CN106285722A - 一种预防隧道二衬拱顶脱空的装置及其施工方法 - Google Patents

一种预防隧道二衬拱顶脱空的装置及其施工方法 Download PDF

Info

Publication number
CN106285722A
CN106285722A CN201610763000.6A CN201610763000A CN106285722A CN 106285722 A CN106285722 A CN 106285722A CN 201610763000 A CN201610763000 A CN 201610763000A CN 106285722 A CN106285722 A CN 106285722A
Authority
CN
China
Prior art keywords
longitudinal
exhaustor
grouting pipe
lining
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610763000.6A
Other languages
English (en)
Inventor
龙青青
赵金叶
韦鹏举
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority to CN201610763000.6A priority Critical patent/CN106285722A/zh
Publication of CN106285722A publication Critical patent/CN106285722A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

一种预防隧道二衬拱顶脱空的装置及其施工方法,其中的装置中竖向注浆管(5)和纵向注浆管(3)之间、竖向排气管(6)和纵向排气管(2)之间分别通过三通连接装置(9)进行“T型”连接;其中的方法包括以下步骤:步骤一、首先制作布置好纵向排气管(2)和纵向注浆管(3),步骤二、将竖向排气管(6)和纵向排气管(2)、竖向注浆管(5)和纵向注浆管(3)进行“T型”连接,步骤三将竖向注浆管(5)和竖向排气管(6)由二衬台车预留孔洞内掏出、并安装溢浆管(7),步骤四,进行二衬混凝土施工。结构简单,施工方便;有效防止拱顶脱空,大大提高了二衬质量。

Description

一种预防隧道二衬拱顶脱空的装置及其施工方法
技术领域
本发明涉及一种装置,更具体的说涉及一种预防隧道二衬拱顶脱空的装置及其施工方法,属于隧道施工技术领域。
背景技术
目前,隧道二衬施工时只在拱顶纵向埋设一根注浆管及一根排气管,待混凝土强度达到100%后由二衬端头进行注浆施工;该种方法存在以下缺陷:一,等待混凝土的强度达到100%使二衬的施工周期过长;二,同时注浆管的注浆口及排气管设置在二衬端头,注浆管堵塞一次就会造成整版二衬注浆失败,混凝土不能充实拱顶,形成脱空。因此,拱顶脱空一直是隧道施工难以解决的二衬质量通病。
发明内容
本发明的目的在于针对现有的隧道二衬施工注浆施工周期过长、容易造成二衬注浆失败形成拱顶脱空等问题,提供一种预防隧道二衬拱顶脱空的装置及其施工方法。
为实现上述目的,本发明的技术解决方案是:一种预防隧道二衬拱顶脱空的装置,包括纵向排气管、纵向注浆管和溢浆管,所述纵向排气管和纵向注浆管沿隧道线路方向通过固定条分别焊接在拱顶两侧的防水板上,纵向排气管的两端和纵向注浆管的两端分别伸出二衬两侧端头,所述溢浆管设置在二衬台车中部正拱顶部位,所述的二衬两侧端头处分别设置有竖向注浆管和竖向排气管,所述的竖向注浆管和纵向注浆管之间、竖向排气管和纵向排气管之间分别通过三通连接装置进行“T型”连接。
所述的纵向排气管和纵向注浆管之间间距为3-5cm。
所述的纵向排气管、纵向注浆管、竖向排气管及竖向注浆管均为Φ30mm的软管。
所述的溢浆管为Φ50mm硬质PVC管或镀锌钢管。
一种预防隧道二衬拱顶脱空装置的施工方法,包括以下步骤:
步骤一,首先制作布置好纵向排气管和纵向注浆管,并使得纵向排气管及纵向注浆管根据二衬施工循环接长;
步骤二,挂设防水板,然后将纵向注浆管和纵向排气管用固定条分别焊接固定在拱顶两侧的防水板上,在二衬两侧端头处用三通连接装置分别将竖向排气管和纵向排气管、竖向注浆管和纵向注浆管进行“T型”连接;
步骤三,待二衬台车定位完毕后,再将竖向注浆管和竖向排气管由二衬台车预留孔洞内掏出,并安装溢浆管;
步骤四,进行二衬混凝土施工,待二衬混凝土强度达到100%后即可注浆,当注浆压力达到0.2Mpa、或溢浆管的溢浆孔出浆时,表示拱顶注浆完成。
与现有技术相比较,本发明的有益效果是:
1、本发明中二衬两侧端头处分别设置有竖向注浆管和竖向排气管,竖向注浆管和纵向注浆管之间、竖向排气管和纵向排气管之间分别通过三通连接装置进行“T型”连接;即在二衬两侧端头处增加了竖向排气管及竖向注浆管,在注浆过程能将拱顶的空气充分排出,保证注浆完全充实拱顶,有效防止拱顶脱空,大大提高了二衬质量;且结构简单,施工方便。
2、本发明可单独进行拱顶回填注浆作业,二衬施工完毕后,无需因等待二衬混凝土的强度达到100%进行注浆作业后才能进行下一循环的二衬作业,与现有的注浆施工技术相比更方便,且省时省力。
附图说明
图1是本发明结构示意图。
图2是本发明安装总体布置图。
图3是本发明中三通连接图。
图中,防水板1,纵向排气管2,纵向注浆管3,固定条4,竖向注浆管5,竖向排气管6,溢浆管7,二衬台车模板8,三通连接装置9。
具体实施方式
以下结合附图说明和具体实施方式对本发明作进一步的详细描述。
参见图1至图3,一种预防隧道二衬拱顶脱空的装置,包括纵向排气管2、纵向注浆管3和溢浆管7。所述纵向排气管2和纵向注浆管3沿隧道线路方向通过固定条4分别焊接在拱顶两侧的防水板1上,纵向排气管2的两端和纵向注浆管3的两端分别伸出二衬两侧端头,即纵向排气管2和纵向注浆管3整条隧道通长设置;具体的,用固定条4分别将纵向排气管2和纵向注浆管3包裹后焊接于拱顶两侧的防水板1上。所述溢浆管7设置在二衬台车中部正拱顶部位,正拱顶当拱顶充满浆液的时候,水泥浆液会从溢浆管7中流出。所述的二衬两侧端头处分别设置有竖向注浆管5和竖向排气管6,所述的竖向注浆管5和纵向注浆管3之间、竖向排气管6和纵向排气管2之间分别通过三通连接装置9进行“T型”连接,即在靠近二衬两侧端头附近使用三通连接装置9将竖向注浆管3和竖向排气管2引至二衬台车模板8内侧。固定条4通常采用现场常见的防水板条制作,三通连接装置9采用镀锌钢管加工改造而成。
参见图1,所述的纵向排气管2和纵向注浆管3之间间距为3-5cm。
所述的纵向排气管2、纵向注浆管3、竖向排气管6及竖向注浆管5均为Φ30mm的软管。
所述的溢浆管7为Φ50mm硬质PVC管或镀锌钢管。
一种预防隧道二衬拱顶脱空装置的施工方法,包括以下步骤:
步骤一,首先制作布置好好纵向排气管2和纵向注浆管3,并使得纵向排气管2及纵向注浆管3根据二衬施工循环接长。
步骤二,挂设防水板1,然后将纵向注浆管3和纵向排气管2用固定条4分别焊接固定在拱顶两侧的防水板1上;在二衬两侧端头处用三通连接装置9分别将竖向排气管6和纵向排气管2、竖向注浆管5和纵向注浆管3进行“T型”连接。
步骤三,待二衬台车定位完毕后,再将竖向注浆管5和竖向排气管6由二衬台车预留孔洞内掏出,并安装溢浆管7。
步骤四,进行二衬混凝土施工,待二衬混凝土强度达到100%后即可注浆,当注浆压力达到0.2Mpa、或溢浆管7的溢浆孔出浆时,表示拱顶注浆完成。从而使得二衬施工无需因注浆未完成而停滞不前,较现有的注浆工艺更为省时,且其二衬注浆效果更密实。
参见图1至图3,本发明结构简单,竖向注浆管5和纵向注浆管3之间、竖向排气管6和纵向排气管2之间分别通过三通连接装置9进行“T型”连接,通长设置的纵向排气管2和纵向注浆管3在注浆过程能将拱顶的空气充分排出,保证注浆完全充实拱顶,能有效避免拱顶空洞,较现有的注浆工艺更加全面,大大提高了施工质量。同时,本发明进行拱顶回填注浆作业,可单独进行作业,二衬施工完毕后,无需因等待二衬混凝土的强度达到100%进行注浆作业后才能进行下一循环的二衬作业,较现有的注浆施工技术更方便,且省时省力。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,上述结构都应当视为属于本发明的保护范围。

Claims (5)

1.一种预防隧道二衬拱顶脱空的装置,包括纵向排气管(2)、纵向注浆管(3)和溢浆管(7),所述纵向排气管(2)和纵向注浆管(3)沿隧道线路方向通过固定条(4)分别焊接在拱顶两侧的防水板(1)上,纵向排气管(2)的两端和纵向注浆管(3)的两端分别伸出二衬两侧端头,所述溢浆管(7)设置在二衬台车中部正拱顶部位,其特征在于:所述的二衬两侧端头处分别设置有竖向注浆管(5)和竖向排气管(6),所述的竖向注浆管(5)和纵向注浆管(3)之间、竖向排气管(6)和纵向排气管(2)之间分别通过三通连接装置(9)进行“T型”连接。
2.根据权利要求1所述的一种预防隧道二衬拱顶脱空的装置,其特征在于:所述的纵向排气管(2)和纵向注浆管(3)之间间距为3-5cm。
3.根据权利要求1所述的一种预防隧道二衬拱顶脱空的装置,其特征在于:所述的纵向排气管(2)、纵向注浆管(3)、竖向排气管(6)及竖向注浆管(5)均为Φ30mm的软管。
4.根据权利要求1所述的一种预防隧道二衬拱顶脱空的装置,其特征在于:所述的溢浆管(7)为Φ50mm硬质PVC管或镀锌钢管。
5.一种预防隧道二衬拱顶脱空装置的施工方法,其特征在于,包括以下步骤:
步骤一,首先制作布置好纵向排气管(2)和纵向注浆管(3),并使得纵向排气管(2)及纵向注浆管(3)根据二衬施工循环接长;
步骤二,挂设防水板(1),然后将纵向注浆管(3)和纵向排气管(2)用固定条(4)分别焊接固定在拱顶两侧的防水板(1)上,在二衬两侧端头处用三通连接装置(9)分别将竖向排气管(6)和纵向排气管(2)、竖向注浆管(5)和纵向注浆管(3)进行“T型”连接;
步骤三,待二衬台车定位完毕后,再将竖向注浆管(5)和竖向排气管(6)由二衬台车预留孔洞内掏出,并安装溢浆管(7);
步骤四,进行二衬混凝土施工,待二衬混凝土强度达到100%后即可注浆,当注浆压力达到0.2Mpa、或溢浆管(7)的溢浆孔出浆时,表示拱顶注浆完成。
CN201610763000.6A 2016-08-30 2016-08-30 一种预防隧道二衬拱顶脱空的装置及其施工方法 Pending CN106285722A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610763000.6A CN106285722A (zh) 2016-08-30 2016-08-30 一种预防隧道二衬拱顶脱空的装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610763000.6A CN106285722A (zh) 2016-08-30 2016-08-30 一种预防隧道二衬拱顶脱空的装置及其施工方法

Publications (1)

Publication Number Publication Date
CN106285722A true CN106285722A (zh) 2017-01-04

Family

ID=57674900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610763000.6A Pending CN106285722A (zh) 2016-08-30 2016-08-30 一种预防隧道二衬拱顶脱空的装置及其施工方法

Country Status (1)

Country Link
CN (1) CN106285722A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795324A (zh) * 2017-12-05 2018-03-13 中国水利水电第五工程局有限公司 一种用于隧道二衬的带模负压压浆系统及压浆方法
CN107939416A (zh) * 2017-11-15 2018-04-20 中铁四局集团有限公司 一种防止隧道拱顶混凝土脱空的预警方法
CN108301846A (zh) * 2018-03-21 2018-07-20 长安大学 隧道衬砌拱顶带模注浆装置及其施工工法
CN108506028A (zh) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 一种隧道衬砌台车拱顶综合注浆管装置及其使用方法
CN108547640A (zh) * 2018-03-16 2018-09-18 中铁十二局集团有限公司 隧道二次衬砌拱部空隙注浆装置
CN109488337A (zh) * 2018-11-20 2019-03-19 中铁上海工程局集团有限公司 一种隧道二衬砼防脱空可视化浇筑方法
CN109882198A (zh) * 2019-01-11 2019-06-14 中铁十一局集团第四工程有限公司 一种隧道二衬混凝土振捣系统施工方法
CN110331993A (zh) * 2019-08-22 2019-10-15 西南交通大学 一种结合隧道衬砌质量缺陷“开天窗”修补的充填注浆法
CN112593978A (zh) * 2020-12-04 2021-04-02 浙大城市学院 一种二次衬砌拱顶防脱空装置及施工方法
CN113279785A (zh) * 2021-07-08 2021-08-20 中交一公局第一工程有限公司 对隧道二衬拱顶空洞及局部松散部处理的方法及其装置
CN113374502A (zh) * 2021-07-29 2021-09-10 中铁隧道集团一处有限公司 基于矿山法隧道施工的拼装衬砌注浆加固空洞的施工方法
CN113464168A (zh) * 2021-07-29 2021-10-01 中铁一局集团(广州)建设工程有限公司 隧道二衬表面渗水防治施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6196635B1 (en) * 1998-02-17 2001-03-06 Fosroc International Limited Method of installation of cuttable mine support
CN203603930U (zh) * 2013-12-10 2014-05-21 中铁十局集团有限公司 预防隧道二衬拱顶脱空装置
CN104895585A (zh) * 2015-04-30 2015-09-09 中铁二十一局集团第四工程有限公司 隧道拱顶预留注浆管的施工方法
CN206071601U (zh) * 2016-08-30 2017-04-05 中铁十一局集团第四工程有限公司 一种预防隧道二衬拱顶脱空的装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6196635B1 (en) * 1998-02-17 2001-03-06 Fosroc International Limited Method of installation of cuttable mine support
CN203603930U (zh) * 2013-12-10 2014-05-21 中铁十局集团有限公司 预防隧道二衬拱顶脱空装置
CN104895585A (zh) * 2015-04-30 2015-09-09 中铁二十一局集团第四工程有限公司 隧道拱顶预留注浆管的施工方法
CN206071601U (zh) * 2016-08-30 2017-04-05 中铁十一局集团第四工程有限公司 一种预防隧道二衬拱顶脱空的装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王利军: "径向注浆管在预防隧道二衬拱顶脱空中的应用", 《价值工程》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939416A (zh) * 2017-11-15 2018-04-20 中铁四局集团有限公司 一种防止隧道拱顶混凝土脱空的预警方法
CN107795324A (zh) * 2017-12-05 2018-03-13 中国水利水电第五工程局有限公司 一种用于隧道二衬的带模负压压浆系统及压浆方法
CN108547640A (zh) * 2018-03-16 2018-09-18 中铁十二局集团有限公司 隧道二次衬砌拱部空隙注浆装置
CN108301846A (zh) * 2018-03-21 2018-07-20 长安大学 隧道衬砌拱顶带模注浆装置及其施工工法
CN108506028A (zh) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 一种隧道衬砌台车拱顶综合注浆管装置及其使用方法
CN109488337A (zh) * 2018-11-20 2019-03-19 中铁上海工程局集团有限公司 一种隧道二衬砼防脱空可视化浇筑方法
CN109882198A (zh) * 2019-01-11 2019-06-14 中铁十一局集团第四工程有限公司 一种隧道二衬混凝土振捣系统施工方法
CN109882198B (zh) * 2019-01-11 2020-05-15 中铁十一局集团第四工程有限公司 一种隧道二衬混凝土振捣系统施工方法
CN110331993A (zh) * 2019-08-22 2019-10-15 西南交通大学 一种结合隧道衬砌质量缺陷“开天窗”修补的充填注浆法
CN112593978A (zh) * 2020-12-04 2021-04-02 浙大城市学院 一种二次衬砌拱顶防脱空装置及施工方法
CN113279785A (zh) * 2021-07-08 2021-08-20 中交一公局第一工程有限公司 对隧道二衬拱顶空洞及局部松散部处理的方法及其装置
CN113279785B (zh) * 2021-07-08 2024-04-09 中交一公局第一工程有限公司 对隧道二衬拱顶空洞及局部松散部处理的方法及其装置
CN113374502A (zh) * 2021-07-29 2021-09-10 中铁隧道集团一处有限公司 基于矿山法隧道施工的拼装衬砌注浆加固空洞的施工方法
CN113464168A (zh) * 2021-07-29 2021-10-01 中铁一局集团(广州)建设工程有限公司 隧道二衬表面渗水防治施工方法

Similar Documents

Publication Publication Date Title
CN106285722A (zh) 一种预防隧道二衬拱顶脱空的装置及其施工方法
CN104895587B (zh) 一种隧道二次衬砌压力灌注混凝土施工工法
CN203603930U (zh) 预防隧道二衬拱顶脱空装置
CN206071601U (zh) 一种预防隧道二衬拱顶脱空的装置
CN106088148B (zh) 综合管廊模板及其应用
CN206419031U (zh) 一种隧道二衬台车用钢木组合端头模板
CN209339466U (zh) 一种装配式女儿墙施工结构
CN109372543A (zh) 一种隧道衬砌欠厚补强构造及施工方法
CN107013040A (zh) 一种套筒预埋式后浇楼板的施工方法
CN105114100B (zh) 盾构隧道管片的棱角加固构件及其使用方法
CN204098486U (zh) 浇筑地下室顶板后浇带的混凝土吊模
CN209195426U (zh) 一种隧道衬砌欠厚补强构造
CN108547640A (zh) 隧道二次衬砌拱部空隙注浆装置
CN209443765U (zh) 一种用于提前填土的沉降后浇带剪力墙的钢模板
CN205189894U (zh) 一种用于具有中埋式止水带的衬砌端模
CN209556422U (zh) 防辐射混凝土楼板结构施工缝的加固结构
CN204676607U (zh) 地下室外墙后浇带封堵结构
CN203346950U (zh) 高层建筑临时供水管道暗敷构造
CN203891470U (zh) 一种剪力墙模板用紧固螺栓
CN203689815U (zh) 一种隧道微台阶法工艺教学仿真体
CN206052996U (zh) 一种后浇带防渗注浆装置
CN206647110U (zh) 隧道预埋槽道安装结构
CN203321537U (zh) 自铆式隧道衬砌模板
CN205114861U (zh) 吊装拉结装置
CN104847090B (zh) 一种小截面尺寸通风管道施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170214

Address after: 430074 Hubei city of Wuhan province East Lake Development Zone Road No. 21

Applicant after: The Fourth Engineering Co., Ltd. of China Railway 11 Civil

Applicant after: China Railroad 11 Bureau Group Co., Ltd.

Address before: 430074 Hubei city of Wuhan province East Lake Development Zone Road No. 21

Applicant before: The Fourth Engineering Co., Ltd. of China Railway 11 Civil

WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104

WD01 Invention patent application deemed withdrawn after publication