CN202405695U CN2011205155119U CN201120515511U CN202405695U CN 202405695 U CN202405695 U CN 202405695U CN 2011205155119 U CN2011205155119 U CN 2011205155119U CN 201120515511 U CN201120515511 U CN 201120515511U CN 202405695 U CN202405695 U CN 202405695U
Authority
CN
China
Prior art keywords
steel pipe
tackle
ground wire
arm
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205155119U
Other languages
Chinese (zh)
Inventor
刘治稳
张建周
李岩
胡宗贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN2011205155119U priority Critical patent/CN202405695U/en
Application granted granted Critical
Publication of CN202405695U publication Critical patent/CN202405695U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及高压送电线路施工的技术领域,公开一种钢管杆架空地线提线工具,包括:钢管杆横担卡具、滑车支架、朝天滑车,所述钢管杆横担卡具通过卡具连接螺丝4与卡具下抱箍2和上抱箍3固定到横担1上,滑车支架5焊接在卡具上抱箍3上,朝天滑车通过底座连接螺丝6固定在滑车支架5上,朝天滑车上部设置有活动封口板14,活动封口板14通过封口螺丝10和弹簧销11固定连接,弹簧销11通过开口销挂绳12与销绳挂环相连。本实用新型避免了提升绳索从滑车中脱落,实现了拆、装方便的目的,克服了用现有提线工具在钢管杆应用的难题。具有结构简单、操作方便、减轻了劳动强度、消除了不安全隐患,提高了工作效率。

The utility model relates to the technical field of high-voltage power transmission line construction, and discloses a steel pipe rod overhead ground wire lifting tool, which includes: a steel pipe rod cross-arm clamp, a pulley bracket, and an overhead pulley, and the steel pipe rod cross-arm clamp passes through the clamp Fixture connecting screw 4 and fixture lower hoop 2 and upper hoop 3 are fixed on the cross arm 1, the tackle bracket 5 is welded on the fixture upper hoop 3, and the skyward tackle is fixed on the tackle bracket 5 through the base connecting screw 6, Floating block top is provided with movable sealing plate 14, and movable sealing plate 14 is fixedly connected by sealing screw 10 and spring pin 11, and spring pin 11 links to each other by cotter pin hanging rope 12 and pin rope hanging ring. The utility model avoids the hoisting rope falling off from the pulley, realizes the purpose of convenient disassembly and assembly, and overcomes the difficult problem of using the existing wire-lifting tool in the application of the steel pipe pole. The utility model has the advantages of simple structure, convenient operation, reduced labor intensity, eliminated unsafe hidden dangers, and improved work efficiency.

Description

一种钢管杆架空地线提线工具A steel pipe rod overhead ground wire lifting tool

技术领域 technical field

本实用新型涉及一种高压送电线路施工的技术领域,尤其涉及一种钢管杆架空地线提线工具。 The utility model relates to the technical field of high-voltage power transmission line construction, in particular to a steel pipe rod overhead ground wire lifting tool.

背景技术 Background technique

目前钢管杆架空地线安装采用人力肩扛或用悬挂紧线器等提线的方法安装,由于钢管杆本身构造的特点,以上安装存在着以下问题: At present, the installation of overhead ground wires on steel pipe poles is carried by human shoulders or by means of lifting wires such as suspension tensioners. Due to the characteristics of the steel pipe pole itself, the above installation has the following problems:

1.由于横担距杆身较远,站在杆身爬梯上采用肩扛的方法,高空作业人员稳定性较差,安装不方便。 1. Since the cross-arm is far away from the shaft, the method of shoulder-carrying the pole when standing on the ladder is poor in stability for high-altitude workers and inconvenient to install.

站在上导线横担上采用肩扛的方法安装,对于导线横担和地线横担距离较远的杆型肩扛不能使地线提升到安装位置。 Stand on the upper wire cross arm and install it on the shoulder. For the rod type shoulder load with a long distance between the wire cross arm and the ground wire cross arm, the ground wire cannot be lifted to the installation position.

2.在地线横担上用手提的方法提升地线,由于地线横担截面较小,坐在横担上的作业人员平衡能力差,用手提的方法提升地线和安装时容易使工具材料脱落造成对地面协助安装人员的伤害,甚至造成地线坠落引起施工事故。 2. Use a hand-held method to lift the ground wire on the ground wire cross-arm. Since the cross-section of the ground wire cross-arm is small, the balance ability of the operator sitting on the cross-arm is poor. It is easy to use tools when lifting the ground wire and installing it by hand. Material falling off will cause damage to the ground assisting installers, and even cause the ground wire to fall and cause construction accidents.

3.用通常的工具采用悬挂的方法提升,由于钢丝套和提线工具本身的长度,不能将地线提升到安装位置,若采用紧线器固定到地线横担上面不仅固定困难,而且在吊装提升过程中容易引起紧线器挤压变形,地线横担损伤,不利于投运后的安全运行。 3. Use ordinary tools to lift by hanging. Due to the length of the wire sleeve and the wire lifting tool itself, the ground wire cannot be lifted to the installation position. During the hoisting and lifting process, it is easy to cause extrusion deformation of the wire tensioner and damage to the cross arm of the ground wire, which is not conducive to safe operation after commissioning.

发明内容 Contents of the invention

   为克服现有技术的不足,本实用新型的目的是提供一种钢管杆架空地线提线工具,具有结构简单、设计合理、安全可靠、适合钢管杆使用安装的架空地线提线工具。 In order to overcome the deficiencies of the prior art, the purpose of this utility model is to provide a steel pipe pole overhead ground wire lifting tool, which has a simple structure, reasonable design, safety and reliability, and is suitable for the use and installation of steel pipe poles.

为实现的上述发明目的,本实用新型采用如下技术方案: For the above-mentioned purpose of the invention realized, the utility model adopts following technical scheme:

一种钢管杆架空地线提线工具,包括:钢管杆横担卡具、滑车支架、朝天滑车,所述钢管杆横担卡具通过卡具连接螺丝4与卡具下抱箍2和上抱箍3固定到横担1上,滑车支架5焊接在卡具上抱箍3上,朝天滑车通过底座连接螺丝6固定在滑车支架5上,朝天滑车上部设置有活动封口板14,活动封口板14通过封口螺丝10和弹簧销11固定连接,弹簧销11通过开口销挂绳12与销绳挂环相连。 A tool for lifting a steel pipe pole overhead ground wire, comprising: a steel pipe pole cross-arm clamp, a pulley bracket, and an overhead tackle, the steel pipe pole cross-arm clamp is connected to the clamp lower hoop 2 and upper clamp through the clamp connection screw 4 The hoop 3 is fixed on the cross arm 1, the tackle bracket 5 is welded on the hoop 3 on the fixture, the upward tackle is fixed on the tackle bracket 5 through the base connecting screw 6, and the upper part of the upward tackle is provided with a movable sealing plate 14, a movable sealing plate 14 The sealing screw 10 is fixedly connected with the spring pin 11, and the spring pin 11 is connected with the pin rope hanging ring through the cotter pin hanging rope 12.

由于采用上述技术方案,本实用新型具有以下优点: Due to the above-mentioned technical scheme, the utility model has the following advantages:

1、              使作业人员在安装地线时,不用肩扛根据各种钢管杆型的特点,可选择在杆身爬梯、导线横担、地线横担的位置进行安装,避免了提升过程中失去平衡造成高空短距离坠落。 1. When installing the ground wire, the operator does not need to carry it on his shoulders. According to the characteristics of various steel pipe pole types, he can choose to install it at the position of the pole ladder, wire cross arm, and ground wire cross arm to avoid loss of balance during the lifting process. Causes a short-distance fall from high altitude.

2、              安装过程中避免了用肩扛或手提提升地线,同时还要兼顾安装而造成工具材料从高空中脱落。 2. During the installation process, it is avoided to lift the ground wire with the shoulder or hand, and at the same time, it is also necessary to take into account the installation and cause the tool materials to fall from the sky.

3、朝天滑车采用开合式封口结合弹簧销闭锁,避免了提升绳索从滑车中脱落,实现了拆、装方便的目的。 3. The sky block adopts a split seal combined with a spring pin to lock, which prevents the lifting rope from falling off the block and realizes the purpose of easy disassembly and assembly.

4、使用该提线工具克服了其它提升工具因钢丝绳挂套和提线工具本身的长度而不能将提线提升到位的困难,同时也避免了钢丝套单点受力对地线横担造成的损伤。 4. The use of this wire lifting tool overcomes the difficulty that other lifting tools cannot lift the wire in place due to the length of the wire rope hanging sleeve and the wire lifting tool itself, and also avoids the damage caused by the single point force of the steel wire sleeve to the ground wire crossarm. damage.

5、该提线工具不仅适用于新架线路钢管杆提升地线安装,同时也适用于在线路检修时对地线的松落和提升。 5. The wire lifting tool is not only suitable for the installation of steel pipe poles for new lines to lift the ground wire, but also for loosening and lifting the ground wire during line maintenance.

6、该工具具有结构合理简单、安全可靠、工作效率高等优点。 6. The tool has the advantages of reasonable and simple structure, safety and reliability, and high work efficiency.

附图说明 Description of drawings

图1 a为钢管杆架空地线提线工具示意图,  Figure 1a is a schematic diagram of the steel pipe rod overhead ground wire lifting tool,

图1 b为图1 a 的侧视图; Fig. 1 b is a side view of Fig. 1 a;

图中:1、地线横担, 2、卡具下抱箍, 3、卡具上抱箍, 4、卡具连接螺丝, 5、滑车支架, 6、底座连接螺丝, 7、朝天滑车架 ,8、滑轮固定螺丝,9、滑轮 ,10、封口螺丝, 11、弹簧销 ,12、开口销挂绳, 13、销绳挂环 ,14、活动封口板。 In the figure: 1. Ground wire cross arm, 2. Fixture lower hoop, 3. Fixture upper hoop, 4. Fixture connection screw, 5. Pulley support, 6. Base connection screw, 7. Skyward pulley frame , 8, pulley fixing screw, 9, pulley, 10, sealing screw, 11, spring pin, 12, cotter pin lanyard, 13, pin rope hanging ring, 14, movable sealing plate.

具体实施方式 Detailed ways

如图1 a 、1 b所示,一种钢管杆架空地线提线工具,包括:钢管杆横担卡具、滑车支架、朝天滑车,所述钢管杆横担卡具通过卡具连接螺丝4与卡具下抱箍2和上抱箍3固定到横担1上,滑车支架5焊接在卡具上抱箍3上,朝天滑车通过底座连接螺丝6固定在滑车支架5上,朝天滑车上部设置有活动封口板14,活动封口板14通过封口螺丝10和弹簧销11固定连接,弹簧销11通过开口销挂绳12与销绳挂环相连。 As shown in Figures 1 a and 1 b, a steel pipe pole overhead ground wire lifting tool includes: a steel pipe pole cross-arm fixture, a pulley bracket, and an overhead tackle, and the steel pipe pole cross-arm fixture is connected to the screw 4 by the fixture The lower hoop 2 and the upper hoop 3 of the jig are fixed to the cross arm 1, the tackle bracket 5 is welded on the upper hoop 3 of the jig, the upward tackle is fixed on the tackle bracket 5 through the base connecting screw 6, and the upper part of the upward tackle is set Movable sealing plate 14 is arranged, and movable sealing plate 14 is fixedly connected by sealing screw 10 and spring pin 11, and spring pin 11 links to each other with pin rope hanging ring by cotter pin hanging rope 12.

本地线提升器使用方法:通过卡具连接螺丝4将卡具下抱箍2和卡具上抱箍3相连,将卡具固定到横担4上,用绳索穿过滑轮9,通过封口螺丝10、活动封口板14和弹簧销11将滑车封死,以免绳索脱落,绳索一端将要提升的地线绑牢,地面协助人员拉动绳索至地线需安装的位置进行安装,安装完毕后拔掉弹簧销11,打开活动挂板14,即可去掉绳索,将滑车架7上设计销绳挂环13和开口销挂绳12是为了在作业过程中防止弹簧销11脱落,同时作业人员选择在导线横担或钢管杆爬梯位置安装时可以直接拉动开口销挂绳 13将弹簧销11去掉,摆动绳索使活动封口板14从封口螺丝10上脱出,将绳索去掉,当作业人员在地线横担1上安装时,弹簧销11可以选择从上向下穿。若横担的截面不是如图一所示的六边形时,提线工具卡具可以根据地线横担的形状改变卡具结构,其使用方法相同。 How to use the local line lifter: Connect the lower clamp 2 of the clamp with the upper clamp 3 of the clamp through the clamp connection screw 4, fix the clamp to the cross arm 4, pass the rope through the pulley 9, and pass the sealing screw 10 1. The movable sealing plate 14 and the spring pin 11 seal the block to prevent the rope from falling off. One end of the rope will fasten the ground wire to be lifted, and the ground assisting personnel will pull the rope to the position where the ground wire needs to be installed for installation. After the installation is completed, pull out the spring pin 11. Open the movable hanging plate 14, and the rope can be removed. The design of the pin rope hanging ring 13 and the cotter pin hanging rope 12 on the block frame 7 is to prevent the spring pin 11 from falling off during the operation process. When the pole or steel pipe pole climbing ladder is installed, you can directly pull the cotter pin lanyard 13 to remove the spring pin 11, swing the rope to make the movable sealing plate 14 escape from the sealing screw 10, and remove the rope. During installation, the spring pin 11 can be selected to pass through from top to bottom. If the cross-section of the cross-arm is not hexagonal as shown in Figure 1, the wire-lifting tool fixture can change the fixture structure according to the shape of the ground wire cross-arm, and its use method is the same.

Claims (1)

1.一种钢管杆架空地线提线工具,其特征在于:包括:钢管杆横担卡具、滑车支架、朝天滑车,所述钢管杆横担卡具通过卡具连接螺丝(4)与卡具下抱箍(2)和上抱箍(3)固定到横担(1)上,滑车支架(5)焊接在卡具上抱箍(3)上,朝天滑车通过底座连接螺丝(6)固定在滑车支架(5)上,朝天滑车上部设置有活动封口板(14),活动封口板(14)通过封口螺丝(10)和弹簧销(11)固定连接,弹簧销(11)通过开口销挂绳(12)与销绳挂环相连。 1. A steel pipe rod overhead ground wire lifting tool is characterized in that: comprising: a steel pipe rod cross-arm fixture, a pulley support, a skyward tackle, and the steel pipe rod cross-arm fixture is connected to the clamp by a clamp screw (4) The lower hoop (2) and the upper hoop (3) are fixed to the cross arm (1), the tackle bracket (5) is welded to the upper hoop (3) of the fixture, and the overhead tackle is fixed by the base connecting screw (6) On the tackle bracket (5), a movable sealing plate (14) is provided on the upper part of the skyward tackle, and the movable sealing plate (14) is fixedly connected with the sealing screw (10) and the spring pin (11), and the spring pin (11) is hung by the cotter pin. Rope (12) links to each other with pin rope hanging ring.
CN2011205155119U 2011-12-12 2011-12-12 Lifting tool for overhead ground wire of steel pipe pole Expired - Fee Related CN202405695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205155119U CN202405695U (en) 2011-12-12 2011-12-12 Lifting tool for overhead ground wire of steel pipe pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205155119U CN202405695U (en) 2011-12-12 2011-12-12 Lifting tool for overhead ground wire of steel pipe pole

Publications (1)

Publication Number Publication Date
CN202405695U true CN202405695U (en) 2012-08-29

Family

ID=46703312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205155119U Expired - Fee Related CN202405695U (en) 2011-12-12 2011-12-12 Lifting tool for overhead ground wire of steel pipe pole

Country Status (1)

Country Link
CN (1) CN202405695U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603539A (en) * 2013-11-20 2014-02-26 国家电网公司 Lifting hoops for long-crossing high-tower erection derrick
CN106786314A (en) * 2016-12-22 2017-05-31 国网河北省电力公司衡水供电分公司 A kind of cement pole ground wire resetting means
CN111864634A (en) * 2020-08-31 2020-10-30 国网河南省电力公司孟州市供电公司 A kind of transmission line hoop pulley
US20210071788A1 (en) * 2019-09-09 2021-03-11 Entegris, Inc. Electrostatic discharge mitigation device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603539A (en) * 2013-11-20 2014-02-26 国家电网公司 Lifting hoops for long-crossing high-tower erection derrick
CN103603539B (en) * 2013-11-20 2015-11-25 国家电网公司 A kind of long span super high town group erection of derrick promotes anchor ear
CN106786314A (en) * 2016-12-22 2017-05-31 国网河北省电力公司衡水供电分公司 A kind of cement pole ground wire resetting means
US20210071788A1 (en) * 2019-09-09 2021-03-11 Entegris, Inc. Electrostatic discharge mitigation device
US11988308B2 (en) * 2019-09-09 2024-05-21 Entegris, Inc. Electrostatic discharge mitigation device
CN111864634A (en) * 2020-08-31 2020-10-30 国网河南省电力公司孟州市供电公司 A kind of transmission line hoop pulley

Similar Documents

Publication Publication Date Title
CN103545751B (en) Overhead transmission line ground wire optical cable fittings replacement bracket
CN204230769U (en) Climb type steel cable ladder
CN102040166A (en) Hoisting tool for equipment on pillar
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN103269036A (en) Tension cross arm hoist
CN204150943U (en) A kind of Novel hook device
CN203998746U (en) Portable suspension installation
CN102992203B (en) Simple hoisting device for steel structure bridge installation
CN202190018U (en) An overhead ground wire ratchet wrench carrying wire tool
CN202190019U (en) Aerial earth wire ratchet wrench type two-point lifting tool
CN203289011U (en) Tension cross arm hoisting device
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN202864675U (en) Shaft-type part hoisting tool
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202127209U (en) Portable overhead ground wire lifter
CN202594699U (en) Power transmission line lifting device for steel pipe tower
CN202488034U (en) Angle iron tower transmission line lifting device
CN102263391B (en) Portable overhead grounding-wire raiser
CN203119386U (en) Concrete rod lightning conductor lifting device
CN205676052U (en) Bench type transformer crane device
CN202488035U (en) Cement pole transmission line maintenance lifting device
CN202657877U (en) Circuit equipment construction lifting frame
CN202197047U (en) A rocker type overhead ground wire lifter
CN102623930B (en) String combination tool is hung in replacing
CN109484974B (en) Method for mounting axial-flow propeller turbine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20121212