CN102511214A - Method for recultivating collapsed soil in coal mining - Google Patents

Method for recultivating collapsed soil in coal mining Download PDF

Info

Publication number
CN102511214A
CN102511214A CN2011103558995A CN201110355899A CN102511214A CN 102511214 A CN102511214 A CN 102511214A CN 2011103558995 A CN2011103558995 A CN 2011103558995A CN 201110355899 A CN201110355899 A CN 201110355899A CN 102511214 A CN102511214 A CN 102511214A
Authority
CN
China
Prior art keywords
soil
collapsed
generating pit
landslide
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103558995A
Other languages
Chinese (zh)
Inventor
甄文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103558995A priority Critical patent/CN102511214A/en
Publication of CN102511214A publication Critical patent/CN102511214A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a method for recultivating collapsed soil in coal mining, which belongs to the technical field of the recultivation of collapsed soil. The method for recultivating the collapsed soil in coal mining comprises the following steps of: carrying out water pumping on accumulated water in the collapsed soil, adopting surface water pumping for a swampland and carrying out a next step directly if no accumulated water exists; digging trapeziform pits in the collapsed soil after water pumping and digging to an underground part at 4 to 5 meters deeply; constructing a methane tank in each pit in which earth is taken out, carrying out back filling by the original soil and using the residual earth for covering a collapsed area; covering a surface layer by using the soil after air outlets and feed ports, which are required by the methane tanks, are remained at the upper faces of the methane tanks, wherein the covering soil reaches 0.8 to 1.2 meter(s); and developing a planting industry and a breeding industry to the soil after treatment. The method for recultivating the collapsed soil in coal mining has the beneficial effects that methane tanks are constructed by utilizing the earth of the collapsed soil of an ore area, and the upper faces of the methane tanks are covered with the soil for planting trees, flowers and the like to develop the planting industry and the breeding industry after the methane tanks are constructed. In this way, a bottomland is lifted, the recultivation of collapsed soil is also realized, the full utilization of soil is achieved, and the utilization rate of the soil is greatly enhanced.

Description

A kind of method of reclaiming with mining landslide
Technical field
The present invention relates to a kind of method of reclaiming with mining landslide, belong to the land reclamation technical field of subsiding.
Background technology
Land reclamation is to soil occupied because of digging, building materials industry development and other industrial and mining waste accumulations etc. or that destroy; Make the production capacity that loses obtain utilizing again again through the regulation transformation; Be to solve the contradiction that industrial and mining enterprises such as digging, building materials and agriculture, forestry, animal husbandry, fisheries are striven ground, prevent the pollution of the environment, the effective way of ecology recovering balance.
Cause surface collapse like the mining area underground mining, when the face of land height after subsiding is lower than before the topsoil water level, or fall ponding in the subsidence area when being difficult to drain, original good farmland will become marsh or lake.Land resources for more and more precious is huge waste.The subside traditional approach of ground land reclamation of tradition mining area mainly adopts the gangue refill mode, subside earlier toward the mining area the backfill spoil and then on spoil earthing.There is following shortcoming in this method: quantities is big, cost is high; The backfill spoil is not enough, can't realize all backfill earthing of subsidence area.
Therefore, change the subside traditional approach of ground land reclamation of mining area, suit measures to local conditions, be built into cultivable good farmland, promote the improvement and the protection of mining collapse area ecotope from the angle of the circular agriculture chaor that will subside.
Summary of the invention
To the problem that above-mentioned prior art exists, the method that the present invention provides a kind of landslide ground of mining to reclaim, utilize the mining area subside the soil build a methane generating pit, accomplish making full use of of soil, improved land utilization rate greatly.
To achieve these goals, the technical scheme that the present invention adopts is: a kind of method of reclaiming comprises the steps: with mining landslide
(1) draw water: the ponding in the landslide ground draws water, and marshland takes the surface to draw water, if no ponding directly carries out next step;
(2) excavate: scrape out trapezoidal hole in the landslide ground after drawing water, deep-cut to underground 4-5 meters;
(3) build a methane generating pit: in taking out each hole of the earthwork, build a biogas generating pit, former earthen backfill surplus earth is topped as the subsidence area;
(4) earthing, shaping: gas outlet, charging aperture top layer afterwards that on biogas generating pit, reserving biogas generating pit needs cover with soil, and earthing reaches 0.8-1.2 meters;
(5) soil utilization: to the soil after step (4) processing, development plant husbandry and aquaculture.
An identical hole is dug at 3-5 meters at the every interval of step (2).
Build a biogas generating pit, promptly centralized biogas generating pit in each hole.
But the good farmland is cultivated in surplus earth backfill reparation.
The invention has the beneficial effects as follows: utilize the soil, ground that subsides, mining area to build a methane generating pit, build up behind the biogas generating pit on biogas generating pit the earthing kind and set, grow flower etc. and develop plant husbandry and aquaculture; So both low-lying land was raised, making full use of of soil accomplished in reclaiming of the ground of having realized again subsiding, and improved land utilization rate greatly; Reasonable Protection land resources, social economy and environmental benefit are high; For the mining area subside ground land reclamation a kind of technology of being convenient to promote is provided.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Embodiment
To combine accompanying drawing that the present invention is described further below.
As shown in Figure 1, a kind of method of reclaiming with mining landslide, specific embodiment comprises the steps:
(1) draw water: according to situation on the spot, then at first draw water if having ponding in the landslide ground, marshland takes the surface to draw water, and after ponding is drained, deep-cuts to underground 4-5 meters.
(2) excavate: with scraping out trapezoidal hole in the landslide ground of excavator after drawing water, an identical hole is dug at 4 meters at every interval, and the centre has soil can connect ground vapour like this, helps the growth of top farming.
(3) build a methane generating pit: in each hole of above-mentioned steps, build a biogas generating pit, promptly centralized biogas generating pit, former earthen backfill surplus earth is topped as the subsidence area; , the former earthen backfill surplus earth of biogas generating pit of building 300 cubic metres is topped as the subsidence area, and every pond can go out a cubic metre of earth 515m3, but removes also subside 950 square metres of marshlands of 0.5 meter of overlying soil of the backfill earthwork.
(4) earthing, shaping: gas outlet, charging aperture top layer afterwards that on biogas generating pit, reserving biogas generating pit needs cover with soil, and earthing reaches 1 meter.
(5) soil utilization: to the soil after step (4) processing, development plant husbandry and aquaculture.
Build the 50000m3 biogas generating pit and take 260 mu of marshlands, but surplus earth backfill reparation can be cultivated the good farmland for 240 mu.
Fowl and animal excrement, sewage etc. are introduced in the pre-treatment pond and grow grass, foreign material cleaning back gets into acidification pool; In acidification pool, get into regulating reservoir after the descum; Arrive the anaerobic fermentation pond again, the natural pond slag is processed into granular fertilizer, and natural pond liquid sprays fertilizer as liquid; Biogas gets into gas storage holder after the desulfurization deodorizing, supply with user or generating through pipe network.Both can realize the resident living central gas supply, improve living environment, and can reduce the life spending again, practice thrift conventional energy resource, improve utilization efficiency of energy.

Claims (4)

1. a method of reclaiming is characterized in that with mining landslide, comprises the steps:
(1) draw water: the ponding in the landslide ground draws water, and marshland takes the surface to draw water, if no ponding directly carries out next step;
(2) excavate: scrape out trapezoidal hole in the landslide ground after drawing water, deep-cut to underground 4-5 meters;
(3) build a methane generating pit: in taking out each hole of the earthwork, build a biogas generating pit, former earthen backfill surplus earth is topped as the subsidence area;
(4) earthing, shaping: gas outlet, charging aperture top layer afterwards that on biogas generating pit, reserving biogas generating pit needs cover with soil, and earthing reaches 0.8-1.2 meters;
(5) soil utilization: to the soil after step (4) processing, development plant husbandry and aquaculture.
2. a kind of method of reclaiming according to claim 1 is characterized in that with mining landslide, and an identical hole is dug at 3-5 meters at the every interval of said step (2).
3. a kind of method of reclaiming according to claim 2 is characterized in that with mining landslide, builds a biogas generating pit, promptly centralized biogas generating pit in described each hole.
4. a kind of method of reclaiming according to claim 1 it is characterized in that, but the good farmland is cultivated in surplus earth backfill reparation with mining landslide.
CN2011103558995A 2011-11-11 2011-11-11 Method for recultivating collapsed soil in coal mining Pending CN102511214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103558995A CN102511214A (en) 2011-11-11 2011-11-11 Method for recultivating collapsed soil in coal mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103558995A CN102511214A (en) 2011-11-11 2011-11-11 Method for recultivating collapsed soil in coal mining

Publications (1)

Publication Number Publication Date
CN102511214A true CN102511214A (en) 2012-06-27

Family

ID=46282523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103558995A Pending CN102511214A (en) 2011-11-11 2011-11-11 Method for recultivating collapsed soil in coal mining

Country Status (1)

Country Link
CN (1) CN102511214A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149747A (en) * 2016-08-20 2016-11-23 苏州高精特专信息科技有限公司 A kind of electric wire tower collapse ground based on stay cord
CN106285683A (en) * 2016-08-18 2017-01-04 沈阳农业大学 Mine reclamation stores water pumping method bottom openpit or Subsidence Area
CN106717218A (en) * 2016-11-22 2017-05-31 紫荆浆体管道工程股份公司 A kind of mining collapse area agricultural is reclaimed comprehensive processing method
CN111133973A (en) * 2020-01-15 2020-05-12 厦门海石生态环境股份有限公司 Mine restoration ecological planning method based on geographic information system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101422094A (en) * 2007-11-02 2009-05-06 煤炭科学研究总院唐山研究院 Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN101713291A (en) * 2009-12-09 2010-05-26 煤炭科学研究总院唐山研究院 Filling-reclaiming method for building land in coal mining subsidence areas
CN101967447A (en) * 2010-10-21 2011-02-09 晋江市中兴农牧机械有限公司 Marsh gas tank

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101422094A (en) * 2007-11-02 2009-05-06 煤炭科学研究总院唐山研究院 Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN101713291A (en) * 2009-12-09 2010-05-26 煤炭科学研究总院唐山研究院 Filling-reclaiming method for building land in coal mining subsidence areas
CN101967447A (en) * 2010-10-21 2011-02-09 晋江市中兴农牧机械有限公司 Marsh gas tank

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁佩等: "矿区塌陷土地复垦与可持续利用", 《煤炭工程》, no. 5, 31 May 2011 (2011-05-31), pages 58 - 60 *
何斌: "论平原矿区煤矿塌陷地复垦与农田生态环境建设", 《乡镇经济》, no. 6, 30 June 2002 (2002-06-30), pages 41 - 42 *
卞正富等: "采煤塌陷地基塘复垦模式与应用", 《矿山测量》, no. 1, 31 December 1996 (1996-12-31), pages 34 - 37 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285683A (en) * 2016-08-18 2017-01-04 沈阳农业大学 Mine reclamation stores water pumping method bottom openpit or Subsidence Area
CN106285683B (en) * 2016-08-18 2018-12-04 沈阳农业大学 Openpit or Subsidence Area bottom store water pumping method in mine reclamation
CN106149747A (en) * 2016-08-20 2016-11-23 苏州高精特专信息科技有限公司 A kind of electric wire tower collapse ground based on stay cord
CN106149747B (en) * 2016-08-20 2018-09-25 国网江西省电力有限公司赣东北供电分公司 A kind of electric wire tower collapse ground based on drawstring
CN106717218A (en) * 2016-11-22 2017-05-31 紫荆浆体管道工程股份公司 A kind of mining collapse area agricultural is reclaimed comprehensive processing method
CN111133973A (en) * 2020-01-15 2020-05-12 厦门海石生态环境股份有限公司 Mine restoration ecological planning method based on geographic information system

Similar Documents

Publication Publication Date Title
CN105519274B (en) A kind of integrated approach of extensive coastal new Climacteric symptoms farmland ecology exploitation
CN103583172B (en) A kind of arid arid area pattern of farming and implantation methods thereof
Bing-yuan et al. Mine Land Reclamation and Eco‐Reconstruction in Shanxi Province I: Mine Land Reclamation Model
CN108532580A (en) A kind of hillock eco-environment restoration comprehensive processing method
CN103609303B (en) A kind of hillock near-nature forest ecological system reconstruction method
CN105432409A (en) Method for improving planting patch forest of saline-alkali soil original soil
CN103262689A (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN102577687A (en) Comprehensive improving method for coastal saline soil
CN108455787A (en) A kind of sewage water treatment method based on ecological canal pool agricultural wetland
CN209941695U (en) Comprehensive treatment structure for steep slope type coal gangue dump
CN103466899A (en) Blocking and controlling system for non-point source pollution in middle water network zone and construction method thereof
CN104652452A (en) Water-collecting irrigation device for slope protection in karst regions
CN102511214A (en) Method for recultivating collapsed soil in coal mining
CN102972112A (en) Method for reclaiming collapsed land of mines
Hussain et al. Water resources management: traditional technology and communities as part of the solution
WO2020094086A1 (en) Modern water conservation technology and circular agriculture system, and construction method for same
CN106192873B (en) Island Wetland ecological water-retaining method
CN205838686U (en) Lawn enters water barge bank ecosystem structure
CN103609386B (en) Muddy coastal zone plant groove or plant hole afforestation method
CN104420676A (en) Method for solving agricultural non-point source pollution
Patro et al. Use of different forms of retention as the condition of sustainable management of water resources in rural environment
CN101904292A (en) Soilless cultivation method using waste compost as substrate
CN104067720B (en) The restorative procedure in the empty damage paddy field, depression stable region of Coal Exploitation
CN108130897A (en) A kind of soil basketing method during highway construction
CN202787191U (en) Water and soil separation dam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120627