CN106320494A - Sponge engineering system based on existing urban road and drainage condition and construction method of sponge engineering system - Google Patents
Sponge engineering system based on existing urban road and drainage condition and construction method of sponge engineering system Download PDFInfo
- Publication number
- CN106320494A CN106320494A CN201610673834.8A CN201610673834A CN106320494A CN 106320494 A CN106320494 A CN 106320494A CN 201610673834 A CN201610673834 A CN 201610673834A CN 106320494 A CN106320494 A CN 106320494A
- Authority
- CN
- China
- Prior art keywords
- road
- water tank
- gutter
- existing
- desilting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/002—Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
- E03F1/005—Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells via box-shaped elements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F11/00—Cesspools
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a sponge engineering system based on an existing urban road and a drainage condition and belongs to the technical field of urban road drainage and rainwater utilization. Road surfaces of a motorized vehicle lane, a non-motorized vehicle lane and a pavement keep unchanged; water collection side ditches are formed in an outer side of the motorized vehicle lane along a road flat teeth part, and a road flat teeth part between the non-motorized vehicle lane and the pavement; gap cover plates cover the water collection side ditches; dredging wells are arranged along the water collection side ditches every 5m to 6m; the water collection side ditches are connected with a round water seepage and storage tank and a square water seepage and storage tank through inclined collection pipes respectively; the water collection side ditches are connected with a municipal rainwater pipe through overflow pipes. The invention further discloses a construction method of the system. By adopting the sponge engineering system and the construction method, an existing drainage system is not changed and burden of downstream drainage is effectively alleviated; pollution to a downstream water body, caused by initial rainwater pollution of the road surface, is avoided; disturbance on the existing rod surface and arbor planting is not caused; the construction is convenient and the road does not need to be blocked; interference to traffic is not caused, water resources are saved and the sponge engineering system and the construction method have promotional value.
Description
Technical field
The invention belongs to urban road drainage and rainwater utilization technology field, be specifically related to based on existing urban road and row
The sponge engineering system of water condition and construction method thereof.
Technical background
In recent years, the road hydrops that heavy showers causes is to affect pedestrian's trip, even jeopardize the persistent ailment of urban traffic safety,
In China city, there is universality, on the one hand, traditional Colophonium or cement pavement top drainage can only be carried out by inlet for stom water, consumption
Time longer and easily produce vapour lock, impeded drainage causes surface gathered water, not only results in vehicle tyre and skids and become potential safety hazard,
The more location of hydrops, the most also can cause that vehicle is soaked to be scrapped, and pollutant overflow and cause environmental pollution;On the other hand, city
It is big that Road Green Space irrigates demand, but conventional drainage systems lacks with roadside greening irrigation system and associates, and rainfall hydrops can not
Application is afforested with irrigating very well, causes the wasting of resources.How to solve water on urban streets and the dilemma of Road Green Space hydropenia,
Become the major issue that contemporary cities road environment faces.
In prior art, for existing urban road surfaces, completely and traffic flow is relatively big, is not suitable for carrying out Pavement Improvement
City road, the reforming mode solving surface gathered water is relatively big to present situation road disturbances, such as the transformation of overstriking conventional discharge pipeline
Mode not only can destroy existing road surface, causes quantities big, it is also desirable to closes road surface and constructs, causes daily traffic order
Interference.
Summary of the invention
Goal of the invention: it is an object of the invention to provide sponge engineering department based on existing urban road Yu drainage condition
System, for existing urban road surfaces, completely and traffic flow is relatively big, is not suitable for carrying out the city road of Pavement Improvement, solves road
While the draining of road, rainwater is collected on the spot to side and divide storage infiltration under band, footpath, supplement the irrigation water of Road Green Space;
Another object of the present invention is to provide construction method based on existing urban road Yu the sponge engineering system of drainage condition.
Technical scheme: for achieving the above object, the present invention adopts the following technical scheme that
Sponge engineering system based on existing urban road Yu drainage condition, existing urban road includes car lane, non-
Car lane and footpath, described car lane, bicycle lane and footpath road surface remain unchanged, at described motor vehicles
It is respectively provided with, at the flat tooth of road, the gutter that catchments along at the flat tooth of road and between described bicycle lane and footpath, at collection outside road
Gap cover plate is covered on the ditch of waterside;Along catchmenting, gutter arranges desilting well every five to six meters, and desilting well connects with the gutter that catchments,
The top of desilting well covers desilting manhole cover plate;Outside car lane along each desilting Jing Chu at the flat tooth of road be provided with the use of
Circle ooze water tank, circle is oozed water tank and is embedded between the existing arbor that band is divided in side;Outside bicycle lane and footpath
Joint along each desilting Jing Chu at the flat tooth of road be provided with the use of the square water tank that oozes, the square water tank that oozes is embedded in
Between the existing arbor of footpath;Catchment gutter and circle is oozed water tank, square oozed between water tank respectively by oblique receipts
Collector connects, and is being provided with a section dirty basket at the collection mouth of pipe of gutter joint of catchmenting;Described catchments gutter by overflow pipe even
Connect municipal administration rain pipe.
Described gap cover plate is rectangle cover plate, and having the degree of depth respectively at gap cover plate two minor face is 20mm, a length of
The groove of 200mm, during adjacent two pieces of gap cover plate splices, it is the prismatic of 40mm that the groove docking of adjacent slits cover plate forms width
Gap, rainwater imports, by prismatic gap, the gutter that catchments.
The described gutter that catchments be outer diameter length be 900mm, width be 300mm, the degree of depth be the U-shaped ditch of 350mm, collect waterside
Ditch wall thickness 50mm;Described gap cover sheet thickness is 120mm, and a length of 900mm, width are 300mm;At described gap cover plate
Two long limits all have 50mm width trough with straight angle.
Described gutter ditch body longitudinal lap joint of catchmenting uses tongue and groove design, longitudinal side evagination 40mm bottom the gutter that catchments,
Opposite side indent 40mm, forms tongue and groove.
Described desilting well depth is 650mm, width is 300mm, a length of 900, wall thickness is 50mm;Described desilting well
Cover plate is concrete material, and thickness is 120mm, a length of 900mm, width are 300mm;Described desilting manhole cover plate has
Three rows five indulge, the circular hole of totally ten five diameter 50mm.
Described collecting pipe is internal diameter 100mm plastic tube, collecting pipe distance desilting well shaft bottom 200mm;Described overflow pipe
For caliber 40mm plastic tube, overflow pipe distance set waterside ditch 20mm suitable for reading.
It is 1200mm that described circle oozes water tank external diameter, and height is 1200mm;Square water tank external diameter length and width of oozing are
1200mm, a height of 1500mm;Water tank is oozed and square water tank periphery of oozing wraps up that to arrange 50mm thick respectively in described circle
Particle diameter 15~25mm metalling.
The described gutter that catchments, gap cover plate, desilting well, circle oozes water tank and the square water tank that oozes is concrete material
Matter.
The described dirty basket that cuts is hemispherical PE Hanging Basket, cuts dirty basket Hanging Basket mouth and sets cross hook.
Described construction method based on existing urban road Yu the sponge engineering system of drainage condition, is included in the most organic
Catchment gutter and the construction procedure of desilting well is put along burying at the flat tooth of road outside motor-car road;Divide in side to bury between the existing arbor of band and put
Circle oozes the construction procedure storing tank;Bury at the flat tooth of road between bicycle lane and footpath and put catchment gutter and desilting well
Construction procedure;Bury between the existing arbor of footpath and put the square construction procedure oozed and store tank.
Catchment gutter and desilting well and divide leukorrhagia to bury in side to put circle is put along burying at the flat tooth of road outside described car lane
The construction procedure of shape water tank is as follows:
1) open along Road tooth outside existing car lane, under dig 350mm deep trench, position corresponding between every strain arbor
Put down and dig 650mm deep trench;
2) gutter is catchmented and desilting well is sequentially placed in groove by prefabricated;
3) first Tree Planting Earthdrill is divided in side and is burrowed between the arbor of band, makes a call to a hole, hole and desilting well between two arbors
Spacing 5-6m at corresponding hole, position, the circle of a diameter of 1300mm in hole, deep 1800mm, and by hole and car lane
Connect side soil take out;
4) bottom burrowed mouth, 50mm thickness particle diameter 15~25mm metalling is laid;
5) circle is oozed water tank and is inserted in hole by Tree Planting Earthdrill, is installed by collecting pipe to circle and oozes water tank and desilting well
Between, periphery fills 50mm thickness particle diameter 15~25mm metalling;
6) above 50mm thickness particle diameter 15~25mm metalling, laying depth is the soil of 500mm;
7) carrying out vegetation plantation after earthing, circle oozes the installation of water tank complementary side can divide band arbor main root system institute energy
Arrive the water content of soil layer;
Bury at the described flat tooth of road between bicycle lane and footpath and put catchment gutter and desilting well and in People's Bank of China
Bury under road that to put the construction procedure of square water tank as follows:
1) open along Road tooth outside existing bicycle lane, under dig 350mm deep trench, corresponding between every strain arbor
650mm deep trench is dug under position;
2) gutter is catchmented and desilting well is sequentially placed in groove by prefabricated;
3) between footpath arbor, open existing footpath guidance tape, under dig a hole mouth a size of 1200mm*1200mm, deeply
1800mm, and the soil taking-up of side that hole is connected with bicycle lane;
4) bottom burrowed mouth, 50mm thickness particle diameter 15~25mm metalling is laid;
5) the square water tank that oozes is inserted in hole by Tree Planting Earthdrill, is installed by collecting pipe and oozes water tank and desilting well to square
Between, periphery fills 50mm thickness particle diameter 15~25mm metalling;
6) above 50mm thickness particle diameter 15~25mm metalling, laying depth is the soil of 500mm;
7) carrying out vegetation plantation in earthing, the square installation oozing water tank can supplement footpath arbor main root system institute
The water content of soil layer can be arrived.
Beneficial effect: compared with prior art, the sponge engineering based on existing urban road Yu drainage condition of the present invention
System and construction method thereof, possess following advantage:
(1) alleviating municipal drainage pressure, rainwater-collecting amount is big, and annual flow overall control rate reaches 90%, can resist 30 years
The one heavy rain not hydrops met;(2) roadside greening megaphanerophyte is without adjusting, only with regard to the shrub section of planting and footpath Local uniqueness;(3)
Do not change existing road surface, therefore without closure construction, there is construction convenient, for the low advantage of traffic impact;(4) do not change existing
Sewerage, by setting up rainwater arresting device, is prevented effectively from or reduces the amount of rainfall entering sewer pipe network, solving urban road
Hydrops problem;(5) road surface initial-rainwater can be prevented effectively from and pollute the pollution to downstream water;(6) road rain water passes through horizontal wall inscription
Enter the gutter that catchments nearby, it is ensured that road surface is without hydrops;(7) having cleared up pavement of road rainwash, overwhelming majority rainwater is on the spot
Storage, reduces the heavy burdens for downstream drainage;(8) solve surface gathered water and affect the problem of traffic safety, and reduce cleaning vehicle
Expenditure and the consumption of water resource;(9) combine permeability water tank etc., collect storage rainwater, increase rainwater and bleed back soil
Ratio;(10) system completes offside and divides the self-organizing of band vegetation to irrigate, and reduces the cost of man-made irrigation, has saved water money
Source;(11) soil irrigation more thoroughly and improves water utilization rate, and a small amount of manual watering and rainfall are difficult to make water arrive one
The soil layer of depthkeeping degree, this is unfavorable for the growth of Tree root system, and the infiltration type of this engineering system is irrigated can effectively supplement arbor master
Want root system can arrive the water content of soil layer;(12) the equally distributed water tank that independently oozes ensure that distribution of water resources well
Benefits for all, it is ensured that the normal growth of roadside greening plant;(13) total system is without artificial material, energy input, runs and safeguards
Low cost;(14) native system uses the mode that links of pipe trench, is respectively provided with desilting mouth and independent savings water pot, have low-maintenance with
The feature maintained easily.
Accompanying drawing explanation
Fig. 1 is sponge engineering system plane graph based on existing urban road Yu drainage condition;
Fig. 2 is sponge engineering system sectional drawing based on existing urban road Yu drainage condition;
Fig. 3 is gap cover plate layout drawing;
Fig. 4 is the gutter sectional drawing that catchments;
Fig. 5 is desilting well sectional drawing;
Fig. 6 is to cut dirty basket layout drawing;
Fig. 7 is that circle oozes water tank sectional drawing;
Fig. 8 is that circle oozes water tank work progress figure.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
Fig. 1-8 reference is: the gutter 1 that catchments, gap cover plate 2, desilting well 3, desilting manhole cover plate 4, collecting pipe 5, section dirt
Basket 6, circle ooze water tank 7, overflow pipe 8, square ooze water tank 9, municipal administration rain pipe 10, municipal administration catch-basin 11, particle diameter 15~
Band 14, bicycle lane 15, footpath 16 and Tree Planting Earthdrill 17, wherein municipal administration are divided in 25mm metalling 12, car lane 13, side
Rain pipe 10 is present situation pumping equipment with municipal administration catch-basin 11, and municipal administration rain pipe 10 is connected on the bottom of municipal administration catch-basin 11.
Sponge engineering system based on existing urban road Yu drainage condition, including the gutter 1 that catchments, gap cover plate 2, desilting
Well 3, desilting manhole cover plate 4, collecting pipe 5, cut dirty basket 6, circle oozes water tank 7, overflow pipe 8 and square ooze water tank 9.
As shown in Figure 1-2, the gutter 1 that catchments is arranged on outside car lane 13 along at the flat tooth of road and at bicycle lane 15
And between footpath 16 at the flat tooth of road, cover gap cover plate 2 on gutter 1 catchmenting;Along catchmenting, gutter 1 sets every five to six meters
Putting desilting well 3, in order to precipitate early-stage rainwater, cover desilting manhole cover plate 4 above desilting well 3, desilting manhole cover plate 4 is daily permissible
Open and desilting well 3 and circle are oozed water tank 7, square ooze water tank 9, carry out desilting, maintenance.Divide in side band 14 existing arbors it
Between bury circle underground and ooze water tank 7, circle is oozed water tank 7 and is arranged with desilting well 3 one_to_one corresponding, facilitates circle to ooze the inspection of water tank 7
Repair and clear up.Between the existing arbor of footpath 16, bury the square water tank 9 that oozes underground, square ooze water tank 9 and desilting well 3 one a pair
Should arrange, facilitate the square maintenance oozing water tank 9 and cleaning.Gutter 1 and the circle of catchmenting ooze water tank 7, square ooze water tank 9 it
Between connected by oblique collecting pipe 5 respectively, be provided with the collecting pipe 5 mouthfuls of desilting well 3 joint and cut a dirty basket 6.
Rainwater in car lane 13, bicycle lane 15 or footpath 16 is converged by gap cover plate 2 through road surface horizontal wall inscription
Enter to catchment gutter 1, after the precipitation of desilting well 3 and the filtration of the dirty basket 6 of collecting pipe 5 mouthfuls section, imports circle via collecting pipe 5 and oozes
Water tank 7, square ooze in water tank 9, and then directly penetrate into side and divide in band and footpath shade tree Soil Surrounding, play irrigation
Afforestation vegetation and the effect of recharging groundwater.Meeting the extra torrential rain beyond 30 years standards, too much rainwater can be caused by overflow pipe
Municipal administration storm sewer is discharged.
As shown in Fig. 3 (a), gap cover plate 2 is concrete material, and gap cover plate 2 is rectangle cover plate, gap cover plate 2 liang
It is 20mm that minor face has the degree of depth respectively, the groove of a length of 200mm, when adjacent two pieces of gap cover plates 2 splice, and adjacent slits lid
The groove docking of plate 2 forms the prismatic gap that width is 40mm, and rainwater imports the gutter 1 that catchments, prismatic gap by prismatic gap
Coordinate desilting manhole cover plate 4 hole, discharge area more than 30 years storm recurrence period time rainwater discharge required for discharge area.
As shown in Fig. 3 (b), the gutter 1 that catchments is for concrete material, and generally, urban road present situation road tooth width is 300mm,
Concrete U-type ditch wall thickness is 50mm, and for existing road surface is not caused disturbance, therefore gutter 1 clear span of catchmenting takes 200mm,.
In the present invention, the gutter 1 that catchments be designed as outer diameter length be 900mm, width be 300mm, the degree of depth be the U-shaped of 350mm
Ditch, catchment gutter 1 wall thickness 50mm, and meanwhile, gap cover plate 2 thickness is 120mm, and a length of 900mm, width are 300mm;In gap
Two long limits of cover plate 2 all have 50mm width trough with straight angle, directly can be placed in by gap cover plate 2 and catchment on gutter 1 ditch body during construction.
The gutter 1 that catchments is arranged along flat tooth outside car lane, and ditch body longitudinal lap joint uses tongue and groove design, bottom the gutter 1 that catchments longitudinally one
Side evagination 40mm, opposite side indent 40mm, form tongue and groove, during construction, adjacent splicing between gutter 1 of catchmenting is convenient and has very well
Seal.
Desilting well 3 is concrete material, and desilting well 3 degree of depth is 650mm, width is 300mm, a length of 900, wall thickness is
50mm, desilting well 3 is connected with the gutter 1 that catchments, at desilting well 3 overlying desilting manhole cover plate 4.Desilting manhole cover plate 4 is concrete material,
Thickness is 120mm, a length of 900mm, width are 300mm, has three rows five and indulge on desilting manhole cover plate 4, totally ten five diameters
The circular hole of 50mm, both can collect rainwater, also designate the position of desilting well 3, and facilitate desilting to overhaul.
Collecting pipe 5 is internal diameter 100mm plastic tube, connects desilting well 3 and oozes water tank 7 with circle or be connected desilting well 3 and side
Shape oozes water tank 9, and collecting pipe 5 is apart from desilting well 3 shaft bottom 200mm.
Circle oozes water tank 7 or the square water tank 9 that oozes is concrete material, and it is 1200mm that circle oozes water tank 7 external diameter,
Being highly 1200mm, square water tank 9 external diameter length and width of oozing are 1200mm, a height of 1500mm, and volume all can meet sponge city
The requirement of 90% annual flow overall control rate.Circle ooze water tank 7 or square ooze water tank 9 periphery parcel 50mm thickness grain is set
Footpath 15~25mm metalling 12, it is possible to by storage rainwater naturally osmotic to soil.
As shown in Figure 4, overflow pipe 8 is caliber 40mm plastic tube, connects catchment gutter 1 and municipal administration rain pipe 10, overflow pipe 8
Distance set waterside ditch 1 20mm suitable for reading, circle oozes water tank 7 or square when oozing the full rainwater of water tank 9, and rainwater is in the gutter 1 that catchments
Water level rises to overflow pipe 8 position, meets the extra torrential rain beyond 30 years standards, and circle oozes water tank 7 or the square water tank 9 that oozes stores
After full rainwater, too much rainwater will cause municipal administration rain pipe 10 by overflow pipe 8 and discharge.
As it is shown in figure 5, receive collector 5 on desilting well 3, can be by filtering foreign in rainwater, foreign material are stayed and are cut in dirty basket 6, just
The rainwater that step purifies imports circle by collecting pipe 5 and oozes water tank 7 or square ooze in water tank 9;On the one hand, as it is shown in fig. 7,
Rainwater is imported by gap cover plate 2 through car lane 13 horizontal wall inscription and catchments gutter 1, then imports circle by collecting pipe 5 and ooze water tank 7
In, directly penetrate into side and divide in band 14 soil;On the other hand, rainwater passes through gap through bicycle lane 15 and footpath 16 horizontal wall inscription
Cover plate 2 imports and catchments gutter 1, then is imported by collecting pipe 5 and square ooze in water tank 9, directly penetrates into footpath 16 shade tree
In Soil Surrounding, play irrigation afforestation vegetation and the effect of recharging groundwater.
As shown in Fig. 6 (a), cut dirty basket 6 and be arranged on the collecting pipe 5 mouthfuls connected with the gutter 1 that catchments, can retain in rainwater
Foreign material, make foreign material enter in desilting well;As shown in Fig. 6 (b), cutting dirty basket 6 is hemispherical PE Hanging Basket, cuts dirty basket 6 Hanging Basket mouth and sets ten
Font is linked up with, and facilitates hook to take cleaning.
Construction method based on existing urban road Yu the sponge engineering system of drainage condition, is included in existing car lane
Catchment gutter and the construction procedure of desilting well are put along burying at the flat tooth of road in outside;Divide in side to bury between the existing arbor of band and put circle and ooze
Store the construction procedure of tank;The construction step putting catchment gutter and desilting well is buried at the flat tooth of road between bicycle lane and footpath
Suddenly;Bury between the existing arbor of footpath and put the square construction procedure oozed and store tank;
Catchment gutter and desilting well and divide leukorrhagia to bury to put circular water-retention in side is put along burying at the flat tooth of road outside car lane
The construction procedure of tank is as follows: 1) open outside existing car lane 13 along Road tooth, under dig 350mm deep trench, every strain arbor
Between dig 650mm deep trench under corresponding position (being spaced about 5-6m);
2) the desilting well 3 of the gutter 1 and 300*650*900 that catchments of prefabricated 300*350*900 is sequentially placed in groove;
3) as shown in Fig. 8 (a), first Tree Planting Earthdrill burrows between side is divided with the arbor of 14, makes a call to one between two arbors
Individual hole, spacing 5-6m at hole and corresponding hole, desilting well 3 position, hole is the circle of a diameter of 1300mm, deep 1800mm,
And the soil of the side that connected with car lane at hole takes out;
4) as shown in Fig. 8 (b), bottom burrowed mouth, 50mm thickness particle diameter 15~25mm metalling 12 is laid;
5) as shown in Fig. 8 (c), circle is oozed water tank 7 and is inserted in hole by Tree Planting Earthdrill, installs collecting pipe 5 to circle
Oozing between water tank 7 and desilting well 3, periphery fills 50mm thickness particle diameter 15~25mm metalling 12;
6) as shown in Fig. 8 (d), above 50mm thickness particle diameter 15~25mm metalling 12, laying depth is the soil of 500mm;
7) as shown in Fig. 8 (e), carrying out vegetation plantation after earthing, circle is oozed the installation of water tank 7 and can effectively complementary side be divided
The water content of soil layer can be arrived with the 14 main root systems of arbor.
Bury at the flat tooth of road between bicycle lane and footpath and put catchment gutter and desilting well and bury under footpath
The construction procedure putting square water tank is as follows:
1) open outside existing bicycle lane 15 along Road tooth, under dig 350mm deep trench, corresponding between every strain arbor
Position under dig 650mm deep trench;
2) gutter 1 is catchmented and desilting well 3 is sequentially placed in groove by prefabricated;
3) between footpath 16 arbor, open existing footpath guidance tape, under dig a hole mouth a size of 1200mm*1200mm,
Deep 1800mm, and the soil taking-up of side that hole is connected with bicycle lane;
4) bottom burrowed mouth, 50mm thickness particle diameter 15~25mm metalling is laid;
5) the square water tank 9 that oozes is inserted in hole by Tree Planting Earthdrill, is installed by collecting pipe 5 to the square water tank 9 that oozes with clear
Between silt well 3, periphery fills 50mm thickness particle diameter 15~25mm metalling;
6) above 50mm thickness particle diameter 15~25mm metalling, laying depth is the soil of 500mm;
7) carrying out vegetation plantation in earthing, the square installation oozing water tank 9 can supplement the main root system of footpath arbor
The water content of soil layer can be arrived.
Claims (10)
1. sponge engineering system based on existing urban road Yu drainage condition, existing urban road include car lane (13),
Bicycle lane (15) and footpath (16), it is characterised in that: described car lane (13), bicycle lane (15) and People's Bank of China
Road (16) road surface remains unchanged, in described car lane (13) outside along at the flat tooth of road and described bicycle lane (15)
And it is respectively provided with the gutter that catchments (1) between footpath (16) at the flat tooth of road, at the gutter that catchments (1) upper covering gap cover plate (2);Edge
The gutter (1) that catchments arranges desilting well (3) every five to six meters, and desilting well (3) connects with the gutter that catchments (1), at desilting well (3)
Top covers desilting manhole cover plate (4);Car lane (13) outside is provided with cooperation makes along each desilting well (3) place at the flat tooth of road
Circle ooze water tank (7), circle is oozed water tank (7) and is embedded between the existing arbor that band is divided in side;Square ooze water tank (9)
It is embedded between the existing arbor of footpath (16);Gutter (1) and the circle of catchmenting ooze water tank (7), square ooze water tank (9) it
Between connected by oblique collecting pipe (5) respectively, be provided with and cutting a dirty basket at collecting pipe (5) mouth of the gutter that catchments (1) joint
(6);The described gutter that catchments (1) connects municipal administration rain pipe (10) by overflow pipe (8).
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
Described gap cover plate (2) is rectangle cover plate, and having the degree of depth respectively at gap cover plate (2) two minor face is 20mm, a length of
The groove of 200mm, during adjacent two pieces of gap cover plates (2) splicing, it is 40mm that the groove docking of adjacent slits cover plate (2) forms width
Prismatic gap, rainwater is imported by prismatic gap and catchments gutter (1).
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
The described gutter that catchments (1) be outer diameter length be 900mm, width be 300mm, the degree of depth be the U-shaped ditch of 350mm, the gutter that catchments (1)
Wall thickness 50mm;Described gap cover plate (2) thickness is 120mm, and a length of 900mm, width are 300mm;At described gap lid
Two long limits of plate (2) all have 50mm width trough with straight angle.
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 3, it is characterised in that:
The described gutter that catchments (1) ditch body longitudinal lap joint uses tongue and groove design, longitudinal side evagination 40mm bottom the gutter that catchments (1), separately
Side indent 40mm, forms tongue and groove.
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
Described desilting well (3) degree of depth is 650mm, width is 300mm, a length of 900, wall thickness is 50mm;Described desilting manhole cover plate
(4) being concrete material, thickness is 120mm, a length of 900mm, width are 300mm;Described desilting manhole cover plate (4) is opened
Three rows five are had to indulge, the circular hole of totally ten five diameter 50mm.
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
Described collecting pipe (5) is internal diameter 100mm plastic tube, collecting pipe (5) distance desilting well (3) shaft bottom 200mm;Described overflow pipe
(8) it is caliber 40mm plastic tube, overflow pipe (8) distance set waterside ditch (1) 20mm suitable for reading.
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
It is 1200mm that described circle oozes water tank (7) external diameter, and height is 1200mm;Square water tank (9) external diameter length and width of oozing are
1200mm, a height of 1500mm;Water tank (7) is oozed and square water tank (9) periphery of oozing wraps up setting respectively in described circle
50mm thickness particle diameter 15~25mm metalling (12).
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
The described gutter that catchments (1), gap cover plate (2), desilting well (3), circle oozes water tank (7) and the square water tank (9) that oozes is
Concrete material.
Sponge engineering system based on existing urban road Yu drainage condition the most according to claim 1, it is characterised in that:
Described dirty basket (6) of cutting is hemispherical PE Hanging Basket, cuts dirty basket (6) Hanging Basket mouth and sets cross hook.
10. sponge engineering system based on existing urban road and drainage condition described in any one in claim 1-9
Construction method, it is characterised in that: it is included in outside existing car lane along burying catchment gutter and desilting well at the flat tooth of road underground
Construction procedure;Between side is divided with existing arbor, bury circle underground ooze the construction procedure storing tank;Bicycle lane and footpath it
Between bury catchment gutter and the construction procedure of desilting well underground at the flat tooth of road;Bury underground between the existing arbor of footpath and square ooze storage tank
Construction procedure;
Along burying catchment gutter and desilting well and divide leukorrhagia to bury circular storage underground in side at the flat tooth of road underground outside described car lane
The construction procedure of water pot is as follows:
1) open along Road tooth outside existing car lane, under dig 350mm deep trench, under position corresponding between every strain arbor
Dig 650mm deep trench;
2) gutter is catchmented and desilting well is sequentially placed in groove by prefabricated;
3) first Tree Planting Earthdrill is divided in side and is burrowed between the arbor of band, makes a call to a hole between two arbors, and hole is put with desilting well location
Spacing 5-6m at corresponding hole, the circle of a diameter of 1300mm in hole, deep 1800mm, and hole is connected with car lane
The soil of side takes out;
4) bottom burrowed mouth, 50mm thickness particle diameter 15~25mm metalling is laid;
5) circle is oozed water tank and is inserted in hole by Tree Planting Earthdrill, collecting pipe is installed to circle ooze water tank and desilting well it
Between, periphery fills 50mm thickness particle diameter 15~25mm metalling;
6) above 50mm thickness particle diameter 15~25mm metalling, laying depth is the soil of 500mm;
7) carrying out vegetation plantation after earthing, circle is oozed the installation of water tank and complementary side the main root system of band arbor can be divided to arrive
The water content of soil layer;
Catchment gutter and desilting well and under footpath is buried underground at the described flat tooth of road between bicycle lane and footpath
The construction procedure burying square water tank underground is as follows:
1) open along Road tooth outside existing bicycle lane, under dig 350mm deep trench, position corresponding between every strain arbor
Under dig 650mm deep trench;
2) gutter is catchmented and desilting well is sequentially placed in groove by prefabricated;
3) between footpath arbor, open existing footpath guidance tape, under dig a hole mouth a size of 1200mm*1200mm, deeply
1800mm, and the soil taking-up of side that hole is connected with bicycle lane;
4) bottom burrowed mouth, 50mm thickness particle diameter 15~25mm metalling is laid;
5) the square water tank that oozes is inserted in hole by Tree Planting Earthdrill, collecting pipe is installed to the most square ooze water tank and desilting well it
Between, periphery fills 50mm thickness particle diameter 15~25mm metalling;
6) above 50mm thickness particle diameter 15~25mm metalling, laying depth is the soil of 500mm;
7) carrying out vegetation plantation in earthing, the square installation oozing water tank can supplement the main root system of footpath arbor and can arrive
Reach the water content of soil layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610673834.8A CN106320494B (en) | 2016-08-15 | 2016-08-15 | The construction method of sponge engineering system based on existing urban road and drainage condition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610673834.8A CN106320494B (en) | 2016-08-15 | 2016-08-15 | The construction method of sponge engineering system based on existing urban road and drainage condition |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106320494A true CN106320494A (en) | 2017-01-11 |
CN106320494B CN106320494B (en) | 2018-03-20 |
Family
ID=57740842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610673834.8A Active CN106320494B (en) | 2016-08-15 | 2016-08-15 | The construction method of sponge engineering system based on existing urban road and drainage condition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320494B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532726A (en) * | 2018-06-06 | 2018-09-14 | 朱光顺 | Linear drainage systems |
CN110409558A (en) * | 2019-08-15 | 2019-11-05 | 浙江省交通规划设计研究院有限公司 | The rainwater utilization system and construction method of greenbelt |
CN110528661A (en) * | 2019-06-20 | 2019-12-03 | 兰州理工大学 | A kind of town road rainwater multiplexing facility based on biological stranded belt system |
CN111593632A (en) * | 2019-02-21 | 2020-08-28 | 潘振建 | Intelligent sponge road |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050238432A1 (en) * | 2004-04-21 | 2005-10-27 | Wen Chen J | A method for constructing a water resource recycling system |
CN104947781A (en) * | 2015-07-07 | 2015-09-30 | 济南轨道交通集团有限公司 | Rainwater collection diversion and strata conservation regulation and storage system |
CN104988825A (en) * | 2015-07-09 | 2015-10-21 | 东南大学 | Ecological road engineering system |
CN105544417A (en) * | 2016-02-23 | 2016-05-04 | 南开大学 | Method for enabling pavements to have strong rainwater storage capacity and reducing rainwater loss |
CN105794523A (en) * | 2016-04-11 | 2016-07-27 | 重庆大学 | Tree pool device with rainwater infiltration, storage and purification functions |
-
2016
- 2016-08-15 CN CN201610673834.8A patent/CN106320494B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050238432A1 (en) * | 2004-04-21 | 2005-10-27 | Wen Chen J | A method for constructing a water resource recycling system |
CN104947781A (en) * | 2015-07-07 | 2015-09-30 | 济南轨道交通集团有限公司 | Rainwater collection diversion and strata conservation regulation and storage system |
CN104988825A (en) * | 2015-07-09 | 2015-10-21 | 东南大学 | Ecological road engineering system |
CN105544417A (en) * | 2016-02-23 | 2016-05-04 | 南开大学 | Method for enabling pavements to have strong rainwater storage capacity and reducing rainwater loss |
CN105794523A (en) * | 2016-04-11 | 2016-07-27 | 重庆大学 | Tree pool device with rainwater infiltration, storage and purification functions |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532726A (en) * | 2018-06-06 | 2018-09-14 | 朱光顺 | Linear drainage systems |
CN111593632A (en) * | 2019-02-21 | 2020-08-28 | 潘振建 | Intelligent sponge road |
CN110528661A (en) * | 2019-06-20 | 2019-12-03 | 兰州理工大学 | A kind of town road rainwater multiplexing facility based on biological stranded belt system |
CN110409558A (en) * | 2019-08-15 | 2019-11-05 | 浙江省交通规划设计研究院有限公司 | The rainwater utilization system and construction method of greenbelt |
Also Published As
Publication number | Publication date |
---|---|
CN106320494B (en) | 2018-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110249844B (en) | Street tree pool with water storage and drainage device | |
CN104988825B (en) | Ecological road engineering system | |
CN202374807U (en) | Solar rainwater irrigation device for green belts | |
CN201943173U (en) | Sinking groove type permeable gutter inlet facility system | |
CN201976543U (en) | Green belt rain collecting automatic micro-sprinkling irrigation device | |
CN104196277A (en) | Functional rainwater garden suitable for interior of urban community grassy area in Shanghai | |
CN204875417U (en) | Ecological way engineering system | |
CN205100360U (en) | Urban road rainwater holds stagnant structure | |
CN106320494B (en) | The construction method of sponge engineering system based on existing urban road and drainage condition | |
CN207567889U (en) | Residential quarters Rainwater collection system | |
CN201539012U (en) | Infiltration-drainage pipe duct for comprehensive utilization of rainwater | |
CN206090587U (en) | School dropout's attitude system of watering is gathered to side slope | |
CN106245487B (en) | The construction method of the urban road sponge engineering system of combining road maintenance | |
CN106192665A (en) | A kind of sponge urban road rain infiltration system and construction method thereof | |
CN107711461A (en) | Arid area arbor integration irrigation system | |
CN207032427U (en) | A kind of Rainwater collection system suitable for old cell | |
CN106087648B (en) | A kind of special Quick drainage of urban road and irrigation system | |
CN106638219A (en) | Ramped urban road of sponge city | |
CN206667420U (en) | Sponge city high-effective penetrating type greenery patches constructs | |
CN103556672A (en) | Rainwater harvesting and water storage system for field road and construction method thereof | |
CN112832365B (en) | Rainwater system of ecological transportation hub and construction method thereof | |
CN207143648U (en) | A kind of ubbase drain system of embedding careless brick surface layer | |
CN210395030U (en) | Waterproof construction suitable for collapsible loess area town road side separate area | |
CN205295848U (en) | Firm type ecology system of mating formation of permeating water | |
CN106284587A (en) | Urban road is with oozing water tank and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201222 Address after: Building 17, headquarters base, 70 Phoenix Road, Jiangning Development Zone, Nanjing, Jiangsu Province 210000 (Jiangning Development Zone) Patentee after: NANJING ZICHENG ENGINEERING DESIGN Co.,Ltd. Address before: 210096, No. four archway, Xuanwu District, Jiangsu, Nanjing 2 Patentee before: SOUTHEAST University |