CN204167793U - Straight line steel tube tower side, double loop cross-arm jig - Google Patents

Straight line steel tube tower side, double loop cross-arm jig Download PDF

Info

Publication number
CN204167793U
CN204167793U CN201420665803.4U CN201420665803U CN204167793U CN 204167793 U CN204167793 U CN 204167793U CN 201420665803 U CN201420665803 U CN 201420665803U CN 204167793 U CN204167793 U CN 204167793U
Authority
CN
China
Prior art keywords
load screw
steel tube
straight line
jig
jig body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420665803.4U
Other languages
Chinese (zh)
Inventor
龚明义
梁佳麒
杨凤
李正文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIVE WORKING BRANCH YUNNAN GRID CO Ltd
Original Assignee
LIVE WORKING BRANCH YUNNAN GRID CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIVE WORKING BRANCH YUNNAN GRID CO Ltd filed Critical LIVE WORKING BRANCH YUNNAN GRID CO Ltd
Priority to CN201420665803.4U priority Critical patent/CN204167793U/en
Application granted granted Critical
Publication of CN204167793U publication Critical patent/CN204167793U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates in a kind of electric transmission line hot-line service work changes that same tower is two, many times straight line steel tube tower insulator string devices, more particularly, relates to straight line steel tube tower side, double loop cross-arm jig.Comprise jig body, two adjustable pole hooks and two load screw mandrels, two load screw mandrels are set in parallel in the two ends of jig body, and vertical with jig body, and two adjustable pole hooks are between two load screw mandrels, and parallel with load screw mandrel.

Description

Straight line steel tube tower side, double loop cross-arm jig
Technical field
The utility model relates in a kind of electric transmission line hot-line service work changes that same tower is two, many times straight line steel tube tower insulator string devices, more particularly, relates to straight line steel tube tower side, double loop cross-arm jig.
Background technology
In the work of current power transmission circuit hotline maintenance, on 110kV-220kV transmission line, when tower is steel tube tower multiloop straight line steel tube tower square cross-arm structure, because tower head is special and do not have corresponding live line working special mould clamp, limit and change that 110kV-220kV is two with tower, the carrying out of many times straight line steel tube tower insulator string live line working work.
Summary of the invention
The utility model, just for the problems referred to above, provides straight line steel tube tower side, a kind of double loop cross-arm jig.To achieve these goals, the utility model adopts following technical scheme, comprise jig body, two adjustable pole hooks and two load screw mandrels, two load screw mandrels are set in parallel in the two ends of jig body, and it is vertical with jig body, two adjustable pole hooks are between two load screw mandrels, and parallel with load screw mandrel.Two adjustable pole hooks are identical with the symmetry axis of two load screw mandrels in jig body.Adjustable pole hook is fixed in jig body by adjustable apparatus set bolt, and two heads hooked are relative.Load screw mandrel is fixed in jig body by load screw mandrel set bolt.Adjustable pole hook upper end is provided with screw thread .
the beneficial effects of the utility model:
The utility model is owing to have employed adjustable tower body fixture, solve in electric transmission line hot-line service work, in replacing 110-220kV pair, the operation of multiloop straight line steel tube tower square cross arm insulator string, because the restricted problem of carrying out that wire diameter and hoist load work to this; Solving circuit turriform is that the width of straight line steel tube tower square cross arm differs, and installs the problem of fixing difficulty; Solve Work tool after load, easily outer sliding, easily cause wire to lift by crane stressed rear skew, not enough to the safe distance of tower body, produce the problem of serious accident; Solve and adopt under single suspension centre lifting method, the accident of landing for avoiding producing serious live wire must take to prevent the problem of the back measure of wire slippage.Acted freely by screw mandrel lifting, whereabouts wire, coordinate without the need to ground staff, time saving and energy saving, simplify work, and improve the fail safe of operation, reduce the labour intensity of personnel.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model.In Fig. 1,1 is jig body, and 2 is adjustable pole hook, and 3 is adjustable apparatus set bolt, and 4 is load screw mandrel, and 5 is load screw mandrel set bolt.
embodiment:
As shown in Figure 1, the utility model comprises jig body, two adjustable pole hooks and two load screw mandrels, and two load screw mandrels are set in parallel in the two ends of jig body, and vertical with jig body, two adjustable pole hooks are between two load screw mandrels, and parallel with load screw mandrel.Two adjustable pole hooks are identical with the symmetry axis of two load screw mandrels in jig body.Adjustable pole hook is fixed in jig body by adjustable apparatus set bolt, and two heads hooked are relative.Load screw mandrel is fixed in jig body by load screw mandrel set bolt.Adjustable pole hook upper end is provided with screw thread.During use, by adjusting the width of the adjustable pole hook fixture of jig, jig being fixed on square cross-arm, the load screw mandrel at the good jig two ends of assembly and connection, then being connected with connector, arm-tie, line lifter etc.Tighten up in tower head side and loosen screw mandrel, completing the work changing insulator string.Embodiment recited above is only be described preferred implementation of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept, the various modification that this area ordinary person makes the technical solution of the utility model and improvement, all should drop into protection range of the present utility model.

Claims (4)

1. double loop straight line steel tube tower side cross-arm jig, it is characterized in that, comprise jig body, two adjustable pole hooks and two load screw mandrels, two load screw mandrels are set in parallel in the two ends of jig body, and it is vertical with jig body, two adjustable pole hooks are between two load screw mandrels, and parallel with load screw mandrel.
2. straight line steel tube tower side, double loop according to claim 1 cross-arm jig, is characterized in that, two adjustable pole hooks are identical with the symmetry axis of two load screw mandrels in jig body.
3. straight line steel tube tower side, double loop according to claim 1 cross-arm jig, it is characterized in that, adjustable pole hook is fixed in jig body by adjustable apparatus set bolt, and two heads hooked are relative.
4. straight line steel tube tower side, double loop according to claim 1 cross-arm jig, it is characterized in that, load screw mandrel is fixed in jig body by load screw mandrel set bolt.
CN201420665803.4U 2014-11-10 2014-11-10 Straight line steel tube tower side, double loop cross-arm jig Active CN204167793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420665803.4U CN204167793U (en) 2014-11-10 2014-11-10 Straight line steel tube tower side, double loop cross-arm jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420665803.4U CN204167793U (en) 2014-11-10 2014-11-10 Straight line steel tube tower side, double loop cross-arm jig

Publications (1)

Publication Number Publication Date
CN204167793U true CN204167793U (en) 2015-02-18

Family

ID=52541444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420665803.4U Active CN204167793U (en) 2014-11-10 2014-11-10 Straight line steel tube tower side, double loop cross-arm jig

Country Status (1)

Country Link
CN (1) CN204167793U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821517A (en) * 2015-06-03 2015-08-05 国网冀北电力有限公司唐山供电公司 Double-pull-rod wing-shaped lead lifting device
CN105514877A (en) * 2016-03-04 2016-04-20 国家电网公司 Cross arm clamp for insulator replacement of steel pipe pole of common-tower double-circuit lines
CN106495060A (en) * 2016-10-21 2017-03-15 广东电网有限责任公司珠海供电局 Auxiliary replacement utensil

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821517A (en) * 2015-06-03 2015-08-05 国网冀北电力有限公司唐山供电公司 Double-pull-rod wing-shaped lead lifting device
CN105514877A (en) * 2016-03-04 2016-04-20 国家电网公司 Cross arm clamp for insulator replacement of steel pipe pole of common-tower double-circuit lines
CN105514877B (en) * 2016-03-04 2018-11-16 国家电网公司 Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture
CN106495060A (en) * 2016-10-21 2017-03-15 广东电网有限责任公司珠海供电局 Auxiliary replacement utensil

Similar Documents

Publication Publication Date Title
CN103545751B (en) Overhead transmission line ground wire optical fiber cable fitting changes support
CN201904568U (en) Overhead ground wire lifting device
CN204167793U (en) Straight line steel tube tower side, double loop cross-arm jig
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN103545753B (en) Multifunctional 550kN titanium alloy closed insulator fixture
CN103594968A (en) Lifting device of multiple divided conductors of transmission tower
CN203251017U (en) Insulation ladder tail end fixing device
CN105305317A (en) Tool of suspending insulated flexible ladder on live wires
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN103928868A (en) Iron tower overhead ground wire lifter
CN202594699U (en) Power transmission line lifting device for steel pipe tower
CN203553740U (en) A replacing apparatus for a 800kV extra-high voltage direct current transmission line single insulator
CN204131005U (en) Double loop tangent tower steeple head cross-arm jig
CN204179569U (en) A kind of sister block wire grip of electric transmission line erection
CN103138204B (en) Strain cross arm is changed and is used multi-functional installing rack
CN102097763A (en) Overhead ground wire lifter
CN202373939U (en) Live-working double-conductor lifting device
CN202488035U (en) Hoisting device for maintenance of power transmission line above concrete poles
CN205141535U (en) Live conductor hangs instrument of insulating rope ladder
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus
CN204675626U (en) Insulator fast-assembling suspender
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN203529713U (en) High-pressure sleeve hoisting structure
CN203119388U (en) Multifunctional mounting rack for changing tension-resistant crossarm
CN204333763U (en) The maintenance vehicle of charged for replacement electric pole cross-arm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant