CN106284096A - 一种预应力孔道阻塞位置确定装置及穿束方法 - Google Patents
一种预应力孔道阻塞位置确定装置及穿束方法 Download PDFInfo
- Publication number
- CN106284096A CN106284096A CN201610854158.4A CN201610854158A CN106284096A CN 106284096 A CN106284096 A CN 106284096A CN 201610854158 A CN201610854158 A CN 201610854158A CN 106284096 A CN106284096 A CN 106284096A
- Authority
- CN
- China
- Prior art keywords
- hollow sphere
- lashing
- dragline
- corrugated tube
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
一种预应力孔道阻塞位置确定装置及穿束方法,装置包括中空球体、导索钢丝绳,所述导索钢丝绳插入在中空球体中并与中空球体焊接固定,在中空球体上、导索钢丝绳插入点的相对侧插接钢筋穿束的牵引索钢绞线,钢筋穿束的牵引索钢绞线也通过焊接与中空球体固定,在导索钢丝绳上设置有刻度。与现有的技术相比,本发明的有益效果是:装置结构简单,制作简单,能够多次重复使用;方法操作简单,在测试管道平顺性的同时顺便将小型杂物带出,起到疏通牵引的作用;能够精确定位阻碍物所在的位置,并有效去除波纹管中的阻塞物,从而顺利完成穿束工作;本发明的装置同时可以作为预应力钢筋束的穿束引线使用。
Description
技术领域
本发明涉及桥梁工程施工领域,尤其涉及一种用于大跨度现浇箱梁预应力孔道阻塞位置确定装置及穿束方法。
背景技术
预应力施工时,特别是大跨度现浇箱梁的预应力钢筋穿束时由于孔道内存在泥浆、弃物或本身因为定位不准确而造成的较大转角而导致预应力钢筋无法顺利穿束施工。如果强行拉拽可能会导致波纹管破损无法穿束,强行穿束后还会增大内摩擦系数影响伸长值的校核。
尤其是在过长的孔道中无法确定障碍物的准确位置,给施工现场预应力钢筋的穿束工作带来极大的困难。
发明内容
本发明的目的是为克服现有技术的不足,提供一种预应力孔道阻塞位置确定装置及穿束方法,可以在预应力钢筋穿束的过程中,去除小的障碍物或者是测量出堵塞物的准确位置,将堵塞物去除后,顺利完成预应力钢筋的穿束工作。
为实现上述目的,本发明采用以下技术方案实现:
一种预应力孔道阻塞位置确定装置,包括中空球体、导索钢丝绳,所述导索钢丝绳插入在中空球体中并与中空球体焊接固定,在中空球体上、导索钢丝绳插入点的相对侧插接钢筋穿束的牵引索钢绞线,钢筋穿束的牵引索钢绞线也通过焊接与中空球体固定,在导索钢丝绳上设置有刻度。
在中空球体的相对两侧对称设置有钢束插入孔。
采用一种预应力孔道阻塞位置确定装置进行穿束的方法,包括如下步骤:
1)先将导索钢丝绳按照孔道的最大长度并考虑余量进行下料,首先将导索钢丝绳的单束穿过波纹管孔道,然后将其一端插入中空球体的一侧钢束插入孔中,将导索钢丝绳和中空球体进行焊接固定;
2)将钢筋穿束的牵引索钢绞线插入中空球体另一侧的钢束插入孔中,将钢筋穿束的牵引索钢绞线和中空球体进行焊接固定;
3)使用卷扬机牵引设备牵引导索钢丝绳的另一端,将中空球体及钢筋穿束牵引至波纹管中,当中空球体在牵引过程中遇到阻碍时,从波纹管的两侧来回拉动中空球体,可以对波纹管中强度不高的小体积的杂物进行碾压疏通,如果中空球体可以顺利通过波纹管,则可直接将钢筋穿束牵引过波纹管完成穿束工作;
4)如果波纹管中阻碍物较大,中空球体实在无法通过,则可以根据设在导索钢丝绳上的刻度来确定阻碍物的位置,将中空球体从钢筋穿束一侧拉出,根据导索钢丝绳上刻度的长度标识,找到波纹管的阻塞位置,将波纹管阻塞段两侧切断,切除阻塞段波纹管后,采用大一号的波纹管将波纹管的断口处套起连接,套接接缝处用防水胶带多层包裹,防止进浆;
5)波纹管孔道阻碍物去除之后,重复上述步骤3中的操作,继续穿束工作,当中空球体从波纹管孔道的一端牵引钢筋穿束通过到另一端时,钢筋穿束也随之穿束完成。
与现有的技术相比,本发明的有益效果是:
1)本发明的一种预应力孔道阻塞位置确定装置结构简单,制作简单,能够多次重复使用;
2)本发明的方法操作简单,能利用空心球体自身刚度及球形表面的特性,在测试管道平顺性的同时顺便将小型杂物带出,起到疏通牵引的作用;
3)能够精确定位阻碍物所在的位置,并有效去除波纹管中的阻塞物,从而顺利完成穿束工作;
4)本发明的一种预应力孔道阻塞位置确定装置同时可以作为预应力钢筋束的穿束引线使用。
附图说明
图1是本发明一种预应力孔道阻塞位置确定装置的结构示意图。
图中:1-中空球体,2-钢束插入孔,3-焊点,4-导索钢丝绳,5-钢筋穿束的牵引索钢绞线,6-钢筋穿束,7-刻度。
具体实施方式
下面结合具体实施例对本发明的实施方式进一步说明:
如图1所示,一种预应力孔道阻塞位置确定装置,包括中空球体1、导索钢丝绳4,所述导索钢丝绳4插入在中空球体1中并与中空球体1焊接固定,在中空球体1上、导索钢丝绳4插入点的相对侧插接钢筋穿束的牵引索钢绞线5,钢筋穿束的牵引索钢绞线5也通过焊接与中空球体1固定,在导索钢丝绳4上设置有刻度7。
在中空球体1的相对两侧对称设置有钢束插入孔2。
中空球体1由不锈钢制成,中空球体1的壁厚一般为6mm,比孔道所用波纹管壁厚稍厚即可。
本装置可实现双向拖拉,当正向进入受阻时可以反向抽出,而且通过来回拖拉可碾压疏通强度不高的杂物。
采用一种预应力孔道阻塞位置确定装置进行穿束的方法,包括如下步骤:
1)先将导索钢丝绳4按照孔道的最大长度并考虑余量进行下料,首先将导索钢丝绳4的单束穿过波纹管孔道,然后将其一端插入中空球体1的一侧钢束插入孔2中,将导索钢丝绳4和中空球体1进行焊接固定;
中空球体1的直径比预应力波纹管孔道内径小5-8mm,导索钢丝绳4的一端插入中空球体1的一个钢束插入孔2中,并与钢束插入孔2周边进行全断面焊接,导索钢丝绳4的另一端连接牵引设备。
2)将钢筋穿束的牵引索钢绞线5插入中空球体1另一侧的钢束插入孔2中,将钢筋穿束的牵引索钢绞线5和中空球体1进行焊接固定;
3)使用卷扬机牵引设备牵引导索钢丝绳4的另一端,将中空球体1及钢筋穿束6牵引至波纹管中,当中空球体1在牵引过程中遇到阻碍时,从波纹管的两侧来回拉动中空球体1,可以对波纹管中强度不高的小体积的杂物进行碾压疏通,如果中空球体1可以顺利通过波纹管,则可直接将钢筋穿束6牵引过波纹管完成穿束工作;
在牵引的过程中,中空球体1会将管中部分杂物带出。
4)如果波纹管中阻碍物较大,中空球体1实在无法通过,则可以根据设在导索钢丝绳4上的刻度7来确定阻碍物的位置,将中空球体1从钢筋穿束6一侧拉出,根据导索钢丝绳4上刻度7的长度标识,找到波纹管的阻塞位置,将波纹管阻塞段两侧切断,切除阻塞段波纹管后,采用大一号的波纹管将波纹管的断口处套起连接,套接接缝处用防水胶带多层包裹,防止进浆;
例如:在导索钢丝绳4上显示已经拉出30m,那么阻碍物应该在30m的附近,根据波纹管不同弧度适当有些变化。导索钢丝绳4上刻度7的测量精度一般可按照lm设置。
5)波纹管孔道阻碍物去除之后,重复上述步骤3中的操作,继续穿束工作,当中空球体1从波纹管孔道的一端牵引钢筋穿束6通过到另一端时,钢筋穿束6也随之穿束完成。
在切断波纹管的操作过程中需要将导索钢丝绳4从波纹管中抽出,待波纹管修复完成后,再将导索钢丝绳4重新穿过波纹管并连接卷扬机,利用卷扬机牵引重复上述步骤3中的操作。
如果出现波纹管孔道被完全堵塞的情况时,在导索钢丝绳4单束穿过波纹管孔道时,导索钢丝绳4会在堵塞处受阻,此时也可以通过导索钢丝绳4上的刻度7对波纹管孔道堵塞点进行测量,然后将导索钢丝绳4抽出,再将波纹管堵塞段两侧切断,切除堵塞段波纹管后,采用大一号的波纹管将波纹管的断口处套起连接,套接接缝处用防水胶带多层包裹,防止进浆。
将波纹管孔道堵塞点修复后,再重新进行导索钢丝绳4单束穿束的操作,重复上述步骤1-5。
本发明的装置结构简单,制作成本低廉;方法简单易操作,可以有效解决大跨度现浇箱梁预应力钢筋穿束时遇到的障碍物阻塞的问题,可以提高预应力钢筋穿束的施工效率,降低施工成本。
Claims (3)
1.一种预应力孔道阻塞位置确定装置,其特征在于,包括中空球体、导索钢丝绳,所述导索钢丝绳插入在中空球体中并与中空球体焊接固定,在中空球体上、导索钢丝绳插入点的相对侧插接钢筋穿束的牵引索钢绞线,钢筋穿束的牵引索钢绞线也通过焊接与中空球体固定,在导索钢丝绳上设置有刻度。
2.根据权利要求1所述的一种预应力孔道阻塞位置确定装置,其特征在于,在中空球体的相对两侧对称设置有钢束插入孔。
3.采用权利要求1所述的一种预应力孔道阻塞位置确定装置进行穿束的方法,其特征在于,包括如下步骤:
1)先将导索钢丝绳按照孔道的最大长度并考虑余量进行下料,首先将导索钢丝绳的单束穿过波纹管孔道,然后将其一端插入中空球体的一侧钢束插入孔中,将导索钢丝绳和中空球体进行焊接固定;
2)将钢筋穿束的牵引索钢绞线插入中空球体另一侧的钢束插入孔中,将钢筋穿束的牵引索钢绞线和中空球体进行焊接固定;
3)使用卷扬机牵引设备牵引导索钢丝绳的另一端,将中空球体及钢筋穿束牵引至波纹管中,当中空球体在牵引过程中遇到阻碍时,从波纹管的两侧来回拉动中空球体,可以对波纹管中强度不高的小体积的杂物进行碾压疏通,如果中空球体可以顺利通过波纹管,则可直接将钢筋穿束牵引过波纹管完成穿束工作;
4)如果波纹管中阻碍物较大,中空球体实在无法通过,则可以根据设在导索钢丝绳上的刻度来确定阻碍物的位置,将中空球体从钢筋穿束一侧拉出,根据导索钢丝绳上刻度的长度标识,找到波纹管的阻塞位置,将波纹管阻塞段两侧切断,切除阻塞段波纹管后,采用大一号的波纹管将波纹管的断口处套起连接,套接接缝处用防水胶带多层包裹,防止进浆;
5)波纹管孔道阻碍物去除之后,重复上述步骤3中的操作,继续穿束工作,当中空球体从波纹管孔道的一端牵引钢筋穿束通过到另一端时,钢筋穿束也随之穿束完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610854158.4A CN106284096A (zh) | 2016-09-27 | 2016-09-27 | 一种预应力孔道阻塞位置确定装置及穿束方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610854158.4A CN106284096A (zh) | 2016-09-27 | 2016-09-27 | 一种预应力孔道阻塞位置确定装置及穿束方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284096A true CN106284096A (zh) | 2017-01-04 |
Family
ID=57715284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610854158.4A Pending CN106284096A (zh) | 2016-09-27 | 2016-09-27 | 一种预应力孔道阻塞位置确定装置及穿束方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284096A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108049573A (zh) * | 2017-12-11 | 2018-05-18 | 中交公局海威工程建设有限公司 | 预应力管道变形探查装置及其使用方法 |
CN110735401A (zh) * | 2019-10-29 | 2020-01-31 | 中铁十八局集团第五工程有限公司 | 一种超长预应力钢绞线整体穿束方法 |
CN112252587A (zh) * | 2020-10-31 | 2021-01-22 | 福建省泰宏建设工程有限公司 | 一种后张法预应力梁及其施工方法 |
CN112267384A (zh) * | 2020-10-14 | 2021-01-26 | 中建安装集团有限公司 | 一种用于pc构件预应力波纹管道中芯棒的清理装置 |
CN113899296A (zh) * | 2021-06-09 | 2022-01-07 | 刘沙 | 一种建筑电气用套管堵塞点定位方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103952976A (zh) * | 2014-04-01 | 2014-07-30 | 中国建筑第六工程局有限公司 | 一种预应力管道疏通装置及其制作、使用方法 |
JP2015094137A (ja) * | 2013-11-13 | 2015-05-18 | 大成建設株式会社 | Pcケーブルの通線方法 |
CN105649340A (zh) * | 2015-12-30 | 2016-06-08 | 宁波冶金勘察设计研究股份有限公司 | 预应力筋在预埋管中穿束用的梳理定位器及其施工方法 |
CN205296865U (zh) * | 2016-01-04 | 2016-06-08 | 中铁十一局集团有限公司 | 一种预应力孔道快速检测装置 |
CN206090321U (zh) * | 2016-09-27 | 2017-04-12 | 中国三冶集团有限公司 | 一种预应力孔道阻塞位置确定装置 |
-
2016
- 2016-09-27 CN CN201610854158.4A patent/CN106284096A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015094137A (ja) * | 2013-11-13 | 2015-05-18 | 大成建設株式会社 | Pcケーブルの通線方法 |
CN103952976A (zh) * | 2014-04-01 | 2014-07-30 | 中国建筑第六工程局有限公司 | 一种预应力管道疏通装置及其制作、使用方法 |
CN105649340A (zh) * | 2015-12-30 | 2016-06-08 | 宁波冶金勘察设计研究股份有限公司 | 预应力筋在预埋管中穿束用的梳理定位器及其施工方法 |
CN205296865U (zh) * | 2016-01-04 | 2016-06-08 | 中铁十一局集团有限公司 | 一种预应力孔道快速检测装置 |
CN206090321U (zh) * | 2016-09-27 | 2017-04-12 | 中国三冶集团有限公司 | 一种预应力孔道阻塞位置确定装置 |
Non-Patent Citations (3)
Title |
---|
卿三惠: "《土木工程施工工艺 桥梁工程第2版》", 31 December 2013 * |
陕西省交通建设集团公司,咸旬高速公路建设管理: "《三水河特大桥标准化施工控制技术》", 28 February 2015 * |
雷源铁: "《建筑施工实例应用手册3》", 31 December 1998 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108049573A (zh) * | 2017-12-11 | 2018-05-18 | 中交公局海威工程建设有限公司 | 预应力管道变形探查装置及其使用方法 |
CN110735401A (zh) * | 2019-10-29 | 2020-01-31 | 中铁十八局集团第五工程有限公司 | 一种超长预应力钢绞线整体穿束方法 |
CN112267384A (zh) * | 2020-10-14 | 2021-01-26 | 中建安装集团有限公司 | 一种用于pc构件预应力波纹管道中芯棒的清理装置 |
CN112267384B (zh) * | 2020-10-14 | 2022-06-28 | 中建安装集团有限公司 | 一种用于pc构件预应力波纹管道中芯棒的清理装置 |
CN112252587A (zh) * | 2020-10-31 | 2021-01-22 | 福建省泰宏建设工程有限公司 | 一种后张法预应力梁及其施工方法 |
CN112252587B (zh) * | 2020-10-31 | 2022-02-15 | 福建省泰宏建设工程有限公司 | 一种后张法预应力梁及其施工方法 |
CN113899296A (zh) * | 2021-06-09 | 2022-01-07 | 刘沙 | 一种建筑电气用套管堵塞点定位方法 |
CN113899296B (zh) * | 2021-06-09 | 2023-10-13 | 新疆鑫宝隆建设工程有限责任公司 | 一种建筑电气用套管堵塞点定位方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284096A (zh) | 一种预应力孔道阻塞位置确定装置及穿束方法 | |
CN102003073B (zh) | 预应力结构钢绞线穿束的施工方法 | |
CN206090321U (zh) | 一种预应力孔道阻塞位置确定装置 | |
CN206768626U (zh) | 一种钢铰线穿束辅助系统 | |
CN205296865U (zh) | 一种预应力孔道快速检测装置 | |
CN210443938U (zh) | 一种pe管道的穿线装置 | |
JP3150252U (ja) | 橋梁ケーブルの単一鋼線の交換が可能な構造 | |
CN204924961U (zh) | 一种用于桥梁梁板预应力孔道内窥检测的装置 | |
CN206752533U (zh) | 一种抗拔桩反力架试验装置 | |
CN110130904B (zh) | 一种用于顶管掘进施工模拟试验的模拟顶管管节 | |
KR102043390B1 (ko) | 전원차단장치와 드릴을 이용한 psc 교량의 그라우팅 결함 측정 시스템 및 그 방법 | |
CN206146396U (zh) | 一种大跨桥梁悬臂合拢竖向变形监测系统 | |
CN201972415U (zh) | 无粘结预应力钢绞线张拉后损伤的更换装置 | |
CN201232165Y (zh) | 一种钢绞线束穿索器 | |
CN107059953A (zh) | 一种锤击法施工的phc管桩桩身内力测试方法 | |
CN209277837U (zh) | 一种基于低阻的柔性线缆测斜仪探测器打捞装置 | |
US20210025419A1 (en) | Coupler for connecting a rebar to a threaded rod or another rebar | |
CN104005340B (zh) | 连续梁通长预应力钢绞线束穿束施工方法 | |
CN104675022B (zh) | 无粘结预应力筋可控式锚具分段装置及其装配方法和应用 | |
JP4757316B2 (ja) | 管路内ケーブル引入状況予測方法 | |
CN201883382U (zh) | 预应力结构钢绞线穿束的连接接头 | |
CN201865249U (zh) | 预应力结构钢绞线穿束的连接锚固件 | |
CN206625214U (zh) | 一种钢筋笼梭形穿管器 | |
CN201865359U (zh) | 预应力钢箱梁钢绞线穿束的连接装置 | |
CN206496961U (zh) | 一种半平行钢丝束索应力松弛试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |
|
RJ01 | Rejection of invention patent application after publication |