CN106285696B - Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method - Google Patents

Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method Download PDF

Info

Publication number
CN106285696B
CN106285696B CN201610975487.4A CN201610975487A CN106285696B CN 106285696 B CN106285696 B CN 106285696B CN 201610975487 A CN201610975487 A CN 201610975487A CN 106285696 B CN106285696 B CN 106285696B
Authority
CN
China
Prior art keywords
portal
hole
sand
clay
rectangular shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610975487.4A
Other languages
Chinese (zh)
Other versions
CN106285696A (en
Inventor
王人生
王翔
章凡
邓江云
汪洋
高进
刘民海
杨武
魏方东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Road And Bridge Construction Co Ltd
Original Assignee
Chengdu Construction Road And Bridge Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Road And Bridge Construction Co Ltd filed Critical Chengdu Construction Road And Bridge Construction Co Ltd
Priority to CN201610975487.4A priority Critical patent/CN106285696B/en
Publication of CN106285696A publication Critical patent/CN106285696A/en
Application granted granted Critical
Publication of CN106285696B publication Critical patent/CN106285696B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of sand-pebble layer rectangular shield top pick earth pressure balances to establish construction method, it is for the sand-pebble layer structure under particular condition, before on rectangular shield top, pick machine originates and in driving, clay prepared by the stratum injection dug around machine shield shell and concrete tube coupling to rectangular shield top, the formation void generated in filling tunneling process, to maintain the earth pressure balance in tunneling process, to reduce the possibility of roadbed subsidence, ensure the safety of construction.

Description

Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method
Technical field
The invention belongs to technical field of building construction, more particularly to earth pressure balance is dug on a kind of sand-pebble layer rectangular shield top Establish construction method.
Background technology
Sand-pebble layer rectangular shield top is dug in work progress, before rectangular shield top pick machine driving and in driving, is all needed The balance of soil pressure in channel is maintained, is otherwise easy to happen roadbed subsidence and possibility that road surface collapses.
It is to rely on to wear Renminnan Road rectangular shield top pick walkway engineering off field with the underground parking of Chengdu Sichuan University, The underground parking of Chengdu Sichuan University is worn Renminnan Road rectangular shield top pick walkway and is mainly passed through from boulder bed off field, at Renminnan Road three sections of sand-pebble layer cobble contents in city are high, and sky is susceptible in stratum in rectangular shield top pick machine driving Gap, it is even empty, it needs to take and effectively fills up measure to maintain earth pressure balance in hole, to ensure being normally carried out for construction. Therefore it is directed to the sand-pebble layer, the foundation of earth pressure balance in work progress is dug on rectangular shield top, for applying for entire channel Work is vital.
Invention content
It is an object of the invention to:In view of the above problems, providing a kind of can effectively maintain in tunneling process Earth pressure balance, it is ensured that the sand-pebble layer rectangular shield top pick earth pressure balance that headwork is normally carried out establishes construction method.
The technical proposal of the invention is realized in this way:Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction party Method, it is characterised in that:Include the following steps:
a), analysis for the sand-pebble layer soil body, the sand-pebble layer includes boulder bed and sandy soils, the cobble In the soil body of layer, the cobble content of slightly close boulder bed is 55%~60%, and grain size is 3 mm~5mm, in the cobble of close boulder bed contain Amount is 60%~70%, and grain size is 4 mm~5mm, and the cobble content of closely knit boulder bed is more than 70%, and grain size is 5 mm~8mm;It is described In the soil body of sandy soils, the thickness of fine sand layer is 1.5m~2.7m, and the thickness of middle layer of sand is 0.8m~1.1m, the fine sand layer and Middle layer of sand is made of the hard particles of feldspar, quartz and sandstone;
b), for the peculiar composed structure of above-mentioned sand-pebble layer, prepare clay, the clay is by calcium-base bentonite, poly- Acrylamide and water composition, the wherein mass percent of calcium-base bentonite are 60%~65%, the quality percentage of polyacrylamide Than being 0.3%~0.6%, remaining is water;
c), dig in machine tunneling process on rectangular shield top, the clay of above-mentioned preparation is set by what is reserved on concrete tube coupling Change the preformed hole injection stratum on injected hole and shield top pick machine shield shell, the range of injection include shield top pick machine itself and its Rear concrete tube coupling, shield top are dug machine and are injected by the preformed hole at the top of anterior shield and shield shell, and rear concrete tube coupling is by setting Injected hole injection is changed, the clay determines injection phase and injection rate according to soil pressure sensor and roadbed subsidence situation.
Sand-pebble layer rectangular shield of the present invention top pick earth pressure balance establishes construction method, in the step c) In, it is headed into stratum by pipe bending cylinder by the concrete tube coupling originated on frame is positioned over, on the concrete tube coupling, along it Radial direction is provided with multiple replacement grouting holes, and the multiple replacement grouting hole is circumferentially distributed at a certain distance along concrete tube coupling, institute The medial and lateral anchor ring that concrete tube coupling is run through in replacement grouting hole is stated, during the concrete tube coupling is headed into, the clay Pipeline of the clay of above-mentioned preparation through being connect with replacement grouting hole is injected into outside concrete tube coupling by the soil pump of beating in channel The stratum in week.
Sand-pebble layer rectangular shield of the present invention top pick earth pressure balance establishes construction method, in new concrete After tube coupling assembly is completed, before normal driving starts, if soil pressure force value is unable to reach the requirement normally tunneled, need from Clay is injected to corresponding position in the anterior shield preformed hole of shield top pick machine, primary slag is often gone out in tunneling process, observes soil pressure Whether force value reaches the condition of earth pressure balance, then decides whether to inject clay, injects clay amount every time and is shown by soil pressure case Numerical value determine, condition of the injection clay until reaching earth pressure balance.
Sand-pebble layer rectangular shield of the present invention top pick earth pressure balance establishes construction method, the rectangular shield Before top pick machine originates, earth pressure balance before originating is provided at portal and establishes system, it is described originate before earth pressure balance establish system It fills in barn hole including portal sealing device and portal, the portal sealing device is arranged in the hole marginal portion of portal, the hole Door hole of filling in barn is arranged in portal ring beam, and the portal fill in barn hole input end be located at portal it is outer above, outlet end is located at In hole, before on rectangular shield top, pick machine originates, the front end of the rectangular shield top pick machine is placed in portal, the rectangular shield Shell and the portal sealing device for pushing up pick machine are fitted close, make between the shell and surrounding formation of the rectangular shield top pick machine with And the gap excavated between face and native storehouse forms opposing seal state, injects clay by portal hole of filling in barn and fills the sky Gap and establish soil pressure.
Sand-pebble layer rectangular shield of the present invention top pick earth pressure balance establishes construction method, is filled out in the portal Storehouse is provided with intrusion pipe in hole, and clay is injected into hole by the intrusion pipe, between the intrusion pipe and portal fill in barn hole Annular space in blocked filled with sealing element.
Sand-pebble layer rectangular shield of the present invention top pick earth pressure balance establishes construction method, the portal sealing Device includes pre-embedded steel slab, rubber slab and pressing plate, and the pre-embedded steel slab is arranged in portal ring beam, and several blocks of rubber slabs are along hole Mouth edge arrangement constitutes cord fabric type structure, and the outer end of each rubber slab is connected and fixed by pressing plate and pre-embedded steel slab, the rubber The inner end of offset plate extends inwardly, and the opening size that several blocks of rubber slabs are formed is less than the dimension of opening of portal, works as institute The front end of rectangular shield top pick machine is stated when being placed in portal, the inner end of the rubber slab is along rectangular shield top pick machine operation side Sealing is cooperatively formed to bending, and with the shell of rectangular shield top pick machine.
Sand-pebble layer rectangular shield of the present invention top pick earth pressure balance establishes construction method, on the pressing plate Be provided with folding paper sealing clamp, the folding paper sealing clamp include the fixed plate being fixedly connected on pressing plate and with fixation The hinged turnover panel of plate, the turnover panel are located at the lateral surface of rubber slab extended segment inwardly, before machine is dug on the rectangular shield top When end is placed in portal, the turnover panel pushes down the rubber slab of bending along rectangular shield top pick machine traffic direction bending, with Make rubber slab in by hole outside clay when flowing pressure without turning up.
The present invention is directed to the sand-pebble layer structure under particular condition, before on rectangular shield top, pick machine originates and in driving, Clay prepared by the stratum injection dug around machine shield shell and tube coupling to rectangular shield top, it is empty to fill the stratum generated in tunneling process Gap, to reduce the possibility of roadbed subsidence, ensures the safety of construction to maintain the earth pressure balance in tunneling process.
The beneficial effects of the invention are as follows:
1, the earth pressure balance in tunneling process is maintained, it is ensured that headwork is normally carried out.
2, fill the formation void that generates in tunneling process, can effectively control surface subsidence, avoid the occurrence of ground collapse, Depression.
If 3, in tunneling process, shield top digs machine posture and relatively large deviation occurs, can be rectified a deviation by injecting clay.
Description of the drawings
Fig. 1 be arranged at the portal in the present invention originate before earth pressure balance establish the structural schematic diagram of system.
Fig. 2 is the structural schematic diagram that earth pressure balance establishes portal sealing device in system before originating.
It is marked in figure:1 is portal sealing device, and 2 fill in barn hole for portal, and 3 be portal, and 4 be portal ring beam, and 5 be pre-buried steel Plate, 6 be rubber slab, and 7 be pressing plate, and 8 be fixed plate, and 9 be turnover panel.
Specific implementation mode
The present invention is described in detail below in conjunction with the accompanying drawings.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, right below in conjunction with attached drawing and embodiment The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Embodiment:A kind of sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method, includes the following steps:
a), analysis for the sand-pebble layer soil body, the sand-pebble layer includes boulder bed and sandy soils, the cobble In the soil body of layer, the cobble content of slightly close boulder bed is 55%~60%, and grain size is 3 mm~5mm, and natural density γ is 20.5 kN/m3, deformation modulus Eo is 20~26 Mpa, and internal friction angle Φ is 30 °~37 °, characteristic load bearing capacity fakFor 300-350 kPa;In close boulder bed cobble content be 60%~70%, grain size be 4 mm~5mm, natural density γ be 21.0 kN/m3, become Shape modulus Eo is 30~36 Mpa, and internal friction angle Φ is 40 °~45 °, characteristic load bearing capacity fakFor 500~560 kPa;Closely knit ovum The cobble content of rock layers is more than 70%, and grain size is 5 mm~8mm, and natural density γ is 22.0 kN/m3, deformation modulus Eo be 42~ 50 Mpa, internal friction angle Φ are 42 °~47 °, characteristic load bearing capacity fakFor 800~880 kPa;In the soil body of the sandy soils, The thickness of fine sand layer is 1.5m~2.7m, and natural density γ is 18.5 kN/m3, deformation modulus Eo is 6~9 Mpa, internal friction angle Φ is 18 °~23 °, characteristic load bearing capacity fakFor 90~100 kPa;The thickness of middle layer of sand is 0.8m~1.1m, natural density γ For 19.0 kN/m3, deformation modulus Eo is 7~10 Mpa, and internal friction angle Φ is 19 °~24 °, characteristic load bearing capacity fakFor 110~ 120 kPa, the fine sand layer and middle layer of sand are made of the hard particles of feldspar, quartz and sandstone.
b), for the peculiar composed structure of above-mentioned sand-pebble layer, prepare clay, the clay is by calcium-base bentonite, poly- Acrylamide and water composition, the wherein mass percent of calcium-base bentonite are 60%~65%, the quality percentage of polyacrylamide Than being 0.3%~0.6%, remaining is water.In the present embodiment, the preparation of the clay use mass percent for 62% calcium base The polyacrylamide that bentonite and mass percent are 0.4%, remaining is water.
c), dig in machine tunneling process on rectangular shield top, the clay of above-mentioned preparation is set by what is reserved on concrete tube coupling Change the preformed hole injection stratum on injected hole and shield top pick machine shield shell, the range of injection include shield top pick machine itself and its Rear concrete tube coupling, shield top are dug machine and are injected by the preformed hole at the top of anterior shield and shield shell, and rear concrete tube coupling is by setting Injected hole injection is changed, the clay determines injection phase and injection rate according to soil pressure sensor and roadbed subsidence situation.Example Such as, it is dug in machine tunneling process on rectangular shield top, somewhere depression several centimeters, it is heavy just to corresponding place injection clay Sunken place can restore.
In the step c)In, it is headed into stratum by pipe bending cylinder by the concrete tube coupling originated on frame is positioned over, On the concrete tube coupling, multiple replacement grouting holes are radially provided with, the multiple replacement grouting hole is along concrete tube coupling Circumferential to be distributed at a certain distance, the medial and lateral anchor ring of concrete tube coupling, the multiple replacement grouting are run through in the replacement grouting hole The axial medium position in corresponding concrete tube coupling is arranged in hole, and during the concrete tube coupling is headed into, the clay is logical Pipeline of the clay of above-mentioned preparation through being connect with replacement grouting hole is injected into concrete tube coupling periphery by the soil pump of beating crossed in channel Stratum.
Wherein, after new concrete tube coupling assembly is completed, before normal driving starts, if soil pressure force value can not reach To the requirement normally tunneled, then needs to inject clay to corresponding position from the anterior shield preformed hole that machine is dug on shield top, tunnel Often go out primary slag in the process, whether observation soil pressure force value reaches the condition of earth pressure balance, then decides whether to inject clay, notes every time Enter clay amount to be determined by the numerical value that soil pressure case is shown, condition of the injection clay until reaching earth pressure balance.
As shown in Figure 1, before the rectangular shield top pick machine originates, it is provided with earth pressure balance before originating at portal and establishes system System, it is described originate before earth pressure balance establish that system includes portal sealing device 1 and portal is filled in barn hole 2, the portal sealing device 1 It is arranged in the hole marginal portion of portal 3, portal hole 2 of filling in barn is arranged in portal ring beam 4, and the portal is filled in barn hole 2 Input end be located at the outer top of portal 3, outlet end is located in hole, and the fill in barn aperture in hole of the portal is Φ 110mm, described Portal is filled in barn the intrusion pipe of the Φ 60mm that outer side band valve is provided in hole 2, and the intrusion pipe is stretched into from outer skew back in hole, length About 3m is blocked in the annular space between the intrusion pipe and portal fill in barn hole 2 filled with sealing element, on rectangular shield top Before pick machine originates, shield top is dug equipment debugging and is completed, and after no-load running is normal, equipment is promoted left away from face 10cm in portal The front end on the right side, i.e., the described rectangular shield top pick machine is placed in portal 3, and the shell of the rectangular shield top pick machine is sealed with portal Device 1 is fitted close, make between the shell and surrounding formation of rectangular shield top pick machine and excavate face and native storehouse it Between gap form opposing seal state, clay is injected into hole by the portal intrusion pipe being arranged in hole 2 of filling in barn, to fill It states gap and establishes soil pressure.
As shown in Fig. 2, the portal sealing device 1 includes pre-embedded steel slab 5, rubber slab 6 and pressing plate 7, the pre-buried steel Plate 5 is arranged in portal ring beam 4, and several blocks of rubber slabs 6 are arranged along hole edge constitutes cord fabric type structure, each rubber slab 6 Outer end is connected and fixed by pressing plate 7 and pre-embedded steel slab 5, and the inner end of the rubber slab 6 extends inwardly, several pieces of rubbers The opening size that offset plate 6 is formed is less than the dimension of opening of portal 3, when the front end that machine is dug on the rectangular shield top is placed in portal 3 When interior, the inner end of the rubber slab 6 is bent along rectangular shield top pick machine traffic direction, and the shell of machine is dug with rectangular shield top Cooperatively form sealing.
Wherein, folding paper sealing clamp is provided on the pressing plate 7, the folding paper sealing clamp includes being fixedly connected Fixed plate 8 on pressing plate 7 and the turnover panel 9 hinged with fixed plate 8, the turnover panel 9 are located at the extended segment inwardly of rubber slab 6 Lateral surface, when the front end that machine is dug on the rectangular shield top is placed in portal 3, the turnover panel 9 is along rectangular shield top pick machine fortune Line direction is bent, and the rubber slab of bending 6 is pushed down, and to prevent rubber slab from turning up when clay pressure in by hole, and is gone out The phenomenon that existing clay outflow.
Before pick machine originates on rectangular shield top, the good clay of filling in barn of mixing is passed through into hole injection of filling in barn, clay filling top pick The gap between gap and excavation face and native storehouse between casing body and surrounding formation, observation top each site pressure of pick machine When the numerical value that sensor is shown reaches requirement, illustrates that the foundation of the earth pressure balance before originating finishes, can formally be tunneled.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (7)

1. sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method, it is characterised in that:Include the following steps:
a), analysis for the sand-pebble layer soil body, the sand-pebble layer includes boulder bed and sandy soils, the boulder bed In the soil body, the cobble content of slightly close boulder bed is 55%~60%, and grain size is 3 mm~5mm, in the cobble content of close boulder bed be 60%~70%, grain size is 4 mm~5mm, and the cobble content of closely knit boulder bed is more than 70%, and grain size is 5 mm~8mm;The sand In the soil body of layer, the thickness of fine sand layer is 1.5m~2.7m, and the thickness of middle layer of sand is 0.8m~1.1m, the fine sand layer and middle sand Layer is made of the hard particles of feldspar, quartz and sandstone;
b), for the peculiar composed structure of above-mentioned sand-pebble layer, prepare clay, the clay is by calcium-base bentonite, polypropylene Amide and water composition, the wherein mass percent of calcium-base bentonite is 60%~65%, and the mass percent of polyacrylamide is 0.3%~0.6%, remaining is water;
c), dig in machine tunneling process on rectangular shield top, the clay of above-mentioned preparation passes through the displacement note reserved on concrete tube coupling It starches the preformed hole on hole and shield top pick machine shield shell and injects stratum, the range of injection includes shield top pick machine itself and its rear Concrete tube coupling, shield top are dug machine and are injected by the preformed hole at the top of anterior shield and shield shell, and rear concrete tube coupling is noted by replacing Hole injection is starched, the clay determines injection phase and injection rate according to soil pressure sensor and roadbed subsidence situation.
2. sand-pebble layer rectangular shield according to claim 1 top pick earth pressure balance establishes construction method, feature exists In:In the step c)In, it is headed into stratum by pipe bending cylinder by the concrete tube coupling originated on frame is positioned over, described mixed On solidifying soil tube coupling, multiple replacement grouting holes are radially provided with, the multiple replacement grouting hole is circumferentially pressed along concrete tube coupling One determining deviation is distributed, and the medial and lateral anchor ring of concrete tube coupling is run through in the replacement grouting hole, is headed into the concrete tube coupling In the process, the clay of above-mentioned preparation is passed through the pipeline being connect with replacement grouting hole injection by the clay by the soil pump of beating in channel To the stratum of concrete tube coupling periphery.
3. sand-pebble layer rectangular shield according to claim 2 top pick earth pressure balance establishes construction method, feature exists In:After new concrete tube coupling assembly is completed, before normal driving starts, if soil pressure force value is unable to reach normal driving Requirement, then need from shield top dig machine anterior shield preformed hole in corresponding position inject clay, often go out in tunneling process Primary slag, observation soil pressure force value whether reach the condition of earth pressure balance, then decide whether inject clay, every time inject clay amount by The numerical value that soil pressure case is shown determines, injects condition of the clay until reaching earth pressure balance.
4. sand-pebble layer rectangular shield according to claim 3 top pick earth pressure balance establishes construction method, feature exists In:Before the rectangular shield top pick machine originates, it is provided with earth pressure balance before originating at portal and establishes system, it is described to originate preceding soil It includes portal sealing device to flatten weighing apparatus and establish system(1)It fills in barn hole with portal(2), the portal sealing device(1)It is arranged in hole Door(3)Hole marginal portion, the portal fills in barn hole(2)It is arranged in portal ring beam(4)It is interior, and the portal is filled in barn hole(2) Input end be located at portal(3)Outer top, outlet end are located in hole, before on rectangular shield top, pick machine originates, the rectangle shield The front end of structure top pick machine is placed in portal(3)It is interior, the shell and portal sealing device of the rectangular shield top pick machine(1)Closely match It closes, the gap that the rectangular shield top is dug between the shell and surrounding formation of machine and excavated between face and native storehouse is made to be formed Opposing seal state is filled in barn hole by portal(2)Injection clay fills the gap and establishes soil pressure.
5. sand-pebble layer rectangular shield according to claim 4 top pick earth pressure balance establishes construction method, feature exists In:It fills in barn hole in the portal(2)It is inside provided with intrusion pipe, clay is injected into hole by the intrusion pipe, in the perfusion Pipe is filled in barn hole with portal(2)Between annular space in blocked filled with sealing element.
6. sand-pebble layer rectangular shield according to claim 4 or 5 top pick earth pressure balance establishes construction method, feature It is:The portal sealing device(1)Including pre-embedded steel slab(5), rubber slab(6)And pressing plate(7), the pre-embedded steel slab(5) It is arranged in portal ring beam(4)It is interior, several blocks of rubber slabs(6)It is arranged along hole edge and constitutes cord fabric type structure, each rubber slab(6) Outer end pass through pressing plate(7)With pre-embedded steel slab(5)It is connected and fixed, the rubber slab(6)Inner end extend inwardly, it is described Several blocks of rubber slabs(6)The opening size of formation is less than portal(3)Dimension of opening, when the rectangular shield top dig machine front end Portion is placed in portal(3)When interior, the rubber slab(6)Inner end along rectangular shield top pick machine traffic direction bending, and and rectangle The shell of shield top pick machine cooperatively forms sealing.
7. sand-pebble layer rectangular shield according to claim 6 top pick earth pressure balance establishes construction method, feature exists In:In the pressing plate(7)On be provided with folding paper sealing clamp, the folding paper sealing clamp includes being fixedly connected on pressing plate (7)On fixed plate(8)And and fixed plate(8)Hinged turnover panel(9), the turnover panel(9)Positioned at rubber slab(6)Prolong inwardly The lateral surface for stretching section, when the front end that machine is dug on the rectangular shield top is placed in portal(3)When interior, the turnover panel(9)Along rectangle shield The bending of machine traffic direction is dug on structure top, and by the rubber slab of bending(6)It pushes down, so that rubber slab(6)Clay outflows in by hole Without turning up when pressure.
CN201610975487.4A 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method Active CN106285696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610975487.4A CN106285696B (en) 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610975487.4A CN106285696B (en) 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method

Publications (2)

Publication Number Publication Date
CN106285696A CN106285696A (en) 2017-01-04
CN106285696B true CN106285696B (en) 2018-07-13

Family

ID=57720948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610975487.4A Active CN106285696B (en) 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method

Country Status (1)

Country Link
CN (1) CN106285696B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057806A (en) * 2018-08-31 2018-12-21 粤水电轨道交通建设有限公司 A kind of development machine clay delivery pump method for correcting error
CN110219658B (en) * 2019-07-25 2024-04-12 中建八局轨道交通建设有限公司 Device for preventing shield tunneling machine from head planting and use method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56122497A (en) * 1980-02-29 1981-09-25 Toyo Construction Earth pressure balance type shield excavator
CN1391053A (en) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 Earth pressure balancing technology for laying rectangular top pipe
CN104373131A (en) * 2014-11-04 2015-02-25 中交第二航务工程局有限公司 Construction method of earth pressure balance shield tunneling machine muck pressure maintaining pumping device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226400B (en) * 2011-05-31 2012-09-12 中铁隧道装备制造有限公司 Method and system for preventing clamping stagnation of shield body due to too large frictional resistance in earth pressure balance shield machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56122497A (en) * 1980-02-29 1981-09-25 Toyo Construction Earth pressure balance type shield excavator
CN1391053A (en) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 Earth pressure balancing technology for laying rectangular top pipe
CN104373131A (en) * 2014-11-04 2015-02-25 中交第二航务工程局有限公司 Construction method of earth pressure balance shield tunneling machine muck pressure maintaining pumping device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
矩形盾构ECL工法砼衬砌模板拼装机的设计与应用;黄均龙等;《西部探矿工程》;20061225(第12期);226-230 *
矩形顶管机出始发井帘布橡胶板设计;佘清雅等;《建筑施工》;20100228;第32卷(第02期);101-103 *

Also Published As

Publication number Publication date
CN106285696A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
Cheng et al. Shield tunnel uplift and deformation characterisation: a case study from Zhengzhou metro
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN208605184U (en) Reinforcing structure of large-section tunnel underpass loose high-fill embankment
CN108412503B (en) Bias shallow-buried tunnel portal construction protection structure and construction method thereof
CN105201518B (en) Disassembling method is received in a kind of major diameter slurry balance shield hole
Wu et al. Sand-layer collapse treatment: An engineering example from Qingdao Metro subway tunnel
CN106801417A (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN107762533A (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN106761918A (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN102296507A (en) Treatment method of subgrade cracks
CN103696416B (en) A kind of method for processing foundation
CN106522966B (en) Antifriction construction method is dug on sand-pebble layer earth pressure balance rectangular shield top
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN102650210B (en) Method for constructing tunnel with low-half cross section being dry powder and fine sand layers
Ni et al. Shield machine disassembly in grouted soils outside the ventilation shaft: a case history in Taipei Rapid Transit System (TRTS)
CN106285696B (en) Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
CN109630193A (en) Subway Tunnel service channel excavates the administering method for water burst phenomenon occur
CN107013225B (en) The anti-collapse tunneling shield method of whirl spraying water shutoff
CN110485444B (en) Construction method for seepage prevention and reinforcement of deepwater cofferdam
JP2019015100A (en) Removing method of earth retaining wall
Wang et al. Direct shield cutting of large-diameter reinforced concrete group piles: Case study on Shenyang Metro construction
CN109469042A (en) Seepage-proofing karst cave processing structure for storage yard field area
CN108277815A (en) The cofferdam structure and its construction method constructed for water intaking header structure in river
CN208605199U (en) The ruggedized construction of structures is worn under a kind of weak soil rich water large cross-section tunnel group

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant