CN105862725A - Underground construction preliminary grouting waterproof and anti-seepage supporting technology - Google Patents

Underground construction preliminary grouting waterproof and anti-seepage supporting technology Download PDF

Info

Publication number
CN105862725A
CN105862725A CN201610206494.8A CN201610206494A CN105862725A CN 105862725 A CN105862725 A CN 105862725A CN 201610206494 A CN201610206494 A CN 201610206494A CN 105862725 A CN105862725 A CN 105862725A
Authority
CN
China
Prior art keywords
area
filled
waterproof
construction
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610206494.8A
Other languages
Chinese (zh)
Inventor
卢明全
柳玉印
张洪军
栾琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd
Original Assignee
Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd filed Critical Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd
Priority to CN201610206494.8A priority Critical patent/CN105862725A/en
Publication of CN105862725A publication Critical patent/CN105862725A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses an underground construction preliminary grouting waterproof and anti-seepage supporting technology. Underground curtain holes and grouting holes are constructed in the design position; firstly, pressure injection of high pressure air or high-pressure water jet is performed in drilled holes, so that flabby substances with which cracks are filled are completely washed away; and then pressure injection of pollution-free quick-set materials specific to large cracks and high water heads is performed. A treated troubled section can meet the basic requirement of waterproofing and seepage-proofing according to the design requirement; besides, as the materials adopted for filling of the cracks are quite high in cohesiveness and high in strength, the cohesive force of the treated flabby soil layer or crumbly strata is improved, the stability of a top plate and side walls can be maintained in the excavation process, and the supporting effect is achieved.

Description

Underground engineering pre-pouring grout waterproof, seepage control support technology
Technical field
The present invention relates to underground engineering construction technical field.
Background technology
Along with high speed development and the urgent needs of national defense construction of China's economic construction, the exploitation application to the underground space has had quite Scale, such as siphonal culvert, tunnel, national defence air defense and civil air defense constructions and installations, and China's Ye Shi world tunnel and underground engineering at most, Country with fastest developing speed.And be to ensure underground engineering antiseep in construction and supporting safety, and the normal peace after completion Full use, reduces maintenance cost, and waterproof, antiseepage and the support work of resolving underground engineering are crucial.
Summary of the invention
Technical problem solved by the invention is to provide a kind of underground engineering pre-pouring grout waterproof, seepage control support technology, make soft layer or Broken rock cohesive strength after treatment is strengthened, it is possible to keeps top board and sidewall in digging process stable, reaches supporting effect.
The technical solution used in the present invention is, underground engineering pre-pouring grout waterproof, seepage control support technology, comprises the following steps:
A. mapping sub-surface construction area, verifies soft layer or crushed zone region, and construction curtain is by soft layer or crushed zone region It is isolated into an area to be filled, prepares cement grout simultaneously;
B. be inserted into Grouting Pipe to area to be filled, the excavation border of the mouth of pipe design to be crossed of Grouting Pipe, the spacing of Grouting Pipe is little In 2m, by Grouting Pipe pressure injection Fast Setting Cement Slurry liquid in area to be filled;This rapid hardening waterproof special material early strength is strong with final Spend relatively light water mud and all improve 10-20%;
C. after slip casting completes, grout cures forms grouting and reinforcing body, when grouting and reinforcing body intensity or volume are inadequate, repeats step a-b。
Between step a and step b, add step a ': the area to be filled construction drill in curtain, passes through bore pressuring injection Pressure-air or carry out high-pressure water jet, rinses well the weak material of filling fracture.
Allow the place of boring on ground, in step a, the construction of curtain is faced down rotary-spraying construction by ground, by soft layer or broken Broken band is isolated into an area to be filled;Step a ' in, face down from ground and offer boring, high to area to be filled pressure injection by boring Press air or carry out high-pressure water jet, the weak material of filling fracture is rinsed well.
Do not allow the construction area of boring on ground, in step a, curtain of constructing in ground in tunnel excavation, curtain will Soft layer or crushed zone are isolated into an area to be filled, and the quantity of area to be filled is one or more, each area to be filled all quilts One group of curtain is individually isolated.
After completing step c, when needing to repeat step b, the gradually intensification that Grouting Pipe is inserted to construction area.
After completing step c, need repeat step b time, Grouting Pipe to construction area insert more and more shallow.The present invention has Benefit effect is, (1), can waterproof, antiseepage, support issues comprehensively be solved in the underground engineering built, and effective shorten and saves Duration;(2), its cost is only the 1/3 1/2 of traditional handicraft;(3), supporting safety problems such as caving in can the most effectively be solved; (4), later maintenance expense is reduced;(5), can be widely applied to urban construction transformation, traffic engineering, civil air defense constructions and installations.
Accompanying drawing explanation
Fig. 1 is embodiment one form of construction work floor map.
Fig. 2 is the generalized section that Fig. 1 is corresponding.
Fig. 3 is embodiment two form of construction work generalized section.
Figure is labeled as: 1-curtain, 2-grouting and reinforcing body, 3-mud jacking hole, 4-soft layer, 71-ground, 72-tunnel border,
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
The underground engineering pre-pouring grout waterproof, seepage control support technology of the present invention, comprises the following steps:
A. mapping sub-surface construction area, verifies soft layer or crushed zone region, and under construction ground, curtain is by soft layer or crushed zone Zone isolation becomes an area to be filled, prepares cement grout simultaneously.
B. can choose whether to carry out according to situation on the spot the step for, the area to be filled drilling construction in curtain, by boring Inwardly pressure injection pressure-air or carry out high-pressure water jet, rinses well the weak material of filling fracture;
C. be inserted into Grouting Pipe to area to be filled, the excavation border of the mouth of pipe design to be crossed of Grouting Pipe, the spacing of Grouting Pipe is little In 2m, by Grouting Pipe inside pressure injection rapid hardening serosity;This rapid hardening waterproof special material early strength and final strength relatively ordinary cement Slurry all improves 10-20%;
D., after slip casting completes, grouting and reinforcing body is formed, when grouting and reinforcing body intensity or volume are inadequate through 20-30 hour grout cures Time, repeat step a-b-c.
Embodiment one: forward pre-pouring grout waterproof, seepage control supporting, it is adaptable to processing position ground space allow construction drill tunnel from The direct pre-pouring grout in ground, then tunneling.
As it is shown in figure 1, in the shallower place of buried depth, in step a, the construction of curtain is faced down rotary-spraying construction by ground, by weakness Soil layer or crushed zone are isolated into an area to be filled, and the band fill area that curtain is surrounded is greater than the excavation boundary of design to be onstructed, Typically to have more more than excavation boundary 2m;In step b, face down from ground and offer boring, high to area to be filled pressure injection by boring Press air or carry out high-pressure water jet, the weak material of filling fracture is rinsed well, the generally mud filling that can rinse well The clay in crack, rubble etc..The existence of these materials, affects the intensity after injecting cement paste solidification and anti-permeability performance, and serosity fills with ground Gap in Ceng, adds intensity, and has blocked penetrating passage.Add triethanolamine, calcium sulfate, sodium formate, hydroxyl carboxylic The cement grouts of chemical compositions such as acid, can solidify at short notice, and not separating water, it is to avoid produce again new after solidification Permeation pathway.
Embodiment two: reversely pre-pouring grout waterproof, seepage control supporting, it is adaptable to processing position ground space does not allows boring downwards of constructing Tunnel, as it is shown on figure 3, excavating jacked piles with small section top, to periphery drilling construction radially, hole depth 2-3 rice, reality Executing insertion Grouting Pipe, inwardly perfusion rapid hardening serosity, forms one and has certain thickness hoop reinforcement band, then strengthen hole depth, Grouting Pipe gos deep into 4-6 rice the most again, continues slip casting, forms a bigger reinforcing band, reinforces band constantly from level to level to extending out , until reinforcing band to surround whole tunnel section, when intensity and the bearing capacity of reinforcing body meet construction requirement, tunnel can be carried out Full-face tunneling.
Embodiment three, identical with embodiment two usable condition, but constructing of back-up coat can also reversely be constructed, first by slip casting Pipe inserts the bigger degree of depth, forms one bigger reinforcing band, it is to avoid the most permeable, the probability that caves in, then in this reinforcing Closer to the direction slip casting of tunnel in band, along with reinforcing band is closer to tunneling, the intensity of integral reinforcing band is bigger, infiltration Probability less be more easy to check.Band to be reinforced covers after treating to come on tunnel excavation, and intensity, then excavates tunneling boring tunnel.

Claims (6)

1. underground engineering pre-pouring grout waterproof, seepage control support technology, comprises the following steps:
A. mapping sub-surface construction area, verifies soft layer or crushed zone region, and construction curtain is by soft layer or crushed zone region It is isolated into an area to be filled, prepares cement grout simultaneously;
B. be inserted into Grouting Pipe to area to be filled, the excavation border of the mouth of pipe design to be crossed of Grouting Pipe, the spacing of Grouting Pipe is little In 2m, by Grouting Pipe pressure injection Fast Setting Cement Slurry liquid in area to be filled;This rapid hardening waterproof special material early strength is strong with final Spend relatively light water mud and all improve 10-20%;
C. after slip casting completes, grout cures forms grouting and reinforcing body, when grouting and reinforcing body intensity or volume are inadequate, repeats step a-b。
2. underground engineering pre-pouring grout waterproof, seepage control support technology as claimed in claim 1, it is characterised in that: in step a and step Between rapid b, add step a ': the area to be filled construction drill in curtain, by bore pressuring injection pressure-air or carry out height Pressure water jet, rinses well the weak material of filling fracture.
3. underground engineering pre-pouring grout waterproof, seepage control support technology as claimed in claim 2, it is characterised in that: allow on ground to bore The place in hole, in step a, the construction of curtain is faced down rotary-spraying construction by ground, soft layer or crushed zone is isolated into one and treats Fill area;Step a ' in, face down from ground and offer boring, to area to be filled pressure injection pressure-air or carry out high pressure by boring Water jet, rinses well the weak material of filling fracture.
4. underground engineering pre-pouring grout waterproof, seepage control support technology as claimed in claim 1, it is characterised in that: do not allow on ground The construction area of boring, in step a, curtain of constructing in ground in tunnel excavation, curtain is by soft layer or crushed zone Being isolated into an area to be filled, the quantity of area to be filled is one or more, and each area to be filled is all individually isolated by one group of curtain.
5. underground engineering pre-pouring grout waterproof, seepage control support technology as claimed in claim 3, it is characterised in that: when completing step c After, when needing to repeat step b, the gradually intensification that Grouting Pipe is inserted to construction area.
6. underground engineering pre-pouring grout waterproof, seepage control support technology as claimed in claim 3, it is characterised in that: when completing step c After, need repeat step b time, Grouting Pipe to construction area insert more and more shallow.
CN201610206494.8A 2016-03-31 2016-03-31 Underground construction preliminary grouting waterproof and anti-seepage supporting technology Pending CN105862725A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610206494.8A CN105862725A (en) 2016-03-31 2016-03-31 Underground construction preliminary grouting waterproof and anti-seepage supporting technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610206494.8A CN105862725A (en) 2016-03-31 2016-03-31 Underground construction preliminary grouting waterproof and anti-seepage supporting technology

Publications (1)

Publication Number Publication Date
CN105862725A true CN105862725A (en) 2016-08-17

Family

ID=56627748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610206494.8A Pending CN105862725A (en) 2016-03-31 2016-03-31 Underground construction preliminary grouting waterproof and anti-seepage supporting technology

Country Status (1)

Country Link
CN (1) CN105862725A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930769A (en) * 2017-05-07 2017-07-07 中铁十八局集团有限公司 One kind is for specific region direction and location grouting strengthening method in the huge talus loose media of macroporosity
CN110486053A (en) * 2019-09-05 2019-11-22 贵阳建筑勘察设计有限公司 A kind of urban track traffic shallow tunnel fault of construction treatment construction method
CN114263163A (en) * 2021-12-29 2022-04-01 成都大学 Grouting reinforcement method for diversion culvert passing through gravel stratum in high and cold regions and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5265674A (en) * 1992-02-20 1993-11-30 Battelle Memorial Institute Enhancement of in situ microbial remediation of aquifers
CN103603689A (en) * 2013-11-04 2014-02-26 葛洲坝集团基础工程有限公司 Curtain grouting construction method for treating mined-out areas
CN103806457A (en) * 2012-11-07 2014-05-21 北京市市政四建设工程有限责任公司 Novel construction technology of waterproof curtain
CN204186400U (en) * 2014-10-22 2015-03-04 中铁二院工程集团有限责任公司 High-pressure water-enriched goaf ruggedized construction
CN104594370A (en) * 2014-11-27 2015-05-06 中国电建集团贵阳勘测设计研究院有限公司 High-pressure combined flushing grouting method and structure in karst region
CN105019913A (en) * 2015-08-03 2015-11-04 中铁六局集团有限公司 Base rock uplift region shielding tool-changing in-situ reinforcement method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5265674A (en) * 1992-02-20 1993-11-30 Battelle Memorial Institute Enhancement of in situ microbial remediation of aquifers
CN103806457A (en) * 2012-11-07 2014-05-21 北京市市政四建设工程有限责任公司 Novel construction technology of waterproof curtain
CN103603689A (en) * 2013-11-04 2014-02-26 葛洲坝集团基础工程有限公司 Curtain grouting construction method for treating mined-out areas
CN204186400U (en) * 2014-10-22 2015-03-04 中铁二院工程集团有限责任公司 High-pressure water-enriched goaf ruggedized construction
CN104594370A (en) * 2014-11-27 2015-05-06 中国电建集团贵阳勘测设计研究院有限公司 High-pressure combined flushing grouting method and structure in karst region
CN105019913A (en) * 2015-08-03 2015-11-04 中铁六局集团有限公司 Base rock uplift region shielding tool-changing in-situ reinforcement method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930769A (en) * 2017-05-07 2017-07-07 中铁十八局集团有限公司 One kind is for specific region direction and location grouting strengthening method in the huge talus loose media of macroporosity
CN110486053A (en) * 2019-09-05 2019-11-22 贵阳建筑勘察设计有限公司 A kind of urban track traffic shallow tunnel fault of construction treatment construction method
CN114263163A (en) * 2021-12-29 2022-04-01 成都大学 Grouting reinforcement method for diversion culvert passing through gravel stratum in high and cold regions and construction method

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN100582386C (en) Construction Method of Permeable Rib Arch Beam Tunnel
CN104405399B (en) One kind passes through drift sand stratum tunnel excavation support body engineering method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN105736004A (en) Balanced shield mud air-pressure cabin opening pressure maintaining and wall protecting construction method for shield tunneling
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN101603431A (en) A reinforcement method for uncovering coal at the stone gate of the outburst dangerous coal seam
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
RU2739880C1 (en) Method of inclined tunnels construction in weak water-saturated soils
CN104594919A (en) Soft rock roadway buffering tapered double strong shell support system and construction method thereof
CN103195467A (en) Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method
CN102162255A (en) Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN104033160A (en) Novel support method applicable to shallow-buried subsurface tunnel of soft soil stratum
CN104806251A (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN205260041U (en) Method of freezing supporting construction is spouted soon to level
CN110284885A (en) Shield inspection-pit construction method
CN102660952A (en) Controllable clay paste slurry grouting technique
CN107401161A (en) High ferro shield tunnel construction method is worn under pipe-roof method and MJS method joint reinforcements
CN110939404A (en) Pressure relief device and pressure relief method for broken surrounding rock roof in coal mine roadway
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
CN204457810U (en) The two strong housing support system of soft-rock tunnel available buffer gradual change type
CN110130978A (en) A kind of small kiln destruction area high seam break up coal side method for blocking of filling second mining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817

RJ01 Rejection of invention patent application after publication