JP2019015100A - How to remove the Yamato wall - Google Patents
How to remove the Yamato wall Download PDFInfo
- Publication number
- JP2019015100A JP2019015100A JP2017133265A JP2017133265A JP2019015100A JP 2019015100 A JP2019015100 A JP 2019015100A JP 2017133265 A JP2017133265 A JP 2017133265A JP 2017133265 A JP2017133265 A JP 2017133265A JP 2019015100 A JP2019015100 A JP 2019015100A
- Authority
- JP
- Japan
- Prior art keywords
- ground
- wall
- mountain
- retaining wall
- mountain retaining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
【課題】軟弱地盤において、シートパイルなどの山留部材を撤去すると、周囲の地盤が沈下する危険性が高い箇所において、隣地など周囲に地盤沈下を及ぼさずに山留部材を撤去する方法を開発する。【解決手段】山留壁に沿わせて地盤内に注入管を挿入させ、当該注入管より隣接境界線と当該山留壁の壁面との間の地盤に地盤硬化剤を注入する補強層形成工程と、前記山留壁を構成する芯材、または鋼製矢板を一本、あるいは複数本引き抜いた後に、セメント系充填剤を引き抜かれた当該芯材または当該鋼製矢板壁が建て込まれていた地盤内の空洞部に充填する工程と、を含む山留壁の撤去方法。【選択図】図1[PROBLEMS] To develop a method for removing a mountain retaining member without causing ground subsidence to the surrounding area, such as a neighboring land, in a place where there is a high risk that the surrounding ground will sink if the mountain retaining member such as a sheet pile is removed on soft ground. To do. A reinforcing layer forming step of inserting an injection pipe into the ground along the mountain retaining wall and injecting a ground hardening agent into the ground between the adjacent boundary line and the wall surface of the mountain retaining wall from the injection pipe. And the core material or the steel sheet pile wall from which the cement filler was pulled out after one or a plurality of core materials or steel sheet piles constituting the mountain retaining wall were drawn out. A method for removing a mountain wall including a step of filling a cavity in the ground. [Selection] Figure 1
Description
本発明は、山留壁の撤去方法に関する。 The present invention relates to a method for removing a mountain wall.
山留工事とは掘削工事をするときに側面を保護して、周囲地盤の崩壊や、土砂の流出を止めるための工事である。山留工事には、親杭(くい)・横矢板工法、シートパイル(鋼矢板工法)工法、地中連続壁(SMW)工法などがある。
山留工事において、山留に使用したシートパイル等の山留部材を引き抜くと、地中に山留部材の体積分の空隙が生じる。空隙が生じると、生じた空隙に向かって周囲の土砂が移動し、工事範囲周辺において地盤沈下を起こしたり、地下水に影響を与えることがある。また、現場およびその周辺の建築物や路面等を変形させることもある。
このような影響は、放置して周辺の土壌と馴染ませる方法やシートパイルなどを引き抜いた後に発生する空隙に、水締め、砂詰め、流動化処理土充填などの方法で埋める方法がある。
例えば、特許文献1には、溝を掘削し、山留部材で溝の両壁を山留めしながら溝内で作業をする山留め工法であって、溝を埋めた後に山留部材を引き抜くとともに硬化剤を地中に注入して山留部材が引き抜かれた後の空隙を埋めるものであり、山留部材の引き抜きによる地中の空隙を硬化材によって埋めることにより、シートパイルなどの山留部材の引き抜きによる地中の空隙を生じさせず、施工後にも周囲の地盤や地下水の流れに変動を与えることがなく、環境問題を発生させない施工方法が開示されている(図7参照)。
The mountain retaining work is a work for protecting the side surface during excavation work and stopping the collapse of surrounding ground and the outflow of earth and sand. Yamato construction includes the parent pile method, sheet pile method, sheet pile method, and continuous underground wall (SMW) method.
When the mountain retaining member such as a sheet pile used for the mountain retaining is pulled out in the mountain retaining construction, a space corresponding to the volume of the mountain retaining member is generated in the ground. When voids are generated, the surrounding earth and sand move toward the generated voids, causing ground subsidence around the construction area and affecting groundwater. In addition, the building and the road surface around the site may be deformed.
Such effects include a method of leaving it to blend in with surrounding soil and a method of filling a void generated after pulling out a sheet pile by a method such as water tightening, sand filling, fluidized soil filling.
For example,
特許文献2(特開2016−148137号公報)には、山留部材を撤去する際に、撤去する予定の山留部材の周囲に機械または手作業等で凹部を形成する凹部形成工程と、凹部に流動化処理土を満たす引抜準備工程と、クレーン等で山留部材を引き抜く引抜工程(図8参照)とを行うことで、山留部材を引き抜いた跡に形成される空隙に流動化処理土を充填して、山留部材の引き抜きに要するサイクルタイムを短縮することが可能であって、かつ、周辺地盤等へ与える影響を少なくできる山留部材の撤去方法が開示されている。 Patent Document 2 (Japanese Patent Application Laid-Open No. 2006-148137) discloses a recess forming step for forming a recess by a machine or manual work around a mountain retaining member to be removed when the mountain retaining member is removed, By performing a drawing preparation step that fills the fluidized soil and a drawing step (see FIG. 8) for drawing the mountain retaining member with a crane, etc. A method for removing a retaining member that can reduce the cycle time required to pull out the retaining member and reduce the influence on the surrounding ground or the like is disclosed.
本発明は、軟弱地盤において、シートパイルなどの山留部材を撤去すると、周囲の地盤が沈下する危険性が高い箇所において、隣地など周囲に地盤沈下を及ぼさずに山留部材を撤去する方法を開発することを目的とする。 The present invention provides a method of removing a mountain retaining member without causing ground subsidence to the surrounding area such as a neighboring land in a place where there is a high risk that the surrounding ground will sink if the mountain retaining member such as a sheet pile is removed on soft ground. The purpose is to develop.
本発明は、山留壁を撤去する前に、隣地側に補強地盤を形成して、シートパイルなどを引き抜き、引き抜き跡に充填材を充填することにより、隣地側に地形変更などの悪影響が出ない山留壁の撤去方法である。
本発明の主な構成は次のとおりである。
1.地盤内に建て込まれた山留壁の撤去方法であって、
前記山留壁に沿わせて地盤内に注入管を挿入させ、当該注入管より隣接境界線と当該山留壁の壁面との間の地盤に地盤硬化剤を注入する補強層形成工程と、
前記山留壁を構成する芯材、または鋼製矢板を一本、あるいは複数本引き抜いた後に、セメント系充填剤を引き抜かれた当該芯材または当該鋼製矢板壁が建て込まれていた地盤内の空洞部に充填する工程と、
を含むことを特徴とする山留壁の撤去方法。
2.地盤内に建て込まれた山留壁の撤去方法であって、
前記山留壁に沿わせて地盤内に注入管を挿入させ、当該注入管より隣接境界線と当該山留壁の壁面との間の地盤に地盤硬化剤を注入する工程と、
前記山留壁を構成する芯材、または鋼製矢板を一本、あるいは複数本引くと同時にセメント系充填剤を引き抜かれた当該芯材または当該鋼製矢板壁が建て込まれていた地盤内の空洞部に充填する工程と、
を含むことを特徴とする山留壁の撤去方法。
3.N値が10以下の地層を有する地盤であることを特徴とする1.又は2.記載の山留壁の撤去方法。
4.補強層形成工程において、地下水位面より上部まで補強層を形成することを特徴とする1.〜3.のいずれかに記載の山留壁の撤去方法。
5.補強層形成工程において、
前記地盤硬化剤は、水ガラスを主材とした薬剤系注入材であり、
当該地盤硬化剤の注入は、複数回に分けて行い、一回目は地盤硬化剤を補強層全体に低濃度に注入し、山留壁近くに地盤硬化剤が高濃度になるように注入することを特徴とする1.〜4.のいずれかに記載の山留壁の撤去方法。
6.N値が10以下の地層を有する地盤において、山留壁撤去跡に、山留壁引き抜き跡の隣地側に地下水位以上に上端を形成した補強層と山留壁引き抜き空隙に充填層が設けられている、山留め撤去跡の補強充填構造。
Before removing the mountain wall, the present invention forms a reinforced ground on the adjacent land side, pulls out the sheet pile, etc., and fills the extracted trace with a filler, thereby adversely affecting the adjacent land side. There is no way to remove the mountain wall.
The main configuration of the present invention is as follows.
1. A method for removing a mountain wall built in the ground,
A reinforcement layer forming step of inserting an injection pipe into the ground along the mountain retaining wall and injecting a ground hardening agent into the ground between the adjacent boundary line and the wall surface of the mountain retaining wall from the injection pipe,
In the ground where the core material or the steel sheet pile wall from which the cement filler was pulled out after one or a plurality of the core materials or steel sheet piles constituting the mountain retaining wall were pulled out Filling the cavity of
A method for removing a mountain retaining wall, comprising:
2. A method for removing a mountain wall built in the ground,
Injecting an injection pipe into the ground along the mountain wall, injecting a ground hardening agent into the ground between the adjacent boundary line and the wall surface of the mountain wall from the injection pipe,
The core material constituting the mountain retaining wall, or one or more steel sheet piles, and at the same time the core material or the steel sheet pile wall from which the cement-based filler has been drawn are built. Filling the cavity,
A method for removing a mountain retaining wall, comprising:
3. 1. A ground having a formation with an N value of 10 or less. Or 2. The removal method of the mountain wall described.
4). In the reinforcing layer forming step, the reinforcing layer is formed from the groundwater level surface to the upper part. ~ 3. The removal method of the mountain retaining wall in any one of.
5. In the reinforcing layer forming process,
The ground hardening agent is a pharmaceutical injection material mainly composed of water glass,
The ground hardening agent is injected in multiple steps. The first time, the ground hardening agent is injected into the entire reinforcing layer at a low concentration, and the ground hardening agent is injected close to the retaining wall so that the concentration is high.
6). In the ground having N strata with N value of 10 or less, the retaining wall is provided in the retaining wall removal trace, the reinforcing layer with the upper end above the groundwater level on the side adjacent to the retaining wall and the filling wall in the retaining wall withdrawal space. Reinforcement filling structure of the removal of the retaining ring.
1.本発明は、軟弱地盤におけるシートパイルなどの山留部材を撤去するに際し、隣地境界側の地盤を補強した後、山留部材を引き抜きながらセメント系充填材を充填することにより、山留壁撤去後の周辺の地盤低下などの弊害を防止できる。特に、隣地境界が迫っている都市部や湾岸地域などでの基礎工事で、隣地側に地盤沈下などの悪影響を及ぼすことがない。
2.特に、地下水位が山留壁に壁高さの上部側にあり、隣地境界線と山留壁との間の距離が狭い工事敷地の場合、山留壁を引き抜く前段階において、隣地境界線と山留壁の壁面との間の地下水位面より上部の地盤については、浸透団結性を高めておくことで、山留壁を引き抜く際に、隣地境界線と山留壁との間の地盤沈下を防止できる。さらに、N値が10以下、特に5以下のような軟弱層を有する地盤では、山留壁が引き抜かれた空洞部の保持力が弱く、地下水の影響により、柔軟化が促進されるような環境下で有効である。
3.山留壁の撤去作業と併行してセメント系充填材で撤去空間を充填するために、撤去空間を柔軟地盤の土壌が撤去空間に侵入することがない。
4.山留壁を引き抜く前段階として、山留壁(芯材や鋼板製矢板)に沿わせて地盤内に薬液系注入剤を複数回に分けて注入することで、山留壁に接する周辺地盤の透水性を減少させて止水性に濃度勾配を設けて形成し、山留壁側の止水性を強化した補強層を形成し、充填材の補強層への地下水の影響を弱めて、地盤強度を確実に高めることができる。
5.山留壁の撤去跡地は、隣地側に補強層が形成され、山留壁撤去空間には充填層が形成されているので、軟弱な地盤において、隣地境界付近が補強されていて、安定した層が形成され、工事終了後にも隣地への影響を緩和できる。
1. The present invention, after removing a retaining member such as a sheet pile in soft ground, after reinforcing the ground on the boundary side of the adjacent land, and then filling the cement-based filler while pulling the retaining member, after removing the retaining wall It is possible to prevent adverse effects such as ground degradation around the area. In particular, foundation works in urban areas and gulf areas where the adjacent land boundary is approaching will not adversely affect the adjacent land such as land subsidence.
2. In particular, in the case of a construction site where the groundwater level is on the upper side of the wall height of the mountain retaining wall and the distance between the adjacent boundary line and the mountain retaining wall is narrow, in the stage before extracting the retaining wall, For the ground above the groundwater level between the wall and the wall of the Yamato wall, by increasing the permeability, when the mountain wall is pulled out, the ground subsidence between the adjacent boundary line and the mountain wall Can be prevented. Further, in the ground having a soft layer with an N value of 10 or less, particularly 5 or less, the holding power of the hollow portion from which the mountain retaining wall is pulled out is weak, and the environment in which softening is promoted by the influence of groundwater Valid below.
3. Since the removal space is filled with the cement filler in parallel with the removal work of the mountain retaining wall, the soil of the flexible ground does not enter the removal space.
4). As a step before pulling out the retaining wall, by injecting the chemical solution injection into the ground several times along the retaining wall (core material and steel sheet pile), the surrounding ground contacting the retaining wall The water permeability is reduced to form a concentration gradient in the waterstop, forming a reinforcing layer that strengthens the waterstop on the mountain retaining wall side, reducing the influence of groundwater on the reinforcing layer of the filler, and reducing the ground strength It can certainly be increased.
5. Since the retaining wall of the mountain retaining wall has a reinforcing layer formed on the adjacent land side and a filling layer is formed in the mountain retaining wall removal space, the vicinity of the boundary of the neighboring land is reinforced in a soft ground, and a stable layer Can be formed and the impact on the adjacent land can be mitigated even after the construction is completed.
本発明は、柔軟地盤など軟弱地盤に設けられた山留壁を撤去する前に、隣地側に補強地盤を形成して、シートパイルなどを引き抜き、引き抜き跡に充填材を充填することにより、隣地側に地形変更などの悪影響が出ない山留壁の撤去方法である。
すなわち、地盤内に建て込まれた山留壁の撤去方法は、山留壁に沿わせて地盤内に注入管を挿入させ、当該注入管より隣接境界線と当該山留壁の壁面との間の地盤に地盤硬化剤を注入する補強層形成工程と、山留壁を構成する芯材、または鋼製矢板を一本、あるいは複数本引き抜いた後に、セメント系充填剤を引き抜かれた当該芯材または当該鋼製矢板壁が建て込まれていた地盤内の空洞部に充填する工程と、を備えている。
なお、工事敷地において山留壁を構築する箇所を隣地に面する箇所として説明しているが、この隣地は、他人の土地という意味だけでなく、施主保有地でも、保存建物などの構築物が存在する部分も含むものとする。
Before removing the retaining wall provided on the soft ground such as the soft ground, the present invention forms a reinforcing ground on the adjacent ground side, pulls out the sheet pile, and fills the pull-out trace with a filler. This is a method of removing a mountain wall that does not cause adverse effects such as terrain changes.
That is, the method of removing the retaining wall built in the ground is to insert an injection pipe into the ground along the retaining wall, and between the adjacent boundary line and the wall surface of the retaining wall. Reinforcing layer forming step of injecting ground hardener into the ground of the core, and the core material from which the cement filler is extracted after one or more core materials constituting the retaining wall or steel sheet piles are extracted Or the process which fills the cavity part in the ground in which the said steel sheet pile wall was erected.
Although the location where the mountain wall is constructed on the construction site is described as the location facing the adjacent land, this adjacent land not only means the land of others, but there are structures such as preservation buildings even in the owner's land The part to do is also included.
<軟弱地盤>
特許文献1や特許文献2などにシートパイルの引き抜き空間を充填して、周囲にひび割れなどが発生することを防止する技術があるが、地下水位が高く、軟弱な地盤では、これらの従来技術では安定性が保てないことがあり、特に隣接建物が近い場合、隣接建物にひび割れや傾きが発生しないように注意を払う必要がある。
軟弱地盤で試しにシートパイルを引き抜いた空間にグラウトを充填したところ、崩壊して付近の地盤沈下を発生した。崩壊した箇所を補修する後処理で対処することも1つであるが、隣接する建物が近い場合、建物が傾くことは重大事故になるので、崩壊を発生させずにシートパイルを引き抜く手段を検討した結果、引き抜きに先立ち、隣地側を補強して、隣地側に地盤沈下などの悪影響を発生させない方法を検討した。
なお、崩壊した理由は、グラウトが硬化して強度を発揮するまで空隙の壁が持たずに崩壊したと考える。
本発明が適用される好ましい地盤は、軟弱な地盤であって、シートパイルなどを引き抜いた跡をそのままにしておいた場合、引き抜き空間に隣接地から土が流れ込んで、隣接地にひびや沈下が発生するような地盤である。このような軟弱地盤としては、N値が10以下、更に5以下の地層がある地盤である。更に、地下水位が高く、山留壁の上部に地下水位があるような場合には水圧の影響もあって、流動化し易く、空洞部に土壌が侵入し、空隙が崩壊し易い。このような地盤は、湾岸の埋め立て地、河川付近、湖沼付近などに分布しており、特に、都市部では工事敷地に余裕はなく、隣地に迫って山留壁が設けられ、山留壁の撤去に伴う隣接建物や道路等の工作物に影響が出ないようにする必要がある。
地盤の状態は、土質調査を行って、確認する。
<Soft ground>
There is a technology to prevent the occurrence of cracks in the surrounding area by filling the sheet pile drawing space in
When the grout was filled in the space where the sheet pile was pulled out on a soft ground, it collapsed and a nearby land subsidence occurred. One approach is to deal with post-processing that repairs the collapsed part, but if adjacent buildings are close, tilting the building will cause a serious accident, so consider a means of pulling out the sheet pile without causing collapse. As a result, prior to pulling out, we studied a method to reinforce the adjacent land side so that no adverse effects such as land subsidence occur on the adjacent land side.
The reason for the collapse is that the void wall does not have to be collapsed until the grout is cured and exhibits strength.
The preferred ground to which the present invention is applied is a soft ground, and when the trace of the sheet pile or the like is left as it is, the soil flows into the drawing space from the adjacent ground, and the adjacent ground is cracked or subsidized. It is the ground that is generated. As such a soft ground, the ground having an N value of 10 or less, and further 5 or less. Furthermore, when the groundwater level is high and there is a groundwater level at the upper part of the mountain retaining wall, it is easily fluidized due to the influence of water pressure, so that the soil easily enters the cavity and the void is easily collapsed. Such ground is distributed in landfills on the shores of the bay, near rivers, lakes, etc., especially in urban areas, there is no room for construction, and there is a mountain wall approaching the adjacent land. It is necessary to prevent the adjacent buildings and roads from being removed.
The soil condition will be confirmed by conducting a soil survey.
山留壁の撤去工程の基本を図1に示す。本工程は、補強層形成工程100、シートパイル引き抜き作業200、充填剤注入工程300、山留壁引き抜き跡補強地盤養生工程400を備えている。
補強層形成工程に先立ち、地盤の土質調査を行い、地下水位の位置、地層構造と各地層のN値などを調査する。
補強層形成工程100は、山留壁に沿わせて地盤内に注入管を挿入させ、この注入管より隣接境界線と山留壁の壁面との間の地盤に地盤硬化剤を注入して、補強層を形成する工程である。
シートパイル引き抜き作業200は、土留部材引き抜き機でシートパイルを引き抜く作業である。この引き抜きによって、シートパイルには土が付着しているなど、シートパイルの断面以上の大きさの引き抜き空間が発生する。シートパイルは1本あるいは2、3本ずつ引き抜く。
充填剤注入工程300は、シートパイルなどの土留部材を引き抜いた跡の空間に、充填材を注入して、充填し崩壊を防止する工程である。
このシートパイルの引き抜き作業と充填材注入は、引き抜き終了後に注入するかあるいは引き上げられるシートパイルの下側にできる空間に引き抜きながら注入することもできる。
The basics of the Yamato wall removal process are shown in FIG. This process includes a reinforcing
Prior to the reinforcement layer formation process, the soil will be investigated, and the location of the groundwater level, the stratum structure and the N value of each layer will be investigated.
The reinforcing
The sheet
The
The sheet pile drawing operation and filling material injection can be carried out after the drawing is finished or while being drawn out into a space formed under the sheet pile to be pulled up.
隣接地境界と建設の関係は、地上部の外壁は建築基準法などに1m又は1.5m後退させるなどの規制はあるが、地下構造物には特に規制はない。
本発明では、隣接境界から、補強層を形成する分後退させて山留壁を構築することとする。
Regarding the relationship between the boundary of adjacent land and construction, the outer wall of the above-ground part has regulations such as retreating by 1 m or 1.5 m in accordance with the Building Standard Law etc., but there are no particular restrictions on underground structures.
In the present invention, the mountain retaining wall is constructed by retreating from the adjacent boundary by the amount of forming the reinforcing layer.
<地盤硬化剤>
補強層を形成する地盤硬化剤として用いられる注入薬剤には、水ガラス系薬剤、特殊シリカ系薬液、セメント系薬液などがある。
水ガラス系薬液:水ガラス系薬液は、土を団結させるよりは、主に止水に効果がある剤である。水ガラスを主剤とし、セメントなどを懸濁液と反応させて固化させる薬剤である。
アルカリ系、非アルカリ系(シリカゾル系)があって、水ガラス・セメント混合系、水ガラス・スラグセメント、水ガラス・酸性反応剤、水ガラス・金属反応剤、水ガラス・アルカリ反応剤、水ガラス・有機系反応剤などがある。
地下水圧下でも安定した特性を持ち、浸透性に優れ、地下水で希釈されてもゲルタイムの遅れが少ない。本発明が適用されやすい砂質土や地下水位の高い軟弱地盤の補強材として適している。
瞬結型としては、無機反応剤を用いて、秒単位で反応させることができる。
中結あるいは緩結型としては有機反応剤を用いて、分から数十分以上の反応となる。
特殊シリカ系薬液:特殊グラウトを硬化剤として、超微粒子の懸濁液を硬化させる剤である。
成分が超微粒子のため、浸透性に優れている。土質や地下水等の影響がしにくい。粘性土〜砂質土に適している。
セメント系薬液:セメントミルクを短時間、凝結・硬化させる。長期耐久性に優れるが、注入時に地下水で希釈されると固化しにくい。
<Ground curing agent>
Examples of injecting agents used as a ground hardening agent for forming a reinforcing layer include water glass-based agents, special silica-based chemical solutions, and cement-based chemical solutions.
Water glass chemicals: Water glass chemicals are agents that are primarily effective in stopping water rather than uniting soil. It is a chemical that uses water glass as the main ingredient and causes cement to react with the suspension to solidify.
Alkaline, non-alkali (silica sol), water glass / cement mixed system, water glass / slag cement, water glass / acid reactant, water glass / metal reactant, water glass / alkali reactant, water glass・ There are organic reactants.
It has stable characteristics even under groundwater pressure, has excellent permeability, and has little gel time delay even when diluted with groundwater. The present invention is suitable as a reinforcing material for sandy soil to which the present invention is easily applied and soft ground having a high groundwater level.
As the instantaneous setting type, an inorganic reactant can be used to react in seconds.
As the intermediate or slow-binding type, an organic reactant is used, resulting in a reaction of several tens of minutes or more.
Special silica-based chemical solution: An agent for curing a suspension of ultrafine particles using a special grout as a curing agent.
Since the component is ultrafine particles, it has excellent permeability. Hard to be affected by soil quality and groundwater. Suitable for cohesive to sandy soils.
Cement-based chemical solution: Cement milk is condensed and hardened for a short time. Excellent long-term durability, but difficult to solidify when diluted with groundwater during injection.
山留壁から隣地側に向けて補強層が形成されているので、シートパイルなどの土留部材を引き抜いても隣接する敷地や建物などの工作物に悪影響を与える危険が減少する。
引き抜き後に地盤に発生する空隙に充填剤は、空隙の壊れやすさなどを考慮して、引き抜きながら充填するか、引き抜き後に行うか適宜選択する。
地盤硬化剤の注入は、一回あるいは二回に分けて行う。二回に分けることにより、山留壁付近を強化することができ、シートパイル引き抜き穴をより安定させることができる。
Since the reinforcing layer is formed from the mountain retaining wall toward the adjacent land side, the risk of adversely affecting a workpiece such as an adjacent site or building is reduced even if a soil retaining member such as a sheet pile is pulled out.
In consideration of the fragility of the voids and the like, the filler generated in the ground after the drawing is appropriately selected to be filled while being drawn or after the drawing.
The ground hardening agent is injected once or twice. By dividing into two times, the vicinity of the mountain retaining wall can be strengthened, and the sheet pile drawing hole can be made more stable.
<充填材>
充填材層を形成する注入薬剤は、セメントベントナイト系薬剤、流動化処理土などを使用することができる。
セメント系充填材には、セメントベントナイト、セメントミルクなどがある。
セメントミルクにベントナイトを混ぜることにより粘性がでて、止水性が向上する。利用用途としては、建築物の地下を掘削するための止水壁(地中連続壁)などに用いられる。
流動化処理土は、建設残土に水とセメントを混ぜて作成する埋め戻し材である。ポンプ圧送による注入や流し込みによる充填を行うことができる。止水効果と不等沈下の恐れが無く、適度な硬化であって、再掘削が可能である。
セメントミルクは、セメントと水を練り混ぜたもので、基礎処理の地盤改良用注入材として使用される。水と共に各種混和剤を加えたものもセメントミルクに含まれる。
<Filler>
A cement bentonite chemical, fluidized soil, or the like can be used as the injection chemical for forming the filler layer.
Cement-based fillers include cement bentonite and cement milk.
Mixing bentonite with cement milk gives viscosity and improves waterstop. As a usage, it is used for a water blocking wall (underground continuous wall) for excavating the underground of a building.
The fluidized soil is a backfill material made by mixing water and cement into the construction residual soil. Filling by pumping or pouring can be performed. There is no risk of water stoppage and uneven settlement, and it is moderately hardened and can be re-excavated.
Cement milk is a mixture of cement and water, and is used as an injecting material for ground improvement in basic processing. What added various admixtures with water is also included in cement milk.
<補強層形成方法>
補強層形成方法とは、二重管ストレーナ工法、二重管ダブルパッカー工法などがある。
シートパイルの隣地側に二重管ストレーナ工法を用いて、補強剤を浸透させて、地盤を強化する。強化域は、例えば、深さ方向がシートパイルの下端付近から地下水位面より上まで、幅が隣地境界以内(例えば、100cm以内)、長さが必要な隣地隣接長で山留壁の構築範囲内とする。
二重管ストレーナ工法は、二重管ロッドを使って注入予定深度下部まで削孔し、二重ロッドの内外管に主剤と反応剤を別々に送って、地盤改良を行う技術である。地盤改良剤の浸透は、下方から順次引き上げながら行われる。
掘削後、瞬間性薬剤を注入管の周囲に粗詰め注入(グラウトパック)を行い、次に中間結合剤あるいは緩行結合剤を限られた対象範囲へ浸透注入を行う。これを順次ステップアップしながら、下部から上方まで行う。地盤強化と止水性を発揮する。
二重管ストレーナ工法は、瞬結性注入剤でロッドの回りをシールするために、ロッドの周囲からの注入剤の散逸は少なく、砂質土に対して浸透注入が行われ、均質な浸透注入が得られる。互層地盤の層境を俊結剤で処理するために良好な改質効果を発揮する。特に、二重管ストレーナ工法は、砂、レキ、互層に良好な改良効果を発揮する。
二重管ダブルパッカー工法は、削孔をケーシングで行い、削孔後ケーシング内に注入用外観を挿入し、その後ケーシングを引き抜き、管の周囲にシールグラウト注入して管空間を保持し、空間内にパッカ付きの内管を挿入し、CB剤などの薬剤の一次注入を行って地盤の均一化を図り、その後溶液型注入剤を浸透させて、改良を行う方法である。二重管ダブルパッカー工法も砂、レキ、互層に良好な改良効果を発揮する。
これらの工法では、1つの削孔をステップアップしながら改良を行い、ボウリングマシンを移動して、次の削孔に移って作業を継続する。
本発明では、地盤硬化剤を2回に分けて、二回目は一回目よりも注入量を多くすることにより、山留壁に接する周辺地盤の止水性や地盤強度を高めることができる。これにより、シートパイルを引き抜いた後の空隙側が補強され、安定性が向上する。
<Reinforcing layer formation method>
Examples of the reinforcing layer forming method include a double tube strainer method and a double tube double packer method.
A double pipe strainer method is used on the adjacent side of the sheet pile to infiltrate the reinforcing agent and strengthen the ground. The strengthening area is, for example, the construction range of the mountain retaining wall in the depth direction from the vicinity of the lower end of the seat pile to above the groundwater level surface, the width is within the boundary of the adjacent land (for example, within 100 cm), and the adjacent land length that requires the length. Within.
The double-pipe strainer method is a technology that uses a double-pipe rod to drill holes to the bottom of the planned depth of injection, and sends the main agent and reactant separately to the inner and outer pipes of the double-rod to improve the ground. The infiltration of the ground improvement agent is performed while pulling up sequentially from below.
After excavation, the instantaneous drug is roughly packed (grouting pack) around the injection tube, and then the intermediate binder or slow binder is injected into a limited target area. This is performed from the bottom to the top, stepping up sequentially. Demonstrates ground reinforcement and waterstop.
The double pipe strainer method seals around the rod with an instantaneous setting agent, so there is little dissipation of the injection agent from the periphery of the rod, and osmotic injection is performed on sandy soil, and homogeneous osmotic injection Is obtained. It exhibits a good reforming effect in order to treat the layer boundary of alternate layers with a hardening agent. In particular, the double-pipe strainer method exhibits a good improvement effect on sand, rake, and alternate layers.
In the double-pipe double packer method, the hole is drilled in the casing, the appearance for injection is inserted into the casing after drilling, and then the casing is pulled out, and seal grout is injected around the pipe to maintain the pipe space. In this method, an inner tube with a packer is inserted, and a primary injection of a drug such as a CB agent is performed to homogenize the ground, and then a solution type injection is infiltrated to improve. The double-pipe double packer method also shows a good improvement effect on sand, rubble and alternate layers.
In these methods, improvements are made while stepping up one drilling hole, the bowling machine is moved, and the operation is continued by moving to the next drilling hole.
In the present invention, the ground hardening agent is divided into two times, and the second time the injection amount is larger than the first time, so that the water stoppage and ground strength of the surrounding ground in contact with the mountain wall can be increased. Thereby, the space | gap side after drawing out a sheet pile is reinforced and stability improves.
<充填材の充填方法>
充填材の充填方法は、シートパイルを引く抜いた後に充填材を充填するか、シートパイル引き抜きと同時併行的に充填する方法がある。
山留壁の隣地側は、補強層が形成されているので安定しており、シートパイルを引き抜いた後に充填することもできるし、また、引き抜き同時充填をすることもできる。
これらの充填方法には、特許文献1、2などに開示された方法を採用することができる。
<Filling method of filler>
As a filling method of the filler, there is a method of filling the filler after pulling out the sheet pile, or filling in parallel with the drawing of the sheet pile.
Since the reinforcing layer is formed on the adjacent side of the mountain retaining wall, it is stable and can be filled after the sheet pile is pulled out, or can be filled at the same time.
For these filling methods, methods disclosed in
本実施態様は、隣地側に近くに設置した山留壁と、隣地側には広く空いた山留壁を引き抜くに当たり、土質調査を行うと供に、広い隣地側山留壁の撤去を先行調査工事行い影響を確認した。
土質調査の結果を図6に示す。
地下水位が深度2.5mと高い位置にある。土質は、シルト層、砂質層などが重なり合っている。N値が5以下の層として、シルト層、砂質シルト系の層に見られ、再中砂、シルト混じり細砂層などに見られている。N値が10以下の層では、細中砂、シルト混じり細砂などに見られる。
In this embodiment, the removal of the large mountainside retaining wall was conducted in advance, while the soil wall was surveyed when pulling out the mountain retaining wall installed near the neighboring land side and the large mountain retaining wall on the neighboring land side. The construction was confirmed and the impact was confirmed.
The results of the soil survey are shown in FIG.
The groundwater level is high at a depth of 2.5m. As for soil quality, silt layer and sandy layer overlap. As a layer having an N value of 5 or less, it is found in silt layers and sandy silt-type layers, and is seen in fine sand layers mixed with sand and silt. In the layer having an N value of 10 or less, it can be seen in fine sand and fine sand mixed with silt.
(先行調査工事)
補強層を形成することなく、シートパイルの引き抜きと同時併行した、下方から充填材を充填する方法を採用した。
図面では、図4、5(ただし、隣接建物は無い状態である)に該当する工程を行った。
シートパイル31を用いて山留壁を構成している。引き抜いたシートパイル32の後に充填材注入機を用いて、ロッドからセメント系ベントナイトを充填材21として引き抜き空隙に注入して充填層2を形成する。シートパイル引き抜く前に、シートパイルの地上部付近を掘り下げて、液面監視用の布張り部を彫り込んで、液だまりを設けている。
この結果、周辺にひび割れや地盤沈下が発生してしまった。通常の引き抜き充填方法では、本工事では、工事敷地の近くにある隣接建物など隣地側に悪影響が想定される。
この原因として、地下水位が高い影響もあって、砂質層などが崩れたと想定された。
(Prior investigation work)
A method of filling the filler from the lower side simultaneously with the drawing of the sheet pile without forming a reinforcing layer was adopted.
In the drawing, the steps corresponding to FIGS. 4 and 5 (where there is no adjacent building) were performed.
The mountain retaining wall is configured using the
As a result, cracks and land subsidence occurred around the area. In the normal drawing and filling method, this construction will have an adverse effect on the adjacent land, such as an adjacent building near the construction site.
This was presumed that the sandy layer collapsed due to the high groundwater level.
(本工事)
本工事では、山留壁の隣地側に悪影響が出ない方法を検討した結果、シートパイルの撤去に先立ち、隣地側に補強層を形成した。特に、高い地下水位の影響が硬化とシートパイル引き抜き穴に影響が出ないことを考慮して、止水性が高く水で希釈されてもゲル化が進む補強剤として水ガラス系を使用した。
シートパイル引き抜き穴に充填する剤として、セメントベントナイト系を採用することとした。セメント系ベントナイトは、止水性も発揮する団結剤であり、本工事現場に適している。
施工現場は、隣接境界まで1000mmであり、隣地には建物が境界付近まで迫っている。敷地の地層条件は前述のとおりであり、地下水位は2.5mである。
(Main work)
In this construction, as a result of examining a method that does not adversely affect the adjacent side of the mountain wall, a reinforcement layer was formed on the adjacent side prior to the removal of the sheet pile. In particular, considering that the influence of high groundwater level does not affect the hardening and sheet pile drawing holes, a water glass system was used as a reinforcing agent that has a high water-stopping property and progresses to gelation even when diluted with water.
The cement bentonite system was adopted as the agent for filling the sheet pile drawing holes. Cement-based bentonite is a binding agent that also exhibits water-stopping properties and is suitable for this construction site.
The construction site is 1000 mm to the adjacent boundary, and the building is approaching the boundary near the boundary. The geological conditions of the site are as described above, and the groundwater level is 2.5m.
施工工程は、図1をメインとして、土質調査と先行調査工事を行っている。
工程の説明は、前述のとおりである。補強層形成工程100、シートパイル引き抜き作業200、充填剤注入工程300、山留壁引き抜き跡補強地盤養生工程400を備えている。
補強層形成工程100は、山留壁に沿わせて地盤内に注入管を挿入させ、この注入管より隣接境界線と山留壁の壁面との間の地盤に地盤硬化剤を注入して、補強層を形成する工程である。
シートパイル引き抜き作業200は、土留部材引き抜き機でシートパイルを引き抜く作業である。
充填剤注入工程300は、シートパイルを引き抜いた跡の空間に充填材を注入して、充填し崩壊を防止する工程である。
山留壁引き抜き跡補強地盤養生工程400は、充填剤が硬化して安定する養生工程である。
As for the construction process, the soil investigation and the preceding investigation work are performed mainly in Fig. 1.
The description of the process is as described above. A reinforcing
The reinforcing
The sheet
The
The Yamadome wall extraction trace reinforcement
補強層形成工程を図2、3に示す。
工事敷地Aは、隣接地Bの建物に迫っており、山留壁3は隣接境界線8から約1000mm下げて構築されている。
シートパイルの上端が突き出ているので、補強剤注入機を据え付けるために工事敷地側に盛土14を行う。
盛土14の上に補強剤注入機4を設置し、ロッド42を打ち込んであるシートパイル31の下端32まで差し込んで、二重管ストレーナ工法複相式により、補強剤として溶液型の水ガラス系薬剤を注入した。順次山留壁3の長さ方向にロッドを1m間隔でロッド41a・・・41nを差し込んで、補強材注入機4aを4bまで移動しながら補強材を注入する。土壌中への補強材の注入距離は、半径1000mmになるように調整している。注入距離の設定は、事前に試し処理を行って、決定する。本例では、隣接ロッド間で重複して注入されることとなるので、とぎれることなく、全長にわたって補強層が形成される。注入ロッドの間隔は、これに限らず、とぎれない範囲で設定することができる。図3に示すように隣接建物7に沿って、補強層1を形成した。注入スピード等の進行は、隣地側に建てたポール8に変動が出ないように、配慮して進めた。
補強層1は、シートパイルの下端から上部は地下水位面より高い深度1000mmで、山留壁の前方側の1000mmの厚みに形成した。
The reinforcing layer forming process is shown in FIGS.
The construction site A approaches the building of the adjacent land B, and the
Since the upper end of the sheet pile protrudes, the
The reinforcing
The reinforcing
充填層形成工程を図4、5に示す。
山留壁3の地上部に液面監視用の布掘部23を設け、充填剤注入機5を山留壁3の一端に設置し、シートパイル31を一端から引き抜き機6で順次引き抜きながら、充填剤センメントベントナイトを下方からロッド22にて注入して、充填層2を形成した。
補強層1と充填層2の下端は同じとしたが、充填層の下端は地下水の影響を受けないように補強層の下端と同じか、それより上に形成する。充填層の上部は、ほぼ地上部まで形成し、布掘部23に接している。地上部まで充填剤が注入されるので、剤が漏出しないように布掘部を設けて、充填剤の液面を監視する。
充填層2の長さは、補強層1と同じにした。
充填剤は、地盤内に埋設されたシートパイルの埋設深さに対応する注入高さ7.5mに、シートパイルの地表面長さ5.6mを乗じた山留面積42.0m2に対して、注入率105L/m2を乗じた設計計画注入量4410m3を充填した。
The filling layer forming process is shown in FIGS.
A
Although the lower ends of the reinforcing
The length of the
Filler is 42.0 m 2 for a pile area of 42.0 m 2 , which is obtained by multiplying the injection height of 7.5 m corresponding to the embedding depth of the sheet pile embedded in the ground by the ground surface length of 5.6 m. , it was charged with design plan injection amount 4410M 3 multiplied by the infusion rate 105L / m 2.
使用した補強剤は、水ガラスを主材とし、硬化剤として瞬結用硬化剤を用いた。ゲルタイムは10数秒以内とした。
使用したセメントベントナイトは、普通セメントとベントナイトを水に混ぜて作成した。28日強度は、1.5MN/m2である。
The reinforcing agent used was water glass as a main material, and a curing agent for instantaneous setting was used as a curing agent. The gel time was set within 10 seconds.
The cement bentonite used was prepared by mixing ordinary cement and bentonite in water. The 28 day intensity is 1.5 MN / m 2 .
この補強層と充填層を組み合わせることにより、隣地側にクラックや沈下が発生すること無く、山留壁の撤去を行うことができた。 By combining this reinforcing layer and packed bed, it was possible to remove the mountain retaining wall without causing cracks or settlement on the adjacent land side.
補強層形成において、2回に分けて補強剤を注入した以外は実施例1と同様である。
一回目の注入として、実施例1と同様の補強剤を注入し、2回目に緩結用硬化剤を用いた水ガラス系薬剤を注入した。
具体的には、一回目では、補強剤を注入高さ6.5mに注入範囲の平面積7.1m2(山留壁の前方側の地盤幅1.0mの範囲)を乗じた対象土量46.15m3に対する土壌注入率として5%を充填し、二回目では水ガラス系薬剤を対象土量に対する土壌注入率として20%を充填した。一回目の注入では薄い層を形成し、2回目では山留壁側の濃度を濃くして、より止水性を向上させた。
止水性の確認は、試験体を作成して、確認した。
The formation of the reinforcing layer is the same as in Example 1 except that the reinforcing agent is injected in two steps.
As the first injection, the same reinforcing agent as in Example 1 was injected, and the second time, a water glass-based agent using a hardening agent for slowing was injected.
Specifically, in the first round, the target soil volume is obtained by multiplying the height of the injection of the reinforcing agent by 6.5 m and the flat area of the injection range of 7.1 m 2 (the range of the ground width of 1.0 m in front of the mountain retaining wall). 5% was filled as a soil injection rate for 46.15 m 3 , and 20% was filled as a soil injection rate with respect to the target soil amount in the second time. In the first injection, a thin layer was formed, and in the second injection, the concentration on the mountain retaining wall side was increased to further improve the water stoppage.
The water stoppage was confirmed by creating a test body.
1 補強層
11 注入管
12 前端
13 下端
14 盛土
2 充填層
21 充填材
22 ロッド
23 布堀部
3 山留壁
31 シートパイル
32 シートパイル下端
4 補強剤注入機
41 注入ロッド
5 充填材注入機
7 隣接建物
8 隣接境界線
9 ポール
100 補強層形成工程
200 シートパイル引き抜き作業
300 充填剤注入工程
400 山留壁引き抜き跡補強地盤養生工程
A 工事敷地
B 隣地
DESCRIPTION OF
DESCRIPTION OF
A Construction site B Adjacent land
Claims (6)
前記山留壁に沿わせて地盤内に注入管を挿入させ、当該注入管より隣接境界線と当該山留壁の壁面との間の地盤に地盤硬化剤を注入する補強層形成工程と、
前記山留壁を構成する芯材、または鋼製矢板を一本、あるいは複数本引き抜いた後に、セメント系充填剤を引き抜かれた当該芯材または当該鋼製矢板壁が建て込まれていた地盤内の空洞部に充填する工程と、
を含むことを特徴とする山留壁の撤去方法。 A method for removing a mountain wall built in the ground,
A reinforcement layer forming step of inserting an injection pipe into the ground along the mountain retaining wall and injecting a ground hardening agent into the ground between the adjacent boundary line and the wall surface of the mountain retaining wall from the injection pipe,
In the ground where the core material or the steel sheet pile wall from which the cement filler was pulled out after one or a plurality of the core materials or steel sheet piles constituting the mountain retaining wall were pulled out Filling the cavity of
A method for removing a mountain retaining wall, comprising:
前記山留壁に沿わせて地盤内に注入管を挿入させ、当該注入管より隣接境界線と当該山留壁の壁面との間の地盤に地盤硬化剤を注入する工程と、
前記山留壁を構成する芯材、または鋼製矢板を一本、あるいは複数本引くと同時にセメント系充填剤を引き抜かれた当該芯材または当該鋼製矢板壁が建て込まれていた地盤内の空洞部に充填する工程と、
を含むことを特徴とする山留壁の撤去方法。 A method for removing a mountain wall built in the ground,
Injecting an injection pipe into the ground along the mountain wall, injecting a ground hardening agent into the ground between the adjacent boundary line and the wall surface of the mountain wall from the injection pipe,
The core material constituting the mountain retaining wall, or one or more steel sheet piles, and at the same time the core material or the steel sheet pile wall from which the cement-based filler has been drawn are built. Filling the cavity,
A method for removing a mountain retaining wall, comprising:
前記地盤硬化剤は、水ガラスを主材とした薬剤系注入材であり、
当該地盤硬化剤の注入は、複数回に分けて行い、一回目は地盤硬化剤を補強層全体に低濃度に注入し、山留壁近くに地盤硬化剤が高濃度になるように注入することを特徴とする請求項1〜4のいずれかに記載の山留壁の撤去方法。 In the reinforcing layer forming process,
The ground hardening agent is a pharmaceutical injection material mainly composed of water glass,
The ground hardening agent is injected in multiple steps. The first time, the ground hardening agent is injected into the entire reinforcing layer at a low concentration, and the ground hardening agent is injected close to the retaining wall so that the concentration is high. The removal method of the mountain retaining wall in any one of Claims 1-4 characterized by these.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017133265A JP2019015100A (en) | 2017-07-07 | 2017-07-07 | How to remove the Yamato wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017133265A JP2019015100A (en) | 2017-07-07 | 2017-07-07 | How to remove the Yamato wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2019015100A true JP2019015100A (en) | 2019-01-31 |
Family
ID=65357263
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017133265A Pending JP2019015100A (en) | 2017-07-07 | 2017-07-07 | How to remove the Yamato wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2019015100A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110295597A (en) * | 2019-05-27 | 2019-10-01 | 山西临汾市政工程集团股份有限公司 | Close to buildings Soft Clay pattern foundation pit supporting structure steel sheet pile is pulled out and grouting strengthening method |
| JP2020125613A (en) * | 2019-02-04 | 2020-08-20 | 大地 山下 | Soil retention member removal method and contaminated soil containment method |
| CN112458883A (en) * | 2020-12-09 | 2021-03-09 | 中电建路桥集团有限公司 | Connecting section structure of highway soft soil roadbed and bridge and culvert structure and construction method |
| KR102664851B1 (en) * | 2023-08-25 | 2024-05-13 | 김재승 | Existing underground building demolition method using sheet pile |
-
2017
- 2017-07-07 JP JP2017133265A patent/JP2019015100A/en active Pending
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020125613A (en) * | 2019-02-04 | 2020-08-20 | 大地 山下 | Soil retention member removal method and contaminated soil containment method |
| JP7277157B2 (en) | 2019-02-04 | 2023-05-18 | 大地 山下 | Method for removing earth retaining members and method for containing contaminated soil |
| CN110295597A (en) * | 2019-05-27 | 2019-10-01 | 山西临汾市政工程集团股份有限公司 | Close to buildings Soft Clay pattern foundation pit supporting structure steel sheet pile is pulled out and grouting strengthening method |
| CN112458883A (en) * | 2020-12-09 | 2021-03-09 | 中电建路桥集团有限公司 | Connecting section structure of highway soft soil roadbed and bridge and culvert structure and construction method |
| KR102664851B1 (en) * | 2023-08-25 | 2024-05-13 | 김재승 | Existing underground building demolition method using sheet pile |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2022502586A (en) | Grouting consolidation method of ready-made piles guided by all-casing excavation, and the ready-made piles | |
| JP6166264B2 (en) | How to build a retaining wall | |
| JP5990214B2 (en) | Reinforcement method of hole wall in construction method of cast-in-place concrete pile. | |
| CN103898916B (en) | Mini stake Composite Braced Retaining Structure and construction method | |
| CN105525619B (en) | A kind of water rich strata bored tunnel occlusion pipe curtain | |
| CN105672348A (en) | Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region | |
| CN108560541A (en) | A kind of full casing follow-up scar drilling construction method of churning driven | |
| CN110685286A (en) | A deep foundation pit support construction technology adjacent to the road under complex geological conditions | |
| CN113565525A (en) | Construction protection system and construction method for newly-built shield tunnel super-close ultra-shallow buried upper-span existing tunnel | |
| CN101560764B (en) | Method for calking exploratory hole by intermittent high-pressure rotary jet grouting | |
| CN104499479A (en) | Dig-hole pile construction method based on penetration of sand gravel backfilling layer | |
| CN107587512A (en) | The construction method of foundation pit enclosure structure under a kind of karst and/or cranny development stratum | |
| CN109826635B (en) | Construction method for reinforcing shield receiving space peripheral soil body constructed by subsurface excavation method | |
| CN110055973B (en) | Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method | |
| CN103572764A (en) | Ultra-deep manual hole digging pile dado water stop structure and construction method thereof | |
| KR101021915B1 (en) | Order temporary construction method for earthquake construction | |
| KR20000006650A (en) | a pole for mud wall and constrution method of fence for mud | |
| CN102425179B (en) | Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile | |
| CN114575355A (en) | Soil protection and descent construction method | |
| KR101924383B1 (en) | A Environment-Friendly construction method of drainage channel on softground by Grouting and Mixing of Solidifying Agent | |
| JP3760343B2 (en) | Drilling bottom stabilization method and construction method of underground building | |
| JP4712456B2 (en) | Foundation reinforcement method | |
| KR100832490B1 (en) | Installation method of main row order wall using overlap cylinder pipe and filling hose | |
| CN115853024B (en) | Anti-seepage wall structure and cofferdam anti-seepage construction method | |
| CN118793070A (en) | A comprehensive construction method for supporting ultra-deep foundation pits in weakly permeable soil with high water level |