CN203689815U - 一种隧道微台阶法工艺教学仿真体 - Google Patents

一种隧道微台阶法工艺教学仿真体 Download PDF

Info

Publication number
CN203689815U
CN203689815U CN201320688651.5U CN201320688651U CN203689815U CN 203689815 U CN203689815 U CN 203689815U CN 201320688651 U CN201320688651 U CN 201320688651U CN 203689815 U CN203689815 U CN 203689815U
Authority
CN
China
Prior art keywords
section
tunnel
micro
formal
teaching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320688651.5U
Other languages
English (en)
Inventor
梁斌
刘吉福
郭程方
谭敏
熊辉
冯春盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Railway Vocational Technical College
Original Assignee
Liuzhou Railway Vocational Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Railway Vocational Technical College filed Critical Liuzhou Railway Vocational Technical College
Priority to CN201320688651.5U priority Critical patent/CN203689815U/zh
Application granted granted Critical
Publication of CN203689815U publication Critical patent/CN203689815U/zh
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型涉及一种隧道微台阶法工艺教学仿真体,包括其上开有隧道的仿真本体和设置在仿真本体隧道内的正式铁路线,所述的仿真本体隧道内设置有展示铁路隧道微台阶法工艺流程的4个工艺展示段、正式隧道断面展示段(15)和隧道洞门展示段(16),4个工艺展示段中第1工艺展示段为开挖段(11),第2工艺展示段为初期支护段(12),第3工艺展示段为拱墙以及防水板、钢筋骨架、模板段(13),第4工艺展示段为立模完成、浇注墙身、拱顶砼和拱顶注浆段(14)。采用本实用新型可在室内全天候开展铁路隧道的教学,既保证了教学的真实性,又保证教学的顺利进行,同时具有极高的经济性。

Description

一种隧道微台阶法工艺教学仿真体
技术领域
本实用新型涉及一种教学用仿真体,特别涉及一种隧道微台阶法工艺教学仿真体。
背景技术
由于隧道的特殊性,目前,铁路隧道的实践教学一般通过到现场参观来实现。但到现场参观受到参观时机安排、现场接受参观的条件、安全管理以及交通等诸多限制,一次教学往往要花费很多的时间和精力在筹备和组织上。不仅增加了组织筹备的工作量,提高了教学成本,而且由于是野外教学,还会受到天气等因素的影响。另外,到隧道施工现场进行教学工作,还存在一定的安全隐患和管理难度。
发明内容
本实用新型要解决的技术问题是:提供一种可在室内全天候开展铁路隧道的教学,既保证了教学的真实性,又保证教学的顺利进行,同时具有极高的经济性的隧道微台阶法工艺教学仿真体,以解决上述现有技术中存在的问题。
解决上述技术问题的技术方案是:一种隧道微台阶法工艺教学仿真体,包括其上开有隧道的仿真本体和设置在仿真本体隧道内的正式铁路线,所述的仿真本体隧道内设置有展示铁路隧道微台阶法工艺流程的工艺展示段。
所述的工艺展示段包括4个工艺展示段,4个工艺展示段中第1工艺展示段为开挖段,第2工艺展示段为初期支护段,第3工艺展示段为拱墙以及防水板、钢筋骨架、模板段,第4工艺展示段为立模完成、浇注墙身、拱顶砼和拱顶注浆段,所述的仿真本体隧道内还设置有正式隧道断面展示段和隧道洞门展示段,正式隧道断面展示段设置在第4工艺展示段后,隧道洞门展示段设置在正式隧道断面展示段后,所述的仿真本体隧道内开挖段设有掌子面和微台阶,所述的微台阶延伸至第2工艺展示段上,即微台阶位于第1工艺展示段和第2工艺展示段上。
所述的正式铁路线延伸至仿真本体隧道内的长度不少于10m。
所述的正式铁路线的钢轨和轨枕是采用有机玻璃或PVC材料制作。
本实用新型之隧道微台阶法工艺教学仿真体,是针对目前隧道施工教学存在不足提出的一种新技术方案,选取隧道施工中最典型的施工方法——微台阶法,将其工艺的主要流程制作外剖面展示。本实用新型具有以下有益效果:
1、采用本实用新型进行隧道教学可在室内进行,即保证了教学的真实性,又避免施作真实隧道的高额费用和现场参观费用,同时也减少了现场参观的组织筹备工作,不仅减少了工作量,而且有效降低教学成本,具有极高的经济性。
2、由于可以在室内进行教学,避免了天气等原因影响野外教学的弊端,可以保证教学的顺利进行。
3、消除了需要到现场参观教学存在的安全隐患,有效确保教学工作的安全。
下面,结合附图和实施例对本实用新型之一种隧道微台阶法工艺教学仿真体的技术特征作进一步的说明。
附图说明
图1:本实用新型之一种隧道微台阶法工艺教学仿真体正视图。
图2:图1的A部放大图。
图3:本实用新型之一种隧道微台阶法工艺教学仿真体分段展示图。
图中:1-仿真本体,11-开挖段,12-初期支护段,13-拱墙以及防水板、钢筋骨架、模板段,14-立模完成、浇注墙身、拱顶砼和拱顶注浆段,15-正式隧道断面展示段,16-隧道洞门展示段,17-掌子面和微台阶,2-正式铁路线,21-钢轨,22-轨枕,3-隧道。
具体实施方式
实施例1:一种隧道微台阶法工艺教学仿真体,如图1-图3所示,包括其上开有隧道的仿真本体1和设置在仿真本体隧道内的双线正式铁路线2,所述的仿真本体隧道内设置有展示铁路隧道微台阶法工艺流程的工艺展示段(即按照铁路隧道微台阶法分段展示各工艺流程的主要工艺),所述的工艺展示段包括4个工艺展示段,4个工艺展示段中最前方一段即第1工艺展示段为开挖段11,设有开挖掌子面和微台阶,掌子面模拟开挖面的原始土层和超前导管、锚杆、大管棚等;第2工艺展示段为初期支护段12,包括钢筋格栅拱架支护、工字钢拱架支护、锚杆支护、导管以及喷锚支护等;第3工艺展示段为拱墙以及防水板、钢筋骨架、模板段13,第4工艺展示段为立模完成、浇注墙身、拱顶砼和拱顶注浆段14,所述的仿真本体隧道内还设置有正式隧道断面展示段(包括二衬、水沟、电缆沟、接触网以及避车洞等)和隧道洞门展示段,正式隧道断面展示段15设置在第4工艺展示段后,隧道洞门展示段16设置在正式隧道断面展示段后,所述的微台阶17延伸至第2工艺展示段上,即微台阶位于第1工艺展示段和第2工艺展示段上。所述的正式铁路线2延伸至仿真本体隧道内的长度不少于10m。
土断面、混凝土采用轻质材料模拟的形式,内部构造材料采用真实材料制作。所述的正式铁路线的钢轨21和轨枕22等重构件采用有机玻璃或高强度PVC材料制作,扣配件则采用全真的轨道材料,加强实训的真实性。
作为本实施例的一种变换,如场地允许,则可将隧道做得尽量长,展示更多工艺流程,更加利于教学;如确实由于场地的受限,可将隧道做得短一些,工艺流程更紧凑一些。
作为本实施例的又一种变换,所述的正式铁路线延伸至仿真本体隧道内的长度可以根据实际情况增加或减少。

Claims (3)

1.一种隧道微台阶法工艺教学仿真体,其特征在于:包括其上开有隧道的仿真本体(1)和设置在仿真本体隧道内的正式铁路线(2),所述的仿真本体隧道内设置有展示铁路隧道微台阶法工艺流程的工艺展示段,所述的工艺展示段包括4个工艺展示段,4个工艺展示段中第1工艺展示段为开挖段(11),第2工艺展示段为初期支护段(12),第3工艺展示段为拱墙以及防水板、钢筋骨架、模板段(13),第4工艺展示段为立模完成、浇注墙身、拱顶砼和拱顶注浆段(14),所述的仿真本体隧道内还设置有正式隧道断面展示段(15)和隧道洞门展示段(16),正式隧道断面展示段(15)设置在第4工艺展示段后,隧道洞门展示段(16)设置在正式隧道断面展示段后,所述的仿真本体隧道内开挖段(11)设有掌子面和微台阶(17),所述的微台阶延伸至第2工艺展示段上,即微台阶位于第1工艺展示段和第2工艺展示段上。
2.根据权利要求1所述的一种隧道微台阶法工艺教学仿真体,其特征在于:所述的正式铁路线(2)延伸至仿真本体隧道内的长度不少于10m。
3.根据权利要求2所述的一种隧道微台阶法工艺教学仿真体,其特征在于:所述的正式铁路线的钢轨(21)和轨枕(22)是采用有机玻璃或PVC材料制作。
CN201320688651.5U 2013-06-09 2013-11-04 一种隧道微台阶法工艺教学仿真体 Withdrawn - After Issue CN203689815U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320688651.5U CN203689815U (zh) 2013-06-09 2013-11-04 一种隧道微台阶法工艺教学仿真体

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201320332742 2013-06-09
CN201320332742.5 2013-06-09
CN201320688651.5U CN203689815U (zh) 2013-06-09 2013-11-04 一种隧道微台阶法工艺教学仿真体

Publications (1)

Publication Number Publication Date
CN203689815U true CN203689815U (zh) 2014-07-02

Family

ID=50317690

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201310537225.6A Active CN103680288B (zh) 2013-06-09 2013-11-04 一种隧道微台阶法工艺教学仿真体
CN201320688651.5U Withdrawn - After Issue CN203689815U (zh) 2013-06-09 2013-11-04 一种隧道微台阶法工艺教学仿真体

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201310537225.6A Active CN103680288B (zh) 2013-06-09 2013-11-04 一种隧道微台阶法工艺教学仿真体

Country Status (1)

Country Link
CN (2) CN103680288B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103680288A (zh) * 2013-06-09 2014-03-26 柳州铁道职业技术学院 一种隧道微台阶法工艺教学仿真体

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106023778A (zh) * 2016-06-13 2016-10-12 江苏建筑职业技术学院 土石方工程危险源识别与体验区及建造方法
CN107991081A (zh) * 2017-12-07 2018-05-04 山东大学 台阶法施工隧道围岩及支护结构力学特性实验系统及方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3642423B2 (ja) * 2001-12-11 2005-04-27 財団法人鉄道総合技術研究所 トンネル圧力波の模型実験方法
CN102235942B (zh) * 2010-04-27 2013-12-25 同济大学 一种隧道及地下工程多功能模型试验系统
CN102507347A (zh) * 2011-10-19 2012-06-20 宁波交通工程建设集团有限公司 一种隧道二次衬砌混凝土结构承载能力试验装置
CN102568292B (zh) * 2011-12-29 2014-03-12 上海市机械施工集团有限公司 盾构法隧道施工测量技术的室内实训系统
CN102606162B (zh) * 2012-02-08 2014-09-17 中铁四局集团第二工程有限公司 隧道软弱围岩浅埋易坍塌区快速施工方法
CN102562075B (zh) * 2012-03-09 2014-06-11 中交第二公路工程局有限公司 一种大断面软弱围岩隧道三台阶六部短距施工方法
CN202677708U (zh) * 2012-05-19 2013-01-16 湖南高铁时代数字化科技有限公司 一种用于地铁车站运营控制系统的模拟教学沙盘
CN103680288B (zh) * 2013-06-09 2015-08-05 柳州铁道职业技术学院 一种隧道微台阶法工艺教学仿真体

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103680288A (zh) * 2013-06-09 2014-03-26 柳州铁道职业技术学院 一种隧道微台阶法工艺教学仿真体
CN103680288B (zh) * 2013-06-09 2015-08-05 柳州铁道职业技术学院 一种隧道微台阶法工艺教学仿真体

Also Published As

Publication number Publication date
CN103680288A (zh) 2014-03-26
CN103680288B (zh) 2015-08-05

Similar Documents

Publication Publication Date Title
CN101858220B (zh) 一种隧道双上侧壁导坑施工方法
CN101775987B (zh) 地下立交上下主隧道交叠处零间距施工方法
CN206942764U (zh) 一种洞内组装和拆卸盾构机或tbm掘进机的辅助结构
CN201560780U (zh) 一种超小净距隧道中岩柱预应力对拉锚杆结构
CN105041349A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法
CN101769154A (zh) 一种隧道施工的开挖支护方法
CN106703814A (zh) 暗挖地铁车站洞桩施工方法
CN105201516B (zh) 一种地铁车站主体结构及其四联拱pba暗挖施工方法
CN103953366B (zh) 单洞隧道改为连拱时中隔墙顶部原衬砌空腔回填施工方法
CN102383806A (zh) 隧道穿越特大型溶洞施工工艺
CN106088148B (zh) 综合管廊模板及其应用
CN104213717B (zh) 多层住宅一体化改造建造方法
CN103362513A (zh) 暗挖区间既有洞体改造施工工法
CN203689815U (zh) 一种隧道微台阶法工艺教学仿真体
CN107964979A (zh) 一种输电线路组合结构装配式承台锚杆基础
CN207998860U (zh) 一种装配式综合管廊
CN204401649U (zh) 拱形抗压纵向预应力拼装式地下管廊
CN103233753A (zh) 用于浅埋大型地下结构建造的全断面开挖的管幕棚架法
CN103578346B (zh) 一种简支梁桥教学仿真结构体
CN105041348B (zh) 一种采用复合顶板的地下空间暗挖构筑方法
CN109083660A (zh) 基于钢筋混凝土底梁的软岩巷(隧)道底鼓治理支护结构及方法
CN103195449B (zh) 大跨度重荷载明洞预应力钢筋混凝土衬砌结构
CN104632228A (zh) 横通道进入正线施工方法及横通道
CN108166395A (zh) 一种跨越营业线修建梁桥的施工方法
CN205036388U (zh) 一种四联拱pba暗挖地铁车站的扣拱施工结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140702

Effective date of abandoning: 20150805

RGAV Abandon patent right to avoid regrant