CN106087648B - A kind of special Quick drainage of urban road and irrigation system - Google Patents
A kind of special Quick drainage of urban road and irrigation system Download PDFInfo
- Publication number
- CN106087648B CN106087648B CN201610673415.4A CN201610673415A CN106087648B CN 106087648 B CN106087648 B CN 106087648B CN 201610673415 A CN201610673415 A CN 201610673415A CN 106087648 B CN106087648 B CN 106087648B
- Authority
- CN
- China
- Prior art keywords
- road
- cover plate
- gutter
- desilting
- catchments
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
- E03F5/0404—Gullies for use in roads or pavements with a permanent or temporary filtering device; Filtering devices specially adapted therefor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种城市道路专用快速排水系统,属于城市道路排水及雨水利用技术领域,沿道路机动车道两侧,在道路平牙下方设置集水边沟,在集水边沟上覆盖缝隙盖板,沿集水边沟每隔五至六米设置清淤井,集水边沟与清淤井相连通,用以沉淀初期雨水;在清淤井的上方覆盖清淤井盖板;在每个清淤井一侧一一对应设置渗蓄水罐,渗蓄水罐设置在道路侧分带中;清淤井与渗蓄水罐之间分别通过斜向的收集管连接,与清淤井相接处的收集管口设有截污篮;在集水边沟上每隔30米设置溢流口。本发明的城市道路专用快速排水系统系统能够在不对既有道路结构作任何改变的前提下实现城市道路雨水径流的快速排除,具有施工成本低、保证城市道路结构安全的特点。
The invention discloses a special rapid drainage system for urban roads, which belongs to the technical field of urban road drainage and rainwater utilization. Along both sides of the road motorway, a water collecting side ditch is arranged under the flat teeth of the road, and a gap cover is covered on the water collecting side ditch Dredging wells are set up every five to six meters along the water-collecting side ditch, and the water-collecting side ditch is connected with the dredging well to deposit initial rainwater; cover the dredging well cover on the top of the dredging well; One side of the dredging wells is provided with seepage storage tanks one by one, and the seepage storage tanks are arranged in the road side zone; The collection nozzle at the junction is provided with a waste intercepting basket; overflow outlets are provided every 30 meters on the side ditch of the water collection. The special rapid drainage system for urban roads of the present invention can realize rapid drainage of rainwater runoff on urban roads without any change to the existing road structure, and has the characteristics of low construction cost and guaranteed urban road structure safety.
Description
技术领域technical field
本发明属于城市道路排水及雨水利用技术领域,具体涉及一种城市道路专用快速排水与灌溉系统。The invention belongs to the technical field of urban road drainage and rainwater utilization, and in particular relates to a special rapid drainage and irrigation system for urban roads.
技术背景technical background
近年来,强降雨导致的道路积水是影响行人出行、甚至危及城市交通安全的顽疾,在我国城市具有普遍性;作为城市下垫面的重要组成部分,既有城市道路面层大多采用沥青混凝土或水泥混凝土等不透水路面,具有产、汇流速度快等特点,当发生短历时强降雨时易发生积水,造成城市道路系统内涝灾害。In recent years, road ponding caused by heavy rainfall has been a chronic disease that affects pedestrian travel and even endangers urban traffic safety. It is common in cities in my country; as an important part of urban underlying surfaces, asphalt concrete is mostly used for existing urban road surfaces Or cement concrete and other impermeable pavements have the characteristics of fast production and confluence. When short-duration heavy rainfall occurs, water accumulation is prone to occur, causing waterlogging disasters in the urban road system.
既有城市道路主要以雨水口点式收集,再通过管道和雨水井快速排放到市政下水系统的排水方式,设计思路主要是“末端集中,快速排除”。既有道路排水系统在解决道路基本排水需求的同时存在雨水收集效率低、系统要素之间关联性高、受路面纵坡影响大等局限性。The existing urban roads are mainly collected by point-type stormwater outlets, and then quickly discharged to the municipal sewage system through pipes and rainwater wells. The design idea is mainly "concentrated at the end and quickly discharged". The existing road drainage system has the limitations of low rainwater collection efficiency, high correlation between system elements, and great influence of road longitudinal slope while solving the basic road drainage needs.
特别对于城市建成区既有城市道路,为应对积水及内涝的威胁,传统改造方式往往是加大排水管道管径,需要对道路进行二次开挖,存在施工周期长、人力物力消耗大、扰民、影响正常交通通行等不足。如何在不改变既有城市道路结构、对市民生活最少干预的前提下实现城市道路排水能力的快速提升成为当下城市道路排水领域重点需要解决的问题。Especially for the existing urban roads in urban built-up areas, in order to cope with the threat of water accumulation and waterlogging, the traditional reconstruction method is often to increase the diameter of drainage pipes, which requires secondary excavation of the roads, which has long construction period, high consumption of manpower and material resources, and Disturbing residents, affecting normal traffic flow and other deficiencies. How to realize the rapid improvement of urban road drainage capacity without changing the existing urban road structure and minimally interfering with citizens' life has become a key problem to be solved in the field of urban road drainage.
发明内容Contents of the invention
发明目的:本发明的目的在于提供一种城市道路专用快速排水与灌溉系统,解决道路排水的同时,将雨水就地收集至侧分带、人行道下存储渗透,补充道路绿地的灌溉用水。Purpose of the invention: The purpose of the present invention is to provide a special rapid drainage and irrigation system for urban roads, which can collect rainwater on the side of the road and store and infiltrate under the sidewalk while solving the road drainage, so as to supplement the irrigation water for road green spaces.
技术方案:为实现上述发明目的,本发明采用如下技术方案:Technical solution: In order to achieve the above-mentioned purpose of the invention, the present invention adopts the following technical solutions:
一种城市道路专用快速排水与灌溉系统,城市道路包括道路机动车道、道路侧分带和道路平牙,沿道路机动车道两侧,在道路平牙下方设置集水边沟,在集水边沟上覆盖缝隙盖板,沿集水边沟每隔五至六米设置清淤井,所述的集水边沟与清淤井相连通,用以沉淀初期雨水;在所述的清淤井的上方覆盖清淤井盖板;在每个所述的清淤井一侧一一对应设置渗蓄水罐,渗蓄水罐设置在道路侧分带中;清淤井与渗蓄水罐之间分别通过斜向的收集管连接,与清淤井相接处的收集管口设有截污篮;在所述的集水边沟上每隔30米设置溢流口。A special rapid drainage and irrigation system for urban roads. Urban roads include road motor vehicle lanes, road side zoning and road flat teeth. Cover the gap cover plate on the top, and set up dredging wells every five to six meters along the water-collecting side ditch. The top is covered with the dredging well cover; one side of each of the dredging wells is provided with seepage storage tanks one by one, and the seepage storage tanks are arranged in the side zone of the road; Connected by oblique collection pipes, the mouth of the collection pipe connected to the dredging well is provided with a waste basket; overflow ports are provided every 30 meters on the side ditch of the water collection.
所述的溢流口为并排设置六个圆形溢流孔。The overflow outlets are six circular overflow holes arranged side by side.
所述的缝隙盖板为矩形盖板,在缝隙盖板两短边均分别开有深度为20mm,长度为200mm的凹槽,相邻两块缝隙盖板拼接时对接形成宽度为40mm的棱形缝隙,雨水通过棱形缝隙汇入集水边沟。The gap cover is a rectangular cover, and grooves with a depth of 20mm and a length of 200mm are respectively opened on both short sides of the gap cover. The rainwater flows into the catchment gutter through the prismatic gap.
所述的集水边沟为外径长度为900mm、宽度为300mm、深度为350mm的U型沟,集水边沟壁厚50mm;所述的缝隙盖板厚度为120mm,长度为900mm、宽度为300mm;在所述的缝隙盖板的两长边均开有50mm宽直角槽。The water-collecting side ditch is a U-shaped ditch with an outer diameter of 900mm, a width of 300mm, and a depth of 350mm, and the wall thickness of the water-collecting side ditch is 50mm; the thickness of the gap cover plate is 120mm, the length is 900mm, and the width is 300mm; 50mm wide right-angle slots are formed on both long sides of the gap cover plate.
所述的集水边沟沟体纵向搭接采用企口设计,集水边沟底部纵向一侧拼接凸槽外突40mm,另一侧拼接凹槽内凹40mm,形成企口。The longitudinal overlap of the water-collecting side ditch adopts a tongue-and-groove design, and the bottom of the water-collecting side ditch is longitudinally spliced with a convex groove of 40mm protruding outward, and the other side of the splicing groove is concaved inward of 40mm, forming a tongue-and-groove.
所述的清淤井深度为650mm、宽度为300mm、长度为900、壁厚为50mm;所述的清淤井盖板厚度为120mm、长度为900mm、宽度为300mm,在所述的清淤井盖板上开有三排五纵,共十五个直径为50mm的圆孔。The depth of the dredging well is 650mm, the width is 300mm, the length is 900mm, and the wall thickness is 50mm; the thickness of the dredging well cover is 120mm, the length is 900mm, and the width is 300mm. There are three rows and five vertical holes on the top, a total of fifteen round holes with a diameter of 50mm.
所述的收集管为内径100mm塑料管,收集管距离清淤井井底200mm。The collection pipe is a plastic pipe with an inner diameter of 100 mm, and the collection pipe is 200 mm away from the bottom of the dredging well.
所述的截污篮为半球形PE挂篮,截污篮挂篮口设十字形挂钩,方便勾取清理。The dirt intercepting basket is a hemispherical PE hanging basket, and a cross-shaped hook is arranged at the hanging basket of the dirt intercepting basket, which is convenient for hooking and cleaning.
所述的溢流口通过溢流管外接市政雨水管,所述的溢流口距离集水边沟上口20mm,溢流管为管径40mm塑料管。The overflow port is externally connected to the municipal rainwater pipe through the overflow pipe, and the overflow port is 20 mm away from the upper mouth of the water collection side ditch, and the overflow pipe is a plastic pipe with a diameter of 40 mm.
所述的集水边沟、缝隙盖板、清淤井、清淤井盖板和渗蓄水罐为混凝土材质。The water-collecting side ditches, gap cover plates, dredging wells, dredging well cover plates and seepage storage tanks are made of concrete.
工作原理:雨水降落到路面后,通过城市道路横坡汇集到两侧集水边沟位置,再通过特殊设计的缝隙盖板沟汇入集水边沟内部,实现对路面径流雨水初步收集。集水边沟下方每隔五至六米设置一个清淤井,用以对初步收集雨水的沉淀和淤泥收集,清淤井上方覆盖清淤井盖板,盖板日常可以打开对清淤井进行清淤、检修。在清淤井侧面设置截污篮及雨水管口,经过沉淀的雨水通过截污篮及雨水管输送到道路中、侧分带及人行道绿化带的雨水收集利用装置,实现对路面雨水的自然收集、渗透和利用。在集水边沟上每隔30米设置溢流口,溢流口为并排设置六个圆形溢流孔,溢流管可直接安放在溢流孔中并与市政雨水管道相连,当集水边沟中汇集雨水径流量超过设计标准时,多余雨水可通过溢流管道排放到城市市政雨水管网,保证整个系统运行的安全。Working principle: After the rainwater falls on the road surface, it collects to the water collection side ditch on both sides through the urban road cross slope, and then flows into the water collection side ditch through the specially designed gap cover ditch to realize the preliminary collection of road surface runoff rainwater. Set up a dredging well every five to six meters below the side ditch to collect the sediment and silt from the initial rainwater collection. The dredging well cover is covered above the dredging well, and the cover can be opened daily to clean the dredging well. Silt, overhaul. Set up the sewage intercepting basket and the rainwater nozzle on the side of the dredging well, and the rainwater after precipitation is transported to the rainwater collection and utilization device in the middle of the road, the side belt and the sidewalk green belt through the sewage intercepting basket and the rainwater pipe, so as to realize the natural collection and infiltration of rainwater on the road surface and exploit. An overflow port is set every 30 meters on the side ditch of the water collection. The overflow port is provided with six circular overflow holes side by side. The overflow pipe can be directly placed in the overflow hole and connected to the municipal rainwater pipe. When the rainwater runoff collected in the side ditch exceeds the design standard, the excess rainwater can be discharged to the urban municipal rainwater pipe network through the overflow pipe to ensure the safety of the entire system.
有益效果:与现有技术相比,本发明一种城市道路专用快速排水与灌溉系统,具备以下优势:(1)该系统能够在不对既有道路结构作任何改变的前提下实现城市道路雨水径流的快速排除,具有施工成本低、保证城市道路结构安全的特点;(2)既有市政排水方式以雨水口点式收集为主,快速排水与灌溉系统采用密集等距缝隙盖板分散快速收集路面径流,径流消减效率更高;(3)系统受道路纵坡影响小,即使在路面纵坡较大区域仍能有效分散收集雨水;(4)能够与既有城市道路排水系统实现独立,互不干扰,不改变既有城市道路排水系统布局,完全兼容既有排水系统;(5)改造施工期间不扰民,不需要对道路实施封闭,不影响正常交通通行;(6)有效消解了道路路面地表径流的产生,防止路面积水和内涝,且为下游排水减轻负担。Beneficial effects: Compared with the prior art, the present invention provides a special rapid drainage and irrigation system for urban roads, which has the following advantages: (1) The system can realize urban road rainwater runoff without making any changes to the existing road structure The rapid drainage has the characteristics of low construction cost and ensuring the safety of urban road structure; (2) The existing municipal drainage method is mainly based on rainwater point collection, and the rapid drainage and irrigation system uses dense equidistant gap cover plates to disperse and quickly collect the road surface (3) The system is less affected by the longitudinal slope of the road, and it can still effectively disperse and collect rainwater even in areas with large longitudinal slopes of the road; (4) It can be independent from the existing urban road drainage system. Interference, does not change the layout of the existing urban road drainage system, and is fully compatible with the existing drainage system; (5) During the renovation and construction, it will not disturb the residents, does not need to close the road, and will not affect normal traffic; (6) Effectively eliminate the surface of the road surface The generation of runoff prevents water accumulation and waterlogging on the road, and reduces the burden on downstream drainage.
附图说明Description of drawings
图1是集水边沟断面图Figure 1 is a cross-sectional view of the water collection ditch
图2是清淤井断面图;Fig. 2 is a sectional view of the dredging well;
图3是截污篮布置图;Fig. 3 is the arrangement diagram of the dirt intercepting basket;
图4是集水边沟缝隙盖板及清淤井盖板平面图;Fig. 4 is a plan view of the cover plate of the water collecting side ditch gap and the cover plate of the dredging well;
图5是普通集水边沟轴侧图;Fig. 5 is a side view of a common catchment ditch;
图6是带溢流口集水边沟轴侧图。Fig. 6 is a side view of the water-collecting gutter with an overflow port.
具体实施方式detailed description
以下结合附图和具体实施方式对本发明做进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
图1-6所示,附图标记为:集水边沟1、缝隙盖板2、清淤井3、清淤井盖板4、收集管5、截污篮6、渗蓄水罐7、溢流口8、溢流孔9、溢流管10、道路机动车道11、道路侧分带12、道路平牙13、缝隙盖板棱形缝隙14、拼接凸槽15和拼接凹槽16,其中道路侧分带12、道路平牙13为城市道路既有设施。As shown in Figure 1-6, the reference signs are: water collecting side ditch 1, gap cover plate 2, dredging well 3, dredging well cover plate 4, collecting pipe 5, sewage intercepting basket 6, seepage storage tank 7, overflow Orifice 8, overflow hole 9, overflow pipe 10, road motor vehicle lane 11, road side sub-belt 12, road flat tooth 13, gap cover prismatic gap 14, splicing convex groove 15 and splicing groove 16, wherein the road Side sub-belts 12 and road flat teeth 13 are existing facilities on urban roads.
集水边沟1设置在道路机动车道11两侧道路平牙13下方,在集水边沟1上覆盖缝隙盖板2,渗蓄水罐7设置在道路侧分带12中;沿集水边沟1每隔五至六米设置清淤井3,用以沉淀初期雨水,在清淤井3的上方覆盖清淤井盖板4,清淤井盖板4日常可以打开对清淤井3及渗蓄水罐7进行清淤、检修,渗蓄水罐7与清淤井3一一对应设置。集水边沟1与渗蓄水罐7之间分别通过斜向的收集管5连接,与清淤井3相接处的收集管5口设有截污篮6。在集水边沟上每隔30米设置溢流口8,溢流口8为并排设置六个圆形溢流孔9。The water-collecting side ditch 1 is arranged under the road flat teeth 13 on both sides of the road motorway 11, the gap cover plate 2 is covered on the water-collecting side ditch 1, and the seepage water storage tank 7 is arranged in the side zone 12 of the road; along the water-collecting side Ditch 1 is provided with dredging wells 3 every five to six meters to deposit initial rainwater. The dredging well cover 4 is covered on the top of the dredging well 3, and the dredging well cover 4 can be opened daily to clean the dredging well 3 and infiltration and storage. Water tank 7 carries out dredging, overhaul, seepage storage tank 7 and dredging well 3 one-to-one corresponding setting. The water-collecting gutter 1 is connected to the seepage storage tank 7 through oblique collection pipes 5 respectively, and the mouth of the collection pipe 5 at the junction with the dredging well 3 is provided with a dirt intercepting basket 6 . Overflow outlets 8 are arranged every 30 meters on the side ditch of the water collection, and the overflow outlets 8 are provided with six circular overflow holes 9 side by side.
道路机动车道11中的雨水经路面横坡通过缝隙盖板2汇入集水边沟1,经过清淤井3的沉淀和收集管5口截污篮6的过滤后,经由收集管5汇入渗蓄水罐7内,进而直接渗透到道路侧分带12及人行道行道树周边土壤中,起到灌溉绿化植被和涵养地下水的作用。遇超出30年标准的特大暴雨,过多雨水可通过溢流管引至市政雨水管道排出。The rainwater in the motorway 11 of the road flows into the water collecting side ditch 1 through the cross slope of the road surface through the gap cover plate 2, and after being deposited in the dredging well 3 and filtered by the collection pipe 5 and the sewage basket 6, it is collected through the collection pipe 5 Seep in the water storage tank 7, and then directly infiltrate into the soil around the sidewalk 12 of the road and sidewalk trees, and play the role of irrigating green vegetation and conserving groundwater. In case of heavy rain exceeding the 30-year standard, the excessive rainwater can be led to the municipal rainwater pipe through the overflow pipe for discharge.
缝隙盖板2为混凝土材质,缝隙盖板2为矩形盖板,在缝隙盖板2两短边均分别开有深度为20mm,长度为200mm的凹槽,相邻两块缝隙盖板2拼接时,相邻缝隙盖板2的凹槽对接形成宽度为40mm的棱形缝隙14,雨水通过棱形缝隙14汇入集水边沟1,棱形缝隙14配合清淤井盖板4的孔隙,过水面积大于30年暴雨重现期时雨水排放所需要的过水面积。The gap cover plate 2 is made of concrete, and the gap cover plate 2 is a rectangular cover plate. There are grooves with a depth of 20mm and a length of 200mm respectively on the two short sides of the gap cover plate 2. When two adjacent gap cover plates 2 are spliced , the grooves of the adjacent gap cover plates 2 are butted to form a prismatic gap 14 with a width of 40mm. Rainwater flows into the water collection side ditch 1 through the prismatic gap 14. The area is greater than the passing area required for rainwater discharge during the 30-year rainstorm return period.
集水边沟1为混凝土材质,通常,城市道路现状路牙宽度为300mm,混凝土U型沟壁厚为50mm,为不对既有路面造成扰动,故集水边沟1净宽取200mm。The catchment ditch 1 is made of concrete. Generally, the curb width of the current urban road is 300mm, and the wall thickness of the concrete U-shaped ditch is 50mm. In order not to cause disturbance to the existing road surface, the net width of the catchment ditch 1 is taken as 200mm.
集水边沟1设计为外径长度为900mm、宽度为300mm、深度为350mm的U型沟,集水边沟1壁厚50mm,同时,缝隙盖板2厚度为120mm,长度为900mm、宽度为300mm;在缝隙盖板2的两长边均开有50mm宽直角槽,施工时可直接将缝隙盖板2安置在集水边沟1沟体上。集水边沟1沿机动车道外侧道路平牙13布置,沟体纵向搭接采用企口设计,集水边沟1底部纵向一侧拼接凸槽15外突40mm,另一侧拼接凹槽16内凹40mm,形成企口,施工时相邻集水边沟1之间拼接方便且具有很好的密闭性。The catchment side ditch 1 is designed as a U-shaped ditch with an outer diameter of 900 mm, a width of 300 mm, and a depth of 350 mm. 300mm; both long sides of the gap cover plate 2 are provided with 50mm wide right-angle grooves, and the gap cover plate 2 can be directly placed on the water collecting side ditch 1 ditch body during construction. The water-collecting side ditch 1 is arranged along the flat teeth 13 of the road outside the motorway. The longitudinal overlap of the ditch body adopts a tongue-and-groove design. The bottom of the water-collecting side ditch 1 is spliced with a convex groove 15 protruding 40mm on one side, and the other side is spliced into a groove 16. Concave 40mm, form tongue and groove, the splicing between adjacent catchment gutters 1 is convenient and has good airtightness during construction.
清淤井3为混凝土材质,清淤井3深度为650mm、宽度为300mm、长度为900、壁厚为50mm,清淤井3与集水边沟1相连,在清淤井3上覆清淤井盖板4。清淤井盖板4为混凝土材质,厚度为120mm、长度为900mm、宽度为300mm,在清淤井盖板4上开有三排五纵,共十五个直径50mm的圆孔,既可收集雨水,也标明了清淤井3的位置,方便清淤检修。The dredging well 3 is made of concrete, the depth of the dredging well 3 is 650mm, the width is 300mm, the length is 900mm, and the wall thickness is 50mm. Manhole cover 4. The dredging well cover plate 4 is made of concrete, with a thickness of 120mm, a length of 900mm, and a width of 300mm. There are three rows and five vertical holes on the dredging well cover plate 4, and a total of fifteen circular holes with a diameter of 50mm can collect rainwater and The position of the dredging well 3 is indicated to facilitate dredging and maintenance.
收集管5为内径100mm塑料管,连接清淤井3与渗蓄水罐7,收集管5距离清淤井3井底200mm。如图3(a)所示,截污篮6安装在与集水边沟1相接的收集管5口,可以截留雨水中的杂物,使杂物进入清淤井中;如图3(b)所示,截污篮6为半球形PE挂篮,截污篮6挂篮口设十字形挂钩,方便勾取清理。渗蓄水罐7均为混凝土材质,容积均可满足海绵城市90%年径流总量控制率的要求。The collecting pipe 5 is a plastic pipe with an inner diameter of 100mm, which connects the dredging well 3 and the seepage storage tank 7, and the collecting pipe 5 is 200mm away from the bottom of the dredging well 3. As shown in Figure 3(a), the dirt intercepting basket 6 is installed on the collection pipe 5 connected to the water collecting side ditch 1, which can intercept the sundries in the rainwater and make the sundries enter the dredging well; as shown in Figure 3(b ), the dirt intercepting basket 6 is a hemispherical PE hanging basket, and the dirt intercepting basket 6 hanging basket mouth is provided with a cross-shaped hook, which is convenient for hooking and cleaning. The seepage storage tank 7 is made of concrete, and its volume can meet the requirement of 90% annual total runoff control rate of the sponge city.
溢流管10为管径40mm塑料管,连接集水边沟1上的溢流口8与市政雨水管,溢流口8距离集水边沟1上口20mm,渗蓄水罐7满雨水时,雨水在集水边沟1中水位上升至溢流管10位置,遇超出30年标准的特大暴雨,渗蓄水罐7蓄满雨水后,过多雨水将通过溢流管10引至市政雨水管排出。The overflow pipe 10 is a plastic pipe with a diameter of 40mm, which connects the overflow port 8 on the water-collecting side ditch 1 with the municipal rainwater pipe. The overflow port 8 is 20mm away from the upper mouth of the water-collecting side ditch 1. The water level of the rainwater rises to the position of the overflow pipe 10 in the water collecting side ditch 1. In the event of a heavy rain exceeding the 30-year standard, after the seepage storage tank 7 is full of rainwater, the excessive rainwater will be led to the municipal rainwater pipe through the overflow pipe 10 for discharge .
工作过程:道路机动车道11中的雨水经路面横坡通过缝隙盖板2汇入集水边沟1,清淤井3上接收集管5,可将雨水中杂物过滤,杂物留在截污篮6中,经过清淤井3的沉淀和收集管5口截污篮6的过滤后,初步净化的雨水通过收集管5汇入渗蓄水罐7,雨水经道路机动车道11横坡通过缝隙盖板2汇入集水边沟1,再通过收集管5汇入渗蓄水罐7内,直接渗透到道路侧分带12土壤中及人行道行道树周边土壤中,起到灌溉绿化植被和涵养地下水的作用。Working process: The rainwater in the road motorway 11 flows into the water collecting side ditch 1 through the cross slope of the road surface through the gap cover plate 2, and the receiving header 5 on the dredging well 3 can filter the sundries in the rainwater and keep the sundries in the interception. In the dirt basket 6, after the precipitation of the dredging well 3 and the filtration of the dirt basket 6 by the collection pipe 5, the preliminary purified rainwater flows into the infiltration storage tank 7 through the collection pipe 5, and the rainwater passes through the cross slope of the road motorway 11 The gap cover plate 2 merges into the water collecting side ditch 1, and then merges into the seepage water storage tank 7 through the collecting pipe 5, and directly penetrates into the soil of the side zone 12 of the road and the soil around the trees on the sidewalk, so as to irrigate green vegetation and conserve The role of groundwater.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610673415.4A CN106087648B (en) | 2016-08-15 | 2016-08-15 | A kind of special Quick drainage of urban road and irrigation system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610673415.4A CN106087648B (en) | 2016-08-15 | 2016-08-15 | A kind of special Quick drainage of urban road and irrigation system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106087648A CN106087648A (en) | 2016-11-09 |
| CN106087648B true CN106087648B (en) | 2017-12-22 |
Family
ID=58071010
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610673415.4A Expired - Fee Related CN106087648B (en) | 2016-08-15 | 2016-08-15 | A kind of special Quick drainage of urban road and irrigation system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106087648B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107060040A (en) * | 2017-05-27 | 2017-08-18 | 南昌大学 | A kind of underground pipe gallery drainage system based on existing blowdown canal |
| CN109853316B (en) * | 2019-01-11 | 2021-01-29 | 温州东联市政工程有限公司 | Sponge type road paving structure |
| CN111910730B (en) * | 2020-06-05 | 2021-11-02 | 黑龙江建筑职业技术学院 | A kind of municipal drainage ditch and its construction method |
| CN112942545A (en) * | 2021-02-01 | 2021-06-11 | 安徽润君环境技术有限公司 | U-shaped groove overflow manhole |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103174079A (en) * | 2012-10-31 | 2013-06-26 | 北京仁创科技集团有限公司 | Road rainwater collecting system for preventing surface gathered water |
| CN104947781A (en) * | 2015-07-07 | 2015-09-30 | 济南轨道交通集团有限公司 | Rainwater collection diversion and strata conservation regulation and storage system |
| CN104988825A (en) * | 2015-07-09 | 2015-10-21 | 东南大学 | Ecological road engineering system |
| CN105794523A (en) * | 2016-04-11 | 2016-07-27 | 重庆大学 | Tree pool device with rainwater infiltration, storage and purification functions |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6962464B1 (en) * | 2004-04-21 | 2005-11-08 | Jui Wen Chen | Method for constructing a water resource recycling system |
-
2016
- 2016-08-15 CN CN201610673415.4A patent/CN106087648B/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103174079A (en) * | 2012-10-31 | 2013-06-26 | 北京仁创科技集团有限公司 | Road rainwater collecting system for preventing surface gathered water |
| CN104947781A (en) * | 2015-07-07 | 2015-09-30 | 济南轨道交通集团有限公司 | Rainwater collection diversion and strata conservation regulation and storage system |
| CN104988825A (en) * | 2015-07-09 | 2015-10-21 | 东南大学 | Ecological road engineering system |
| CN105794523A (en) * | 2016-04-11 | 2016-07-27 | 重庆大学 | Tree pool device with rainwater infiltration, storage and purification functions |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106087648A (en) | 2016-11-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110249844B (en) | Street tree pool with water storage and drainage device | |
| CN202017223U (en) | Rain collection and permeation recharging device | |
| CN103548601B (en) | Tree pool and method for filtering runoff rainwater through tree pool | |
| CN215454456U (en) | Greening irrigation system based on municipal road green belt rainwater cyclic utilization | |
| CN101775839B (en) | Rainwater penetrating-discharging integrated ecological system | |
| CN205741825U (en) | Roadway rainwater collection system | |
| CN106245487B (en) | The construction method of the urban road sponge engineering system of combining road maintenance | |
| CN205444302U (en) | Urban road rainwater control valve network system | |
| CN205100360U (en) | Urban road rainwater holds stagnant structure | |
| CN101467511A (en) | Dispersion type rainwater-collecting infiltrating irrigation device for urban road green area | |
| CN201459905U (en) | Urban rainwater drainage system | |
| CN205012441U (en) | Rainwater infiltration - discharges integrative device | |
| CN105297872A (en) | LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining | |
| CN106087648B (en) | A kind of special Quick drainage of urban road and irrigation system | |
| CN106320494B (en) | The construction method of sponge engineering system based on existing urban road and drainage condition | |
| CN103233433A (en) | Urban road pavement rainwater collection and utilization system | |
| CN109797839A (en) | A kind of efficient pollution cutting device of urban road inlet for stom water and cut dirty operating method | |
| CN202544019U (en) | Rain water collection system for urban green land | |
| CN107905331A (en) | Stagnant system is oozed in a kind of self-cleaning of sponge city | |
| CN102086658B (en) | Permeation and drainage pipe duct for comprehensively utilizing rainwater | |
| CN204898828U (en) | Rainwater conserves - restores integrative device | |
| CN201284492Y (en) | Simple and practical overhead road rainwater utilization system | |
| CN208072566U (en) | A kind of both sides of the road rainwater gaseous-waste holdup system | |
| CN212224121U (en) | Road structure with surface type water collecting function | |
| CN218951878U (en) | A sunken green belt structure for municipal roads |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20201216 Address after: Building 17, headquarters base, 70 Phoenix Road, Jiangning Development Zone, Nanjing, Jiangsu Province 210000 (Jiangning Development Zone) Patentee after: NANJING ZICHENG ENGINEERING DESIGN Co.,Ltd. Address before: 210096, No. four archway, Xuanwu District, Jiangsu, Nanjing 2 Patentee before: SOUTHEAST University |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 |