CN208608639U - Aerial earth wire hanging point bolt replaces tool - Google Patents
Aerial earth wire hanging point bolt replaces tool Download PDFInfo
- Publication number
- CN208608639U CN208608639U CN201821135478.5U CN201821135478U CN208608639U CN 208608639 U CN208608639 U CN 208608639U CN 201821135478 U CN201821135478 U CN 201821135478U CN 208608639 U CN208608639 U CN 208608639U
- Authority
- CN
- China
- Prior art keywords
- lead screw
- handle
- hole
- bolt
- screwed pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of aerial earth wire hanging point bolts to replace tool, including fixed device and lifting device, the fixed device use crossarm bolt fixture, and the lifting device includes casing threads lead screw, handle and detachable novel hook;Described sleeve pipe thread lead screw is made of lead screw handle, feed screw nut, lead screw screwed pipe, threaded rod and u shaped connector;The upper end of described sleeve pipe thread lead screw is arranged in the lead screw handle, the lower end of the lead screw handle connects the lead screw screwed pipe, feed screw nut described in the external connection of the lead screw screwed pipe, the inside of the lead screw screwed pipe connect the threaded rod, and the lower end of the threaded rod connects the u shaped connector;The handle is connected to the bottom righthand side of the lead screw handle, and the crossarm bolt fixture is arranged in the left end of described sleeve pipe thread lead screw and is connected on the feed screw nut, and the detachable novel hook is connected to the lower end of the u shaped connector;The utility model performance is stablized, time saving and energy saving, is suitable for a variety of towers.
Description
Technical field
The utility model relates to a kind of bolts of overhead transmission line road to replace tool, and in particular to a kind of aerial earth wire extension
Point bolt replaces tool.
Background technique
Overhead transmission line due to running outdoors for a long time, inclement condition.Overhead ground wire is protection overhead transmission line
From the device of lightening strikes, usually steel strand wires is mostly used to form, overhead ground wire improves line it is possible to prevente effectively from lightning stroke trip
The safety of road transport row is the important component part of transmission line of electricity.The gravity of overhead ground wire is all born by hanging point bolt,
Under wind-force effect, phenomena such as aerial earth wire is often waved, vibrated, the abrasion of hanging point bolt is exacerbated, therefore, the extension of aerial earth wire
Point bolt usually needs replacing.
During actual job, since hanging point bolt carries whole gravity of aerial earth wire, when replacing fitting, need
Lift aerial earth wire using tool, offsets the aerial earth wire gravity that fitting is subject to, just can be carried out replacement fitting.500kV line at present
Road replacement aerial earth wire hanging point bolt generally uses the Lever Blocks of 1.5T for lifting device, using U-shaped ring as on Lever Blocks
Then suspension hook hitch point catches on aerial earth wire with lower suspension hook, after aerial earth wire promotes certain altitude, the lifting force of Lever Blocks
The gravity of aerial earth wire is offset, operating personnel can replace at this time.Due to the total length of aerial earth wire connection gold utensil
Usually in 400mm or so, Lever Blocks transmission device is larger, leads to ground wire installation site operation faciostenosis, and worker is inconvenient to grasp
Make, average time activity duration is 64 minutes, and in livewire work, since Lever Blocks tail portion iron chains is longer, tail chain is sagging to be made
The safe distance for obtaining conducting wire and iron chains is inadequate, easily causes single-line to ground fault.
In addition, 1.5T Lever Blocks own wt is larger, the artificial upper tower of carrying is larger to the physical demands of worker;Hand pulls calabash
Reed does not have dedicated steel tower fixing end, is fixed by rope sling and U-shaped ring, mounts and dismounts cumbersome, promoted in rotating spanner aerial
During ground wire, lever hoist operation planar is parallel with aerial earth wire in vertical direction, and worker is in the inconvenience of ground wire cross-arm top
Operation.
Domestic invention has the tool for promoting ground wire at present, but the new tool invented at present is only for certain particular columns
Type is effective, is not suitable with a variety of towers, is not able to satisfy the actual needs of existing 500kV route.500kV route mostly uses greatly JLB4-
150 type ground wires, JLB4-150 ground wire maximum working tension 31598N, average running tension 12346N-13514N table look-up and know
Wire quality M=696.7kg/km of JLB4-150 type ground wire unit length, the ground mm of cross-sectional area S=148.072, administrative route
Maximum away from being 524 meters, then on steel tower hanging point bolt bear aerial earth wire gravity F are as follows: the N of F=11574.It is provided by consulting
Expect, generally to retain the safety factor of 20%-30% in engineering science for specified amount of support, choosing safety factor is 25%, i.e. 11574N
× 1.25=14467.8N, therefore, if need to lift aerial earth wire, the lifting force of tool is at least 15000N, it can uses the work
Tool carries out replacement aerial earth wire fitting.
Utility model content
The technical problem to be solved by the utility model is to the conventional method hand in the line process of hoisting frame vacant lot is overcome to pull calabash
Reed operation is limited, tail chain there are security risk, construction is time-consuming the problems such as, a kind of aerial earth wire hanging point bolt replacement tool is provided,
By reducing the volume of hoisting tool, to change stress model, increase operating surface, reduction activity duration.
The technical solution of the utility model is: a kind of aerial earth wire hanging point bolt replacement tool, including fixes device and mention
Rise device, the fixed device uses crossarm bolt fixture, and the lifting device includes casing threads lead screw, handle and detachable
Novel hook;Described sleeve pipe thread lead screw is made of lead screw handle, feed screw nut, lead screw screwed pipe, threaded rod and u shaped connector;It is described
The upper end of described sleeve pipe thread lead screw is arranged in lead screw handle, and the lower end of the lead screw handle connects the lead screw screwed pipe, the lead screw
The inside of feed screw nut described in the external connection of screwed pipe, the lead screw screwed pipe connects the threaded rod, the lower end of the threaded rod
Connect the u shaped connector;The handle is connected to the bottom righthand side of the lead screw handle, and the crossarm bolt fixture is arranged in the set
The left end of pipe screw thread lead screw is simultaneously connected on the feed screw nut, and the detachable novel hook is connected to the u shaped connector
Lower end.
The inside and outside of the lead screw screwed pipe has tapping, and inside is connected through a screw thread the threaded rod, external to be connected by screw thread
The feed screw nut is connect, the crossarm bolt fixture is fixed on the periphery of the feed screw nut;The lower end and the right side of the lead screw handle
End is provided with mounting hole: the lead screw screwed pipe is fixedly welded in the mounting hole of lower end, right end installs the fixed handle of hole horizontal;
The threaded rod is welded on the upper end of the u shaped connector, and lower end passes through detachable novel hook described in rivet interlacement.
The crossarm bolt fixture is made of fixture mount, cross-arm folder platform and bolt;The fixture mount is welded by steel plate
It forms, is divided into the horizontal brace frame that the vertical height of left end is tried to stop people from fighting each other with right end, is arranged on the left wall center line that the vertical height is tried to stop people from fighting each other
There are two the bolt, right end and the cross-arm folder platform of the horizontal brace frame are horizontally welded together;The cross-arm presss from both sides platform
Centre be provided with a circular through hole, two oval-shaped grooves and four screw holes, the oval-shaped groove is arranged described
The left and right ends of circular through hole simultaneously communicate therewith, and the corner that the oval-shaped groove is connected with the circular through hole is each provided with
One bolt hole, the crossarm bolt fixture are connected and fixed by the circular through hole and the feed screw nut.
The detachable novel hook is by linking up with outer ring stand, inner ring neonychium, central axis, connection sheet and hexagonal axis pin bank
At;The outer ring stand of the hook is connected to become entirety by the central axis for two-flap type structure, outside the hook in ring stand: under
End is provided with interlaced rotatable claw type structure, and intermediate circle is intracavitary to be provided with the inner ring neonychium, upper end triangle
Threaded hole is provided on plate;The outer ring stand of the hook and the connection sheet by the hexagonal axis pin connection, the connection sheet
Upper end hole is connect by rivet with the lower end of the u shaped connector.
Described sleeve pipe thread lead screw uses the single thread lead screw that length is 2.5mm for 420mm, screw pitch, the lifting device
Total height be 540mm.
The axial length of the outer ring stand of the hook is 100mm, the right end mounting hole center to the right side of the crossarm bolt fixture
The distance at side edge is 25mm, and the length that the vertical height is tried to stop people from fighting each other is 45mm, is highly 80mm, the horizontal brace frame and described
The total length that cross-arm presss from both sides platform is 155mm.
The beneficial effects of the utility model are:
1) the utility model uses crossarm bolt fixture fixing device, can satisfy the entire fixation for promoting specific purpose tool with
Support, fixed device fixation is reliable, structure is simple, save the cost, easy for assemble or unload, and is able to bear entire aerial ground
The gravity traction of line.
2) the utility model uses screw pitch for the single thread lead screw of 2.5mm, and hook direction is adjustable, lifting is quick, and effectively
Ground wire lifting distance is lengthened, adapts to more tower-shaped, high altitude operation should pay the utmost attention to worker's actual conditions on tower, this is practical new
Type is more laborsaving, and working is safer, convenient and efficient, reduces the activity duration.
3) the utility model uses detachable novel hook, and hook will not be rotated with lead screw and be rotated, in lifting process by
Force area is big, pressure is small, does not allow easy damaged ground wire, and lifting force is greater than 15000N.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the main view of crossarm bolt fixture in above-mentioned Fig. 1;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the main view of detachable novel hook in above-mentioned Fig. 1;
Fig. 5 is the left view of Fig. 4.
Specific embodiment
The utility model is made further explanation in the following with reference to the drawings and specific embodiments:
Referring to Fig. 1-4, in figure, 1- casing threads lead screw, 11- lead screw handle, 12- feed screw nut, 13- lead screw screwed pipe, 14- spiral shell
Rasp bar, 15-U type joint, 2- handle, 3- crossarm bolt fixture, 31- fixture mount, 32- cross-arm folder platform, 33- bolt, 4- are removable
Novel hook is unloaded, 41- links up with outer ring stand, 42- inner ring neonychium, 43- central axis, 44- connection sheet, 45- hexagonal pivot pin.
Embodiment: a kind of aerial earth wire hanging point bolt replacement tool, including fixed device and lifting device, fixed device are adopted
With crossarm bolt fixture 3, lifting device includes casing threads lead screw 1, handle 2 and detachable novel hook 4;Casing threads lead screw
1 uses the single thread lead screw that length is 2.5mm for 420mm, screw pitch, and the total height of lifting device is 540mm.
Casing threads lead screw 1 is by lead screw handle 11, feed screw nut 12, lead screw screwed pipe 13, threaded rod 14 and 15 groups of u shaped connector
At;Lead screw handle 11 is mounted on the upper end of casing threads lead screw 1, and the lower end of lead screw handle 11 connects lead screw screwed pipe 13, lead screw screwed pipe 13
External connection feed screw nut 12, the inner joining threads bar 14 of lead screw screwed pipe 13, the lower end of threaded rod 14 connects u shaped connector
15;Handle 2 is connected to the bottom righthand side of lead screw handle 11, and crossarm bolt fixture 3 is arranged in the left end of casing threads lead screw 1 and is connected to
On feed screw nut 12, detachable novel hook 4 is connected to the lower end of u shaped connector 15.
The inside and outside of lead screw screwed pipe 13 has tapping, and inside is connected through a screw thread threaded rod 14, and outside is connected through a screw thread silk
Thick stick nut 12, crossarm bolt fixture 3 are fixed on the periphery of feed screw nut 12;The lower end of lead screw handle 11 and right end are provided with installation
Hole: being fixedly welded lead screw screwed pipe 13 in the mounting hole of lower end, right end installs hole horizontal fixed handle 2;Threaded rod 14 is welded on U-shaped connect
First 15 upper end, lower end pass through the detachable novel hook 4 of rivet interlacement.
Crossarm bolt fixture 3 is made of fixture mount 31, cross-arm folder platform 32 and bolt 33;Fixture mount 31 is welded by steel plate
It forms, is divided into the horizontal brace frame that the vertical height of left end is tried to stop people from fighting each other with right end, is equipped with two on the left wall center line that vertical height is tried to stop people from fighting each other
A bolt 33, right end and the cross-arm folder platform 32 of horizontal brace frame are horizontally welded together;There is a circle in the centre of cross-arm folder platform 32
The left and right ends of circular through hole and therewith phase are arranged in shape through-hole, two oval-shaped grooves and four screw holes, oval-shaped groove
Logical, the corner that oval-shaped groove is connected with circular through hole is respectively tapped with a bolt hole, and crossarm bolt fixture 3 passes through circular through hole
It is connected and fixed with feed screw nut 12.
The distance at the right end mounting hole center of crossarm bolt fixture 3 to the right edge is 25mm, the length that vertical height is tried to stop people from fighting each other
For 45mm, be highly 80mm, the total length of horizontal brace frame and cross-arm folder platform 32 is 155mm.
Detachable novel hook 4 is by linking up with outer ring stand 41, inner ring neonychium 42, central axis 43, connection sheet 44 and hexagonal axis
Pin 45 forms;It links up with outer ring stand 41 and entirety is connected to become by central axis 43 for two-flap type structure, link up with the axial direction of outer ring stand 41
Length is 100mm, in linking up with outer ring stand 41: lower end is provided with interlaced rotatable claw type structure, intermediate round intracavitary
It is provided with inner ring neonychium 42, tapped hole on the triangular plate of upper end;It links up with outer ring stand 41 and passes through hexagonal axis with connection sheet 44
Pin 45 links together, and the upper end hole of connection sheet 44 is connect by rivet with the lower end of u shaped connector 15.
Working principle: when promoting aerial earth wire, the fixation position on tower is chosen first, first by crossarm bolt fixture 3
It is fixed on casing threads lead screw 1, the utility model tool is fixed on by the bolt 33 to screw up with a wrench on crossarm bolt fixture 3
On tower, then aerial earth wire is placed on the inner ring neonychium 42 in detachable novel hook 4, then hexagonal pivot pin 45 is installed
Fixed in the hole for linking up with outer ring stand 41 and connection sheet 44, last rotational handle 2 is turned handle 2 by casing threads lead screw 1
Turn is changed to the horizontal of screw rod and is promoted, and aerial earth wire can raise up.
The utility model is using bolted fixture as fixed form, based on casing threads lead screw, with detachable novel hook
For the hoisting tool of impetus, according to lead screw transmission principle, by handle horizontally rotate be converted to by casing threads lead screw it is perpendicular
Straight to be promoted, the utility model performance is stable, convenient and efficient, low in cost, is suitable for a variety of towers.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model
Limitation, it is made by the above technical examples according to the technical essence of the present invention it is any it is simple modification, equivalent variations with
Modification, is still within the scope of the technical solutions of the present invention.
Claims (5)
1. a kind of aerial earth wire hanging point bolt replaces tool, including fixed device and lifting device, it is characterised in that: the fixation
Device uses crossarm bolt fixture (3), and the lifting device includes casing threads lead screw (1), handle (2) and detachable Novel hanging
Hook (4);Described sleeve pipe thread lead screw (1) is by lead screw handle (11), feed screw nut (12), lead screw screwed pipe (13), threaded rod (14) and U
Type joint (15) composition;The lead screw handle (11) is arranged in the upper end of described sleeve pipe thread lead screw (1), the lead screw handle (11)
Lower end connects the lead screw screwed pipe (13), feed screw nut (12) described in the external connection of the lead screw screwed pipe (13), the lead screw
The inside of screwed pipe (13) connects the threaded rod (14), and the lower end of the threaded rod (14) connects the u shaped connector (15);It is described
Handle (2) is connected to the bottom righthand side of the lead screw handle (11), and the crossarm bolt fixture (3) is arranged in described sleeve pipe thread lead screw
(1) left end is simultaneously connected on the feed screw nut (12), and the detachable novel hook (4) is connected to the u shaped connector
(15) lower end.
2. aerial earth wire hanging point bolt according to claim 1 replaces tool, it is characterized in that: the lead screw screwed pipe (13)
Inside and outside to have tapping, inside is connected through a screw thread the threaded rod (14), and outside is connected through a screw thread the feed screw nut (12),
The crossarm bolt fixture (3) is fixed on the periphery of the feed screw nut (12);The lower end of the lead screw handle (11) and right end are equal
It is provided with mounting hole: being fixedly welded the lead screw screwed pipe (13) in the mounting hole of lower end, right end installs the fixed handle of hole horizontal
(2);The threaded rod (14) is welded on the upper end of the u shaped connector (15), and lower end passes through detachable novel described in rivet interlacement
It links up with (4).
3. aerial earth wire hanging point bolt according to claim 1 replaces tool, it is characterized in that: the crossarm bolt fixture
(3) it is made of fixture mount (31), cross-arm folder platform (32) and bolt (33);The fixture mount (31) is welded by steel plate,
It is divided into the horizontal brace frame that the vertical height of left end is tried to stop people from fighting each other with right end, on the left wall center line that the vertical height is tried to stop people from fighting each other there are two settings
The bolt (33), right end and cross-arm folder platform (32) of the horizontal brace frame are horizontally welded together;The cross-arm folder
The centre of platform (32) is provided with a circular through hole, two oval-shaped grooves and four screw holes, the oval-shaped groove setting
The circular through hole left and right ends and communicate therewith, the corner that the oval-shaped groove is connected with the circular through hole is each
It is provided with a bolt hole, the crossarm bolt fixture (3) connect by the circular through hole with the feed screw nut (12) solid
It is fixed.
4. aerial earth wire hanging point bolt according to claim 1 replaces tool, it is characterized in that: the detachable novel hook
(4) it is formed by linking up with outer ring stand (41), inner ring neonychium (42), central axis (43), connection sheet (44) and hexagonal pivot pin (45);Institute
It states the outer ring stand (41) of hook and entirety is connected to become by the central axis (43) for two-flap type structure, the ring stand outside the hook
(41) in: lower end is provided with interlaced rotatable claw type structure, and intermediate circle is intracavitary to be provided with the inner ring neonychium
(42), threaded hole is provided on the triangular plate of upper end;The outer ring stand (41) of the hook and the connection sheet (44) pass through described six
The upper end hole of angle pivot pin (45) connection, the connection sheet (44) is connect by rivet with the lower end of the u shaped connector (15).
5. a kind of aerial earth wire hanging point bolt according to claim 1 replaces tool, it is characterized in that: described sleeve pipe screw thread silk
Thick stick (1) uses the single thread lead screw that length is 2.5mm for 420mm, screw pitch, and the total height of the lifting device is 540mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821135478.5U CN208608639U (en) | 2018-07-18 | 2018-07-18 | Aerial earth wire hanging point bolt replaces tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821135478.5U CN208608639U (en) | 2018-07-18 | 2018-07-18 | Aerial earth wire hanging point bolt replaces tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208608639U true CN208608639U (en) | 2019-03-15 |
Family
ID=65668847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821135478.5U Active CN208608639U (en) | 2018-07-18 | 2018-07-18 | Aerial earth wire hanging point bolt replaces tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208608639U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111130018A (en) * | 2020-03-02 | 2020-05-08 | 国网通用航空有限公司 | Ground wire lifter utilizing construction hole operation |
CN111130017A (en) * | 2020-03-02 | 2020-05-08 | 国网通用航空有限公司 | Ground wire lifter operating by utilizing ground wire cross arm angle steel |
CN111404074A (en) * | 2019-12-13 | 2020-07-10 | 国网浙江省电力有限公司金华供电公司 | Device for replacing extra-high voltage insulator in live mode |
CN112260139A (en) * | 2020-10-29 | 2021-01-22 | 大庆油田有限责任公司 | Tool for disassembling wire connector of spanning rod |
CN114188879A (en) * | 2021-11-29 | 2022-03-15 | 广西电网有限责任公司桂林供电局 | Device with balanced ground wire, optical cable tension and lifting function |
-
2018
- 2018-07-18 CN CN201821135478.5U patent/CN208608639U/en active Active
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111404074A (en) * | 2019-12-13 | 2020-07-10 | 国网浙江省电力有限公司金华供电公司 | Device for replacing extra-high voltage insulator in live mode |
CN111404074B (en) * | 2019-12-13 | 2021-05-18 | 国网浙江省电力有限公司金华供电公司 | Device for replacing extra-high voltage insulator in live mode |
CN111130018A (en) * | 2020-03-02 | 2020-05-08 | 国网通用航空有限公司 | Ground wire lifter utilizing construction hole operation |
CN111130017A (en) * | 2020-03-02 | 2020-05-08 | 国网通用航空有限公司 | Ground wire lifter operating by utilizing ground wire cross arm angle steel |
CN111130017B (en) * | 2020-03-02 | 2023-11-14 | 国网电力空间技术有限公司 | Ground wire lifter utilizing ground wire cross arm angle steel operation |
CN111130018B (en) * | 2020-03-02 | 2023-11-17 | 国网电力空间技术有限公司 | Ground wire lifter operated by construction hole |
CN112260139A (en) * | 2020-10-29 | 2021-01-22 | 大庆油田有限责任公司 | Tool for disassembling wire connector of spanning rod |
CN112260139B (en) * | 2020-10-29 | 2021-11-23 | 大庆油田有限责任公司 | Tool for disassembling wire connector of spanning rod |
CN114188879A (en) * | 2021-11-29 | 2022-03-15 | 广西电网有限责任公司桂林供电局 | Device with balanced ground wire, optical cable tension and lifting function |
CN114188879B (en) * | 2021-11-29 | 2024-01-05 | 广西电网有限责任公司桂林供电局 | Device with balanced ground wire, optical cable tension and hoisting function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208608639U (en) | Aerial earth wire hanging point bolt replaces tool | |
CN201240787Y (en) | Flat-top tower crane | |
CN103342296B (en) | Adhering self-elevating-type tower crane for hoisting wind power equipment | |
CN103991800A (en) | Roof surface crane for building | |
CN201501730U (en) | Special hanger for blade of large-scale wind generator | |
CN201703776U (en) | Inverted lifting device of storage tank | |
CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
CN202488034U (en) | Lifting device for electric transmission line of angle iron tower | |
CN116946856A (en) | Marine horizontal single-blade lifting appliance and working method thereof | |
CN201247939Y (en) | Anti-dance weight dropper of high voltage overhead transmission line | |
CN203660422U (en) | 500 kV overhead ground wire lifting tool | |
CN202978098U (en) | Overhead ground wire lifter | |
CN201980890U (en) | Herringbone hoisting mast for hoisting under special situation of high altitude | |
CN208445196U (en) | It is a kind of for lead wire and earth wire in transmission line and the Multifunctional hanging line device of optical cable | |
CN212712478U (en) | Dismounting device for cargo boom and balance arm of tower crane | |
CN210065018U (en) | Rotatory davit device of synthetic insulator chain hangs in pair L type | |
CN209210260U (en) | A kind of boom hoisting applied to electric power tower equipment | |
CN203119386U (en) | Concrete rod lightning conductor lifting device | |
CN202488035U (en) | Hoisting device for maintenance of power transmission line above concrete poles | |
CN215057047U (en) | Combined type wire outlet horizontal ladder | |
CN220950792U (en) | Prefabricated component telescopic lifting appliance | |
CN217264210U (en) | Self-tensioning hoisting adjusting unit for lower chord cable, hoisting assembly and hoisting system | |
CN218058093U (en) | Self-tensioning lifting appliance for lower chord cable | |
CN103640986A (en) | Wind power generation tower attached pick crane | |
CN202190027U (en) | 35-220kV line overhaul operation frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |