CN106327072A - Budget cost management system for project node controlling - Google Patents

Budget cost management system for project node controlling Download PDF

Info

Publication number
CN106327072A
CN106327072A CN201610696911.1A CN201610696911A CN106327072A CN 106327072 A CN106327072 A CN 106327072A CN 201610696911 A CN201610696911 A CN 201610696911A CN 106327072 A CN106327072 A CN 106327072A
Authority
CN
China
Prior art keywords
cost
data
project
module
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610696911.1A
Other languages
Chinese (zh)
Inventor
李广伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610696911.1A priority Critical patent/CN106327072A/en
Publication of CN106327072A publication Critical patent/CN106327072A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a budget cost management system for project node controlling. The management system mainly comprises the components of a project node setting module, a cost calculating module, a data recording module, a comparative analysis module and a data report output module. A project construction engineering progress is combined with a time node. Setting of different nodes is performed according to a project period requirement. Furthermore budgeting is performed on the project cost of each node. Detailed checking is performed on the actual cost according to the project node progress. Comparative data analysis is performed according to the project time node and the progress. An obtained analysis result report is generated and is displayed through the data report output module. Therefore cost management for better project guidance is realized. According to the budget cost management system, bidirectional cost management is realized from a project progress node and the time node, so that higher refinement and higher scientific performance are realized in budget cost management. Database processing analysis software is utilized for performing detailed data analysis, and project budget cost management of an enterprise is optimized.

Description

The estimated cost management system that a kind of item nodes controls
Technical field
The invention belongs to cost management and control field, be specifically that the estimated cost management that a kind of item nodes controls is System.
Background technology
Cost management every cost accounting during referring to enterprise production and management, cost analysis, Decision-Making of Cost and cost control The general name of a series of scientific management behaviors such as system.Cost management is an important component part of business administration, and it requires system And comprehensive, scientifical and reasonable, it is for promoting volume increase joint, strengthening business accounting, improves business administration, improves enterprise's integral tube Reason level is significant.Usually said cost management is by cost planning, cost calculation, cost control and evaluation of performance Four content compositions.Cost planning is the competitive strategy according to enterprise and the formulation of residing economic environment, is also to cost pipe The planning that reason is made, provides thinking and general requirement for concrete cost management.Cost calculation is the information of Cost Management System Basis.Cost control is the information utilizing cost calculation to provide, take the means such as economy, technology and tissue realize reducing cost or A series of activities of cost improvement purpose.Evaluation of performance is the assessment to cost control effect, it is therefore intended that improve original one-tenth This control activity and incentives plus restraints employee and the cost behavior of group.
But cost management to be done well and improve cost management level, first have to conscientiously carry out forecasting of cost work, planning The cost level of regular period and cost objective, relative analysis realizes every scheme of cost objective, carries out maximally effective cost Decision-making.Then should work out cost planning according to the particular content of Decision-Making of Cost, and in this, as the foundation of cost control, strengthen Daily cost audit supervision, finds at any time and overcomes the loss and waste situation in production process, to be conscientiously organized at ordinary times This calculation work, establishes and improve cost-accounting system and every groundwork, strict implement allowable costs, and it is suitable to use Cost accounting method, is computed correctly product cost.
The estimate for a project cost management typically combines with timing node, and interior project process is to affect cost The key of management, therefore, cost management can not be limited only to produce consuming activity, should expand to product design, processing arrangement, set Production, the technology such as standby utilization, materials procurement, manpower distribution, sell, lay in and the every field such as operation.On last stage The result of appraisal instruct the cost management of next stage, only in this way could preferably controlling the cost management of whole project, from And reach high estimated cost management level.
Summary of the invention
Present invention solves the technical problem that and there is provided a kind of progress relying on project and the next detail control of timing node Estimated cost management system.
Technical scheme is as follows: the estimated cost management system that a kind of item nodes controls, described management system System specifically includes that item nodes arranges module, cost calculation module, data inputting module, relative analysis module, data output mould Block;Described item nodes arranges module and refers to be combined project construction project progress with timing node, wants according to the project cycle Asking, partial node is arranged, and the project cost to each node carries out budget simultaneously, and described project cost refers to material cost, people Work cost, other costs, carry out appropriateness budget and distribution according to project process respectively, forms cost detail control;Described Cost calculation module be, according to item nodes progress, actual cost is carried out detail accounting;Described data inputting module Refer to the cost data input relative analysis module that will adjust, carry out Data Comparison from the double bar line of PROJECT TIME node and progress and divide Analysis, will be obtained analysis result generation report and be presented by data outputting module, carry out the cost of more preferable guide item with this Management.
Further, described project cost can arrange content according to the requirement of disparity items, such as conventional material Cost, cost of labor, other costs etc., it is possible to the relatedness between time and project process is set as requested, by project Refining, the performance of each small project is corresponding with timing node, it is possible to will be corresponding with the parameter such as space, area.
Further, it is connection data base in system server that described item nodes arranges module, is recorded by data Enter module and the major parameter data of item nodes are imported data base, by the master data maintenance unit major parameter to importing Data are safeguarded, described data maintenance unit is used for receiving, increase, revise, inquire about and deleting various data information, then Again by the cost details of project construction project progress and timing node corresponding segments control, carried out point by Data Computation Unit The cost data that section item nodes is corresponding calculates, and result of calculation is stored in data base, the number connected by system server According to output module, with the form of standard costs form, data being presented output, setting up procedure is simple, easily operates, non-professional cost Management personnel can also complete independently.
Further, described data inputting module is keyboard, handwriting pad, touch screen etc. or other input equipments, operation Simply;Described data outputting module is the outut devices such as liquid crystal display, the most intuitively.
Further, described relative analysis module is to arrange in module by data maintenance unit according to item nodes The major parameter data of the item nodes provided import database data, then the one-tenth actually occurred by data inputting module typing The major parameter data of the cost data actually occurred with the item nodes in database data are tried out relative analysis by notebook data Software is analyzed, and forms cost control deviation data according to contrast situation, and described relative analysis software is according to user Set analysis type utilizes the optimal method of least square cost data to pre-setting to carry out geometric properties matching, then counts Deviation between each cost data and the institute's fitted figure that actually occur, and this deviation is compared with tolerance value, if This deviation is less than or equal to described tolerance value, then judge that cost management is normal, if this deviation is more than described tolerance value, then judges into This management is abnormal, sends estimated cost and controls early warning, then will provide analysis result.
Further, described tolerance value is the allowable tolerance model that the importance according to project difference node is correspondingly arranged Enclose, the percentage rate of planned costs shared by actual cost and the difference of planned costs represent,.
Further, described analysis result is raw by the deviation calculated according to geometric tolerances analytic unit and comparative result The report of pictograph intuitively become.
Compared with prior art, the beneficial effects of the present invention is: project construction project progress is combined with timing node, According to project cycle requirement, partial node arranges, the project cost of each node is carried out budget, respectively according to project process simultaneously Carrying out appropriateness budget and distribution, actual cost, control, is carried out carefully by formation cost detail further according to item nodes progress Joint property is adjusted, and by relative analysis module, the data obtained are carried out date comprision, will obtain analysis result and generate report Presented by data report output module, carry out the cost management of more preferable guide item with this.The management system of the present invention Control cost management from project process node with two-way of timing node, make the management of estimated cost change with scientific in further detail, Maintenance data storehouse Treatment Analysis software carries out detailed data analysis, improves the accuracy of project budget cost management, more Optimize the project budget cost management of enterprise.
Accompanying drawing explanation
Fig. 1 is the estimated cost management system flow schematic diagram of a kind of item nodes control of the present invention.
Detailed description of the invention
In conjunction with the flow chart of system, the present invention is further elaborated with.
As it is shown in figure 1, the estimated cost management system that a kind of item nodes controls, described management system specifically includes that Item nodes arranges module, cost calculation module, data inputting module, relative analysis module, data outputting module;Described item Mesh node arranges module and refers to be combined project construction project progress with timing node, and according to project cycle requirement, partial node sets Putting, the project cost to each node carries out budget simultaneously, described project cost refer to material cost, cost of labor, other Cost, carries out appropriateness budget and distribution according to project process respectively, forms cost detail control;Described cost calculation mould Block is, according to item nodes progress, actual cost is carried out detail accounting;Described data inputting module refers to accounting Cost data input relative analysis module, carries out date comprision from the double bar line of PROJECT TIME node and progress, will be divided Analysis result is generated report and is presented by data outputting module, carrys out the cost management of more preferable guide item with this.
Wherein, described project cost can arrange content according to the requirement of disparity items, conventional material cost, people Work cost, other costs, it is possible to the relatedness between time and project process is set as requested, project is refined, The performance of each small project is corresponding with timing node.It is to connect in system server that described item nodes arranges module The major parameter data of item nodes are imported data base by data inputting module by data base, are safeguarded single by master data The major parameter data imported are safeguarded by unit, and described data maintenance unit is used for receiving, increase, revise, inquire about and deleting Except various data informations, the most again by the cost details of project construction project progress and timing node corresponding segments control, logical Cross Data Computation Unit and carry out the cost data calculating that segmentation item nodes is corresponding, and result of calculation is stored in data base, logical Data are presented output, setting up procedure letter with the form of standard costs form by the data outputting module crossing system server connection Single, easily operate, non-professional cost management personnel can also complete independently.Described data inputting module is keyboard, operation letter Single;Described data outputting module is liquid crystal display, the most intuitively.Described relative analysis module is to set according to item nodes Put in module and import database data by the major parameter data of the item nodes of offer in data maintenance unit, then by number The cost data actually occurred according to typing module typing, cost data and the item nodes in database data that will actually occur Major parameter data try out relative analysis software and be analyzed, and form cost control deviation data, institute according to contrast situation The relative analysis software stated is to utilize the optimal method of least square cost to pre-setting according to the analysis type set by user Data carry out geometric properties matching, then calculate the deviation between each cost data actually occurred and institute's fitted figure, and This deviation is compared with tolerance value, if this deviation is less than or equal to described tolerance value, then judges that cost management is normal, if should Deviation is more than described tolerance value, then judge that cost management is abnormal, sends estimated cost and controls early warning, then will provide analysis knot Really.Described tolerance value is the Measurement Allowance that the importance according to project difference node is correspondingly arranged, by actual cost with Shared by the difference of planned costs, the percentage rate of planned costs represents.Described analysis result is for according to geometric tolerances analytic unit institute The report of pictograph intuitively that the deviation calculated and comparative result generate.
The present invention is further illustrated by the process of construction below in conjunction with certain real estate project:
The estimated cost management system that the item nodes of the present invention controls, described management system specifically includes that project saves Point arranges module, cost calculation module, data inputting module, relative analysis module, data outputting module;For certain real estate item Mesh, is first combined arranging module by described item nodes project construction project progress with timing node, and the project cycle is wanted Asking is 2 years, and timing node controls to arrange for monthly partial node, carries out integration project progress to project cost every month simultaneously Budget, described project cost refers to building cost, greening cost, cost of marketing, other costs, enters according to project process respectively Row appropriateness budget and distribution, formed cost detail control, described building cost include material cost, cost of labor, its His cost;Described cost calculation module is, according to item nodes progress, actual cost is carried out detail accounting;Monthly will The actual cost data produced passes through data inputting module and the cost data with budget passes through relative analysis module when project Intermediate node and the double bar line of progress carry out date comprision, will obtain analysis result generation report and be carried out by data outputting module Present, wherein the cost of December cheap rate analytical data such as following table:
In summary, this management system can allow cost management detailed-oriented, for during problem can quickly review, There is good flow custom and management function, efficiency can be improved, reduce cost, make the cost management of enterprise's production and operation Scientific and efficient.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it still may be used So that the technical scheme described in previous embodiment to be modified, or wherein portion of techniques feature is carried out equivalent;And These amendments or replacement, do not make the essence of appropriate technical solution depart from spirit and the model of embodiment of the present invention technical scheme Enclose.

Claims (7)

1. the estimated cost management system that an item nodes controls, it is characterised in that described management system specifically includes that item Mesh node arranges module, cost calculation module, data inputting module, relative analysis module, data outputting module;Described project Node arranges module and refers to be combined project construction project progress with timing node, and according to project cycle requirement, partial node is arranged, Project cost to each node carries out budget simultaneously, and described project cost refers to material cost, cost of labor, other one-tenth This, carry out appropriateness budget and distribution according to project process respectively, forms cost detail control;Described cost calculation module It is, according to item nodes progress, actual cost is carried out detail accounting;Described data inputting module refers to the one-tenth that will adjust Notebook data input relative analysis module, carries out date comprision from the double bar line of PROJECT TIME node and progress, will be analyzed Result is generated report and is presented by data outputting module, carrys out the cost management of more preferable guide item with this.
The estimated cost management system that a kind of item nodes the most according to claim 1 controls, it is characterised in that described Project cost can arrange content according to the requirement of disparity items, it is possible to arranges between time and project process as requested Relatedness.
The estimated cost management system that a kind of item nodes the most according to claim 1 controls, it is characterised in that described It is connection data base in system server that item nodes arranges module, by data inputting module by the main ginseng of item nodes Number data import data base, are safeguarded, by master data maintenance unit, the major parameter data imported, described data Maintenance unit is used for receiving, increase, revise, inquire about and deleting various data information, the most again by project construction project progress With the cost details handle control of timing node corresponding segments, carry out, by Data Computation Unit, the cost number that segmentation item nodes is corresponding According to calculating, and result of calculation is stored in data base, the data outputting module connected by system server by data with standard The form of the statement of costs presents output.
The estimated cost management system that a kind of item nodes the most according to claim 2 controls, it is characterised in that described Data inputting module is keyboard, handwriting pad, touch screen etc. or other input equipments;Described data outputting module is liquid crystal display The outut devices such as device.
The estimated cost management system that a kind of item nodes the most according to claim 1 controls, it is characterised in that described Relative analysis module is to arrange in module by the main ginseng of the item nodes of offer in data maintenance unit according to item nodes Number data import database data, then the cost data actually occurred by data inputting module typing, the one-tenth that will actually occur The major parameter data of notebook data and the item nodes in database data are tried out relative analysis software and are analyzed, and according to right Forming cost control deviation data than situation, described relative analysis software is to utilize according to the analysis type set by user The good method of least square cost data to pre-setting carries out geometric properties matching, then calculates each cost number actually occurred According to the deviation between institute's fitted figure, and this deviation is compared with tolerance value, if this deviation is less than or equal to described public affairs Difference, then judge that cost management is normal, if this deviation is more than described tolerance value, then judges that cost management is abnormal, sends pre-being counted as This control early warning, then will provide analysis result.
The estimated cost management system that a kind of item nodes the most according to claim 4 controls, it is characterised in that described Tolerance value is the Measurement Allowance that the importance according to project difference node is correspondingly arranged, by actual cost and planned costs The percentage rate of planned costs shared by difference represents.
The estimated cost management system that a kind of item nodes the most according to claim 4 controls, it is characterised in that described The report of pictograph intuitively that analysis result generates by the deviation calculated according to geometric tolerances analytic unit and comparative result.
CN201610696911.1A 2016-08-19 2016-08-19 Budget cost management system for project node controlling Pending CN106327072A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610696911.1A CN106327072A (en) 2016-08-19 2016-08-19 Budget cost management system for project node controlling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610696911.1A CN106327072A (en) 2016-08-19 2016-08-19 Budget cost management system for project node controlling

Publications (1)

Publication Number Publication Date
CN106327072A true CN106327072A (en) 2017-01-11

Family

ID=57741106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610696911.1A Pending CN106327072A (en) 2016-08-19 2016-08-19 Budget cost management system for project node controlling

Country Status (1)

Country Link
CN (1) CN106327072A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107169672A (en) * 2017-06-07 2017-09-15 俊杰机械(深圳)有限公司 System, the method and device of a kind of automatic data collection workshop task
CN107169894A (en) * 2017-05-16 2017-09-15 上海斐晟企业管理有限公司 Real estate operation management system based on SAP
CN108154389A (en) * 2017-12-19 2018-06-12 国家电网公司 Hydroelectric project budgetary estimate control system
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN108510088A (en) * 2018-02-28 2018-09-07 广州越创信息科技有限公司 A kind of information system O&M closed loop management system and method
CN109446597A (en) * 2018-10-10 2019-03-08 广联达科技股份有限公司 A kind of the personalized customization statistical method and equipment of construction equipment dosage
CN111008780A (en) * 2019-12-03 2020-04-14 池州学院 Management system of garden design project
CN111832999A (en) * 2019-04-16 2020-10-27 杭州麦扑文化创意有限公司 Project enterprise management system
CN112967022A (en) * 2021-03-05 2021-06-15 广州地铁设计研究院股份有限公司 Efficient accounting system and method for project income and cost
CN113010951A (en) * 2021-03-19 2021-06-22 广州地铁设计研究院股份有限公司 Cost simulation and comparison implementation method based on lightweight BIM engine
CN113205264A (en) * 2021-05-11 2021-08-03 天元大数据信用管理有限公司 Project cost control method, device, equipment and medium
CN116205613A (en) * 2023-05-04 2023-06-02 益企商旅(山东)科技服务有限公司 On-line monitoring method and system for automatic tour inspection system for traveling
CN116228175A (en) * 2023-05-09 2023-06-06 南京煌泰慧筑科技有限公司 Real-time management system based on enterprise-level engineering construction cost
CN118211996A (en) * 2024-05-22 2024-06-18 迈思诚(大连)信息技术有限公司 Project cost prediction method and system based on data driving

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859416A (en) * 2010-06-25 2010-10-13 冀中能源峰峰集团有限公司 Method and system for monitoring budget cost of coal enterprises
CN102819774A (en) * 2011-06-09 2012-12-12 上海市第七建筑有限公司 Project cost management system and architecture thereof
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting
CN103177310A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Data processing system for cost control

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859416A (en) * 2010-06-25 2010-10-13 冀中能源峰峰集团有限公司 Method and system for monitoring budget cost of coal enterprises
CN102819774A (en) * 2011-06-09 2012-12-12 上海市第七建筑有限公司 Project cost management system and architecture thereof
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting
CN103177310A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Data processing system for cost control

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107169894A (en) * 2017-05-16 2017-09-15 上海斐晟企业管理有限公司 Real estate operation management system based on SAP
CN107169672A (en) * 2017-06-07 2017-09-15 俊杰机械(深圳)有限公司 System, the method and device of a kind of automatic data collection workshop task
CN108154389A (en) * 2017-12-19 2018-06-12 国家电网公司 Hydroelectric project budgetary estimate control system
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN108510088B (en) * 2018-02-28 2022-03-15 广州越创信息科技有限公司 Information system operation and maintenance closed-loop management system and method
CN108510088A (en) * 2018-02-28 2018-09-07 广州越创信息科技有限公司 A kind of information system O&M closed loop management system and method
CN109446597A (en) * 2018-10-10 2019-03-08 广联达科技股份有限公司 A kind of the personalized customization statistical method and equipment of construction equipment dosage
CN111832999A (en) * 2019-04-16 2020-10-27 杭州麦扑文化创意有限公司 Project enterprise management system
CN111008780A (en) * 2019-12-03 2020-04-14 池州学院 Management system of garden design project
CN112967022A (en) * 2021-03-05 2021-06-15 广州地铁设计研究院股份有限公司 Efficient accounting system and method for project income and cost
CN113010951A (en) * 2021-03-19 2021-06-22 广州地铁设计研究院股份有限公司 Cost simulation and comparison implementation method based on lightweight BIM engine
CN113205264A (en) * 2021-05-11 2021-08-03 天元大数据信用管理有限公司 Project cost control method, device, equipment and medium
CN116205613A (en) * 2023-05-04 2023-06-02 益企商旅(山东)科技服务有限公司 On-line monitoring method and system for automatic tour inspection system for traveling
CN116205613B (en) * 2023-05-04 2023-08-04 益企商旅(山东)科技服务有限公司 On-line monitoring method and system for automatic tour inspection system for traveling
CN116228175A (en) * 2023-05-09 2023-06-06 南京煌泰慧筑科技有限公司 Real-time management system based on enterprise-level engineering construction cost
CN118211996A (en) * 2024-05-22 2024-06-18 迈思诚(大连)信息技术有限公司 Project cost prediction method and system based on data driving

Similar Documents

Publication Publication Date Title
CN106327072A (en) Budget cost management system for project node controlling
Wu et al. Impact and threshold effect of Internet technology upgrade on forestry green total factor productivity: Evidence from China
CN105205575A (en) Business process performance evaluation and decision analysis system
CN108537519A (en) A kind of architectural design method based on BIM
Chen et al. Green financial risk management based on intelligence service
García et al. Measuring organizational capabilities for technological innovation through a fuzzy inference system
Garcia-Gonzalo et al. A decision support system for a multi stakeholder’s decision process in a Portuguese National Forest
Mao et al. Evaluation of smart city construction efficiency based on multivariate data fusion: A perspective from China
Zhong et al. A comprehensive appraisal of the factors impacting construction project delivery method selection: A systematic analysis
CN104424513A (en) Supplier information management processing system for decoration market industry
Yang et al. Application of data mining in the evaluation of enterprise lean management effect
Yan et al. Dynamic control of integrated project management system based on engineering projects
Gufroni Information systems strategic planning at the Siliwangi University Tasikmalaya
Yuan et al. Research on intelligent financial information framework and smarter university campus
Chen Application research of data envelopment analysis and multimedia information fusion algorithm in public performance management
CN102005006A (en) Multi-project contract management method based on credit rating system
Wu et al. A study of smart construction and information management models of AEC projects in China
Oparina et al. Modeling the balance of interests of the participants of an investment and construction project in the context of the use of BIM technologies
CN102005002A (en) Method for customizing enterprise data statement based on credit rating system
Yao et al. Analysis of the Role of Informatization, Based on Data Analyses, in Hospitals to Improve Hospital Management.
CN101231717A (en) Method and system of multidimensional dynamic parameter cost segregation
Xu et al. A Study of the Multi-Agent Benefit Distribution Model in the Transformation of Medical Science and Technology Achievements
Tang et al. International Reference and Management Model for the Integration of Budget and Performance Management in Universities
Liu et al. Fuzzy Prediction System of Construction Cost Based on Data Analysis Algorithm
Braganza Leveraging of Big Data from Manufacturing Facilities to Create New Business Insights

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111