CN203529713U - High-voltage bushing hoisting structure - Google Patents
High-voltage bushing hoisting structure Download PDFInfo
- Publication number
- CN203529713U CN203529713U CN201320576665.8U CN201320576665U CN203529713U CN 203529713 U CN203529713 U CN 203529713U CN 201320576665 U CN201320576665 U CN 201320576665U CN 203529713 U CN203529713 U CN 203529713U
- Authority
- CN
- China
- Prior art keywords
- bushing
- hoisting
- voltage bushing
- belt
- hoisting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000000977 initiatory effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 3
- 230000005484 gravity Effects 0.000 abstract 2
- 238000004804 winding Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 229910052573 porcelain Inorganic materials 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a hoisting structure, especially a high-tension bushing hoisting structure. The utility model provides a high-voltage bushing hoisting structure for avoiding damaging a high-voltage bushing, which comprises a high-voltage bushing, a hoisting hole arranged on the high-voltage bushing, a hoisting belt and a fixing belt, wherein the fixing belt is wound and fixed at the gravity center position of the high-voltage bushing; the starting end of the hoisting belt penetrates and is fixedly connected to the hoisting hole in a winding mode, and the hoisting belt is arranged along the high-voltage sleeve. The hoisting belt is adopted to hoist the high-voltage bushing, the hoisting belt has good flexibility, the high-voltage bushing can be prevented from being damaged, the fixing belt can enable the hoisting point of the hoisting belt to be located at the gravity center of the high-voltage bushing, and the high-voltage bushing is prevented from rotating left and right to collide when being hoisted. Meanwhile, the two ends of the temperature high-voltage bushing can be controlled by using the control ropes, so that the high-voltage bushing is prevented from rotating and shaking in the hoisting process.
Description
Technical field
The utility model relates to a kind of hoisting structure, especially a kind of bushing hoisting structure.
Background technology
Along with the development of industrial technology, commercial production is more and more important to the demand of electric energy, and the utilization of high pressure and ehv power transmission is more and more extensive, and large-scale voltage transformer is high pressure and ehv power transmission pith.It is more general that the installation of high-power transformer becomes, and bushing lifting is the emphasis of the installation of voltage transformer.What at present the lifting of bushing mainly adopted is the setting angle that chain block is adjusted sleeve pipe, and workman's labour intensity is large, the angular adjustment time is long, the damaging height of chain to porcelain insulator.Therefore be necessary existing lifting mode to improve, improve installation quality and work efficiency.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of bushing hoisting structure of avoiding damaging bushing.
The utility model solves the bushing hoisting structure that its technical matters adopts, and comprises bushing, is provided with hole for hoist on bushing, also comprises hanging belt and clamping band, and described clamping band is fastened at the center-of-gravity position of bushing; The initiating terminal of described hanging belt is worn around being fixedly connected on hole for hoist, and described hanging belt is fixed in the center-of-gravity position place colligation of bushing along the band that is fixed after bushing extends.
Further, also comprise tricing line, described tricing line is connected to the end of bushing.
Further, described tricing line is provided with two, and described two tricing lines are separately positioned on the two ends of bushing.
Further, also comprise auxiliary fixing band, described auxiliary fixing band is fastened and fixes on bushing and by hanging belt colligation, and described auxiliary fixing band is between clamping band and hole for hoist.
The beneficial effects of the utility model are: owing to having adopted lifting to bring lifting bushing, and the pliability of hanging belt itself is better, therefore can prevent the bushing of damaging, and clamping band can, so that the Heave Here of hanging belt is positioned at the center-of-gravity position of bushing, be avoided bushing left-right rotation collision when lifting.Meanwhile, can also by tricing line, control the two ends of temperature bushing, avoid bushing in the process of lifting, rotate and rock.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model;
Parts, position and numbering in figure: bushing 1, hanging belt 2, clamping band 3, tricing line 4, auxiliary fixing band 5.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, the utility model comprises bushing, is provided with hole for hoist on bushing, also comprises hanging belt 2 and clamping band 3, and described clamping band 3 is fastened at the center-of-gravity position of bushing 1; The initiating terminal of described hanging belt 2 is worn around being fixedly connected on hole for hoist, and described hanging belt 2 is fixed in the center-of-gravity position place colligation of bushing 1 with 3 along being fixed after bushing 1 extends.Also comprise tricing line 4, described tricing line 4 is connected to the end of bushing 1.Described tricing line 4 is provided with two, and described two tricing lines 4 are separately positioned on the two ends of bushing 1.Also comprise auxiliary fixing band 5, described auxiliary fixing band 5 is fastened and fixes on bushing 1 and by hanging belt 2 colligations, and described auxiliary fixing band 5 is between clamping band 3 and hole for hoist.The general nylon material that adopts of hanging belt 2, clamping band 3 and tricing line 4 is made, to reach enough intensity.The length of tricing line 4 need reach enough height, so that bushing 1 can be controlled in whole hoisting height.
In use, lift by crane according to the following steps bushing 1:
1, weight, length and the setting angle according to bushing 1 shop instructions, submitted to, determine Heave Here;
2, the hole for hoist of original setting on bushing 1, hanging belt 2 need all be worn around rear, and two take the lead to close up;
3, the hanging belt 2 after closing up is along bushing 1 full skirt to determining that place, Heave Here is fixing with clamping band 3, locking, can also colligation auxiliary fixing band 5 between clamping band 3 and hole for hoist, and hanging belt 2 is connected more firm;
4, bushing Shang Xia 1 two ends be respectively a tricing line 4, adjust bushing 1 in lifting process spatial location, prevent collision;
5, bushing hangs 1 and adjusts position when raising seat, inserts in the seat that raises, and clamp flange screw, completes lifting work;
6, after flange is fastening, be dismountable hanging belt 2, clamping band 3, auxiliary fixing band 5 and tricing line 4.
Claims (4)
1. bushing hoisting structure, comprises bushing, is provided with hole for hoist on bushing, it is characterized in that: also comprise hanging belt (2) and clamping band (3), described clamping band (3) is fastened at the center-of-gravity position of bushing (1); The initiating terminal of described hanging belt (2) is worn around being fixedly connected on hole for hoist, and described hanging belt (2) is fixed in the center-of-gravity position place colligation of bushing (1) along the band (3) that is fixed after bushing (1) extends.
2. bushing hoisting structure as claimed in claim 1, is characterized in that: also comprise tricing line (4), described tricing line (4) is connected to the end of bushing (1).
3. bushing hoisting structure as claimed in claim 2, is characterized in that: described tricing line (4) is provided with two, and described two tricing lines (4) are separately positioned on the two ends of bushing (1).
4. the bushing hoisting structure as described in claim 1,2 or 3, it is characterized in that: also comprise auxiliary fixing band (5), described auxiliary fixing band (5) is fastened upper at bushing (1) and hanging belt (2) colligation is fixed, and described auxiliary fixing band (5) is positioned between clamping band (3) and hole for hoist.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320576665.8U CN203529713U (en) | 2013-09-17 | 2013-09-17 | High-voltage bushing hoisting structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320576665.8U CN203529713U (en) | 2013-09-17 | 2013-09-17 | High-voltage bushing hoisting structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203529713U true CN203529713U (en) | 2014-04-09 |
Family
ID=50415949
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320576665.8U Expired - Lifetime CN203529713U (en) | 2013-09-17 | 2013-09-17 | High-voltage bushing hoisting structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203529713U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104961044A (en) * | 2015-05-29 | 2015-10-07 | 云南省送变电工程公司 | Method for installing or removing high voltage bushing by using C-shaped hoseclamp cross binding strap |
| CN106429817A (en) * | 2016-11-17 | 2017-02-22 | 国网福建省电力有限公司 | Ultrahigh-voltage bushing hosting method |
-
2013
- 2013-09-17 CN CN201320576665.8U patent/CN203529713U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104961044A (en) * | 2015-05-29 | 2015-10-07 | 云南省送变电工程公司 | Method for installing or removing high voltage bushing by using C-shaped hoseclamp cross binding strap |
| CN106429817A (en) * | 2016-11-17 | 2017-02-22 | 国网福建省电力有限公司 | Ultrahigh-voltage bushing hosting method |
| CN106429817B (en) * | 2016-11-17 | 2017-12-05 | 国网福建省电力有限公司 | Extra-high voltage sleeve pipe hanging method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204607396U (en) | A kind of stator core suspender | |
| CN201966539U (en) | Overhead ground wire mounting lifter of power transmission line | |
| CN102882153B (en) | Phase replacing insulator string method in charged for replacement circuit many times towers | |
| CN203428736U (en) | Electrode hoisting fixture of electric melting furnace | |
| CN106099747B (en) | Livewire work conduction wire riser | |
| CN203529713U (en) | High-voltage bushing hoisting structure | |
| CN207170926U (en) | Engine cylinder-body suspended core fixture | |
| CN201868784U (en) | Lifter for 220KV earth wire of power transmission line | |
| CN201674159U (en) | Double angle steel hanging point insulator string live replacement tool | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN202429945U (en) | Hoisting device for power supply facility | |
| CN206188298U (en) | Transformer lifting device | |
| CN203114144U (en) | Overhung maintenance hook ladder | |
| CN201868786U (en) | Special repairing lifter for 220KV lightning wire of power transmission line | |
| CN103138204B (en) | Strain cross arm is changed and is used multi-functional installing rack | |
| CN105305316B (en) | A kind of mountain region effort-saving circuit line lifter | |
| CN201907924U (en) | Spreading wing-type winding drum lifting device | |
| CN205811418U (en) | Livewire work conduction wire riser | |
| CN105110202A (en) | Boom-rotating type hoisting support for pole-mounted switch | |
| CN102468619A (en) | Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line | |
| CN205092143U (en) | Coil suit tool equipment | |
| CN203553744U (en) | An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus | |
| CN203589426U (en) | Lifting device for mounting grounding wire hanging hook | |
| CN203983864U (en) | 500kV overhead transmission line tangent tower lightning conducter lifting operation device | |
| CN202444205U (en) | Grounding wire which people can hang without mounting a pole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140409 |