention.
In figure:1- capstan winch seats, 2- rope sheaves, 3- steel wire ropes, 4- suspension hooks, 5- axles one, 6- aerial earth wires, 7- worm gears, 8- worm screws, 9- axles two, 10- umbrella tooths one, 11- umbrella tooths two, 12- axles three, 13- foot stools, the upper bearings of 14-, 15- bolts, 16- nuts, 17- notches, 18- strengthening connection bodies, 19- support bars, 20- aerial earth wire support angle steel, 21- direct current generators, 22- battery cases, 23- control box, 24- remote controllers, 25- aerial earth wire wire clamps, 26- elevator belts, 27- overhead earth wire lifters.
Embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
See Fig. 1, be overhead earth wire lifter example structure schematic diagram of the present invention, the overhead earth wire lifter is by electric mincing Disk and foot stool composition, electric capstan structure include capstan winch seat 1, rope sheave 2, steel wire rope 3, suspension hook 4, axle 1 and direct current generator 21, Axle 1 is placed in the endoporus of rope sheave 2, and the both ends of axle 1 are connected with capstan winch seat 1 respectively, the side connection worm gear 7 of rope sheave 2, with The worm screw 8 that worm gear is meshed is on axle 29, one end connection umbrella tooth 1 of axle two, the umbrella tooth engaged with umbrella tooth one 2 11 In on axle 3 12, one end of axle three is provided with direct current generator 21;
The bottom of capstan winch seat 1 connects foot stool 13, and foot stool includes upper bearing 14, leg 1, leg 2 132, end plate 1, end plate 2 142, connecting rod 1 and connecting rod 2 152, upper bearing 14 are connected to the same side end of leg 1 and leg 2 132, end plate 1 The end side of leg 1 is connected to, end plate 2 142 is connected to the end side of leg 2 132, the both ends of connecting rod 1 End plate 1 is connected by bolt 15 and nut 16 respectively and end plate 2 142, the both ends of connecting rod 2 152 pass through bolt 15 respectively End plate 1 and end plate 2 142 are connected with nut 16, is enclosed between leg 1, leg 2 132 and connecting rod 1 and connecting rod 2 152 Into the notch 17 with aerial earth wire support angle steel form fit.
Strengthening connection body 18 is provided between leg 1 and leg 2 132.Leg 1 and leg 2 132 are that square steel tube is made 90 ° of buckling structures, 90 ° of flexings sentence Type of Welding connection support bar 19.Strengthening connection body 18 and support bar 19 can improve leg one 131 and the structural strength and rigidity of leg 2 132, ensure that leg 1 and leg 2 132 are indeformable in stress.
Direct current generator 21 uses lithium battery power supply, and battery case 22 is located at the dorsal part of the upper bearing 14 of foot stool.The direct current generator Equipped with control box 23, control box, which is provided with, to be risen, declines, stop button, and GSM/GPRS wireless communication modules are provided with control box PT105, wireless communication module PT105 are communicated with remote controller 24, and remote controller 24 can be operated by ground staff.
See Fig. 2, Fig. 3, during using the overhead earth wire lifter, after notch 17 is connected with aerial earth wire support angle steel 20, rope It is 350~550mm to take turns 2 centers and be higher by notch base H.Notch 17 can translate along aerial earth wire support angle steel 20, until suspension hook position Above aerial earth wire wire clamp 25, you can hook aerial earth wire 6 and carry out proposing line operation.
See Fig. 4, the lifting installation method of overhead earth wire lifter of the present invention is exactly to be carried using elevator belt 26 and aerial earth wire The self power of line device 27, by overhead earth wire lifter along elevator belt automatic lifting to earth wire support 20, finally by being grasped on tower It is in place to make personnel's upset, overhead earth wire lifter is fixed on earth wire support, you can proceeds by and proposes line operation, it is specifically grasped It is as follows to make step:
1) the loop aerial condutor is breaking, operating personnel climb up earth wire support with one end of elevator belt on tower;
2) Fig. 5 is seen, the both ends of elevator belt are Bifurcation Structure, and operating personnel are respectively by two bands of the one end of elevator belt 26 on tower Head is securely attached on the bolt of the both sides of earth wire support angle steel 20;
3) overhead earth wire lifter 27 is moved to below aerial earth wire support, the other end of elevator belt is passed through on its foot stool Notch be fixed to electric capstan rope sheave on, the other end of elevator belt is pinned with bolt, and now elevator belt surrounds on rope sheave The outside of steel wire rope and suspension hook;
4) direct current generator on overhead earth wire lifter is opened, as elevator belt is constantly by rope sheave, aerial earth wire Line lifter 27 constantly rises along elevator belt, edges down upon aerial earth wire support;
5) when overhead earth wire lifter is risen to below aerial earth wire support termination, direct current generator stops;
6) operating personnel hold overhead earth wire lifter on tower, overhead earth wire lifter are flipped up pulling, Zhi Daoqi Notch on foot stool introduces from earth wire support angle steel termination;
7) nut on connecting rod one and connecting rod two is fastened, together with foot stool is tightly attached to aerial earth wire support;
8) direct current generator is reversely rotated, one end of elevator belt is taken off from rope sheave, you can the suspension hook on control rope sheave is opened Beginning proposes line operation, carries out upkeep operation;
9) after aerial earth wire service work terminates, the other end of elevator belt is fixed on rope sheave again, and opened straight Stream motor is by elevator belt on rope sheave;
10) nut on connecting rod one and connecting rod two is unclamped, shifts overhead earth wire lifter 27 onto aerial earth wire bracket end, Until overhead earth wire lifter and the disengaging of aerial earth wire support, suspend in midair on elevator belt;
11) direct current generator is reversely rotated, overhead earth wire lifter slowly drops down onto ground;
12) operating personnel pull down one end of elevator belt on tower, under throwing;
13) end of job.
Above example is only the specific reality to describe the purpose of the present invention in detail, technical scheme and beneficial effect are chosen Example, but protection scope of the present invention is should in no way limit, all kinds on the premise of without prejudice to the spirit and principles in the present invention, made Kind modification, equivalent substitution and improvement, all should fall under the scope of the present invention.

Claims (5)

1. the lifting installation method of a kind of overhead earth wire lifter, it is characterised in that utilize elevator belt and overhead earth wire lifter Self power, overhead earth wire lifter is finally turned over along elevator belt automatic lifting to earth wire support by operating personnel on tower Turn in place, the overhead earth wire lifter is fixed on earth wire support, its concrete operation step is as follows:
1) the loop aerial condutor is breaking, operating personnel climb up earth wire support with one end of elevator belt on tower;
2) both ends of the elevator belt are Bifurcation Structure, and two of elevator belt one end are taken the lead firmly to connect by operating personnel respectively on tower It is connected on the bolt of earth wire support angle steel both sides;
3) overhead earth wire lifter is moved into ground below aerial earth wire support, the other end of elevator belt is passed through into the frame On the rope sheave for the electric capstan that notch on the foot stool of vacant lot line line lifter is fixed to the overhead earth wire lifter, make described carry Rise band and surround the outside of steel wire rope and suspension hook on rope sheave;
4) direct current generator on overhead earth wire lifter is opened, as elevator belt is constantly by rope sheave, aerial earth wire carries line Device constantly rises along elevator belt, edges down upon aerial earth wire support;
5) when overhead earth wire lifter is risen to below aerial earth wire support termination, direct current generator stops;
6) operating personnel hold the electric capstan on tower, and electric capstan is flipped up pulling, until the notch is from ground wire Support angle steel termination introduces;
7) nut on connecting rod one and connecting rod two is fastened, together with foot stool is tightly attached to aerial earth wire support;
8) direct current generator is reversely rotated, one end of the elevator belt is taken off from the rope sheave, you can hanging on operation rope sheave Hook, carry out upkeep operation;
9) after aerial earth wire service work terminates, the other end of elevator belt is fixed on rope sheave again, and open direct current Machine is by the elevator belt on the rope sheave;
10) nut on the connecting rod one and the connecting rod two is unclamped, shifts the electric capstan onto aerial earth wire bracket end, Until electric capstan and the disengaging of aerial earth wire support, suspend in midair on elevator belt;
11) direct current generator is reversely rotated, the electric capstan slowly drops down onto ground;
12) operating personnel pull down one end of elevator belt on tower, under throwing;
13) end of job.
2. the lifting installation method of a kind of overhead earth wire lifter according to claim 1, it is characterised in that described aerial Ground wire line lifter includes electric capstan and foot stool, the electric capstan, including capstan winch seat, rope sheave, steel wire rope, suspension hook, the and of axle one Direct current generator, the axle one are placed in the endoporus of rope sheave, and the both ends of axle one are connected with capstan winch seat respectively, the side of the rope sheave Worm gear is connected, the worm screw being meshed with the worm gear one end connection umbrella tooth one of axle two, engages on axle two with umbrella tooth one Umbrella tooth two is located on axle three, and one end of the axle three is provided with direct current generator.
A kind of 3. lifting installation method of overhead earth wire lifter according to claim 2, it is characterised in that the foot stool Including upper bearing, leg one, leg two, end plate one, end plate two, connecting rod one and connecting rod two, the upper bearing is connected to leg one and leg two Same side end, the end plate one is connected to the end side of leg one, and the end plate two is connected to the end side of leg two, The both ends of the connecting rod one are bolted end plate one and end plate two respectively, and the both ends of the connecting rod two pass through bolt spiral shell respectively Mother's connection end plate one and end plate two, are surrounded and aerial earth wire support angle steel shape between the leg one, leg two and connecting rod one, connecting rod two The notch of shape matching.
A kind of 4. lifting installation method of overhead earth wire lifter according to claim 3, it is characterised in that the leg one It is 90 ° of made buckling structures of square steel tube with leg two, support bar is provided with 90 ° of flexings.
A kind of 5. lifting installation method of overhead earth wire lifter according to claim 1, it is characterised in that the notch After aerial earth wire support Bolted angle connection, it is 350~550mm that the rope sheave center, which is higher by notch base H,.
CN201710822157.6A 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof Active CN107425475B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710822157.6A CN107425475B (en) 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710822157.6A CN107425475B (en) 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof

Publications (2)

Publication Number Publication Date
CN107425475A true CN107425475A (en) 2017-12-01
CN107425475B CN107425475B (en) 2023-04-07

Family

ID=60433266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710822157.6A Active CN107425475B (en) 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof

Country Status (1)

Country Link
CN (1) CN107425475B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108383009A (en) * 2018-03-08 2018-08-10 辽宁工业大学 A kind of architectural electricity construction lifting gear
CN110867767A (en) * 2019-10-22 2020-03-06 云南电网有限责任公司曲靖供电局 Auxiliary device for replacing 500kV heavy-load linear insulator string in electrified manner
CN112834537A (en) * 2021-01-29 2021-05-25 四川赛康智能科技股份有限公司 X-ray live detection method based on ground potential power transmission line
CN113612160A (en) * 2021-09-10 2021-11-05 亿嘉和科技股份有限公司 Winch working tool for bypass cable lap joint and operation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102237655A (en) * 2011-07-05 2011-11-09 河南省电力公司洛阳供电公司 Method and tool for lifting overhead ground wire
CN202183573U (en) * 2011-07-05 2012-04-04 河南省电力公司洛阳供电公司 Rocker type two-point lifting tool of overhead ground wire
CN104064996A (en) * 2014-07-09 2014-09-24 国家电网公司 Lifting device for overhead ground wires
CN104953507A (en) * 2015-06-30 2015-09-30 国网山东招远市供电公司 Device and method for lifting wire during distribution line construction
CN207381860U (en) * 2017-09-13 2018-05-18 国网辽宁省电力有限公司鞍山供电公司 A kind of overhead earth wire lifter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102237655A (en) * 2011-07-05 2011-11-09 河南省电力公司洛阳供电公司 Method and tool for lifting overhead ground wire
CN202183573U (en) * 2011-07-05 2012-04-04 河南省电力公司洛阳供电公司 Rocker type two-point lifting tool of overhead ground wire
CN104064996A (en) * 2014-07-09 2014-09-24 国家电网公司 Lifting device for overhead ground wires
CN104953507A (en) * 2015-06-30 2015-09-30 国网山东招远市供电公司 Device and method for lifting wire during distribution line construction
CN207381860U (en) * 2017-09-13 2018-05-18 国网辽宁省电力有限公司鞍山供电公司 A kind of overhead earth wire lifter

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108383009A (en) * 2018-03-08 2018-08-10 辽宁工业大学 A kind of architectural electricity construction lifting gear
CN110867767A (en) * 2019-10-22 2020-03-06 云南电网有限责任公司曲靖供电局 Auxiliary device for replacing 500kV heavy-load linear insulator string in electrified manner
CN112834537A (en) * 2021-01-29 2021-05-25 四川赛康智能科技股份有限公司 X-ray live detection method based on ground potential power transmission line
CN112834537B (en) * 2021-01-29 2024-03-22 四川赛康智能科技股份有限公司 X-ray live detection method based on ground potential power transmission line
CN113612160A (en) * 2021-09-10 2021-11-05 亿嘉和科技股份有限公司 Winch working tool for bypass cable lap joint and operation method thereof

Also Published As

Publication number Publication date
CN107425475B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN107425475A (en) A kind of overhead earth wire lifter and its lifting installation method
CN204760890U (en) Wire hoisting device in distribution lines construction
CN104953507A (en) Device and method for lifting wire during distribution line construction
CN105896379B (en) For the live working platform of overhead transmission line
CN105058052B (en) A kind of 3MW wind power generating sets installation method
CN103939299B (en) The split type mounting process of a kind of offshore wind turbine
CN105162039A (en) Portable grounding wire transmitter and using method
CN206502544U (en) Bucket type mixing plant duplex type sister block fall arrest lifting device
CN104538887B (en) A kind of lightning conducter lifts converter
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN207381860U (en) A kind of overhead earth wire lifter
CN103738861B (en) A kind of ultra-high voltage transformer station type column of steel pipe integral hoisting method
CN203278097U (en) Electric pole cross arm erecting device
CN204752090U (en) Motor -driven elevating gear of pole
CN203720636U (en) Novel transformer substation camera operation maintenance protecting device
CN103010965A (en) Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN203289011U (en) Tension cross arm hoisting device
CN202063655U (en) Anti-tilting safe device of tower type crane
CN108466938A (en) A kind of transformer on-load voltage regulating tap switch boom hoisting
CN201285999Y (en) Soft ladder for high voltage line maintenance
CN208401377U (en) A kind of inspection platform for power station high voltage switchyard
CN2401531Y (en) Lifting/lowering cradle for wind electricity generator
CN208632051U (en) A kind of hanging basket for the maintenance of high tower lamp
CN108502700B (en) Lifting appliance for cabin of wind driven generator
CN207347061U (en) A kind of mechanical whole freight weight limit power-off protection apparatus and its ground jack of application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant