CN106284372A - 一种电力沟整体浇注过程中顶板模板的支撑方法 - Google Patents

一种电力沟整体浇注过程中顶板模板的支撑方法 Download PDF

Info

Publication number
CN106284372A
CN106284372A CN201510280907.2A CN201510280907A CN106284372A CN 106284372 A CN106284372 A CN 106284372A CN 201510280907 A CN201510280907 A CN 201510280907A CN 106284372 A CN106284372 A CN 106284372A
Authority
CN
China
Prior art keywords
ziliang
pvc pipe
concrete floor
supporting
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510280907.2A
Other languages
English (en)
Inventor
方海强
张永亮
李春
彭岩
曲红叶
杨学明
孙义波
潘艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201510280907.2A priority Critical patent/CN106284372A/zh
Publication of CN106284372A publication Critical patent/CN106284372A/zh
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及电力施工领域,特别涉及一种电力沟整体浇注过程中顶板模板的支撑方法。它包括在电缆沟的混凝土底板上埋设土字梁,土字梁的总高度比混凝土底板的上平面低2~3cm,土字梁的横向筋比混凝土底板的底面高15cm,然后在土字梁的上端套上PVC管,所述PVC管的底端搭在横向筋上,将支撑钢管插在PVC管内并套在土字梁上,混凝土底板浇筑完成后抽去支撑钢管和PVC管,用膨胀防水砂浆将PVC管留下的孔洞抹平。本发明的有益效果是:本发明可省去钢筋切割过程,既节约成本又安全,美观,且保证了土字梁处15cm厚的底板整体浇筑,可保证防水。

Description

一种电力沟整体浇注过程中顶板模板的支撑方法
(一) 技术领域
本发明涉及电力施工领域,特别涉及一种电力沟整体浇注过程中顶板模板的支撑方法。
(二) 背景技术
在电力沟整体浇注过程中,传统的顶板模板的支撑方法为:在电力沟底板上做一土字梁,土字梁高出电力沟底板约10~20cm,然后将支撑用的钢管支撑在土字梁上,电力沟底板浇筑完成后,在底板上留下约10~20cm的钢筋头,施工完毕后必须将该钢筋头切除,然后用砂浆将此钢筋头上部全部封死,这种传统的支撑方法存在着如下弊端:1、钢筋切割前需对混凝土进行剔除,浪费人力,又不美观;2、外露钢筋造成材料浪费且不安全。
(三) 发明内容
本发明为了弥补现有技术的缺陷,提供了一种省时省力、安全、美观的电力沟整体浇注过程中顶板模板的支撑方法。
本发明是通过如下技术方案实现的:
一种电力沟整体浇注过程中顶板模板的支撑方法,其特征是:在电缆沟的混凝土底板上埋设土字梁,土字梁的总高度比混凝土底板的上平面低2~3cm,土字梁的横向筋比混凝土底板的底面高15cm,然后在土字梁的上端套上PVC管,所述PVC管的底端搭在横向筋上,将支撑钢管插在PVC管内并套在土字梁上,混凝土底板浇筑完成后抽去支撑钢管和PVC管,用膨胀防水砂浆将PVC管留下的孔洞抹平。
本发明的有益效果是:本发明可省去钢筋切割过程,既节约成本又安全,美观,且保证了土字梁处15cm厚的底板整体浇筑,可保证防水。
(四) 具体实施方式
以下为本发明的实施例:
侧墙及顶板模板支架施工
1侧墙及顶板模板安装
电缆沟底板、侧墙及顶板模板一般采用12mm厚竹胶板,侧墙及顶板支架采用满堂式钢管支架,顶托采用螺旋顶托,以便于调节高度。通过对拉螺栓及利用脚手架支固墙身模板。
(1) 模板设计
侧墙及顶板模板采用竹胶板,12mm厚,用5×8cm方木间距60cm背肋,横向拼装,Φ48钢管支撑系统,结合“蝴蝶”形卡扣、对拉螺杆及花篮螺丝固定。因为施工中最大侧压力在下部,所以对拉螺杆在墙身1.2m以下拟采用@600×350mm双向布置,1.2m以上拟采用@600×600mm双向布置。模板支撑拟用Φ48钢管固定,钢管立杆纵横间距≤90mm,水平间距≤1200mm,并按施工操作规程的规定设置斜撑、外撑等。模板拼装完成后按顺序编号,便于周转使用,模板接缝处采用3mm厚海棉胶条密封。
(2)竹胶板模板制作与拼装
①技术准备。要认真审核模板的设计图纸并核对模板的型号和数量。尤其制作竹胶板模板时,要在熟悉图纸基础上,对各部位尺寸进行核对,确定加工制作的数量,然后下料。在竹胶板周转使用过程中,损坏或变形的模板要及时修整或更换。
③当底板及侧墙钢筋绑扎完成后,先进行侧墙内模板的安装,然后进行侧墙外模板的安装,再然后进行顶板模板脚手架支架,最后进行顶板底模板的安装施工。
④安装模板时,考虑浇筑混凝土的工作特点,模板结构应与所采取的钢筋安装方法及混凝土的浇筑方法相适应。在必要的地方可设置活板或临时窗口,以便于混凝土的浇筑捣固,及时清除模板内杂物。模板必须在内部钢筋绑扎好并经检查无误后,方可封闭。
竹胶板模板在使用过程中要加强管理,支、拆模及运输时要轻搬轻放,发现有损坏及变形时,要及时修理。模板应平整摆放,防止变形,并编号标记,便于周转使用。
(3)支架搭设
根据工程特点和施工条件,顶板混凝土施工时,必须保证支架的强度及稳定性,一般采用钢管支设满堂式支架的方案施工。
钢管支架设置通过土字筋支撑在垫层上,支架横向间距拟采用≤90cm,纵向间距拟采用≤60cm,进行支架强度和稳定性验算。支架拼装必须由熟练工操作,要注意拼好后的主杆垂直,在电缆沟的混凝土底板上埋设土字梁,土字梁的总高度比混凝土底板的上平面低2~3cm,土字梁的横向筋比混凝土底板的底面高15cm,然后在土字梁的上端套上PVC管,所述PVC管的底端搭在横向筋上,将支撑钢管插在PVC管内并套在土字梁上,混凝土底板浇筑完成后抽去支撑钢管和PVC管,用膨胀防水砂浆将PVC管留下的孔洞抹平。这样可省去钢筋切割过程,既节约成本又安全,且此方案保证了土字型钢筋处15cm厚的地板整体浇筑,可保证防水。
根据设计的支架高度及布局,由专人负责检查合格后,在支架顶托上铺设8×10cm纵向方木后再铺设带肋竹模板。
(4)模板的固定
根据施工操作规程的相关要求,对于墙身模板用对拉螺栓固定外,还要采用钢管固定。
对拉螺栓长度 ≥墙厚+(竹胶板厚度+木肋厚度+钢管直径+蝴蝶卡扣厚度+双螺母厚度)×2。采用双螺母固定在拉杆上。套丝长度每侧3~4cm,螺杆比螺母每侧外露2~3cm,采用橡胶垫止水卡片,提高混凝土墙的防渗功能。
自下而上每隔40cm~60cm设置双排横向钢管;然后架立竖向钢管,钢管采用双排,间距60cm布置在带孔模板处,通过对拉螺栓连接并用双螺母紧固在蝴蝶型卡扣上。然后,每间距120~150cm加设一道剪力撑和外撑。模板外侧通过钢管脚手架加强对外墙的加固,还
可在上搭设木板形成操作平台。
2端模板的设计
使用竹胶板拼装制作端模板,制作尺寸要准确。安装时要与墙身侧模板结合紧密,并用海绵条填塞密实,以防漏浆。用钢管固定时,在端模底部设置双排钢管,上下间距60cm为宜,斜钢管固定在压实槽底或底板混凝土上。
支设端模板时要注意钢板止水带的安装,用两块竹胶板将钢板止水带挤紧,然后对模板进行加固。因为钢板止水带关系到箱涵的防渗效果,所以钢板止水带的安装位置要准确。钢筋绑扎完成后安装止水带,把其放到规定位置后,用φ8钢筋做一U型卡固定在止水带两侧的钢筋上,以便对橡胶止水带加以固定。
3脚手架及支架拆除
拆架程序应遵守先上后下,先搭后拆的原则,即先拆拉杆、脚手板、剪刀撑、斜撑,然后拆小横杆、大横杆、立杆等,不准分立面拆架或在上下两步同时进行拆架。做到一步一清、一杆一清。拆立杆时,要先抱住立杆再拆开最后两个扣。拆除大横杆、斜撑、剪刀撑时,应先拆中间扣件,然后托住中间,再解端头扣。
除说明书所述技术特征外,其余技术特征均为本领域技术人员已知技术。

Claims (1)

1.一种电力沟整体浇注过程中顶板模板的支撑方法,其特征是:在电缆沟的混凝土底板上埋设土字梁,土字梁的总高度比混凝土底板的上平面低2~3cm,土字梁的横向筋比混凝土底板的底面高15cm,然后在土字梁的上端套上PVC管,所述PVC管的底端搭在横向筋上,将支撑钢管插在PVC管内并套在土字梁上,混凝土底板浇筑完成后抽去支撑钢管和PVC管,用膨胀防水砂浆将PVC管留下的孔洞抹平。
CN201510280907.2A 2015-05-28 2015-05-28 一种电力沟整体浇注过程中顶板模板的支撑方法 Pending CN106284372A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510280907.2A CN106284372A (zh) 2015-05-28 2015-05-28 一种电力沟整体浇注过程中顶板模板的支撑方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510280907.2A CN106284372A (zh) 2015-05-28 2015-05-28 一种电力沟整体浇注过程中顶板模板的支撑方法

Publications (1)

Publication Number Publication Date
CN106284372A true CN106284372A (zh) 2017-01-04

Family

ID=57635639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510280907.2A Pending CN106284372A (zh) 2015-05-28 2015-05-28 一种电力沟整体浇注过程中顶板模板的支撑方法

Country Status (1)

Country Link
CN (1) CN106284372A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661068A (zh) * 2018-06-22 2018-10-16 中国五冶集团有限公司 一种设备基础模板结构及加固方法
CN109149497A (zh) * 2018-10-16 2019-01-04 洪火权 采用整体移动式模板装置的缆线沟施工方法
RU198875U1 (ru) * 2020-03-19 2020-07-30 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Фундамент станка-качалки скважинной насосной установки

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2238871Y (zh) * 1995-03-07 1996-10-30 李琳 框架支撑装置
CN202187552U (zh) * 2011-06-17 2012-04-11 中建八局第二建设有限公司 一种楼梯间平台模板支撑系统的钢管底座
CN202627519U (zh) * 2012-04-25 2012-12-26 中国十七冶集团有限公司 现浇钢筋砼内钢管支撑系统通用底座
CN203285056U (zh) * 2013-05-20 2013-11-13 中国华冶科工集团有限公司 楼梯模板支撑底座
EP2698486A2 (en) * 2012-08-14 2014-02-19 Hämeen Laaturemontti Oy Vertical support structure for roofing safety fence system
CN203684680U (zh) * 2013-11-13 2014-07-02 中国建筑第七工程局有限公司 一种固定模板的埋件
CN204252535U (zh) * 2014-11-10 2015-04-08 中建三局第二建设工程有限责任公司 一种固定螺杆用丁字板套筒预埋件

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2238871Y (zh) * 1995-03-07 1996-10-30 李琳 框架支撑装置
CN202187552U (zh) * 2011-06-17 2012-04-11 中建八局第二建设有限公司 一种楼梯间平台模板支撑系统的钢管底座
CN202627519U (zh) * 2012-04-25 2012-12-26 中国十七冶集团有限公司 现浇钢筋砼内钢管支撑系统通用底座
EP2698486A2 (en) * 2012-08-14 2014-02-19 Hämeen Laaturemontti Oy Vertical support structure for roofing safety fence system
CN203285056U (zh) * 2013-05-20 2013-11-13 中国华冶科工集团有限公司 楼梯模板支撑底座
CN203684680U (zh) * 2013-11-13 2014-07-02 中国建筑第七工程局有限公司 一种固定模板的埋件
CN204252535U (zh) * 2014-11-10 2015-04-08 中建三局第二建设工程有限责任公司 一种固定螺杆用丁字板套筒预埋件

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661068A (zh) * 2018-06-22 2018-10-16 中国五冶集团有限公司 一种设备基础模板结构及加固方法
CN109149497A (zh) * 2018-10-16 2019-01-04 洪火权 采用整体移动式模板装置的缆线沟施工方法
RU198875U1 (ru) * 2020-03-19 2020-07-30 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Фундамент станка-качалки скважинной насосной установки

Similar Documents

Publication Publication Date Title
CN105220874B (zh) 地下室超高外墙自撑单侧支模体系的施工方法
CN109162296B (zh) 单侧支模体系及利用该体系进行外墙浇筑的施工方法
CN102220806B (zh) 一种超高悬空单面竖向模板支撑加固的施工方法
CN104452812A (zh) 地下室外墙的施工方法
CN107327050B (zh) 一种免拆式地下室外墙翻边单侧支模装置及施工方法
CN204983662U (zh) 一种对拉螺杆与钢管排架组合单侧支模装置
CN108677962B (zh) 一种地铁出入线段基坑模架安装及拆除方法
CN106284372A (zh) 一种电力沟整体浇注过程中顶板模板的支撑方法
CN206438529U (zh) 梁板式筏型基础模板支撑结构
CN205348761U (zh) 地下室无梁顶板上安装无基础升降机的加固结构
CN206956979U (zh) 一种带顶柱的一字型剪力墙
CN109024676A (zh) 一种现浇综合管廊的模板支撑系统及其施工方法
CN211228607U (zh) 构筑物现浇混凝土结构外墙与底板整体成型施工结构
CN111173042B (zh) 基础底板超前止水后浇带及施工方法
CN207847150U (zh) 一种用于结构拆除和复建的临时设施
CN106193120A (zh) 地下室悬挑底板逆作结构及施工方法
CN207244633U (zh) 基坑围护顶圈梁上砖砌挡土墙钢筋桁架加固系统
CN102767378A (zh) 排架施工隧道双柱式洞门方法
CN212223971U (zh) 后浇带侧固内撑钢板组合模板
CN202509530U (zh) 一种基础底板后浇带止水钢板组合结构
CN212129909U (zh) 后浇带侧固内撑钢丝网组合支模体系
CN202596173U (zh) 一种桥架预埋件
CN108104506A (zh) 一种用于结构拆除和复建的临时设施及其施工方法
CN205637707U (zh) 一种泳池
CN204703191U (zh) 一种兼做结构外墙的预制桩与顶板节点连接结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104