CN111008780A - Management system of garden design project - Google Patents

Management system of garden design project Download PDF

Info

Publication number
CN111008780A
CN111008780A CN201911220396.XA CN201911220396A CN111008780A CN 111008780 A CN111008780 A CN 111008780A CN 201911220396 A CN201911220396 A CN 201911220396A CN 111008780 A CN111008780 A CN 111008780A
Authority
CN
China
Prior art keywords
garden
design
construction
management
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911220396.XA
Other languages
Chinese (zh)
Inventor
余维君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chizhou University
Original Assignee
Chizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chizhou University filed Critical Chizhou University
Priority to CN201911220396.XA priority Critical patent/CN111008780A/en
Publication of CN111008780A publication Critical patent/CN111008780A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a management system of garden design projects, which comprises: the client management module is used for providing basic information of garden design and budget of garden design construction; the garden project design module is used for estimating the construction cost in each design link of the garden design according to the basic information of the garden design and the budget of the garden design construction by combining the garden design model in the database, and determining a garden design scheme within the cost range; and the leader management module is used for auditing the quality of the garden design scheme within the cost range and remotely managing the garden construction process. Through the basic information of the garden design and the budget of the garden design construction, the construction cost is estimated in each design link of the garden design, the garden design scheme within the cost range is determined, namely the cost budget is considered in each link of the garden design, the finally determined garden design scheme is a better scheme based on the requirements and budget of clients, and the design efficiency is improved.

Description

Management system of garden design project
Technical Field
The invention relates to the technical field of garden design management, in particular to a management system of a garden design project.
Background
The garden design is a process of building beautiful natural environment and life and rest domains by means of garden art and engineering technical means in a certain region and by means of terrain reconstruction (or further building mountains, stacking stones and managing water), tree planting, flower planting, building, garden path arrangement and the like. The garden design project management comprises the following steps: scheme design management stage and site construction management stage.
At the scheme design management stage, at present, a designer mainly designs a garden construction scheme according to the requirements of a client, and then starts construction after approval of the client, however, the client budget and the cost and profit of a design enterprise are not specifically integrated into the scheme design in the process, and the management of the design enterprise is relatively simple, so that the design enterprise needs to modify the related schemes in a large amount or repeatedly when talking about the budget after the scheme is well designed, thereby not only increasing the workload of the designer, but also delaying the progress of the whole garden design project and reducing the efficiency of the whole garden design project.
Disclosure of Invention
The embodiment of the invention provides a management system for garden design projects, which is used for solving the problems in the prior art.
The embodiment of the invention provides a management system for garden design projects, which comprises: the system comprises a client management module, a garden project design module and a leader management module, wherein the garden project design module is connected with a database;
the client management module is used for providing basic information of garden design and budget of garden design construction, and managing garden design and construction processes; the basic information of the garden design includes: garden site information and garden design requirement information;
the garden project design module is used for estimating the construction cost in each design link of the garden design according to the basic information of the garden design and the budget of the garden design construction by combining the garden design model in the database, and determining a garden design scheme within the cost range;
and the leader management module is used for auditing the quality of the garden design scheme within the cost range and remotely managing the safety and progress in the garden construction process.
Further, the customer management module includes: the system comprises a garden site information providing unit, a garden design requirement providing unit and a budget providing unit;
the garden site information providing unit is used for providing the field shape and area, the geographical position, the natural environment, the existing landscape and peripheral facilities of the garden site; the garden design requirement providing unit is used for providing a garden construction purpose, a garden construction theme, garden construction inclusion factors and garden construction layout planning requirements; the budget providing unit is used for providing the total budget of garden construction and the budget of key landscapes in garden design.
Further, the customer management module further comprises: a scheme preview auditing unit and a modification adjusting unit;
the preview auditing unit is used for previewing the garden design scheme, auditing whether the garden design scheme meets the basic landscape design layout requirement, auditing whether the theme of the garden design scheme meets the garden construction purpose, and auditing whether the garden design scheme is innovative; the modification and adjustment unit is used for carrying out adaptive adjustment and modification or specification of adjustment and modification requirements on the garden design scheme.
Further, the customer management module further comprises: a client progress management unit, the client progress management unit comprising: designing a stage progress management subunit and a construction stage progress management subunit;
the design stage progress management subunit is used for monitoring the progress of the design stage by accessing the design page in real time; and the construction stage progress management subunit is used for monitoring the progress of the construction stage by accessing the construction feedback information in real time.
Further, the garden item design module includes: the system comprises a design demand analysis unit, a budget analysis unit and a garden scheme design unit;
the design requirement analysis unit is used for analyzing the rationality of the garden design requirement provided by the client by combining garden site information and industrial garden design standards and specifications; the budget analysis unit is used for analyzing the cost and the profit in the garden construction according to the reasonable garden design requirement; and the garden scheme design unit is used for integrating the construction cost factors into each design link of garden design and designing the garden scheme within the cost range.
Further, the garden item design module further comprises: and the modification analysis unit is used for carrying out reasonableness analysis on the adjustment modification of the garden design scheme or the explanation of the adjustment modification requirement fed back by the client.
Further, the garden design unit includes: the three-dimensional model building subunit, the design link analysis subunit and the scheme forming subunit are connected;
the three-dimensional model creating subunit is used for creating a garden design three-dimensional model according to the garden site information; the design link analysis subunit is used for analyzing the cost of each design link according to the importance proportion of each design link and determining the layout and material selection of each design link; and the scheme forming subunit is used for forming the garden design scheme within the cost range according to the layout and material selection of each coordinated design link, and explaining the layout and material selection of the garden design scheme.
Further, the leader management module comprises: the project finance management unit, the project design auditing unit and the project construction management unit;
the project financial management unit is used for analyzing and recording and managing the cost and profit of each link in the garden building process; the project design auditing unit is used for auditing the feasibility of a design scheme in the garden building process and auditing the cost and profit of each link in the garden building process; and the project construction management unit is used for remotely managing materials, personnel safety and construction progress in the garden construction process.
Further, the project construction management unit includes: a material management subunit, a security management subunit and a progress management subunit;
the material management subunit is used for realizing the management of the material quantity by registering the material utilization of a construction site; the safety management subunit is used for monitoring images of personnel on a construction site to realize safety supervision of the personnel; and the progress management subunit is used for reporting and registering the work of the construction site every day to realize the management of the construction progress.
Further, the database includes: and the corresponding relation among the garden design model, the garden design case, the garden design material selection and the cost.
The embodiment of the invention provides a management system for garden design projects, which has the following beneficial effects compared with the prior art:
according to the basic information of garden design and budget of garden design construction, combined with a garden design model in a database, construction cost is estimated in each design link of garden design, a garden design scheme within a cost range is determined, namely the cost budget is considered in each link of garden design, the finally determined garden design scheme is a better scheme based on customer requirements and budget, and design efficiency is improved. In addition, in the technical scheme, the client, the designer and the designer leader are mutually cooperated and correspondingly managed, so that the whole garden design project is more rigorous and efficient.
Drawings
Fig. 1 is a schematic overall principle diagram of a management system of a garden design project according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of a customer management module according to an embodiment of the present invention;
FIG. 3 is a schematic diagram illustrating a garden project design module according to an embodiment of the present invention;
fig. 4 is a schematic diagram of a leader management module according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, an embodiment of the present invention provides a management system for garden design projects, including: the garden project management system comprises a client management module 1, a garden project design module 2 and a leader management module 3, wherein the garden project design module 2 is connected with a database 4.
The client management module 1 is used for providing basic information of garden design and budget of garden design construction, and managing garden design and construction processes; the basic information of the garden design includes: garden site information and garden design requirement information; the garden project design module 2 is used for estimating the construction cost in each design link of the garden design according to the basic information of the garden design and the budget of the garden design construction by combining the garden design model in the database 4 and determining a garden design scheme within the cost range; and the leader management module 3 is used for auditing the quality of the garden design scheme within the cost range and remotely managing the safety and progress in the garden construction process.
In the technical scheme, according to the basic information of garden design and budget of garden design construction, combined with a garden design model in a database, the construction cost is estimated in each design link of garden design, and a garden design scheme within a cost range is determined, namely the cost budget is considered in each link of garden design, and the finally determined garden design scheme is a better scheme based on customer requirements and budget, so that the design efficiency is improved. In addition, in the technical scheme, the client, the designer and the designer leader are mutually cooperated and correspondingly managed, so that the whole garden design project is more rigorous and efficient. Wherein, whole garden design project process includes: a design stage and a construction stage.
The customer management module 1 in the embodiment of the present invention specifically includes: a garden site information providing unit 11, a garden design requirement providing unit 12 and a budget providing unit 13.
A garden site information providing unit 11 for providing a field shape and area, a geographical position, a natural environment, an existing landscape, peripheral facilities, etc. of a garden site; a garden design requirement providing unit 12, configured to provide a garden construction purpose, a garden construction theme, garden construction inclusion factors, garden construction layout planning requirements, and the like; and the budget providing unit 13 is used for providing the total budget of garden construction, the budget of important landscapes in garden design and the like.
Preferably, in order to enable the client to provide opinions on the garden design scheme in time so as to speed up the progress of garden design scheme design, the client management module 1 in the embodiment of the present invention further includes: a scheme preview review unit 14 and a modification adjustment unit 15.
The preview auditing unit 14 is used for previewing the garden design scheme, auditing whether the garden design scheme meets the basic landscape design layout requirement, auditing whether the theme of the garden design scheme meets the garden construction purpose, auditing whether the garden design scheme has novelty and the like; and the modification adjusting unit 15 is used for performing adaptive adjustment and modification on the garden design scheme or explaining the requirements of the adjustment and modification.
Preferably, in order to ensure that the client can know the progress of garden building in time, the client management module 1 in the embodiment of the present invention further includes: the client schedule management unit 16, the client schedule management unit 16 includes: a design stage progress management subunit 161 and a construction stage progress management subunit 162.
A design stage progress management subunit 161, configured to monitor the progress of the design stage by accessing the design page in real time; and the construction stage progress management subunit 162 is configured to monitor the progress of the construction stage by accessing the construction feedback information in real time.
The garden project design module 2 in the embodiment of the invention specifically comprises: a design requirement analysis unit 21, a budget analysis unit 22 and a garden plan design unit 23.
The design requirement analysis unit 21 is used for analyzing the rationality of the garden design requirement provided by the customer by combining garden site information and industrial garden design standards and specifications; the budget analyzing unit 22 is used for analyzing the cost and profit in the garden construction according to the reasonable garden design requirement; and the garden scheme design unit 23 is used for integrating the construction cost factors into each design link of garden design and designing the garden scheme within the cost range.
In order to adapt to the specification of the adjustment and modification requirements of the client for the adaptability of the garden design scheme, the garden project design module 2 in the embodiment of the present invention further includes: and the modification analysis unit 24 is used for performing reasonableness analysis on the adjustment modification of the garden design scheme or the description of the adjustment modification requirement fed back by the client.
The garden design unit 23 specifically includes: a three-dimensional model creation subunit 231, a design link analysis subunit 232, and a solution formation subunit 233.
A three-dimensional model creation subunit 231 for creating a garden design three-dimensional model according to the garden site information; a design link analysis subunit 232, configured to analyze the cost of each design link according to the importance proportion of each design link, and determine the layout and material selection of each design link; and a scheme forming subunit 233, configured to form a garden design scheme within the cost range according to the layout and material selection of each design link, and explain the layout and material selection of the garden design scheme.
The leader management module 3 in the embodiment of the present invention specifically includes: a project finance management unit 31, a project design auditing unit 32 and a project construction management unit 33.
The project financial management unit 31 is used for analyzing and recording and managing the cost and profit of each link in the garden building process; the project design auditing unit 32 is used for auditing the feasibility of a design scheme in the garden building process and auditing the cost and profit of each link in the garden building process; and the project construction management unit 33 is used for remotely managing materials, personnel safety and construction progress in the garden construction process.
In order to comprehensively manage the project construction, the project construction management unit 33 in the embodiment of the present invention includes: a material management subunit 331, a security management subunit 332, and a schedule management subunit 333.
A material management subunit 331 configured to manage the amount of material by registering the material availability at the construction site; the safety management subunit 332 is used for monitoring images of personnel on a construction site to realize safety supervision of the personnel; and a progress management subunit 333, configured to implement management of the construction progress by reporting and registering the work on the construction site every day.
The database 4 in the embodiment of the present invention includes: and the corresponding relation among the garden design model, the garden design case, the garden design material selection and the cost.
The working principle of the embodiment of the invention is as follows: firstly, a designer obtains basic information of garden design and budget of garden design construction; secondly, according to basic information of garden design and budget of garden design construction, a designer estimates construction cost in each design link of the garden design by combining a garden design model in the database and determines a garden design scheme within a cost range; then, the leader audits the quality of the garden design scheme within the cost range; then, the client adjusts and modifies the garden design scheme within the cost range or provides the opinions of the adjustment and modification; and finally, construction is carried out according to the final garden design scheme, and safety and progress in the garden construction process are remotely managed in the construction process. Wherein, the customer still manages garden design and work progress.
The above disclosure is only a few specific embodiments of the present invention, and those skilled in the art can make various modifications and variations of the present invention without departing from the spirit and scope of the present invention, and it is intended that the present invention encompass these modifications and variations as well as others within the scope of the appended claims and their equivalents.

Claims (10)

1. A management system for garden design projects, comprising: the garden project design system comprises a client management module (1), a garden project design module (2) and a leader management module (3), wherein the garden project design module (2) is connected with a database (4);
the client management module (1) is used for providing basic information of garden design and budget of garden design construction, and managing garden design and construction processes; the basic information of the garden design includes: garden site information and garden design requirement information;
the garden project design module (2) is used for estimating construction cost in each design link of garden design according to basic information of garden design and budget of garden design construction by combining a garden design model in the database (4), and determining a garden design scheme within a cost range;
and the leader management module (3) is used for auditing the quality of the garden design scheme within the cost range and remotely managing the safety and progress in the garden construction process.
2. The garden design project management system according to claim 1, wherein the client management module (1) includes: a garden site information providing unit (11), a garden design requirement providing unit (12) and a budget providing unit (13);
the garden site information providing unit (11) is used for providing the field shape and area, the geographical position, the natural environment, the existing landscape and peripheral facilities of the garden site; the garden design requirement providing unit (12) is used for providing garden construction purposes, garden construction themes, garden construction inclusion factors and garden construction layout planning requirements; the budget providing unit (13) is used for providing the total budget of garden construction and the budget of key landscapes in garden design.
3. A garden design project management system, as set forth in claim 2, characterized in that the client management module (1) further comprises: a scheme preview auditing unit (14) and a modification adjusting unit (15);
the preview auditing unit (14) is used for previewing the garden design scheme, auditing whether the garden design scheme meets the basic landscape design layout requirement, auditing whether the theme of the garden design scheme meets the garden construction purpose, and auditing whether the garden design scheme is innovative; the modification and adjustment unit (15) is used for carrying out adaptive adjustment and modification on the garden design scheme or explaining the adjustment and modification requirements.
4. A garden design project management system, as set forth in claim 3, characterized in that the client management module (1) further comprises: a client schedule management unit (16), the client schedule management unit (16) comprising: a design stage progress management subunit (161) and a construction stage progress management subunit (162);
the design stage progress management subunit (161) is used for monitoring the progress of the design stage by accessing the design page in real time; and the construction stage progress management subunit (162) is used for monitoring the progress of the construction stage by accessing the construction feedback information in real time.
5. A management system of garden design items according to claim 2, where the garden item design module (2) comprises: a design requirement analysis unit (21), a budget analysis unit (22) and a garden scheme design unit (23);
the design requirement analysis unit (21) is used for analyzing the rationality of the garden design requirement provided by the customer by combining garden site information and industrial garden design standards and specifications; the budget analysis unit (22) is used for analyzing the cost and profit in the garden construction according to reasonable garden design requirements; and the garden scheme design unit (23) is used for integrating the construction cost factors into each design link of garden design and carrying out garden scheme design within a cost range.
6. A management system of garden design items according to claim 3, where the garden item design module (2) further comprises: a modification analysis unit (24), wherein the modification analysis unit (24) is used for carrying out reasonableness analysis on the adjustment modification of the garden design scheme or the description of the adjustment modification requirement fed back by the client.
7. The garden design project management system according to claim 5, wherein the garden design unit (23) includes: a three-dimensional model creation subunit (231), a design link analysis subunit (232) and a scheme formation subunit (233);
the three-dimensional model creating subunit (231) is used for creating a garden design three-dimensional model according to garden site information; the design link analysis subunit (232) is used for analyzing the cost of each design link according to the importance proportion of each design link and determining the layout and material selection of each design link; and the scheme forming subunit (233) is used for forming the garden design scheme within the cost range according to the layout and material selection of each coordinated design link, and explaining the layout and material selection of the garden design scheme.
8. A garden design project management system, as claimed in claim 1, characterized in that the leader management module (3) comprises: a project finance management unit (31), a project design auditing unit (32) and a project construction management unit (33);
the project financial management unit (31) is used for analyzing and recording and managing the cost and profit of each link in the garden building process; the project design auditing unit (32) is used for auditing the feasibility of a design scheme in the garden building process and auditing the cost and profit of each link in the garden building process; and the project construction management unit (33) is used for remotely managing materials, personnel safety and construction progress in the garden construction process.
9. The management system of landscape design project according to claim 1, wherein the project construction management unit (33) includes: a material management subunit (331), a security management subunit (332), and a progress management subunit (333);
the material management subunit (331) is used for realizing the management of the material quantity by registering the material utilization of a construction site; the safety management subunit (332) is used for monitoring images of personnel on a construction site to realize safety supervision of the personnel; and the progress management subunit (333) is used for reporting and registering the work of the construction site every day to realize the management of the construction progress.
10. A garden design project management system, as claimed in claim 1, wherein the database (4) includes: and the corresponding relation among the garden design model, the garden design case, the garden design material selection and the cost.
CN201911220396.XA 2019-12-03 2019-12-03 Management system of garden design project Pending CN111008780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911220396.XA CN111008780A (en) 2019-12-03 2019-12-03 Management system of garden design project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911220396.XA CN111008780A (en) 2019-12-03 2019-12-03 Management system of garden design project

Publications (1)

Publication Number Publication Date
CN111008780A true CN111008780A (en) 2020-04-14

Family

ID=70113965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911220396.XA Pending CN111008780A (en) 2019-12-03 2019-12-03 Management system of garden design project

Country Status (1)

Country Link
CN (1) CN111008780A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070073569A1 (en) * 2005-08-10 2007-03-29 Global E-Sourcing, Inc. Method and software for managing kitchen and bath design projects
WO2012145788A1 (en) * 2011-04-27 2012-11-01 Abode Design & Construct Pty Ltd Construction management methods
CN103295104A (en) * 2013-06-13 2013-09-11 深圳市加斯特工程咨询有限公司 Quota design management method and project investment service platform for cost accounting
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106327072A (en) * 2016-08-19 2017-01-11 李广伟 Budget cost management system for project node controlling
CN108898358A (en) * 2018-06-20 2018-11-27 广州晖恒广告策划有限公司 A kind of management system of landscape design project
CN109872125A (en) * 2019-01-30 2019-06-11 广州轨道交通建设监理有限公司 A kind of engineering information management method, apparatus, terminal and storage medium based on BIM
CN110334924A (en) * 2019-06-21 2019-10-15 中交二公局第三工程有限公司 CAD, construction integrated management system and method based on BIM

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070073569A1 (en) * 2005-08-10 2007-03-29 Global E-Sourcing, Inc. Method and software for managing kitchen and bath design projects
WO2012145788A1 (en) * 2011-04-27 2012-11-01 Abode Design & Construct Pty Ltd Construction management methods
CN103295104A (en) * 2013-06-13 2013-09-11 深圳市加斯特工程咨询有限公司 Quota design management method and project investment service platform for cost accounting
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106327072A (en) * 2016-08-19 2017-01-11 李广伟 Budget cost management system for project node controlling
CN108898358A (en) * 2018-06-20 2018-11-27 广州晖恒广告策划有限公司 A kind of management system of landscape design project
CN109872125A (en) * 2019-01-30 2019-06-11 广州轨道交通建设监理有限公司 A kind of engineering information management method, apparatus, terminal and storage medium based on BIM
CN110334924A (en) * 2019-06-21 2019-10-15 中交二公局第三工程有限公司 CAD, construction integrated management system and method based on BIM

Similar Documents

Publication Publication Date Title
De Lange et al. An operational, multi-scale, multi-model system for consensus-based, integrated water management and policy analysis: The Netherlands Hydrological Instrument
Stimmel Big data analytics strategies for the smart grid
CN104240043A (en) Full-service centralized management service platform for electric power customer service based on number 95598
CN203165006U (en) Engineering project management system
US20120166616A1 (en) System and method for energy performance management
CN103500372A (en) Collaborative design method and system based on SOA
CN102855546A (en) Integrated project management system
CN102646224A (en) Management integrating system of enterprise standardization
CN109558412A (en) The data growing method and device of assembled architecture construct platform
Gomo et al. Assessing the performance of smallholder irrigation and deriving best management practices in South Africa
CN102118446A (en) WEB-based high-performance intelligent reporting system
CN103295104A (en) Quota design management method and project investment service platform for cost accounting
CN104376415A (en) Cable book management system
Baganz et al. Site resource inventories–a missing link in the circular city's information flow
Johnson et al. Simulating forest structure, timber production, and socioeconomic effects in a multi‐owner province
CN111008780A (en) Management system of garden design project
Randrup et al. Managing the maintenance of urban open spacess
CN105243473A (en) BI analysis based display method for power marketing decision system data
Sakata The application of information and communication technologies (ICT) in agriculture: present status, opportunities, and challenges in Vietnam
Bo et al. Research on the lean process reengineering based on value stream mapping for Chinese enterprises
Borges Júnior et al. Computational modeling for irrigated agriculture planning. Part I: General description and linear programming
Hu et al. The energy authority optimizes water routing and hydroelectric generation on the Columbia River
US20130046708A1 (en) System and method for using metadata to facilitate the distribution of goods through a supply chain
Gilmore Assessing the Adaptive Capacity of Idaho's Magic Valley As a Complex Social-Ecological System
JP2002189773A (en) System for supporting farming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200414