CN202488034U - Lifting device for electric transmission line of angle iron tower - Google Patents

Lifting device for electric transmission line of angle iron tower Download PDF

Info

Publication number
CN202488034U
CN202488034U CN2012200408163U CN201220040816U CN202488034U CN 202488034 U CN202488034 U CN 202488034U CN 2012200408163 U CN2012200408163 U CN 2012200408163U CN 201220040816 U CN201220040816 U CN 201220040816U CN 202488034 U CN202488034 U CN 202488034U
Authority
CN
China
Prior art keywords
steel wire
lifting device
transmission line
clamping plate
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200408163U
Other languages
Chinese (zh)
Inventor
李志清
张金秋
刘爱新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN2012200408163U priority Critical patent/CN202488034U/en
Application granted granted Critical
Publication of CN202488034U publication Critical patent/CN202488034U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a lifting device for an electric transmission line of an angle iron tower, and relates to a maintenance tool for electric transmission lines. The lifting device comprises a support rod arranged in a support sleeve and connected by a bolt, a superposed clamp plate is arranged on one side of the support sleeve and comprises an inner clamp plate and an outer clamp plate, a triangular lateral plate is arranged at the top of the support rod, a U-shaped hanging ring is arranged on the lateral plate, a connection part, the bolt and a pulley are sequentially arranged below the hanging ring, a steel wire rope penetrates through the pulley, one end of the steel wire rope is connected with a hook, the other end of the steel wire rope is connected with a reel in a fixing device, and a unidirectional wheel and a handle are arranged on one side of the fixing device. The lifting device has the advantages of simplicity and easiness in manufacture, convenience and rapidness in operation, safety, reliability, labor and time saving, low labor intensity, high working efficiency, low maintenance cost and the like.

Description

Angle tower transmission line boom hoisting
Technical field
This practicality relates to a kind of power transmission lines overhauling instrument.
Background technology
The circuit of the top of angle tower, aging because of wind or corrosion, situation such as damaging, come off often appears; Need in time to get rid of, to avoid short trouble, existing maintenance all is that manual work is shouldered transmission line on shoulder; And then have the staff to unload the circuit of damage, time-consuming, labour intensity is big; Potential safety hazard is many, inefficiency, and the cost of overhaul is high.
Summary of the invention
The purpose of the utility model provides a kind of angle tower transmission line boom hoisting, and time-consuming to solve prior art, labour intensity is big, and potential safety hazard is many, inefficiency, problems such as cost of overhaul height.
It is to increase boom hoisting that the utility model solves the technical scheme that its technical problem adopted; Support bar places in the supporting sleeve, adopts bolt to connect, and supporting sleeve one side is provided with the clamping plate of mutual stack; Clamping plate Wei “ ╚ " the shape structure, clamping plate are made up of inside and outside clamping plate; Support bar top is provided with the triangle side plate, and the U-shaped link is set on the side plate, and the link below sets gradually connector, bolt and pulley; The steel wire penetrating pulley, steel wire rope one end coupling hook, the other end connects the spool in the fixture, and fixture one side is provided with one-way wheel and handle, constitutes boom hoisting.
Adopt the good effect of the utility model to be: easy row simple for production, convenient to operation, safe and reliable, saving of work and time, labour intensity is low, high efficiency, advantage such as the cost of overhaul is low.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified:
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model A-A view;
1 clamping plate, 2 supporting sleeves, 3 support bars, 4 fixtures, 5 hooks, 6 steel wire ropes, 7 side plates, 8 links, 9 connectors, 10 bolts, 11 pulleys, 12 one-way wheels, 13 handles, 14 inner splints, 15 external splints among the figure.
Embodiment
As shown in the figure: this boom hoisting support bar 3 places in the supporting sleeve 2, adopts bolt 10 to connect, and supporting sleeve 2 one sides are provided with 1 clamping plate of mutual stack, clamping plate 1 Wei “ ╚ " the shape structure, clamping plate 1 are made up of inside and outside clamping plate 14,15; Support bar 3 tops are provided with triangle side plate 7, and U-shaped link 8 is set on the side plate 7, and link 8 belows set gradually connector 9, bolt 10 and pulley 11; Steel wire rope 6 passes pulley 11, steel wire rope 6 one end coupling hooks 5, and the other end connects the spool in the fixture 4, and fixture 4 one sides are provided with one-way wheel 12 and handle 13, constitute boom hoisting.
During use, angle bar places the centre of inside and outside clamping plate, tights a bolt, and adjusts length of steel wire rope then, tangles transmission line, uses handle that transmission line is slowly sling and gets final product.

Claims (2)

1. an angle tower transmission line boom hoisting is characterized in that this boom hoisting support bar places in the supporting sleeve, adopts bolt to connect, and supporting sleeve one side is provided with the clamping plate of mutual stack, and clamping plate are made up of inside and outside clamping plate; Support bar top is provided with the triangle side plate, and the U-shaped link is set on the side plate, and the link below sets gradually connector, bolt and pulley; The steel wire penetrating pulley, steel wire rope one end coupling hook, the other end connects the spool in the fixture, and fixture one side is provided with one-way wheel and handle.
2. angle tower transmission line boom hoisting according to claim 1 is characterized in that clamping plate Wei “ ╚ " the shape structure.
CN2012200408163U 2012-02-09 2012-02-09 Lifting device for electric transmission line of angle iron tower Expired - Fee Related CN202488034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200408163U CN202488034U (en) 2012-02-09 2012-02-09 Lifting device for electric transmission line of angle iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200408163U CN202488034U (en) 2012-02-09 2012-02-09 Lifting device for electric transmission line of angle iron tower

Publications (1)

Publication Number Publication Date
CN202488034U true CN202488034U (en) 2012-10-10

Family

ID=46962425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200408163U Expired - Fee Related CN202488034U (en) 2012-02-09 2012-02-09 Lifting device for electric transmission line of angle iron tower

Country Status (1)

Country Link
CN (1) CN202488034U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229651A (en) * 2014-08-26 2014-12-24 高威 Elevator device
CN104261283A (en) * 2014-09-18 2015-01-07 中邮建技术有限公司 Construction method of antenna hoisting device of wireless base station
CN105162039A (en) * 2015-09-21 2015-12-16 国网辽宁省电力有限公司鞍山供电公司 Portable grounding wire transmitter and using method
CN105932601A (en) * 2016-07-05 2016-09-07 国网山东省电力公司德州供电公司 Method for repairing break strand of overhead ground wire

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229651A (en) * 2014-08-26 2014-12-24 高威 Elevator device
CN104261283A (en) * 2014-09-18 2015-01-07 中邮建技术有限公司 Construction method of antenna hoisting device of wireless base station
CN104261283B (en) * 2014-09-18 2016-01-06 中邮建技术有限公司 A kind of construction method of antenna hanging apparatus of wireless base station
CN105162039A (en) * 2015-09-21 2015-12-16 国网辽宁省电力有限公司鞍山供电公司 Portable grounding wire transmitter and using method
CN105932601A (en) * 2016-07-05 2016-09-07 国网山东省电力公司德州供电公司 Method for repairing break strand of overhead ground wire

Similar Documents

Publication Publication Date Title
CN103545751B (en) Overhead transmission line ground wire optical fiber cable fitting changes support
CN102237655A (en) Method and tool for lifting overhead ground wire
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN201171148Y (en) Machine for supporting overhead pround wire
CN202594699U (en) Power transmission line lifting device for steel pipe tower
CN202488035U (en) Hoisting device for maintenance of power transmission line above concrete poles
CN204167793U (en) Straight line steel tube tower side, double loop cross-arm jig
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN202978098U (en) Overhead ground wire lifter
CN205132903U (en) Steel wire slings
CN204185103U (en) Shaped steel tackle
CN202917897U (en) Cable hoisting horizontal pulley
CN203660422U (en) 500 kV overhead ground wire lifting tool
CN202671170U (en) Traction cap of telegraph pole
CN204258148U (en) A kind of built on stilts earth connection lifter
CN203295025U (en) Clamping tool for hoisting single H beam
CN202575684U (en) Prefabricated-slab hoisting tool
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus
CN203682865U (en) Tyre lifting-transporting clamp
CN202897821U (en) Fixture for baking-free bricks
CN203439906U (en) I-beam sling
CN202931129U (en) Generator stator hoisting turning-over apparatus
CN202175522U (en) Device for hoisting concrete pole
CN202670992U (en) Rod hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130123

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130123

Address after: 253000 Shandong Province, Dezhou City Lake Street No. 1237

Patentee after: Dezhou Power Supply Company of Shandong Electric Power Group Corporation

Patentee after: State Grid Corporation of China

Address before: 253000 Shandong Province, Dezhou City Lake Street No. 2347

Patentee before: Dezhou Power Supply Company of Shandong Electric Power Group Corporation

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121010

Termination date: 20160209