CN106285683A CN201610681294.8A CN201610681294A CN106285683A CN 106285683 A CN106285683 A CN 106285683A CN 201610681294 A CN201610681294 A CN 201610681294A CN 106285683 A CN106285683 A CN 106285683A
Authority
CN
China
Prior art keywords
hole
water
openpit
ettle
adopting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610681294.8A
Other languages
Chinese (zh)
Other versions
CN106285683B (en
Inventor
边振兴
毕建平
魏忠义
刘永海
孟卓
王井学
于淼
毕英杰
曹庆寰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianping Shengde Rixin Mining Industry Co ltd
Original Assignee
Jianping Shengde Rixin Mining Industry Co Ltd
Shenyang Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianping Shengde Rixin Mining Industry Co Ltd, Shenyang Agricultural University filed Critical Jianping Shengde Rixin Mining Industry Co Ltd
Priority to CN201610681294.8A priority Critical patent/CN106285683B/en
Publication of CN106285683A publication Critical patent/CN106285683A/en
Application granted granted Critical
Publication of CN106285683B publication Critical patent/CN106285683B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/20Reduction of greenhouse gas [GHG] emissions in agriculture, e.g. CO2

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Remote Sensing (AREA)
  • Water Supply & Treatment (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

A kind of mine reclamation stores water pumping method bottom openpit or Subsidence Area, it is characterized in that utilization is adopted bottom hole without crack channel-shaped form, backfill ettle clearance configurations class underground reservoir;And by reserved some openpit not fillings, hole is stored up temporarily as collect surface water, landform is utilized to collect in temporary storage hole than fall or intercepting drain by the rainwash water adopting periphery gathering ground, hole, through natural subsidence and filtration, laterally it is collected to adopt bottom hole by ettle gap (filter course), periphery subsoil water in openpit middle and lower part laterally collects and adopts bottom hole simultaneously, forms the water storage storehouse, underground after adopting hole filling, and reserves pipe well water lift during by filling.The bright storage of water in mine reclamation is become dark storage by this technological merit, and reservoir evaporation loss has been reduced or avoided, and it also avoid occupation of land and the potential safety hazard building the pool, earth's surface water storage side, reaches the effect of Bao Xushuiyuan, Economization on land.

Description

Mine reclamation stores water pumping method bottom openpit or Subsidence Area
Technical field
The invention belongs to water source deposit method in a kind of novel openpit or mining depression land reclamation, especially for Arid, semiarid region evaporation capacity are big, and natural rainfall can not meet farming crop water consumption after mine reclamation.
Background technology
Mine reclamation refers in mine construction and production process, and in a planned way regulation is because of destructions such as destroying, subside, cover Soil so that it is return to the work of availability status.During mining, destroy local ecological balance, be mine The main contributor that environmental problem produces, mine reclamation is to solve mine environment and the main path of mining economy development present stage. At present land reclamation in mining area can be divided into agricultural to reclaim according to its purposes, Forestry reclamation, fishery is reclaimed, conservation of nature is reclaimed, water provides Reclaim in source and industry is reclaimed.Wherein agricultural is reclaimed and Forestry reclamation is most common.Limited due to cultivated area in China, mesh Before the core reclaimed be to recover to plough.
Reclamation Technique generally comprises biological reclamation and Engineering Reclamation two broad aspect.Its core content of biological reclamation technology is main It is contained in Forestry reclamation, i.e. includes the destroyed biocompatible evaluation in soil, Reclaimed Soil improving technology, artificial forest battalion Make, promote the volume increase skills of reclaiming such as growing technology, plant species selection technique and fertilising, Parcel of seed, mycorhiza, water absorbing agent volume increase Art.Engineering Reclamation Technology refers in Engineering Reclamation, according to location natural environmental condition and the requirement of reclaimed land utilization orientation, To discarded using waste filling, flyash filling, digging that the means such as deep pad is shallow backfill, heap is built and smooth and take necessity The measures such as flood control, water drainage and environmental improvement.
At present, mine reclamation engineering many carry out exploring from filling technique, Soil Reconstruction technology, Technology of reclaiming and Innovation, and define Patents technical products.And for mine reclamation water source technique, the traditional utilization of many employings is adopted hole and is built The pool, side savings water, draw periphery surface water, beat motor-pumped well and take the modes such as subsoil water as arable land iirigation water source after mine reclamation, also pin Orographic condition specific to mine and water source, the mine Technology patent of water resources condition research and development.Mine openpit is the most relatively Deeply, reach 100 meters of deep adopting to cheat more typically, it is generally required to pumping drainage can ensure mining in recovery process.Once close Hole, in adopting hole, majority has subsoil water and surface water accumulation.Set up a set of novel hole of adopting and store water lift technology, on the one hand can solve multiple Cultivate arable land iirigation water source problem, on the other hand also contribute to soil saving utilization and ecological environmental protection.
There is no guarantee that water source in arid, Semi-arid Mountain Area mine reclamation, side's pool water storage easily evaporates, it is impossible to ensure to reclaim use Water.
Summary of the invention
It is an object of the invention to for arid, water source there is no guarantee that in the mine reclamation of Semi-arid Mountain Area, side's pool water storage easily steams The present situation such as send out, it is provided that bottom a kind of openpit or mining depression ground, store water pumping method, efficient and rational utilization row's rock waste fill Underground surely heavy after numerous spaces between rubble, construct class water-bearing layer;And by the most unfilled adopt hole temporarily storage ground precipitation and Subsoil water recharge laterally, makes to become bottom openpit or mining depression ground underground savings reservoir, ploughs as after mine reclamation Iirigation water source.
The present invention seeks to be achieved through the following technical solutions:
(1) utilize bottom openpit without crack channel-shaped form, select at the bottom of the ettle filling openpit of particle diameter 20 ~ 50cm Portion, the hole of adopting closing hole is fills up to and the height of adjacent earth's surface 40-60cm apart by the ettle of backfill, and this height is for reserving Structure surface layer thickness;By ettle clearance configurations class underground reservoir;
(2) certain limit not filling is set with adopting hole or mining depression in the open and stores up hole temporarily as rainwash water, utilize ground The rainwash water of openpit or periphery gathering ground, mining depression ground is come together in and stores up hole temporarily by shape ratio fall or intercepting drain, and passes through Natural subsidence and filtration, laterally penetrate into the ettle clearance configurations class underground bottom openpit or mining depression ground aqueous Layer;Adopt the recharge laterally of hole or mining depression ground periphery subsoil water to adopting bottom hole or mining depression ground and between ettle simultaneously Gap, ultimately form mine reclamation openpit or mining depression ground bottom save water source;
(3) while filling rejected ore, pre-buried multistage cast iron well casing, to cheating at the end bottom pipe, cast iron well casing external diameter 440mm is Preferably, and be coated with antioxidation coating;Multistage cast iron well casing is followed successively by precipitation tube, filter pipe and wall casing by cheating bottom to earth's surface;Precipitation tube A length of 5 ~ 10m, filter tube a length of underground reservoir thickness, the tube wall of filter tube is laid treatment hole, in cast iron well casing Arranging water inlet pipe, water inlet pipe lower end connects immersible pump;By immersible pump, water being evacuated to earth's surface, after being used for reclaiming, agricultural land fills Irrigate;
(4) adopting after hole utilizes waste rock to fill, lay clay fixed layer on upper strata, thickness is 10-20cm, and compacting is fixing, and Laying iron tailings layer of sand, thickness is 5-10cm, topmost covers suitable agric, and thickness is 25-30cm.
Irrigating facility uses drip irrigation or sprinkling irrigation.
The positive effect of the present invention: efficient and rational utilization row's rock waste fill, because of the soil that destroys of mining, reduces that it is original Landforms, utilize numerous spaces between steady heavy row's rock rubble, construct class water-bearing layer;And adopt the temporary deposit and remittance collection in hole by the most unfilled Ground precipitation and subsoil water recharge laterally, make to become bottom openpit or mining depression ground underground savings reservoir, as mine The iirigation water source ploughed after reclaiming.
Accompanying drawing explanation
Fig. 1 is the openpit schematic cross-section that earth's surface is smooth.
Fig. 2 is the openpit schematic cross-section in hillside fields.
Fig. 3 is the schematic diagram that the present invention adopts the interior pre-buried cast iron well casing in hole in the open.
Fig. 4 is to adopt hole interior backfill ettle in the open and every staying storage hole schematic diagram temporarily.
Fig. 5 is to lay clay fixed layer, laying iron tailings sand and soil moved in improve the original schematic diagram on upper strata.
Fig. 6 is cast iron well casing structural representation.
Fig. 7 is to adopt backfill structure enlarged diagram in hole in the open.
Detailed description of the invention
Embodiment one
1, the smooth openpit (see figure 1) of an arid or earth's surface, semiarid zone is chosen;Utilize bottom openpit without splitting Slot shape form, backfills ettle (see figure 5), and the hole of adopting closing hole is fills up to adjacent earth's surface apart by the ettle of backfill The height of 40-60cm, this height is for reserving structure surface layer thickness;Select the ettle filling dew of 20 ~ 50cm particle size range It adopts bottom hole, by ettle clearance configurations class underground reservoir.
2, see Fig. 3,4 before waste fill, choose " well location ", while filling rejected ore, pre-buried multistage cast iron Well casing, to cheating at the end bottom pipe, cast iron well casing external diameter 440mm is advisable, and thickness of pipe wall is on the basis of bearing ettle lateral pressure, and is coated with Antioxidation coating 2;Multistage cast iron well casing is followed successively by precipitation tube 6, filter pipe 4 and wall casing 1 by cheating bottom to earth's surface;Precipitation tube 6 is long Degree is 5 ~ 10m, filter pipe 4 a length of underground reservoir thickness, the tube wall of filter pipe 4 is laid treatment hole, in cast iron well casing Arranging water inlet pipe 3, water inlet pipe 3 lower end connects immersible pump 5;After reclaiming, agricultural land is irrigated.Laying pipe well quantity can basis Long-term cropping water consumption and the underground savings water yield determine.
3, seeing Fig. 5, form filter course at the suitable position rubble adopting hole, particle diameter is row's rock barren rock of 5-15cm, every staying Going out certain limit not filling and store up hole temporarily as rainwash water, storage pit-size determines according to charge for remittance amount temporarily, utilizes landform than fall Or the rainwash water adopting periphery gathering ground, hole is come together in and stores up hole temporarily by intercepting drain, and through natural subsidence and filtration, by broken Stone filter course laterally penetrates into the ettle clearance configurations class underground reservoir bottom openpit;Adopt hole periphery subsoil water simultaneously Recharge laterally to adopting bottom hole to ettle gap, ultimately form savings water source bottom the openpit of mine reclamation.
4, see Fig. 6,7, adopt hole utilize waste rock fill after, upper strata lay clay fixed layer 9, thickness is 10-20cm, Compacting is fixing, and lays iron tailings layer of sand 8, and thickness is 5-10cm, is topmost soil moved in improve the original layer 7, and thickness is 25-30cm, uses excellent Matter is ploughed native.Irrigating facility uses drip irrigation or sprinkling irrigation.
Already ensure that before enforcement that water quality meets country's irrigation norm, and set up routine test water collecting sump water quality system, it is ensured that Water quality can reach agricultural irrigation water quality national standard all the time, ensures grain yield, food safety.
Embodiment two
Choose the openpit (see figure 2) in an arid or hillside fields, semiarid zone.
Step one, two, three as above, step 4: adopt after hole utilizes waste rock to fill, lay clay fixed layer 9 on upper strata, Thickness is 10-20cm, and compacting is fixing, and lays iron tailings layer of sand, and thickness is 5-10cm, is topmost soil moved in improve the original layer 7, and thickness is 25-30cm, uses high-quality to plough native.Build terraced fields to be used for preventing erosion simultaneously, play water-retention, soil conservation, production-increasing function.Fill Irrigate facility and use drip irrigation or sprinkling irrigation.

Claims (1)

1. mine reclamation stores a water pumping method bottom openpit or Subsidence Area, it is characterized in that:
(1) utilize bottom openpit without crack channel-shaped form, select at the bottom of the ettle filling openpit of particle diameter 20 ~ 50cm Portion, the hole of adopting closing hole is fills up to and the height of adjacent earth's surface 40-60cm apart by the ettle of backfill, and this height is for reserving Structure surface layer thickness;By ettle clearance configurations class underground reservoir;
(2) certain limit not filling is set with adopting hole or mining depression in the open and stores up hole temporarily as rainwash water, utilize ground The rainwash water of openpit or periphery gathering ground, mining depression ground is come together in and stores up hole temporarily by shape ratio fall or intercepting drain, and passes through Natural subsidence and filtration, laterally penetrate into the ettle clearance configurations class underground bottom openpit or mining depression ground aqueous Layer;Adopt the recharge laterally of hole or mining depression ground periphery subsoil water to adopting bottom hole or mining depression ground and between ettle simultaneously Gap, ultimately form mine reclamation openpit or mining depression ground bottom save water source;
(3) while filling rejected ore, pre-buried multistage cast iron well casing, to cheating at the end bottom pipe, cast iron well casing external diameter 440mm is Preferably, and be coated with antioxidation coating;Multistage cast iron well casing is followed successively by precipitation tube, filter pipe and wall casing by cheating bottom to earth's surface;Precipitation tube A length of 5 ~ 10m, filter tube a length of underground reservoir thickness, the tube wall of filter tube is laid treatment hole, in cast iron well casing Arranging water inlet pipe, water inlet pipe lower end connects immersible pump;By immersible pump, water being evacuated to earth's surface, after being used for reclaiming, agricultural land fills Irrigate;
(4) adopting after hole utilizes waste rock to fill, lay clay fixed layer on upper strata, thickness is 10-20cm, and compacting is fixing, and Laying iron tailings layer of sand, thickness is 5-10cm, topmost covers suitable agric, and thickness is 25-30cm.
CN201610681294.8A 2016-08-18 2016-08-18 Openpit or Subsidence Area bottom store water pumping method in mine reclamation Active CN106285683B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610681294.8A CN106285683B (en) 2016-08-18 2016-08-18 Openpit or Subsidence Area bottom store water pumping method in mine reclamation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610681294.8A CN106285683B (en) 2016-08-18 2016-08-18 Openpit or Subsidence Area bottom store water pumping method in mine reclamation

Publications (2)

Publication Number Publication Date
CN106285683A true CN106285683A (en) 2017-01-04
CN106285683B CN106285683B (en) 2018-12-04

Family

ID=57679639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610681294.8A Active CN106285683B (en) 2016-08-18 2016-08-18 Openpit or Subsidence Area bottom store water pumping method in mine reclamation

Country Status (1)

Country Link
CN (1) CN106285683B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107701229A (en) * 2017-09-29 2018-02-16 华北理工大学 Surface mining landfill is administered and underground head stage casings goaf filling draining Synergistic method
CN110029631A (en) * 2018-12-07 2019-07-19 包头钢铁(集团)有限责任公司 A kind of high-quality operation operating method in extremely frigid zones high-concentration tailings library
CN111088788A (en) * 2019-12-16 2020-05-01 中国矿业大学 Method for communicating aquifers of soil dumping site in strip mine
CN113107061A (en) * 2021-04-15 2021-07-13 中国矿业大学 Stratum reconstruction method for near-urban abandoned strip mine

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4611951A (en) * 1985-10-07 1986-09-16 American Cyanamid Company Process for reclamation of excavated mine sites
CN101176400A (en) * 2006-11-08 2008-05-14 中国矿业大学(北京) New process for recultivating glebe in mine subsidence area
CN101451355A (en) * 2008-12-03 2009-06-10 中国矿业大学 Water retention method of back fill course
CN102511214A (en) * 2011-11-11 2012-06-27 甄文杰 Method for recultivating collapsed soil in coal mining
CN102972112A (en) * 2012-11-28 2013-03-20 常州大学 Method for reclaiming collapsed land of mines
CN104255109A (en) * 2014-10-24 2015-01-07 刘勇 Method for conducting ecological restoration in mine geological disaster region
CN104641755A (en) * 2014-12-09 2015-05-27 涞水丰源环保科技有限公司 Land restoration method for abandoned sand mining field
CN104831678A (en) * 2015-01-30 2015-08-12 王健 Ecological restoration method for tailing depot reclamation after tailing depot closure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4611951A (en) * 1985-10-07 1986-09-16 American Cyanamid Company Process for reclamation of excavated mine sites
CN101176400A (en) * 2006-11-08 2008-05-14 中国矿业大学(北京) New process for recultivating glebe in mine subsidence area
CN101451355A (en) * 2008-12-03 2009-06-10 中国矿业大学 Water retention method of back fill course
CN102511214A (en) * 2011-11-11 2012-06-27 甄文杰 Method for recultivating collapsed soil in coal mining
CN102972112A (en) * 2012-11-28 2013-03-20 常州大学 Method for reclaiming collapsed land of mines
CN104255109A (en) * 2014-10-24 2015-01-07 刘勇 Method for conducting ecological restoration in mine geological disaster region
CN104641755A (en) * 2014-12-09 2015-05-27 涞水丰源环保科技有限公司 Land restoration method for abandoned sand mining field
CN104831678A (en) * 2015-01-30 2015-08-12 王健 Ecological restoration method for tailing depot reclamation after tailing depot closure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107701229A (en) * 2017-09-29 2018-02-16 华北理工大学 Surface mining landfill is administered and underground head stage casings goaf filling draining Synergistic method
CN110029631A (en) * 2018-12-07 2019-07-19 包头钢铁(集团)有限责任公司 A kind of high-quality operation operating method in extremely frigid zones high-concentration tailings library
CN111088788A (en) * 2019-12-16 2020-05-01 中国矿业大学 Method for communicating aquifers of soil dumping site in strip mine
CN111088788B (en) * 2019-12-16 2020-11-13 中国矿业大学 Method for communicating aquifers of soil dumping site in strip mine
CN113107061A (en) * 2021-04-15 2021-07-13 中国矿业大学 Stratum reconstruction method for near-urban abandoned strip mine

Also Published As

Publication number Publication date
CN106285683B (en) 2018-12-04

Similar Documents

Publication Publication Date Title
CN103583172B (en) A kind of arid arid area pattern of farming and implantation methods thereof
CN102577789B (en) Method of cyclic sustainable vegetation recovery for waste dump of grassland mining area
CN101451355B (en) Water retention method of back fill course
Prinz et al. Technological potential for improvements of water harvesting
CN106285683B (en) Openpit or Subsidence Area bottom store water pumping method in mine reclamation
CN102696300A (en) Method for water seepage, salt discharge and afforestation of low-humidity saline and alkaline beach and application of method
CN103718686B (en) The afflux anatonosis of a kind of local presses down alkaline land improving system and the improvement method of evaporation
CN104652452A (en) Water-collecting irrigation device for slope protection in karst regions
CN206547425U (en) A kind of side slope plants raw slot structure from seeping water
CN103866750A (en) Water-accumulating and soil-conserving spiral ditch construction method for barren slopes
CN105706555B (en) Saline land greening engineering original soil structure-improved and its construction method
CN102392453A (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN102888849B (en) A kind of large outdoors colliery refuse dump, loess area micro-slope reconstruction method
CN107896548A (en) A kind of method and irrigation system suitable for Karst stony mountain areas steep cliff section ecological management
CN109168381A (en) The ground plane apertures conflux of prevention and treatment Soil Dried Layer enters infiltration method
CN206150066U (en) A ecological bank protection device for semi -arid area side slope
CN203646005U (en) Local collection permeation-enhancing evaporation-suppression saline-alkali land improvement system
CN1296735A (en) Method for transplanting old and noble trees
CN210580198U (en) Sloping field water collection and soil conservation structure
CN208219672U (en) A kind of rainwater side slope based on mine reclamation
CN109618884A (en) A kind of phreatic water seepage flow catchments hidden pipe structure
CN204343308U (en) A kind of water-collecting irrigation device for karst bank protection
CN202482980U (en) Storage afforesting system applicable to coastal areas
CN209457126U (en) A kind of rainwater ecological filter well
CN104563136A (en) Water-collecting irrigation device for slope protection in karst region

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231102

Address after: 122400 Xincheng Village, Xiaotang Town, Jianping County, Chaoyang City, Liaoning Province

Patentee after: JIANPING SHENGDE RIXIN MINING INDUSTRY Co.,Ltd.

Address before: 110866 120 Dongling Road, Shenhe District, Shenyang, Liaoning

Patentee before: SHENYANG AGRICULTURAL University

Patentee before: JIANPING SHENGDE RIXIN MINING INDUSTRY Co.,Ltd.

TR01 Transfer of patent right