CN107425475B - Overhead ground wire lifter and lifting in-place method thereof - Google Patents

Overhead ground wire lifter and lifting in-place method thereof Download PDF

Info

Publication number
CN107425475B
CN107425475B CN201710822157.6A CN201710822157A CN107425475B CN 107425475 B CN107425475 B CN 107425475B CN 201710822157 A CN201710822157 A CN 201710822157A CN 107425475 B CN107425475 B CN 107425475B
Authority
CN
China
Prior art keywords
ground wire
overhead ground
lifting
lifter
overhead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710822157.6A
Other languages
Chinese (zh)
Other versions
CN107425475A (en
Inventor
符绍朋
佟明
刘向东
张德伟
韩啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Anshan Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anshan Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Anshan Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN201710822157.6A priority Critical patent/CN107425475B/en
Publication of CN107425475A publication Critical patent/CN107425475A/en
Application granted granted Critical
Publication of CN107425475B publication Critical patent/CN107425475B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
    • B66C23/166Simple cranes with jibs which may be fixed or can slew or luff
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/78Supports, e.g. outriggers, for mobile cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明涉及架空输电线路维修技术领域,具体而言是涉及一种架空地线提线器及其提升就位方法。该架空地线提线器由电动绞盘和脚架组成,提供一种架空地线提线器及其提升就位方法,针对起吊架空地线的绞盘起吊点过低,起吊困难,以及架空地线提线器自重较大,提升就位不便的问题,改善绞盘结构,优化提升方法,解决目前架空地线起吊检修困难的难题,改善塔上操作的便利性,减轻劳动强度,提高架空地线的检修效率。

Figure 201710822157

The invention relates to the technical field of maintenance of overhead power transmission lines, in particular to an overhead ground wire lifter and a lifting and positioning method thereof. The overhead ground wire lifting device is composed of an electric winch and a tripod, and provides an overhead ground wire lifting device and its lifting method. The lifting point of the winch for lifting the overhead ground wire is too low, the lifting is difficult, and the overhead ground wire The problem of the heavy weight of the wire lifter and the inconvenience of lifting in place, improving the structure of the winch, optimizing the lifting method, solving the current problem of difficult lifting and maintenance of the overhead ground wire, improving the convenience of operation on the tower, reducing labor intensity, and improving the safety of the overhead ground wire Maintenance efficiency.

Figure 201710822157

Description

一种架空地线提线器及其提升就位方法An overhead ground wire lifter and its lifting and positioning method

技术领域technical field

本发明涉及架空输电线路维修技术领域,具体而言是涉及一种架空地线提线器及其提升就位方法。The invention relates to the technical field of maintenance of overhead power transmission lines, in particular to an overhead ground wire lifter and a lifting and positioning method thereof.

背景技术Background technique

架空地线是保护架空输电线路免遭雷闪袭击的装置。为了提高线路运行的安全性,架空地线一般都是架设在被保护的导线上方。在线路上方出现雷云对地面放电时,雷闪通道容易首先击中架空地线,使雷电流进入大地,以保护导线正常送电。同时,架空地线还有电磁屏蔽作用,当线路附近雷云对地面放电时,可以降低在导线上引起的雷电感应过电压。因此架空地线必须与杆塔接地装置牢固相连,以保证遭受雷击后能将雷电流可靠地导入大地。重要的输电线路一般采用两根架空地线以将被保护的导线全部置于它的保护范围内。An overhead ground wire is a device that protects overhead transmission lines from lightning strikes. In order to improve the safety of line operation, overhead ground wires are generally erected above the protected wires. When a thundercloud discharges to the ground above the line, the lightning channel is likely to hit the overhead ground wire first, so that the lightning current enters the ground to protect the normal power transmission of the wire. At the same time, the overhead ground wire also has the function of electromagnetic shielding. When the thundercloud near the line discharges to the ground, it can reduce the lightning-induced overvoltage caused on the wire. Therefore, the overhead ground wire must be firmly connected with the grounding device of the tower to ensure that the lightning current can be reliably guided into the ground after being struck by lightning. Important transmission lines generally use two overhead ground wires to place all the protected conductors within its protection range.

架空地线由于不负担输送电流的功能,所以多采用钢绞线组成。也有些输电线路使用良导体地线,即用铝合金或铝包钢导线制成的架空地线。这种地线导电性能较好,可以改善线路输电性能,减轻对邻近通信线的干扰。Since the overhead ground wire does not bear the function of carrying current, it is mostly composed of steel strands. There are also some transmission lines that use good conductor ground wires, that is, overhead ground wires made of aluminum alloy or aluminum-clad steel wires. This kind of ground wire has better conductivity, which can improve the power transmission performance of the line and reduce the interference to adjacent communication lines.

输电线路架空地线缺陷时有发生,当架空地线出现断股需要更换或在定期检查地线线夹时,施工人员需要起吊架空地线,松开地线线夹,进行更换或检查作业。由于杆塔结构限制,起吊架空地线的绞盘没有合适的挂点,普遍存在起吊点过低,起吊困难的问题。Defects in the overhead ground wires of transmission lines occur from time to time. When the overhead ground wires are broken and need to be replaced or the ground wire clamps are regularly inspected, the construction personnel need to lift the overhead ground wires, loosen the ground wire clamps, and perform replacement or inspection operations. Due to the limitation of the tower structure, the winch for hoisting the overhead ground wire has no suitable hanging point, and there is a common problem that the lifting point is too low and the lifting is difficult.

中国专利号为“2014103248189”公开了一种“架空地线提线器”,方案中的绞线盘上设置线轴,线轴上连接线轴扳手,绳索缠绕在线轴上,绳索的引出端连接提线钩,绞线盘上活动连接伸缩连杆的一端,伸缩连杆的另一端连接卡座,卡座上设有调节机构。绞线盘为正多边形。线轴为方轴。绞线盘与伸缩连杆之间通过螺栓螺母活动连接。卡座为直角U形。调节机构为:垫片I和垫片II对称设置在卡座的内表面,垫片I连接调节螺丝。该方案旨在解决人工提线效率低,存在安全隐患的问题。The Chinese patent number "2014103248189" discloses a "overhead ground wire lifter". In the scheme, a bobbin is arranged on the winch reel, and a bobbin wrench is connected to the bobbin. The rope is wound on the bobbin, and the leading end of the rope is connected to the wire lifting hook , One end of the telescopic connecting rod is movably connected to the winch reel, and the other end of the telescopic connecting rod is connected to the deck, and the deck is provided with an adjustment mechanism. The winch is a regular polygon. The spool is square. The winch reel and the telescopic connecting rod are flexibly connected by bolts and nuts. The card seat is a right angle U shape. The adjustment mechanism is as follows: gasket I and gasket II are symmetrically arranged on the inner surface of the deck, and gasket I is connected to the adjustment screw. This solution aims to solve the problems of low efficiency and potential safety hazards in manual thread lifting.

架空地线提线器工作时,需由塔上工作人员用绝缘绳提起十多米高,然后安装到架空地线支架上,由于提线器自重较大,整个提升安装过程比较耗时,还存在意外脱落的隐患。When the overhead ground wire lifter is working, it needs to be lifted more than ten meters high by the staff on the tower with an insulating rope, and then installed on the overhead ground wire support. There is a risk of accidental detachment.

发明内容Contents of the invention

本发明的目的是提供一种架空地线提线器及其提升就位方法,针对起吊架空地线的绞盘起吊点过低,起吊困难,以及架空地线提线器自重较大,提升就位不便的问题,改善绞盘结构,优化提升方法,解决目前架空地线起吊检修困难的难题,改善塔上操作的便利性,减轻劳动强度,提高架空地线的检修效率。The object of the present invention is to provide a wire lifter for overhead ground wire and its lifting method. The hoisting point of the winch for lifting the overhead ground wire is too low, which makes lifting difficult, and the weight of the wire lifter for overhead ground wire is relatively large, so it can be lifted into place. To solve the problem of inconvenience, improve the structure of the winch, optimize the lifting method, solve the current difficult problem of hoisting and maintenance of overhead ground wires, improve the convenience of operation on the tower, reduce labor intensity, and improve the maintenance efficiency of overhead ground wires.

为了实现上述目的,本发明的技术方案是这样的:In order to achieve the above object, the technical solution of the present invention is as follows:

一种架空地线提线器的提升就位方法,利用提升带和架空地线提线器的自身动力,使架空地线提线器沿提升带自动提升到地线支架上,最后由塔上操作人员翻转就位,将所述架空地线提线器固定到地线支架上,其具体操作步骤如下:A lifting and positioning method for an overhead ground wire lifter, using the self-power of the lifting belt and the overhead ground wire lifter, so that the overhead ground wire lifter is automatically lifted along the lifting belt to the ground wire support, and finally lifted by the tower The operator turns over and fixes the overhead ground wire lifter to the ground wire support. The specific operation steps are as follows:

1)将回路架空导线断路,塔上操作人员带着提升带的一端登上地线支架;1) Disconnect the overhead wire of the circuit, and the operator on the tower climbs on the ground wire support with one end of the lifting belt;

2)所述提升带的两端为分岔结构,塔上操作人员分别将提升带一端的两个带头牢固连接到地线支架角钢两侧的螺栓上;2) The two ends of the lifting belt are bifurcated structures, and the operator on the tower firmly connects the two belt heads at one end of the lifting belt to the bolts on both sides of the angle steel of the ground wire support;

3)将所述架空地线提线器移至架空地线支架下方地面,将提升带的另一端穿过所述架空地线提线器的脚架上的槽口固定到所述架空地线提线器的电动绞盘的绳轮上,使所述提升带包绕在绳轮上钢丝绳和吊钩的外侧;3) Move the overhead ground wire lifter to the ground below the overhead ground wire support, pass the other end of the lifting belt through the notch on the foot of the overhead ground wire lifter and fix it to the overhead ground wire On the sheave of the electric winch of the wire lifter, the lifting belt is wrapped around the outer side of the wire rope and the hook on the sheave;

4)开启架空地线提线器上的直流电机,随着提升带不断被绕到绳轮上,架空地线提线器沿提升带不断上升,缓缓接近架空地线支架;4) Turn on the DC motor on the overhead ground wire lifter, and as the hoisting belt is continuously wound onto the sheave, the overhead ground wire hoist continues to rise along the hoisting belt and slowly approaches the overhead ground wire support;

5)当架空地线提线器升至架空地线支架端头下方时,直流电机停止;5) When the overhead ground wire lifter rises below the end of the overhead ground wire support, the DC motor stops;

6)塔上操作人员握住所述电动绞盘,将电动绞盘向上翻转拖曳,直到所述槽口从地线支架角钢端头引入;6) The operator on the tower holds the electric winch, flips the electric winch up and drags it until the notch is introduced from the end of the angle steel of the ground wire support;

7)紧固连杆一和连杆二上的螺母,直到脚架与架空地线支架紧固地连接在一起;7) Tighten the nuts on connecting rod 1 and connecting rod 2 until the tripod and the overhead ground wire bracket are firmly connected together;

8)反向旋转直流电机,将所述提升带的一端从所述绳轮上解下,即可操作绳轮上的吊钩,进行检修作业;8) Reversely rotate the DC motor, untie one end of the hoisting belt from the sheave, and then operate the hook on the sheave for maintenance work;

9)待架空地线检修工作结束后,重新将提升带的另一端固定到绳轮上,并开启直流电机将所述提升带绕到所述绳轮上;9) After the maintenance work of the overhead ground wire is completed, fix the other end of the lifting belt to the sheave again, and turn on the DC motor to wind the lifting belt around the sheave;

10)松开所述连杆一和所述连杆二上的螺母,将所述电动绞盘推到架空地线支架端部,直到电动绞盘与架空地线支架脱离,悬吊到提升带上;10) Loosen the nuts on the first connecting rod and the second connecting rod, push the electric winch to the end of the overhead ground wire support until the electric winch is separated from the overhead ground wire support, and hang on the lifting belt;

11)反向旋转直流电机,所述电动绞盘缓缓落至地面;11) Reversely rotate the DC motor, and the electric winch slowly falls to the ground;

12)塔上操作人员拆下提升带的一端,抛下;12) The operator on the tower removes one end of the lifting belt and throws it down;

13)作业结束。13) The job ends.

所述电动绞盘,包括绞盘座、绳轮、钢丝绳、吊钩、轴一和直流电机,所述轴一置于绳轮的内孔中,轴一的两端分别与绞盘座相连接,其特征在于,所述绳轮的一侧连接蜗轮,与所述蜗轮相啮合的蜗杆设于轴二上,轴二的一端连接伞齿一,与伞齿一啮合的伞齿二位于轴三上,所述轴三的一端设有直流电机。The electric winch includes a winch seat, a rope wheel, a steel wire rope, a hook, a shaft one and a DC motor, the shaft one is placed in the inner hole of the rope wheel, and the two ends of the shaft one are respectively connected with the winch seat, and its characteristics One side of the rope wheel is connected to the worm wheel, and the worm meshed with the worm wheel is arranged on the second shaft, one end of the second shaft is connected to the bevel gear one, and the bevel gear two meshing with the bevel gear one is located on the third shaft, so One end of the shaft three is provided with a DC motor.

所述脚架包括上承座、腿一、腿二、端板一、端板二、连杆一和连杆二,所述上承座连接在腿一和腿二的同侧端部,所述端板一连接于腿一的另一侧端部,所述端板二连接于腿二的另一侧端部,所述连杆一的两端分别通过螺栓连接端板一和端板二,所述连杆二的两端分别通过螺栓螺母连接端板一和端板二,所述腿一、腿二与连杆一、连杆二之间围成与架空地线支架角钢形状匹配的槽口。The tripod includes an upper bearing seat, a leg one, a second leg, an end plate one, an end plate two, a connecting rod one and a connecting rod two, and the upper bearing seat is connected to the ends of the first leg and the second leg on the same side. The end plate 1 is connected to the other end of the leg 1, the end plate 2 is connected to the other end of the leg 2, and the two ends of the connecting rod 1 are respectively connected to the end plate 1 and the end plate 2 by bolts. , the two ends of the connecting rod two are respectively connected to the end plate one and the end plate two through bolts and nuts, and the legs one and two are surrounded by the connecting rod one and the connecting rod two to form a shape matching with the angle steel of the overhead ground wire support. notch.

所述腿一和腿二均为方钢管所制的90°屈曲结构,所述90°屈曲处设有支撑杆。The first leg and the second leg are 90° buckling structures made of square steel pipes, and support rods are provided at the 90° buckling positions.

所述槽口与架空地线支架角钢连接后,所述绳轮中心高出槽口底边H为350~550mm。After the notch is connected with the angle steel of the overhead ground wire support, the center of the sheave is 350-550mm higher than the bottom edge H of the notch.

与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:

1)针对电动绞盘自重较大,提升就位不便的问题,通过优化提升方法,解决了目前架空地线起吊检修困难的难题,改善了塔上操作的便利性。1) Aiming at the problem of heavy self-weight of the electric winch and inconvenient lifting and positioning, by optimizing the lifting method, the problem of difficult lifting and maintenance of the overhead ground wire is solved, and the convenience of operation on the tower is improved.

2)采用蜗轮蜗杆减速机构,结构简单,布局紧凑,性能稳定,完全能满足架空地线的提线操作要求,操作方便,省时省力。2) The worm gear reduction mechanism is adopted, with simple structure, compact layout and stable performance, which can fully meet the requirements of the wire lifting operation of the overhead ground wire, and is easy to operate and saves time and effort.

3)借助架空地线支架作为挂点,有效提高了吊装点高度,使塔上作业人员一人操作即可完成架空地线吊装工作,减轻劳动强度,提高了作业安全系数和效率。3) With the help of the overhead ground wire bracket as the hanging point, the height of the hoisting point is effectively increased, so that one operator on the tower can complete the hoisting work of the overhead ground wire, which reduces labor intensity and improves the safety factor and efficiency of the operation.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本发明架空地线提线器实施例结构示意图;Fig. 1 is the structural schematic diagram of the embodiment of overhead ground wire lifter of the present invention;

图2为图1的A向视图;Fig. 2 is the A direction view of Fig. 1;

图3为架空地线线夹结构示意图;Fig. 3 is a schematic diagram of the structure of the overhead ground wire clamp;

图4为本发明架空地线提线器实施例自动提升就位状态示意图;Fig. 4 is a schematic diagram of the automatic lifting and in-position state of an embodiment of the overhead ground wire lifter of the present invention;

图5为本发明提升带实施例端头结构示意图。Fig. 5 is a schematic diagram of the end structure of the lifting belt embodiment of the present invention.

图中:1-绞盘座,2-绳轮,3-钢丝绳,4-吊钩,5-轴一,6-架空地线,7-蜗轮,8-蜗杆,9-轴二,10-伞齿一,11-伞齿二,12-轴三,13-脚架,14-上承座,15-螺栓,16-螺母,17-槽口,18-加强连接体,19-支撑杆,20-架空地线支架角钢,21-直流电机,22-电池盒,23-控制盒,24-摇控器,25-架空地线线夹,26-提升带,27-架空地线提线器。In the figure: 1-winch seat, 2-rope wheel, 3-wire rope, 4-hook, 5-axis one, 6-overhead ground wire, 7-worm gear, 8-worm, 9-axis two, 10-bevel gear 1, 11-bevel tooth 2, 12-axis 3, 13-footstand, 14-upper seat, 15-bolt, 16-nut, 17-notch, 18-reinforced connector, 19-support rod, 20- Overhead ground wire bracket angle steel, 21-DC motor, 22-battery box, 23-control box, 24-remote controller, 25-overhead ground wire clamp, 26-lift belt, 27-overhead ground wire lifter.

具体实施方式Detailed ways

下面结合附图对本发明的具体实施方式作进一步说明:The specific embodiment of the present invention will be further described below in conjunction with accompanying drawing:

见图1,是本发明架空地线提线器实施例结构示意图,该架空地线提线器由电动绞盘和脚架组成,电动绞盘结构中包括绞盘座1、绳轮2、钢丝绳3、吊钩4、轴一5和直流电机21,轴一5置于绳轮2的内孔中,轴一5的两端分别与绞盘座1相连接,绳轮2的一侧连接蜗轮7,与蜗轮相啮合的蜗杆8设于轴二9上,轴二的一端连接伞齿一10,与伞齿一啮合的伞齿二11位于轴三12上,轴三的一端设有直流电机21;See Figure 1, which is a structural schematic diagram of an embodiment of the overhead ground wire lifter of the present invention. The overhead ground wire lifter is composed of an electric winch and a tripod. The electric winch structure includes a winch seat 1, a rope wheel 2, a steel wire Hook 4, shaft one 5 and DC motor 21, shaft one 5 is placed in the inner hole of rope wheel 2, the two ends of shaft one 5 are connected with capstan seat 1 respectively, one side of rope wheel 2 is connected with worm wheel 7, and worm wheel The meshing worm 8 is arranged on the shaft 2 9, one end of the shaft 2 is connected to the bevel gear 1 10, the bevel gear 2 11 meshing with the bevel gear 1 is located on the shaft 3 12, and one end of the shaft 3 is provided with a DC motor 21;

绞盘座1底部连接脚架13,脚架包括上承座14、腿一131、腿二132、端板一141、端板二142、连杆一151和连杆二152,上承座14连接在腿一131和腿二132的同侧端部,端板一141连接于腿一131的另一侧端部,端板二142连接于腿二132的另一侧端部,连杆一151的两端分别通过螺栓15和螺母16连接端板一141和端板二142,连杆二152的两端分别通过螺栓15和螺母16连接端板一141和端板二142,腿一131、腿二132与连杆一151和连杆二152之间围成与架空地线支架角钢形状匹配的槽口17。The bottom of the winch seat 1 is connected to the tripod 13, and the tripod includes an upper bearing seat 14, a leg one 131, a leg two 132, an end plate one 141, an end plate two 142, a connecting rod one 151 and a connecting rod two 152, and the upper bearing seat 14 connects At the end of the same side of the first leg 131 and the second leg 132, the first end plate 141 is connected to the other end of the first leg 131, the second end plate 142 is connected to the other end of the second leg 132, and the first connecting rod 151 The two ends of connecting rod 141 and end plate 142 are respectively connected by bolt 15 and nut 16, and the two ends of connecting rod 152 are respectively connected by bolt 15 and nut 16 to end plate 141 and end plate 2 142, leg one 131, Between the second leg 132 and the first connecting rod 151 and the second connecting rod 152, a notch 17 matching the shape of the overhead ground wire support angle steel is formed.

腿一131和腿二132之间设有加强连接体18。腿一131和腿二132均为方钢管所制的90°屈曲结构,90°屈曲处以焊接形式连接支撑杆19。加强连接体18和支撑杆19能提高腿一131和腿二132的结构强度和刚度,保证腿一131和腿二132在受力时不变形。A reinforcing connector 18 is provided between the first leg 131 and the second leg 132 . The first leg 131 and the second leg 132 are both 90° buckling structures made of square steel pipes, and the 90° buckling parts are connected to the support rod 19 in a welded form. Reinforcing the connecting body 18 and the supporting rod 19 can improve the structural strength and rigidity of the first leg 131 and the second leg 132 to ensure that the first leg 131 and the second leg 132 are not deformed when stressed.

直流电机21采用锂电池供电,电池盒22位于脚架的上承座14的背侧。该直流电机配有控制盒23,控制盒上设有上升、下降、停止按钮,控制盒内设有GSM/GPRS无线通讯模块,无线通讯模块与摇控器24通信,摇控器24可由地面人员操作。The DC motor 21 is powered by a lithium battery, and the battery box 22 is located on the back side of the upper seat 14 of the tripod. The DC motor is equipped with a control box 23, which is provided with up, down, and stop buttons. The control box is provided with a GSM/GPRS wireless communication module. The wireless communication module communicates with the remote controller 24. The remote controller 24 can be controlled by ground personnel operate.

见图2、图3,应用该架空地线提线器时,槽口17与架空地线支架角钢20连接后,绳轮2中心高出槽口底边H为350~550mm。槽口17可沿架空地线支架角钢20平移,直到吊钩位于架空地线线夹25上方,即可钩住架空地线6进行提线作业了。See Fig. 2 and Fig. 3, when using the overhead ground wire lifter, after the notch 17 is connected with the overhead ground wire support angle steel 20, the center of the sheave 2 is 350-550mm higher than the bottom edge H of the notch. The notch 17 can be translated along the overhead ground wire bracket angle steel 20 until the hook is positioned above the overhead ground wire clamp 25, and then the overhead ground wire 6 can be hooked and carried out the wire lifting operation.

见图4,本发明架空地线提线器的提升就位方法就是利用提升带26和架空地线提线器27的自身动力,将架空地线提线器沿提升带自动提升到地线支架20上,最后由塔上操作人员翻转就位,使架空地线提线器固定到地线支架上,即可开始进行提线操作,其具体操作步骤如下:See Fig. 4, the hoisting and positioning method of the overhead ground wire lifter of the present invention is to use the self-power of the lifting belt 26 and the overhead ground wire lifter 27 to automatically lift the overhead ground wire lifter to the ground wire support along the lifting belt 20, and finally the operator on the tower turns it into place to fix the overhead ground wire lifter to the ground wire support, and then the wire lifting operation can be started. The specific operation steps are as follows:

1)将回路架空导线断路,塔上操作人员带着提升带的一端登上地线支架;1) Disconnect the overhead wire of the circuit, and the operator on the tower climbs on the ground wire support with one end of the lifting belt;

2)见图5,提升带的两端为分岔结构,塔上操作人员分别将提升带26一端的两个带头牢固连接到地线支架角钢20两侧的螺栓上;2) As shown in Figure 5, the two ends of the lifting belt are bifurcated structures, and the operators on the tower respectively firmly connect the two belt heads at one end of the lifting belt 26 to the bolts on both sides of the ground wire bracket angle steel 20;

3)将架空地线提线器27移至架空地线支架下方,将提升带的另一端穿过其脚架上的槽口固定到电动绞盘的绳轮上,提升带的另一端用螺栓锁住,此时提升带包绕在绳轮上钢丝绳和吊钩的外侧;3) Move the overhead ground wire lifter 27 to the bottom of the overhead ground wire bracket, pass the other end of the lifting belt through the notch on the tripod and fix it to the rope wheel of the electric winch, and lock the other end of the lifting belt with a bolt. At this time, the lifting belt is wrapped around the outer side of the steel wire rope and the hook on the sheave;

4)开启架空地线提线器上的直流电机,随着提升带不断被绕到绳轮上,架空地线提线器27沿提升带不断上升,缓缓接近架空地线支架;4) Turn on the DC motor on the overhead ground wire lifter, and the overhead ground wire lifter 27 continues to rise along the lifting belt as the hoisting belt is continuously wound onto the sheave, slowly approaching the overhead ground wire support;

5)当架空地线提线器升至架空地线支架端头下方时,直流电机停止;5) When the overhead ground wire lifter rises below the end of the overhead ground wire support, the DC motor stops;

6)塔上操作人员握住架空地线提线器,将架空地线提线器向上翻转拖曳,直到其脚架上的槽口从地线支架角钢端头引入;6) The operator on the tower holds the overhead ground wire lifter, flips the overhead ground wire lifter up and drags it until the notch on the tripod is introduced from the angle steel end of the ground wire support;

7)紧固连杆一和连杆二上的螺母,直到脚架与架空地线支架紧固地连接在一起;7) Tighten the nuts on connecting rod 1 and connecting rod 2 until the tripod and the overhead ground wire bracket are firmly connected together;

8)反向旋转直流电机,将提升带的一端从绳轮上解下,即可控制绳轮上的吊钩开始提线操作,进行检修作业;8) Reversely rotate the DC motor, untie one end of the hoisting belt from the sheave, and then control the hook on the sheave to start the wire lifting operation for maintenance work;

9)待架空地线检修工作结束后,重新将提升带的另一端固定到绳轮上,并开启直流电机将提升带绕到绳轮上;9) After the maintenance work of the overhead ground wire is completed, fix the other end of the lifting belt to the sheave again, and turn on the DC motor to wind the lifting belt around the sheave;

10)松开连杆一和连杆二上的螺母,将架空地线提线器27推到架空地线支架端部,直到架空地线提线器与架空地线支架脱离,悬吊到提升带上;10) Loosen the nuts on connecting rod 1 and connecting rod 2, push the overhead ground wire lifter 27 to the end of the overhead ground wire support until the overhead ground wire lifter is separated from the overhead ground bring;

11)反向旋转直流电机,架空地线提线器缓缓落至地面;11) Reversely rotate the DC motor, and the overhead ground wire lifter slowly falls to the ground;

12)塔上操作人员拆下提升带的一端,抛下;12) The operator on the tower removes one end of the lifting belt and throws it down;

13)作业结束。13) The job ends.

以上实施例仅是为详细说明本发明的目的、技术方案和有益效果而选取的具体实例,但不应该限制本发明的保护范围,凡在不违背本发明的精神和原则的前提下,所作的种种修改、等同替换以及改进,均应落入本发明的保护范围之内。The above embodiments are only specific examples selected for the purpose of the present invention, technical solutions and beneficial effects in detail, but should not limit the protection scope of the present invention. Various modifications, equivalent replacements and improvements shall fall within the protection scope of the present invention.

Claims (4)

1. The lifting and positioning method of the overhead ground wire lifter is characterized in that the self power of a lifting belt and the overhead ground wire lifter is utilized to automatically lift the overhead ground wire lifter onto a ground wire bracket along the lifting belt, and finally, an operator on a tower turns over to position the overhead ground wire lifter to fix the overhead ground wire lifter onto the ground wire bracket, and the method comprises the following specific operation steps: the overhead ground wire lifter comprises an electric winch and a foot rest, the electric winch comprises a winch base, a rope pulley, a steel wire rope, a lifting hook, a first shaft and a direct current motor, the first shaft is arranged in an inner hole of the rope pulley, two ends of the first shaft are respectively connected with the winch base, one side of the rope pulley is connected with a worm wheel, a worm meshed with the worm wheel is arranged on a second shaft, one end of the second shaft is connected with a first bevel gear, a second bevel gear meshed with the first bevel gear is arranged on a third shaft, and one end of the third shaft is provided with the direct current motor;
1) The loop overhead conductor is broken, and an operator on the tower with one end of the lifting belt climbs the ground wire bracket;
2) Two ends of the lifting belt are of a bifurcation structure, and operators on the tower respectively and firmly connect two belt heads at one end of the lifting belt to bolts at two sides of the angle steel of the ground wire bracket;
3) Moving the overhead ground wire lifter to the ground below the overhead ground wire bracket, and fixing the other end of a lifting belt to a rope wheel of an electric winch of the overhead ground wire lifter by penetrating a notch on a foot stool of the overhead ground wire lifter so that the lifting belt is wound on the outer sides of a steel wire rope and a lifting hook on the rope wheel;
4) Starting a direct current motor on the overhead ground wire lifter, and continuously lifting the overhead ground wire lifter along the lifting belt along with the continuous winding of the lifting belt on the rope pulley to slowly approach the overhead ground wire support;
5) When the overhead ground wire lifter rises to the position below the end of the overhead ground wire bracket, the direct current motor stops;
6) An operator on the tower holds the electric winch and turns the electric winch upwards to drag the electric winch until the notch is led in from the end of the angle iron of the ground wire bracket;
7) Nuts on the first connecting rod and the second connecting rod are fastened until the foot rest is fixedly connected with the overhead ground wire support;
8) Rotating the direct current motor reversely, and detaching one end of the lifting belt from the rope pulley, so that a lifting hook on the rope pulley can be operated to carry out maintenance operation;
9) After the overhead ground wire maintenance work is finished, fixing the other end of the lifting belt to the rope pulley again, and starting the direct current motor to wind the lifting belt on the rope pulley;
10 Loosening nuts on the first connecting rod and the second connecting rod, pushing the electric winch to the end of the overhead ground wire support until the electric winch is separated from the overhead ground wire support and is suspended on a lifting belt;
11 The electric capstan slowly falls to the ground;
12 Operator on the tower removes one end of the lifting belt and throws it down;
13 The operation ends.
2. The method for lifting the overhead ground wire lifter in place according to claim 1, wherein the foot rest comprises an upper bearing seat, a first leg, a second leg, a first end plate, a second end plate, a first connecting rod and a second connecting rod, the upper bearing seat is connected to the ends of the first leg and the second leg on the same side, the first end plate is connected to the end of the first leg on the other side, the second end plate is connected to the end of the second leg on the other side, two ends of the first connecting rod are respectively connected with the first end plate and the second end plate through bolts and nuts, two ends of the second connecting rod are respectively connected with the first end plate and the second end plate through bolts and nuts, and notches matched with the shape of the angle steel of the overhead ground wire support are formed among the first leg, the second leg, the first connecting rod and the second connecting rod.
3. The method for lifting and positioning the overhead ground wire lifter according to claim 2, wherein the first leg and the second leg are both of a 90-degree buckling structure made of square steel tubes, and a support rod is arranged at the 90-degree buckling position.
4. The method for lifting the overhead ground wire lifter into position as claimed in claim 1, wherein after the notch is connected with the overhead ground wire bracket angle steel, the height of the center of the rope pulley above the bottom edge H of the notch is 350-550 mm.
CN201710822157.6A 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof Active CN107425475B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710822157.6A CN107425475B (en) 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710822157.6A CN107425475B (en) 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof

Publications (2)

Publication Number Publication Date
CN107425475A CN107425475A (en) 2017-12-01
CN107425475B true CN107425475B (en) 2023-04-07

Family

ID=60433266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710822157.6A Active CN107425475B (en) 2017-09-13 2017-09-13 Overhead ground wire lifter and lifting in-place method thereof

Country Status (1)

Country Link
CN (1) CN107425475B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108383009A (en) * 2018-03-08 2018-08-10 辽宁工业大学 A kind of architectural electricity construction lifting gear
CN110867767B (en) * 2019-10-22 2024-10-01 云南电网有限责任公司曲靖供电局 Auxiliary device for live replacement of 500kV heavy-load linear insulator string
CN112834537B (en) * 2021-01-29 2024-03-22 四川赛康智能科技股份有限公司 X-ray live detection method based on ground potential power transmission line
CN113612160B (en) * 2021-09-10 2023-05-02 亿嘉和科技股份有限公司 Winch operation tool for bypass cable lapping and operation method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202183573U (en) * 2011-07-05 2012-04-04 河南省电力公司洛阳供电公司 Rocker type two-point lifting tool of overhead ground wire
CN102237655A (en) * 2011-07-05 2011-11-09 河南省电力公司洛阳供电公司 Method and tool for lifting overhead ground wire
CN104064996B (en) * 2014-07-09 2017-01-25 国家电网公司 Lifting device for overhead ground wires
CN104953507A (en) * 2015-06-30 2015-09-30 国网山东招远市供电公司 Device and method for lifting wire during distribution line construction
CN207381860U (en) * 2017-09-13 2018-05-18 国网辽宁省电力有限公司鞍山供电公司 A kind of overhead earth wire lifter

Also Published As

Publication number Publication date
CN107425475A (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN107425475A (en) A kind of overhead earth wire lifter and its lifting installation method
CN115977456B (en) Floor type double-rocker arm holding pole
CN203359893U (en) Portable lift
CN207381860U (en) A kind of overhead earth wire lifter
CN203352053U (en) Chain-type ladder used for maintenance of straight line tower of power transmission line
CN201336516Y (en) Device for manually installing pole top switch
CN207303796U (en) One kind is used for electric power apparatus examination Portable lifting device
CN102611038B (en) Porcelain insulator moving device
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN218603054U (en) Cable traction device of wind turbine generator
CN203205234U (en) Transformer high-tension bushing lead traction device
CN204689169U (en) A kind of fuel manipulator crane telescopic shaft anchor fitting
CN218708673U (en) Climbing-rod-free auxiliary lifting device for installing grounding wire
CN205204677U (en) Special lifting device of circuit breaker
CN103318773A (en) Transformer hoisting apparatus
CN108545645A (en) A kind of lifting auxiliary threader
CN104064996B (en) Lifting device for overhead ground wires
CN203014282U (en) An overhead ground wire lifting device in a power transmission line
CN203065072U (en) Lifting device for substation outdoor equipment
CN111498714A (en) Electric power overhauls uses electronic hoist device
CN205687456U (en) A kind of portable high-pressure line guy dish delivery device
CN103738860A (en) Small interval dual-purpose hoisting device
CN104897931A (en) Telescopic wiring device for high-altitude test
CN203284092U (en) Transformer substation insulator lifting frame
CN216785283U (en) Many specifications cable reel pay-off

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant