CN106276601A - 一种用于火电机组π式锅炉折焰角整体起吊就位的工艺 - Google Patents

一种用于火电机组π式锅炉折焰角整体起吊就位的工艺 Download PDF

Info

Publication number
CN106276601A
CN106276601A CN201610685211.2A CN201610685211A CN106276601A CN 106276601 A CN106276601 A CN 106276601A CN 201610685211 A CN201610685211 A CN 201610685211A CN 106276601 A CN106276601 A CN 106276601A
Authority
CN
China
Prior art keywords
furnace
lifting
water
cooling wall
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610685211.2A
Other languages
English (en)
Inventor
公建锋
吕慧军
谢鸿钢
吴强强
戴海涛
温顺利
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Tianjin Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority to CN201610685211.2A priority Critical patent/CN106276601A/zh
Publication of CN106276601A publication Critical patent/CN106276601A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明是一种用于火电机组π式锅炉折焰角整体起吊就位的工艺,具体步骤为:审图确认折焰角水冷壁及框架结构、组件安装就位位置标高;确认折焰角水冷壁和框架整体组合及临时加固后的荷重;确认整体组件起吊时主吊用的卷扬机及需采用的滑轮组型号、定滑轮生根点及需要布置的双拼工字钢型号;在地面对设备进行预组合;对组合后的设备进行整体吊装。本发明减少了吊装所需时间,同时减少了后续的拼接、焊接及找正工作,为后续工作及其他相关工序打开更多的作业面,有利于集中完成施工任务,确保了工期。本发明为整体吊装,减少了吊装次数,减少了吊装风险。地面整体组合的方式,更加有利于施工尺寸及焊接质量的控制和检验,减少了高空作业的风险。

Description

一种用于火电机组π式锅炉折焰角整体起吊就位的工艺
技术领域
本发明涉及一种火电机组π型锅炉折焰角整体起吊施工的领域,尤其涉及一种用于火电机组π式锅炉折焰角整体起吊就位的工艺。
背景技术
目前国内火电新建机组参数越来越高,容量越来越大,超临界、超超临界锅炉已成为主流,设备部件的重量和体积也随之越来越大。折焰角水冷壁和框架安装作为受热面安装的第一组大部件,也是现场起吊作业的第一个难点和质量精度控制的关键环节。一般情况下折焰角水冷壁和框架整体重量在100吨左右,部件数量接近200件。在以往施工中,一般会将折焰角水冷壁分为若干组件分别进行组合后再起吊,就位后再整体拼接找正,最后安装其支撑框架。这种方法不仅增加了对口及焊接人员的高空作业时间,同时脚手架的配合难度也提高了,安装质量和精度也不易控制;由于工序繁琐,对安装工期的保证也是不利的。
发明内容
本发明旨在解决现有技术的不足,而提供一种用于火电机组π式锅炉折焰角整体起吊就位的工艺。
本发明为实现上述目的,采用以下技术方案:
一种用于火电机组π式锅炉折焰角整体起吊就位的工艺,具体步骤为:
(1)准备工作:
审图确认折焰角水冷壁及框架结构、组件安装就位位置标高;确认折焰角水冷壁和框架整体组合及临时加固后的荷重;确认整体组件起吊时主吊用的卷扬机及需采用的滑轮组型号、定滑轮生根点及需要布置的双拼工字钢型号;
(2)进行设备预组合:
预组合场地为炉膛0米;
首先组合折焰角框架,采用先组合大梁,后安装附件的原则;框架组合完毕后,与就近钢架进行临时连接加固,防止整体组件发生倾倒;
折焰角框架组合完成后,将折焰角水冷壁与框架进行组合;逐步将单片水冷壁摆放在折焰角框架上,水冷壁找正及预组合完成后,安装与刚性梁的连接件、进行水冷壁拼缝焊接;地面组合严格控制安装尺寸,保证焊接质量;
(3)整体框架设备摆放及水冷壁组件的吊装机械可视现场情况灵活选择,可以是汽车吊或者履带吊;组件整体吊装时主吊机械选用2台卷扬机加滑轮组的组合方式,配合抬吊的机械为现场大型机械;
(4)吊装时,组件的吊点布置在折焰角框架上,需要在正式就位位置上方的次板梁上选择滑轮组生根点,如其上方没有合适的钢梁作为吊装生根点,现场设计并制作临时生根梁作为吊挂点;
(5)组件吊装到位后,主吊的卷扬机不着急摘钩,用倒链对组件进行细调整并与上方后水垂帘管进行对口焊接,及时安装吊挂装置;由于折焰角水冷壁及框架重心偏向炉后,卷扬机撤钩前需用倒链对框架进行吊挂调整水平,防止整体重心下垂造成水冷壁变形。
本发明的有益效果是:本发明比常规方案可以至少提前8天完成折焰角水冷壁及刚性梁的吊装工作,同时减少了后续的拼接、焊接及找正工作,为后续工作及其他相关工序打开更多的作业面,有利于集中完成施工任务,确保了工期。常规施工方法将水冷壁组件分为若干部分进行吊装,本发明改为整体吊装,减少了吊装次数,减少了吊装风险。地面整体组合的方式,更加有利于施工尺寸及焊接质量的控制和检验,减少了高空作业的风险。
具体实施方式
下面结合实施例对本发明作进一步说明:
一种用于火电机组π式锅炉折焰角整体起吊就位的工艺,具体步骤为:
(1)准备工作:
审图确认折焰角水冷壁及框架结构、组件安装就位位置标高;确认折焰角水冷壁和框架整体组合及临时加固后的荷重;确认整体组件起吊时主吊用的卷扬机及需采用的滑轮组型号、定滑轮生根点及需要布置的双拼工字钢型号;
(2)进行设备预组合:
预组合场地为炉膛0米;
首先组合折焰角框架,采用先组合大梁,后安装附件的原则;框架组合完毕后,与就近钢架进行临时连接加固,防止整体组件发生倾倒;
折焰角框架组合完成后,将折焰角水冷壁与框架进行组合;逐步将单片水冷壁摆放在折焰角框架上,水冷壁找正及预组合完成后,安装与刚性梁的连接件、进行水冷壁拼缝焊接;地面组合严格控制安装尺寸,保证焊接质量;
(3)整体框架设备摆放及水冷壁组件的吊装机械可视现场情况灵活选择,可以是汽车吊或者履带吊;组件整体吊装时主吊机械选用2台卷扬机加滑轮组的组合方式,配合抬吊的机械为现场大型机械;
(4)吊装时,组件的吊点布置在折焰角框架上,需要在正式就位位置上方的次板梁上选择滑轮组生根点,如其上方没有合适的钢梁作为吊装生根点,现场设计并制作临时生根梁作为吊挂点;
(5)组件吊装到位后,主吊的卷扬机不着急摘钩,用倒链对组件进行细调整并与上方后水垂帘管进行对口焊接,及时安装吊挂装置;由于折焰角水冷壁及框架重心偏向炉后,卷扬机撤钩前需用倒链对框架进行吊挂调整水平,防止整体重心下垂造成水冷壁变形。
具体实施例:
一种用于火电机组π式锅炉折焰角整体起吊就位的工艺,针对1000MW超超临界参数变压直流炉,它的最大连续蒸发量为3005t/h。它是半露天布置、固态排渣、全钢构架、全悬吊结构的π型锅炉。
组件最大外形尺寸为6433mm×34575mm,最大起吊重量105000kg。吊装采用2台10吨卷扬机主吊;75吨履带吊和150吨平臂吊配合抬吊。在炉顶次板梁上布置了两处临时生根梁,每处为两根I63工字钢。
吊装前对吊车性能进行确认,明确作业过程,详细计算负荷分配。抬吊时75吨履带吊臂长25米,吊装作业半径为6米,允许最大起吊重量为39.8吨,分配负荷32吨,负荷率为32/39.8=80.4%;150吨平臂吊作业半径为54米,允许最大起吊重量为48.1吨,分配负荷32吨,负荷率为32/48.1=66.5%;10吨卷扬机选用的钢丝绳为Φ21.5,单股受力3吨,滑轮组返14股绳,钢丝绳6倍率可以吊装56吨,与组件连接选用的是Φ43钢丝绳,4股受力,钢丝绳7倍率单股承受最大重量13.8吨。两台卷扬机可以承受110吨重量,吊装过程中每对钢丝绳上有1个20吨的手拉葫芦用于调节组件的平衡度。
由于该整体起吊组件体积大,质量重,因此在吊装初期要尽量缓慢,几台机械必须步调一致,开卷扬机的起重人员、观察人员必须配备可靠的对讲机,持对讲机人员要配合默契,一旦出现一方没有回话,应立即暂停吊装,查看无误后方可继续。当组件被吊装至就位位置时,卷扬机停止作业,并且锁死防止回绳。后水的垂帘管屏共计112组,可以先将垂帘管与折烟角吊挂装装置通过销轴穿装起来,然后,手拉葫芦调整间隙对口焊接,管屏焊口焊接完毕后,卷扬机摘钩。
上面结合实施例对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。

Claims (1)

1.一种用于火电机组π式锅炉折焰角整体起吊就位的工艺,其特征在于,具体步骤为:
(1)准备工作:
审图确认折焰角水冷壁及框架结构、组件安装就位位置标高;确认折焰角水冷壁和框架整体组合及临时加固后的荷重;确认整体组件起吊时主吊用的卷扬机及需采用的滑轮组型号、定滑轮生根点及需要布置的双拼工字钢型号;
(2)进行设备预组合:
预组合场地为炉膛0米;
首先组合折焰角框架,采用先组合大梁,后安装附件的原则;框架组合完毕后,与就近钢架进行临时连接加固,防止整体组件发生倾倒;
折焰角框架组合完成后,将折焰角水冷壁与框架进行组合;逐步将单片水冷壁摆放在折焰角框架上,水冷壁找正及预组合完成后,安装与刚性梁的连接件、进行水冷壁拼缝焊接;地面组合严格控制安装尺寸,保证焊接质量;
(3)整体框架设备摆放及水冷壁组件的吊装机械可视现场情况灵活选择,可以是汽车吊或者履带吊;组件整体吊装时主吊机械选用2台卷扬机加滑轮组的组合方式,配合抬吊的机械为现场大型机械;
(4)吊装时,组件的吊点布置在折焰角框架上,需要在正式就位位置上方的次板梁上选择滑轮组生根点,如其上方没有合适的钢梁作为吊装生根点,现场设计并制作临时生根梁作为吊挂点;
(5)组件吊装到位后,主吊的卷扬机不着急摘钩,用倒链对组件进行细调整并与上方后水垂帘管进行对口焊接,及时安装吊挂装置;由于折焰角水冷壁及框架重心偏向炉后,卷扬机撤钩前需用倒链对框架进行吊挂调整水平,防止整体重心下垂造成水冷壁变形。
CN201610685211.2A 2016-08-17 2016-08-17 一种用于火电机组π式锅炉折焰角整体起吊就位的工艺 Pending CN106276601A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610685211.2A CN106276601A (zh) 2016-08-17 2016-08-17 一种用于火电机组π式锅炉折焰角整体起吊就位的工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610685211.2A CN106276601A (zh) 2016-08-17 2016-08-17 一种用于火电机组π式锅炉折焰角整体起吊就位的工艺

Publications (1)

Publication Number Publication Date
CN106276601A true CN106276601A (zh) 2017-01-04

Family

ID=57679890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610685211.2A Pending CN106276601A (zh) 2016-08-17 2016-08-17 一种用于火电机组π式锅炉折焰角整体起吊就位的工艺

Country Status (1)

Country Link
CN (1) CN106276601A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487713A (zh) * 2017-08-01 2017-12-19 中国能源建设集团天津电力建设有限公司 一种π型锅炉后水上部整体组合起吊就位工艺
CN107514630A (zh) * 2017-08-11 2017-12-26 中国化学工程第六建设有限公司 生物质高温高压循环流化床锅炉成套安装方法
CN108793026A (zh) * 2018-06-25 2018-11-13 珠海市蓝海工业技术有限公司 一种锅炉检修平台的吊点设置方法
CN109266869A (zh) * 2018-10-28 2019-01-25 中国十九冶集团有限公司南京分公司 一种炉盖倒装及炉盖安装工艺
CN110255361A (zh) * 2019-07-12 2019-09-20 山西省工业设备安装集团有限公司 一种锅炉水冷壁双滑移吊装装置及其使用方法
CN110788506A (zh) * 2019-12-30 2020-02-14 福能(贵州)发电有限公司 一种防止水冷壁组合件变形的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090044766A1 (en) * 2007-08-16 2009-02-19 Besterra Co., Ltd., Method for disassembling a boiler
CN202063631U (zh) * 2011-05-20 2011-12-07 湖北省电力建设第二工程公司 一种双机抬吊自由脱钩装置
CN202670985U (zh) * 2012-07-04 2013-01-16 江苏双良锅炉有限公司 水管锅炉本体翻转吊装工装
CN104344163A (zh) * 2013-08-05 2015-02-11 天津市三鑫阳光工贸有限公司 大型水火电机组调试安装设备
CN104828758A (zh) * 2015-01-29 2015-08-12 中国能源建设集团江苏省电力建设第三工程有限公司 一种火电机组引风机结构支架整体移位装置及移位方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090044766A1 (en) * 2007-08-16 2009-02-19 Besterra Co., Ltd., Method for disassembling a boiler
CN202063631U (zh) * 2011-05-20 2011-12-07 湖北省电力建设第二工程公司 一种双机抬吊自由脱钩装置
CN202670985U (zh) * 2012-07-04 2013-01-16 江苏双良锅炉有限公司 水管锅炉本体翻转吊装工装
CN104344163A (zh) * 2013-08-05 2015-02-11 天津市三鑫阳光工贸有限公司 大型水火电机组调试安装设备
CN104828758A (zh) * 2015-01-29 2015-08-12 中国能源建设集团江苏省电力建设第三工程有限公司 一种火电机组引风机结构支架整体移位装置及移位方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金小雄: "折焰角水冷壁整体吊装技术", 《河南科技》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487713A (zh) * 2017-08-01 2017-12-19 中国能源建设集团天津电力建设有限公司 一种π型锅炉后水上部整体组合起吊就位工艺
CN107514630A (zh) * 2017-08-11 2017-12-26 中国化学工程第六建设有限公司 生物质高温高压循环流化床锅炉成套安装方法
CN107514630B (zh) * 2017-08-11 2019-12-31 中国化学工程第六建设有限公司 生物质高温高压循环流化床锅炉成套安装方法
CN108793026A (zh) * 2018-06-25 2018-11-13 珠海市蓝海工业技术有限公司 一种锅炉检修平台的吊点设置方法
CN109266869A (zh) * 2018-10-28 2019-01-25 中国十九冶集团有限公司南京分公司 一种炉盖倒装及炉盖安装工艺
CN109266869B (zh) * 2018-10-28 2021-01-05 中国十九冶集团有限公司南京分公司 一种炉盖倒装及炉盖安装工艺
CN110255361A (zh) * 2019-07-12 2019-09-20 山西省工业设备安装集团有限公司 一种锅炉水冷壁双滑移吊装装置及其使用方法
CN110255361B (zh) * 2019-07-12 2024-04-30 山西省安装集团股份有限公司 一种锅炉水冷壁双滑移吊装装置及其使用方法
CN110788506A (zh) * 2019-12-30 2020-02-14 福能(贵州)发电有限公司 一种防止水冷壁组合件变形的方法

Similar Documents

Publication Publication Date Title
CN106276601A (zh) 一种用于火电机组π式锅炉折焰角整体起吊就位的工艺
CN1944914B (zh) 锅炉大型部件的检修用脚手架及其搭建方法
CN105443871B (zh) 一种用于水平多管道对口连接的新型支吊架及施工工艺
CA2585323C (en) Method of installing furnace walls of a boiler
CN104762438B (zh) 一种转炉设备更换安装方法
CN106435087B (zh) 一种转炉汽化烟道分段组合安装方法
CN106015729A (zh) 一种厂房封闭下汽化烟道逆向就位的方法
CN204675610U (zh) 曲轴吊具的辅助吊链工装
CN106351454A (zh) 一种炼钢厂房钢结构屋面组合安装方法
CN106016233B (zh) 一种跨度长焊点少的锅炉顶棚及其吊装方法
CN106119454A (zh) 高炉热风围管的安装方法
CN104030176B (zh) 吊装平台桁架的平衡梁及其吊装方法
CN106287645A (zh) 塔式炉刚性梁整体安装方法
CN105066097A (zh) 一种百万机组π式锅炉螺旋水冷壁冷灰斗的收口工艺
CN107487713A (zh) 一种π型锅炉后水上部整体组合起吊就位工艺
CN110273039A (zh) 一种高炉围管吊装结构及其安装方法
CN107699254A (zh) 焦炉上升管的维修工艺
CN108247296A (zh) 催化裂化再生器旋风器小开孔更换施工方法
CN208520221U (zh) 用于汽水管道的恒力支吊架及熔炼炉组件
CN204824952U (zh) 转炉的水冷炉口
CN212609006U (zh) 一种用于柔性直流换流阀冷却管路的吊装工装
CN211496566U (zh) 一种用于高空立式设备更换的圆环式平衡梁
CN204727416U (zh) 一种起吊装置
CN103017538B (zh) 阳极焙烧火道墙整体吊装工具
CN207030738U (zh) 抓钩装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104