CN106285696A - Sand-pebble layer rectangular shield top digging pressure balanced sets up construction method - Google Patents

Sand-pebble layer rectangular shield top digging pressure balanced sets up construction method Download PDF

Info

Publication number
CN106285696A
CN106285696A CN201610975487.4A CN201610975487A CN106285696A CN 106285696 A CN106285696 A CN 106285696A CN 201610975487 A CN201610975487 A CN 201610975487A CN 106285696 A CN106285696 A CN 106285696A
Authority
CN
China
Prior art keywords
portal
hole
shield top
sand
clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610975487.4A
Other languages
Chinese (zh)
Other versions
CN106285696B (en
Inventor
王人生
王翔
章凡
邓江云
汪洋
高进
刘民海
杨武
魏方东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Road And Bridge Construction Co Ltd
Original Assignee
Chengdu Construction Road And Bridge Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Road And Bridge Construction Co Ltd filed Critical Chengdu Construction Road And Bridge Construction Co Ltd
Priority to CN201610975487.4A priority Critical patent/CN106285696B/en
Publication of CN106285696A publication Critical patent/CN106285696A/en
Application granted granted Critical
Publication of CN106285696B publication Critical patent/CN106285696B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of sand-pebble layer rectangular shield top digging pressure balanced and set up construction method, it is for the sand-pebble layer structure under particular condition, before rectangular shield top pick machine originates and in driving, the clay of preparation is injected on stratum around rectangular shield top pick machine shield shell and concrete tube coupling, fill the formation void produced in tunneling process, thus maintain the earth pressure balance in tunneling process, to reduce the possibility of roadbed subsidence, it is ensured that the safety of construction.

Description

Sand-pebble layer rectangular shield top digging pressure balanced sets up construction method
Technical field
The invention belongs to technical field of building construction, particularly to a kind of sand-pebble layer rectangular shield top digging pressure balanced Set up construction method.
Background technology
In sand-pebble layer rectangular shield top pick work progress, before rectangular shield top pick machine driving and in driving, all need The balance of soil pressure in passage to be maintained, is otherwise susceptible to roadbed subsidence and probability that road surface subsides.
With the underground parking of Chengdu Sichuan University wear after the match pick walkway, Renminnan Road rectangular shield top engineering for rely on, The underground parking of Chengdu Sichuan University is worn pick walkway, Renminnan Road rectangular shield top after the match and is mainly passed from boulder bed, becomes Renminnan Road three sections of sand-pebble layer cobble content in city are high, easily occur sky when rectangular shield top pick machine driving in stratum Gap, even cavity, need to take effectively to fill up measure to maintain earth pressure balance in hole, to ensure being normally carried out of construction. Therefore for this sand-pebble layer, in rectangular shield top pick work progress, the foundation of earth pressure balance, executes for whole passage Work it is critical that.
Summary of the invention
It is an object of the invention to: for the problem of above-mentioned existence, it is provided that a kind of can effectively maintain in tunneling process Earth pressure balance, it is ensured that the sand-pebble layer rectangular shield top digging pressure balanced that headwork is normally carried out sets up construction method.
The technical scheme is that and be achieved in that: sand-pebble layer rectangular shield top digging pressure balanced sets up construction party Method, it is characterised in that: comprise the following steps:
A), for the analysis of the sand-pebble layer soil body, described sand-pebble layer includes boulder bed and sandy soils, described boulder bed In the soil body, the cobble content of the closeest boulder bed is 55%~60%, and particle diameter is 3 mm~5mm, in the cobble content of close boulder bed be 60%~70%, particle diameter is 4 mm~5mm, and the cobble content of closely knit boulder bed is more than 70%, and particle diameter is 5 mm~8mm;Described sand In the soil body of layer, the thickness of fine sand layer is 1.5m~2.7m, and the thickness of middle layer of sand is 0.8m~1.1m, described fine sand layer and medium sand Layer is formed by the hard particles of Anhydrite, quartz and sandstone;
B), for the peculiar composition structure of above-mentioned sand-pebble layer, preparing clay, described clay is by calcium-base bentonite, polypropylene Amide and water composition, wherein the mass percent of calcium-base bentonite is 60%~65%, and the mass percent of polyacrylamide is 0.3%~0.6%, remaining is water;
C), in rectangular shield top pick machine tunneling process, the clay of above-mentioned preparation is noted by displacement reserved on concrete tube coupling Preformed hole on slurry hole and shield top pick machine shield shell injects stratum, and the scope of injection includes shield top pick machine self and rear thereof Concrete tube coupling, pick machine in shield top is injected by the preformed hole in anterior shield and shield roof portion, and rear concrete tube coupling is noted by displacement Slurry hole is injected, and described clay, according to soil pressure sensor and roadbed subsidence situation, determines injection phase and injection rate.
Sand-pebble layer rectangular shield top digging pressure balanced of the present invention sets up construction method, and it is in described step c) In, head in stratum by pipe bending cylinder by being positioned over the concrete tube coupling originated on frame, on described concrete tube coupling, along it Being radially arranged multiple replacement grouting hole, the plurality of replacement grouting hole is distributed at a certain distance along concrete tube coupling circumference, institute State replacement grouting hole and run through the medial and lateral anchor ring of concrete tube coupling, during described concrete tube coupling is headed into, described clay By the soil pump of beating in passage, the pipeline that the clay warp of above-mentioned preparation is connected with replacement grouting hole is injected into outside concrete tube coupling The stratum in week.
Sand-pebble layer rectangular shield top digging pressure balanced of the present invention sets up construction method, and it is at new concrete After tube coupling assembly completes, before normal driving starts, if soil pressure force value is unable to reach the requirement of normal driving, then need from The anterior shield preformed hole of shield top pick machine injects clay to corresponding position, tunneling process often goes out primary slag, observes soil pressure Whether force value reaches the condition of earth pressure balance, then decides whether to inject clay, injects clay amount every time and is shown by soil pressure case Numerical value determine, inject clay until reaching the condition of earth pressure balance.
Sand-pebble layer rectangular shield top digging pressure balanced of the present invention sets up construction method, its described rectangular shield Top before pick machine originates, is provided with earth pressure balance before originating at portal and sets up system, described in originate front earth pressure balance and set up system Filling in barn hole including portal sealing device and portal, described portal sealing device is arranged on the marginal portion, hole of portal, described hole Door hole of filling in barn is arranged in portal ring beam, and the fill in barn entrance point in hole of described portal is positioned at the outer top of portal, and its port of export is positioned at In hole, before rectangular shield top pick machine originates, the leading section of described rectangular shield top pick machine is placed in portal, described rectangular shield Top pick machine housing closely cooperate with portal sealing device, make described rectangular shield top dig machine housing and surrounding formation between with And excavation face and soil storehouse between space formed opposing seal state, by portal fill in barn hole inject clay fill described sky Gap and set up soil pressure.
Sand-pebble layer rectangular shield top digging pressure balanced of the present invention sets up construction method, and it is filled out at described portal Storehouse is provided with intrusion pipe in hole, injects clay by described intrusion pipe, fill in barn between hole at described intrusion pipe and portal in hole Annular space in be filled with sealing member and block.
Sand-pebble layer rectangular shield top digging pressure balanced of the present invention sets up construction method, and its described portal seals Device includes that pre-embedded steel slab, rubber slab and pressing plate, described pre-embedded steel slab are arranged in portal ring beam, and some blocks of rubber slabs are along hole Mouth edge is arranged and is constituted cord fabric type structure, and the outer end of each rubber slab is connected fixing by pressing plate with pre-embedded steel slab, described rubber The inner end of offset plate extends to inner side, and the opening size that described some blocks of rubber slabs are formed, less than the dimension of opening of portal, works as institute Stating the leading section of rectangular shield top pick machine when being placed in portal, the inner end of described rubber slab digs machine operation side along rectangular shield top To bending, and cooperatively form sealing with the housing of rectangular shield top pick machine.
Sand-pebble layer rectangular shield top digging pressure balanced of the present invention sets up construction method, and it is on described pressing plate Being provided with folding paper sealing clamp, described folding paper sealing clamp includes the fixed plate being fixedly connected on pressing plate and with fixing The turnover panel that plate is hinged, described turnover panel is positioned at the rubber slab lateral surface to extension, inner side, when before described rectangular shield top pick machine When end is placed in portal, described turnover panel is along rectangular shield top pick machine traffic direction bending, and is pushed down by the rubber slab of bending, with Without turning up when making the rubber slab outer flowing pressure of clay in by hole.
The present invention is directed to the sand-pebble layer structure under particular condition, before rectangular shield top pick machine originates and in driving, The clay of preparation is injected on stratum around rectangular shield top pick machine shield shell and tube coupling, fills the stratum produced in tunneling process empty Gap, thus maintain the earth pressure balance in tunneling process, to reduce the possibility of roadbed subsidence, it is ensured that the safety of construction.
The invention has the beneficial effects as follows:
1, the earth pressure balance in tunneling process is maintained, it is ensured that headwork is normally carried out.
2, fill the formation void produced in tunneling process, it is possible to effectively control surface subsidence, it is to avoid occur ground collapse, Depression.
If in 3 tunneling processes, shield top pick machine attitude generation relatively large deviation, can rectify a deviation by injecting clay.
Accompanying drawing explanation
Fig. 1 be the present invention is arranged at portal originate before earth pressure balance set up the structural representation of system.
Fig. 2 is to originate front earth pressure balance to set up the structural representation of portal sealing device in system.
Labelling in figure: 1 is portal sealing device, 2 fill in barn hole for portal, and 3 is portal, and 4 is portal ring beam, and 5 is pre-buried steel Plate, 6 is rubber slab, and 7 is pressing plate, and 8 is fixed plate, and 9 is turnover panel.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings.
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and embodiment, right The present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, and It is not used in the restriction present invention.
Embodiment: a kind of sand-pebble layer rectangular shield top digging pressure balanced sets up construction method, comprises the following steps:
A), for the analysis of the sand-pebble layer soil body, described sand-pebble layer includes boulder bed and sandy soils, described boulder bed In the soil body, the cobble content of the closeest boulder bed is 55%~60%, and particle diameter is 3 mm~5mm, and natural density γ is 20.5 kN/m3, Deformation modulus Eo is 20~26 Mpa, and internal friction angle Φ is 30 °~37 °, characteristic load bearing capacity fakFor 300-350 kPa;In close The cobble content of boulder bed is 60%~70%, and particle diameter is 4 mm~5mm, and natural density γ is 21.0 kN/m3, deformation modulus Eo Being 30~36 Mpa, internal friction angle Φ is 40 °~45 °, characteristic load bearing capacity fakIt is 500~560 kPa;The ovum of closely knit boulder bed Stone content is more than 70%, and particle diameter is 5 mm~8mm, and natural density γ is 22.0 kN/m3, deformation modulus Eo is 42~50 Mpa, Internal friction angle Φ is 42 °~47 °, characteristic load bearing capacity fakIt is 800~880 kPa;In the soil body of described sandy soils, fine sand layer Thickness is 1.5m~2.7m, and natural density γ is 18.5 kN/m3, deformation modulus Eo is 6~9 Mpa, and internal friction angle Φ is 18 ° ~23 °, characteristic load bearing capacity fakIt is 90~100 kPa;The thickness of middle layer of sand is 0.8m~1.1m, and natural density γ is 19.0 kN/m3, deformation modulus Eo is 7~10 Mpa, and internal friction angle Φ is 19 °~24 °, characteristic load bearing capacity fakIt is 110~120 KPa, described fine sand layer and middle layer of sand are formed by the hard particles of Anhydrite, quartz and sandstone.
B), for the peculiar composition structure of above-mentioned sand-pebble layer, preparing clay, described clay is by calcium-base bentonite, poly- Acrylamide and water composition, wherein the mass percent of calcium-base bentonite is 60%~65%, the percent mass of polyacrylamide Ratio is 0.3%~0.6%, and remaining is water.In the present embodiment, the preparation of described clay uses mass percent to be the calcio of 62% Bentonite and mass percent are the polyacrylamide of 0.4%, and remaining is water.
C), in rectangular shield top pick machine tunneling process, the clay of above-mentioned preparation is by reserved putting on concrete tube coupling Change injected hole and shield top pick machine shield shell on preformed hole inject stratum, the scope of injection include shield top pick machine self and Rear concrete tube coupling, pick machine in shield top is injected by the preformed hole in anterior shield and shield roof portion, and rear concrete tube coupling is by putting Changing injected hole to inject, described clay, according to soil pressure sensor and roadbed subsidence situation, determines injection phase and injection rate.Example As, in rectangular shield top pick machine tunneling process, depression several centimeters somewhere, just local inject clay to corresponding, sink The place fallen into just can be recovered.
In described step c), head in stratum by pipe bending cylinder by being positioned over the concrete tube coupling originated on frame, On described concrete tube coupling, being radially provided with multiple replacement grouting hole, the plurality of replacement grouting hole is along concrete tube coupling Circumference is distributed at a certain distance, and the medial and lateral anchor ring of concrete tube coupling, the plurality of replacement grouting are run through in described replacement grouting hole Hole is arranged on the axial medium position of corresponding concrete tube coupling, and during described concrete tube coupling is headed into, described clay leads to The pipeline that the clay warp of above-mentioned preparation is connected with replacement grouting hole is injected into concrete tube coupling periphery by the soil pump of beating crossed in passage Stratum.
Wherein, after new concrete tube coupling assembly completes, before normal driving starts, if soil pressure force value cannot reach To the requirement of normal driving, then need to inject to corresponding position clay from the anterior shield preformed hole of shield top pick machine, at driving During often go out primary slag, observe whether soil pressure force value reaches the condition of earth pressure balance, then decide whether to inject clay, note every time Entering the numerical value decision that clay amount is shown by soil pressure case, injecting clay until reaching the condition of earth pressure balance.
As it is shown in figure 1, before described rectangular shield top pick machine originates, be provided with earth pressure balance before originating at portal and set up system System, described in originate front earth pressure balance and set up system and include that portal sealing device 1 and portal are filled in barn hole 2, described portal sealing device 1 Being arranged on the marginal portion, hole of portal 3, described portal hole 2 of filling in barn is arranged in portal ring beam 4, and described portal is filled in barn hole 2 Entrance point be positioned at the outer top of portal 3, its port of export is positioned at hole, and the fill in barn aperture in hole of described portal is Φ 110mm, described Portal is filled in barn the intrusion pipe of the Φ 60mm being provided with outside band valve in hole 2, and described intrusion pipe stretches in hole from outer skew back, length It is about 3m, in the annular space between hole 2 filled in barn by described intrusion pipe and portal, is filled with sealing member blocks, on rectangular shield top Before pick machine originates, shield top pick equipment debugging completes, after no-load running is normal, left away from face 10cm in equipment advances portal The right side, the leading section of the most described rectangular shield top pick machine is placed in portal 3, and the housing of described rectangular shield top pick machine seals with portal Device 1 closely cooperates, make described rectangular shield top pick machine housing and surrounding formation between and excavation face with soil storehouse it Between space form opposing seal state, in hole, inject clay, to fill by the portal intrusion pipe arranged in hole 2 of filling in barn State space and set up soil pressure.
As in figure 2 it is shown, described portal sealing device 1 includes pre-embedded steel slab 5, rubber slab 6 and pressing plate 7, described pre-buried steel Plate 5 is arranged in portal ring beam 4, and some blocks of rubber slabs 6 are arranged along edge, hole and constituted cord fabric type structure, each rubber slab 6 Outer end is connected fixing by pressing plate 7 with pre-embedded steel slab 5, and the inner end of described rubber slab 6 extends to inner side, described some pieces of rubbers The opening size that offset plate 6 is formed is less than the dimension of opening of portal 3, when the leading section of described rectangular shield top pick machine is placed in portal 3 Time interior, the inner end of described rubber slab 6 is along rectangular shield top pick machine traffic direction bending, and digs the housing of machine with rectangular shield top Cooperatively form sealing.
Wherein, being provided with folding paper sealing clamp on described pressing plate 7, described folding paper sealing clamp includes fixing connection Fixed plate 8 on pressing plate 7 and the turnover panel 9 hinged with fixed plate 8, described turnover panel 9 is positioned at rubber slab 6 to extension, inner side Lateral surface, when the leading section of described rectangular shield top pick machine is placed in portal 3, described turnover panel 9 is along rectangular shield top pick machine fortune Line direction bends, and is pushed down by the rubber slab 6 of bending, to prevent rubber slab from turning up during clay pressure in by hole, and goes out The phenomenon of existing clay outflow.
Before rectangular shield top pick machine originates, being injected by hole of filling in barn by clay of filling in barn good for mixing, clay fills top pick The space between space and excavation face and soil storehouse between casing body and surrounding formation, observes the top each site pressure of pick machine When the numerical value that sensor shows reaches requirement, illustrate that the earth pressure balance before originating is set up complete, can formally tunnel.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Any amendment, equivalent and the improvement etc. made within god and principle, should be included within the scope of the present invention.

Claims (7)

1. digging pressure balanced in sand-pebble layer rectangular shield top sets up construction method, it is characterised in that: comprise the following steps:
A), for the analysis of the sand-pebble layer soil body, described sand-pebble layer includes boulder bed and sandy soils, described boulder bed In the soil body, the cobble content of the closeest boulder bed is 55%~60%, and particle diameter is 3 mm~5mm, in the cobble content of close boulder bed be 60%~70%, particle diameter is 4 mm~5mm, and the cobble content of closely knit boulder bed is more than 70%, and particle diameter is 5 mm~8mm;Described sand In the soil body of layer, the thickness of fine sand layer is 1.5m~2.7m, and the thickness of middle layer of sand is 0.8m~1.1m, described fine sand layer and medium sand Layer is formed by the hard particles of Anhydrite, quartz and sandstone;
B), for the peculiar composition structure of above-mentioned sand-pebble layer, preparing clay, described clay is by calcium-base bentonite, polypropylene Amide and water composition, wherein the mass percent of calcium-base bentonite is 60%~65%, and the mass percent of polyacrylamide is 0.3%~0.6%, remaining is water;
C), in rectangular shield top pick machine tunneling process, the clay of above-mentioned preparation is noted by displacement reserved on concrete tube coupling Preformed hole on slurry hole and shield top pick machine shield shell injects stratum, and the scope of injection includes shield top pick machine self and rear thereof Concrete tube coupling, pick machine in shield top is injected by the preformed hole in anterior shield and shield roof portion, and rear concrete tube coupling is noted by displacement Slurry hole is injected, and described clay, according to soil pressure sensor and roadbed subsidence situation, determines injection phase and injection rate.
Sand-pebble layer rectangular shield top digging pressure balanced the most according to claim 1 sets up construction method, and its feature exists In: in described step c), head in stratum by pipe bending cylinder by being positioned over the concrete tube coupling originated on frame, described mixed On solidifying soil tube coupling, being radially provided with multiple replacement grouting hole, the plurality of replacement grouting hole is pressed along concrete tube coupling circumference One determining deviation distribution, described replacement grouting hole is run through the medial and lateral anchor ring of concrete tube coupling, is headed at described concrete tube coupling During, the pipeline that the clay warp of above-mentioned preparation is connected with replacement grouting hole is injected by described clay by the soil pump of beating in passage Stratum to concrete tube coupling periphery.
Sand-pebble layer rectangular shield top digging pressure balanced the most according to claim 2 sets up construction method, and its feature exists In: after new concrete tube coupling assembly completes, before normal driving starts, if soil pressure force value is unable to reach normal driving Requirement, then need from shield top pick machine anterior shield preformed hole to corresponding position inject clay, often go out in tunneling process Primary slag, observes whether soil pressure force value reaches the condition of earth pressure balance, then decides whether to inject clay, inject every time clay amount by The numerical value that soil pressure case shows determines, injects clay until reaching the condition of earth pressure balance.
Sand-pebble layer rectangular shield top digging pressure balanced the most according to claim 3 sets up construction method, and its feature exists Before: described rectangular shield top pick machine originates, at portal, be provided with earth pressure balance before originating set up system, described in originate front soil Pressure balanced is set up system and is included that portal sealing device (1) and portal are filled in barn hole (2), and described portal sealing device (1) is arranged on hole The marginal portion, hole of door (3), described portal is filled in barn in hole (2) is arranged on portal ring beam (4), and described portal is filled in barn hole (2) Entrance point be positioned at portal (3) top outward, its port of export is positioned at hole, before in the pick of rectangular shield top, machine originates, described rectangle shield The leading section of structure top pick machine is placed in portal (3), and the housing of described rectangular shield top pick machine is closely joined with portal sealing device (1) Close, make the space between housing and the surrounding formation of described rectangular shield top pick machine and between excavation face and soil storehouse be formed Opposing seal state, by portal fill in barn hole (2) inject clay fill described space and set up soil pressure.
Sand-pebble layer rectangular shield top digging pressure balanced the most according to claim 4 sets up construction method, and its feature exists In: in described portal fills in barn hole (2), it is provided with intrusion pipe, in hole, injects clay by described intrusion pipe, in described perfusion Pipe and portal are filled in barn and are filled with sealing member in the annular space between hole (2) and block.
6. set up construction method according to the sand-pebble layer rectangular shield top digging pressure balanced described in claim 4 or 5, its feature It is: described portal sealing device (1) includes pre-embedded steel slab (5), rubber slab (6) and pressing plate (7), described pre-embedded steel slab (5) Being arranged in portal ring beam (4), some pieces of rubber slabs (6) are arranged along edge, hole and are constituted cord fabric type structure, each rubber slab (6) Outer end by pressing plate (7) is connected with pre-embedded steel slab (5) fix, the inner end of described rubber slab (6) to inner side extension, described The opening size that some pieces of rubber slabs (6) are formed is less than the dimension of opening of portal (3), when the front end of described rectangular shield top pick machine Portion be placed in portal (3) interior time, the inner end of described rubber slab (6) is along rectangular shield top pick machine traffic direction bending, and and rectangle The housing of shield top pick machine cooperatively forms sealing.
Sand-pebble layer rectangular shield top digging pressure balanced the most according to claim 6 sets up construction method, and its feature exists In: being provided with folding paper sealing clamp on described pressing plate (7), described folding paper sealing clamp includes being fixedly connected on pressing plate (7) fixed plate (8) on and the turnover panel (9) hinged with fixed plate (8), described turnover panel (9) is positioned at rubber slab (6) and prolongs to inner side The lateral surface of the section of stretching, when the leading section of described rectangular shield top pick machine is placed in portal (3), described turnover panel (9) is along rectangle shield Structure top pick machine traffic direction bending, and the rubber slab (6) of bending is pushed down, so that rubber slab (6) clay in by hole outflows Without turning up during pressure.
CN201610975487.4A 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method Active CN106285696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610975487.4A CN106285696B (en) 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610975487.4A CN106285696B (en) 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method

Publications (2)

Publication Number Publication Date
CN106285696A true CN106285696A (en) 2017-01-04
CN106285696B CN106285696B (en) 2018-07-13

Family

ID=57720948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610975487.4A Active CN106285696B (en) 2016-11-07 2016-11-07 Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method

Country Status (1)

Country Link
CN (1) CN106285696B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057806A (en) * 2018-08-31 2018-12-21 粤水电轨道交通建设有限公司 A kind of development machine clay delivery pump method for correcting error
CN110219658A (en) * 2019-07-25 2019-09-10 中建八局轨道交通建设有限公司 Prevent shield machine from planting the device and its application method of head

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56122497A (en) * 1980-02-29 1981-09-25 Toyo Construction Earth pressure balance type shield excavator
CN1391053A (en) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 Earth pressure balancing technology for laying rectangular top pipe
US20140079485A1 (en) * 2011-05-31 2014-03-20 China Railway Tunneling Equipment Co., Ltd. Method for Preventing Shield Casing Catching Due to Too Large Frictional Resistance in Earth Pressure Balance Shield Machine
CN104373131A (en) * 2014-11-04 2015-02-25 中交第二航务工程局有限公司 Construction method of earth pressure balance shield tunneling machine muck pressure maintaining pumping device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56122497A (en) * 1980-02-29 1981-09-25 Toyo Construction Earth pressure balance type shield excavator
CN1391053A (en) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 Earth pressure balancing technology for laying rectangular top pipe
US20140079485A1 (en) * 2011-05-31 2014-03-20 China Railway Tunneling Equipment Co., Ltd. Method for Preventing Shield Casing Catching Due to Too Large Frictional Resistance in Earth Pressure Balance Shield Machine
CN104373131A (en) * 2014-11-04 2015-02-25 中交第二航务工程局有限公司 Construction method of earth pressure balance shield tunneling machine muck pressure maintaining pumping device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
佘清雅等: "矩形顶管机出始发井帘布橡胶板设计", 《建筑施工》 *
黄均龙等: "矩形盾构ECL工法砼衬砌模板拼装机的设计与应用", 《西部探矿工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057806A (en) * 2018-08-31 2018-12-21 粤水电轨道交通建设有限公司 A kind of development machine clay delivery pump method for correcting error
CN110219658A (en) * 2019-07-25 2019-09-10 中建八局轨道交通建设有限公司 Prevent shield machine from planting the device and its application method of head
CN110219658B (en) * 2019-07-25 2024-04-12 中建八局轨道交通建设有限公司 Device for preventing shield tunneling machine from head planting and use method thereof

Also Published As

Publication number Publication date
CN106285696B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN108412503B (en) Bias shallow tunnel entrance construction safeguard structure and its construction method
CN208605184U (en) The ruggedized construction of loose highfill embankment is worn under a kind of large cross-section tunnel
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN103032097B (en) Be applicable to tunnel drainage structure and the construction method thereof of bias voltage water rich strata
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN103696416B (en) A kind of method for processing foundation
CN107023026A (en) A kind of sealing bottom type caisson wall and construction method
CN106761814A (en) A kind of pipe curtain and bamboo reinforcement grouted anchor bar combined retaining structure and method
CN106522966B (en) Antifriction construction method is dug on sand-pebble layer earth pressure balance rectangular shield top
CN112832802B (en) Large-bottom plate supporting structure and method for asymmetric pressure
Ni et al. Shield machine disassembly in grouted soils outside the ventilation shaft: a case history in Taipei Rapid Transit System (TRTS)
CN109630193A (en) Subway Tunnel service channel excavates the administering method for water burst phenomenon occur
CN108661652B (en) Reinforcing device and method for shield starting and receiving ends in mine tunnel
JP2019015100A (en) Removing method of earth retaining wall
CN107245989A (en) Bear the tunnel structure and its construction technology of external water pressure in height
CN106285696A (en) Sand-pebble layer rectangular shield top digging pressure balanced sets up construction method
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN206800431U (en) A kind of sealing bottom type caisson wall
CN108277815A (en) The cofferdam structure and its construction method constructed for water intaking header structure in river
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN105862725A (en) Underground construction preliminary grouting waterproof and anti-seepage supporting technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant