CN106268148B - A kind of air cleaning system suitable for painting workshop - Google Patents

A kind of air cleaning system suitable for painting workshop Download PDF

Info

Publication number
CN106268148B
CN106268148B CN201610874224.4A CN201610874224A CN106268148B CN 106268148 B CN106268148 B CN 106268148B CN 201610874224 A CN201610874224 A CN 201610874224A CN 106268148 B CN106268148 B CN 106268148B
Authority
CN
China
Prior art keywords
framework
screen pack
fixedly connected
spring
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610874224.4A
Other languages
Chinese (zh)
Other versions
CN106268148A (en
Inventor
姜康义
徐淑萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yu Yu Environmental Protection Technology Co., Ltd.
Original Assignee
Zhejiang Yu Yu Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yu Yu Environmental Protection Technology Co Ltd filed Critical Zhejiang Yu Yu Environmental Protection Technology Co Ltd
Priority to CN201610874224.4A priority Critical patent/CN106268148B/en
Publication of CN106268148A publication Critical patent/CN106268148A/en
Application granted granted Critical
Publication of CN106268148B publication Critical patent/CN106268148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

A kind of air cleaning system suitable for painting workshop,Including the first frame device (1),Preliminary filter (2),Water purification installation (3),First plumbing installation (4),Second framework device (5),First filter (6),Second filter (7),Retracting device (8) and the 3rd filter (9),First frame device (1) includes the first framework (11),First pipeline (12),First blower fan (15),First valve (16),First cross bar (13),First support (14),Preliminary filter (2) includes first baffle (21),First spongy layer (22),First screen pack (23),Water purification installation includes the first transverse slat,First sponge block,First spring,3rd screen pack and the second sponge block,The present invention can carry out thoroughly effective filtration, purification to the dust of spray painting,So that the pollution-free environmental protection of gas of discharge,Environment can be effectively protected.

Description

A kind of air cleaning system suitable for painting workshop
Technical field
The present invention relates to environmental technology field, more particularly to a kind of air cleaning system suitable for painting workshop.
Background technology
At present, during some daily spray painting operations, a fan is often aside installed, so as to spray Caused coating cloud or dust are directly discharged in the air of outdoor during paint, and this behavior arbitrarily discharged seriously pollutes Environment, and certain influence is brought to the health of people, and influence the quality of life of resident nearby.
Chinese patent literature CN204684882U discloses a kind of water rotation type paint dust Environmental-protecting treater, including purification Device housing, circulating water pool, high-pressure axial flow fan, connect provided with dust-filtering room and with circulating water pool in the purifier shell Filtration channel one and filtration channel two, the filtration channel one are connected with the top of filtration channel two by connecting tube, the mistake One end of filter passage one is provided with air inlet, is sequentially provided with moisture separation device, water whirlpool device, water supply line from top to bottom inside it And the deflector of inner side, the circulating water pool is interior to be provided with water pump, and the water pump is connected by water supply line with water whirlpool device, described Dust-filtering chamber interior is provided with bag filter and activated carbon filter layer, and the high-pressure axial flow fan is arranged on outside dust-filtering room The air outlet in portion, the high-pressure axial flow fan are provided with floss hole, and it can reduce spray painting with purified treatment spray-dust and coating cloud The pollution of dust and coating cloud to environment destroys and people is damaged, and efficiency is higher, high treating effect.But when spray-dust compared with When more, it may still remain a part of dust after filtering by passage one and passage two, its again by bag filter with And easily blocked after the filtering of active carbon layer, and then its filter efficiency and filter effect are influenceed, even can be to it when serious Cause to damage, shorten its service life;The water in circulating water pool needs to recycle simultaneously, in use for some time, pond Interior impurity increase, influence the effect of its purification;And impurity can not be effective when being deposited on bag filter and active carbon layer Disposed so that impurity easily accumulation on the filter.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
The content of the invention
The problem to be solved in the present invention is to provide a kind of air cleaning system suitable for painting workshop, including the first framework Device, preliminary filter, water purification installation, the first plumbing installation, second framework device, the first filter, the second filtering Device, retracting device and the 3rd filter, the first frame device include the first framework, the first pipeline, the first blower fan, the first valve Door, the first cross bar, first support, preliminary filter include first baffle, the first spongy layer, the first screen pack, Water warfare dress Put including the first transverse slat, the first sponge block, the first spring, the 3rd screen pack, the second sponge block, the present invention can be to the powder of spray painting Dirt carries out thoroughly effective filtration, purification so that the pollution-free environmental protection of gas of discharge, can be effectively protected environment.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of air cleaning system suitable for painting workshop, including the first frame device, it is contained in first framework Preliminary filter in device, the water purification installation on the right side of the preliminary filter, fill positioned at first framework The first plumbing installation on the right side of putting, the second framework device below first plumbing installation, it is contained in second frame The first filter in body device, the second filter below first filter, positioned at second frame Retracting device on the left of body device and the 3rd filter below the retracting device, first frame device include First framework, the first pipeline on the left of first framework, the first blower fan, the first valve being arranged on first pipeline Door, the first cross bar on the right side of first blower fan, the first support below first cross bar, positioned at described first Second pipe above framework, the first water pump being arranged on the second pipe, the second valve and positioned at first framework 3rd pipeline of lower section, the preliminary filter include first baffle, the first spongy layer on the left of the first baffle, The first screen pack below first spongy layer, the second screen pack below first screen pack, it is contained in The first roller in second screen pack and some first bristles being arranged on first roller, the water purification installation The first sponge block including the first transverse slat, below first transverse slat, the first bullet below first sponge block Spring, the 3rd screen pack on the left of first spring, the second sponge block above first transverse slat, positioned at described Second spring on the left of second sponge block, the second bristle on the right side of the second sponge ring, positioned at second sponge block Second transverse slat of top, first plumbing installation include the 4th pipeline, the second support being arranged on the 4th pipeline, the Four valves, the first fix bar, the first brace below first fix bar, the on the left of first brace the 3rd Support, the second framework device include second framework, the 4th support below the second framework, positioned at the described 4th The second brace on the right side of support, the 3rd brace on the left of the 4th support, first below the 3rd brace Montant, the second montant above the 3rd brace, the 5th pipeline on the left of the second framework, be arranged at it is described The 5th valve on 5th pipeline, first filter include being contained in the second rolling of the left and right sides in the second framework The third bristle that take turns, is arranged on second roller, the first elastic plate between second roller, positioned at described The 4th screen pack at left and right sides of one elastic plate, the second elastic plate between the 4th screen pack, positioned at described second The 3rd spring above elastic plate, the 5th screen pack below second elastic plate and under the 5th screen pack 3rd transverse slat of side, second filter include the first swash plate, the second baffle on the left of first swash plate, are located at Third baffle on the left of the second baffle, the 6th screen pack on the right side of first swash plate, positioned at first swash plate 7th screen pack of lower section, the 4th spring on the left of the 7th screen pack, on the right side of the 7th screen pack Three rollers and some projections for being arranged at the 3rd roller, the retracting device include the second cross bar, positioned at the described second horizontal stroke The 3rd cross bar on the left of bar, the 5th spring below the 3rd cross bar, the 6th bullet above the 3rd cross bar Spring, the collection box on the left of the 6th spring, the 3rd filter include the 3rd framework, positioned at the 3rd framework The discharge pipe of lower section, the 8th screen pack being contained in the 3rd framework, the bracing wire below the 8th screen pack, position In the collecting board of the 8th screen pack lower section left and right sides, the motor below the bracing wire, below the motor Supporting plate, the 7th spring below the supporting plate, first framework is provided with positioned at the first logical of its left surface Hole, second through hole on surface disposed thereon, the third through-hole positioned at its right surface and the fourth hole positioned at its lower surface, it is described Second framework is provided with the 6th through hole on surface disposed thereon and the 7th through hole positioned at its left surface, is set on the first baffle There is the fifth hole through its left and right surface.
First framework is in hollow shape, the right-hand member of first pipeline be aligned the first through hole and with first frame The left surface of body is fixedly connected, and first cross bar is horizontal, and the left end of first cross bar is fixed with first blower fan Connection, the right-hand member of first cross bar are fixedly connected with the left surface of first framework, and the first support is L-shaped, described One end of first support is fixedly connected with first cross bar, the other end of the first support and the left-handed watch of first framework Face is fixedly connected, and the second through hole described in the lower end aligned of the second pipe and being fixed with the upper surface of first framework connects Connect, the 3rd pipeline is in vertical shape, the upper end of the 3rd pipeline be aligned the fourth hole and with first framework Lower surface is fixedly connected, and the 3rd pipeline is provided with the 3rd valve.
The first baffle is placed in vertical, and the first baffle is fixedly connected with the inner surface of first framework, institute State the left side that first baffle is located at fourth hole, first spongy layer is horizontal, the left surface of first spongy layer with The inner surface of first framework is fixedly connected, and the right surface and the left surface of the first baffle of first spongy layer are fixed Connection, first screen pack is horizontal, and the right surface and the left surface of the first baffle of first screen pack are fixed Connection, the right surface of first screen pack is fixedly connected with the left surface of the first baffle, under first spongy layer Surface is fixedly connected with the upper surface of first screen pack, and second screen pack is in hollow round table-like, second mistake The lower surface of filter screen is fixedly connected with the inner surface of first framework, and first roller is in spherical, the first roller receipts It is dissolved in second screen pack and turns connection with its axle, first bristle is provided with several, and first bristle uniformly divides Cloth is on first roller and is secured to connect.
First transverse slat is horizontal, and the left end of first transverse slat is fixed with the right surface of the first baffle to be connected Connect, the right-hand member of first transverse slat is fixedly connected with the inner surface of first framework, and the right-hand member of first transverse slat is provided with the One groove, first sponge block is horizontal, and the right surface of first sponge block and the inner surface of first framework are consolidated Fixed connection, the upper surface of first sponge block are fixedly connected with the lower surface of first transverse slat, the first sponge block position In the lower section of first groove, first spring is provided with two, and first spring is in vertical shape, first spring Lower end is fixedly connected with the inner surface of first framework, the upper end of first spring and the lower surface of first sponge block It is fixedly connected, the cross section of the 3rd screen pack is in semi-annular shape, and the upper surface of the 3rd screen pack is horizontal with described first The lower surface of plate is fixedly connected, and the 3rd screen pack is acted against on the inner surface of first framework, second sponge block Cross section be in ellipticity, second sponge block is between first transverse slat and the second transverse slat and is slidably connected with it, The second spring is provided with two, and the second spring is horizontal, the left end of the second spring and the first baffle Right surface is fixedly connected, and the right-hand member of the second spring is fixedly connected with second sponge block, if second bristle is provided with Dry, second bristle is horizontal, and the left end of second bristle is fixedly connected with second sponge block, and described second Transverse slat is horizontal, and the right-hand member of second transverse slat is fixedly connected with the inner surface of first framework, second transverse slat Left end is fixedly connected with the right surface of the first baffle, and the left end of second transverse slat is provided with the second groove.
The upper end of 4th pipeline is directed at the third through-hole and is fixedly connected with the right surface of first framework, institute The lower end for stating the 4th pipeline is in vertical shape, and the second support is L-shaped, the lower end of the second support and first framework Right surface is fixedly connected, and the upper end of the second support is in vertical shape, and the 4th pipeline runs through the left and right of the second support Surface and it is secured to connect, first fix bar is horizontal, the left end of first fix bar and first framework Right surface be fixedly connected, the 4th pipeline through first fix bar upper and lower surface and be secured to connect, it is described First brace is oblique, and the upper end of first brace is fixedly connected with the lower surface of first framework, described 3rd Frame is L-shaped, and the upper end of the 3rd support is fixedly connected with the lower surface of first framework, and the lower end of the 3rd support is in It is horizontal.
The second framework is in hollow cuboid, and the second framework is placed vertically, the lower end pair of the 4th pipeline Accurate 6th through hole and it is fixedly connected with the upper surface of the second framework, the lower end of first brace and second frame The upper surface of body is fixedly connected, and the lower end of the 3rd support is fixedly connected with the left surface of the second framework, and the described 4th Support is L-shaped, and the upper end of the 4th support is fixedly connected with the lower surface of the second framework, the lower end of the 4th support Horizontal, second brace is oblique, and the upper end of second brace is fixed with the lower surface of the second framework to be connected Connect, the lower end of second brace is fixedly connected with the right surface of the 4th support, and the 3rd brace is oblique, described The upper end of 3rd brace is fixedly connected with the lower surface of the second framework, and first montant is in vertical shape, and described first is perpendicular The upper end of bar is fixedly connected with the 3rd brace, and the lower end of first montant is fixedly connected with the 4th support, described Second montant is in vertical shape, and the upper end of second montant is fixedly connected with the lower surface of the 3rd support, and described second is perpendicular The lower end of bar is fixedly connected with the 3rd brace, and the right-hand member of the 5th pipeline is directed at the 7th through hole and with described second The left surface of framework is fixedly connected.
Second roller is provided with two, and second roller is in cylinder, and second roller is contained in described second Turn connection in framework and with the second framework axle, the third bristle is provided with several, and the third bristle is evenly distributed on On second roller and it is secured to connect, first elastic plate is in cuboid and horizontal positioned, first elastic plate Positioned at the lower section of the 6th through hole, the 4th screen pack is provided with two, and the 4th screen pack is oblique, and the described 4th The lower end of screen pack is fixedly connected with the inner surface of the second framework, the upper end of the 4th screen pack and the described first elasticity The right-hand member of plate is fixedly connected, and for second elastic plate in cuboid and horizontal positioned, the 3rd spring is provided with two, and described the Three springs are in vertical shape, and the upper end of the 3rd spring is fixedly connected with the lower surface of first elastic plate, the 3rd bullet The lower end of spring is fixedly connected with the upper surface of second elastic plate, cylinder of the 5th screen pack in cross section for annulus, 5th screen pack is in vertical shape, and the upper surface of the 5th screen pack is fixed with the lower surface of second elastic plate to be connected Connect, the lower surface of the 5th screen pack is fixedly connected with the upper surface of the 3rd transverse slat, and the 3rd transverse slat is in cuboid And it is horizontal positioned, the side of the 3rd transverse slat is fixedly connected with the inner surface of the second framework, is set on the 3rd transverse slat There is the 8th through hole through its upper and lower surface, the 8th through hole is located at the lower section of the 5th screen pack.
The second baffle is in cuboid and places vertically, under the upper surface of the second baffle and the 3rd transverse slat Surface is fixedly connected, and the lower surface of the second baffle is fixedly connected with the inner surface of the second framework, the second baffle Be provided with the 9th through hole through its left and right surface, the third baffle in cuboid and horizontal positioned, the third baffle Left surface is fixedly connected with the inner surface of the second framework, the right surface of the third baffle and the left-handed watch of the second baffle Face is fixedly connected, and first swash plate is oblique, and the upper end of first swash plate is fixed with the right surface of the second baffle Connection, in wavy, the left end of the 6th screen pack is fixedly connected the 6th screen pack with first swash plate, and described the The right-hand member of six screen packs is fixedly connected with the inner surface of the second framework, and the 7th screen pack is in bending, and the described 7th The lower end of screen pack is fixedly connected with the inner surface of the second framework, upper end and first swash plate of the 7th screen pack It is fixedly connected, the 4th spring is provided with two, and the 4th spring is horizontal, the right-hand member of the 4th spring and described the Seven screen packs are fixedly connected, and the left end of the 4th screen pack is fixedly connected with the right surface of the second baffle, and the described 3rd Roller is in cylinder, and the 3rd roller turns connection with the second framework axle, and the projection is provided with several, and the projection is equal It is even to be distributed on the 3rd roller and be secured to connect.
Second cross bar is in cuboid and horizontal positioned, the right-hand member of second cross bar and the left-handed watch of the second framework Face is fixedly connected, and the left end of second cross bar is fixedly connected with the right surface of second montant, and the 3rd cross bar is in length Cube and horizontal positioned, the right-hand member of the 3rd cross bar is fixedly connected with the left surface of second montant, the 5th spring In vertical shape, the upper end of the 5th spring is fixedly connected with the lower surface of the 3rd cross bar, the lower end of the 5th spring It is fixedly connected with the 5th pipeline, the 6th spring is horizontal, right-hand member and second montant of the 6th spring Left surface be fixedly connected, the left end of the 6th spring is fixedly connected with the collection box, and the collection box is in hollow length Cube, the lower surface of the collection box are connected with the upper surface slide of the 3rd cross bar, and the collection box is located at the described 3rd The lower section of pipeline.
3rd framework is in hollow cylinder, and the 3rd framework is provided with the first circular hole and the second circular hole, described The left end of 5th pipeline is directed at the first through hole and is fixedly connected with the outer surface of the 3rd framework, the 4th support Lower end is fixedly connected with the 3rd framework, and the lower end of the 3rd brace is fixedly connected with the 3rd framework, the discharge Pipe is in vertical shape, and the upper end of the discharge pipe is directed at second circular hole and is fixedly connected with the outer surface of the 3rd framework, The discharge pipe is provided with the 6th valve, and the cross section of the 8th screen pack is in the shape of the letter V, the side of the 8th screen pack with The inner surface of 3rd framework is slidably connected, and the collecting board is provided with two and the respectively left and right in the 3rd framework Both sides, the collecting board is oblique, and the lower end of the collecting board is fixedly connected with the inner surface of the 3rd framework, the receipts Collection plate is provided with the 8th spring that is positioned above, and the 8th spring is in vertical shape, the lower end of the 8th spring with it is described Collecting board is fixedly connected, and the upper end of the 8th spring is fixedly connected with the lower surface of the 8th screen pack, the supporting plate Horizontal and between the collecting board, the side of the supporting plate is fixedly connected with the collecting board, the supporting plate Some the 3rd circular holes through its upper and lower surface are provided with, company is fixed in the lower surface of the motor and the upper surface of the supporting plate Connect, the motor is provided with output shaft, the output shaft in cylinder and with the motor connection, the upper end of the bracing wire and institute The 8th screen pack to be stated to be fixedly connected, the lower end of the bracing wire is fixedly connected with the output shaft, and the 7th spring is provided with two, 7th spring is in vertical shape, and the upper end of the 7th spring is fixedly connected with the lower surface of the supporting plate, and the described 7th The lower end of spring is fixedly connected with the inner surface of the 3rd framework.
After adopting the above technical scheme, the air cleaning system proposed by the present invention suitable for painting workshop is with following excellent Point:
Air cleaning system proposed by the present invention suitable for painting workshop is simple in construction, easy to use, can be to spray painting Dust carry out thoroughly effective filtration, purification so that the pollution-free environmental protection of gas of discharge, environment can be effectively protected;This hair The bright filtering that can be carried out the dust of suction first substantially, then makes it sufficiently be contacted with purified water, purified water now Impurity is less, and dust preferably can be purified, and the time that purified water contacts with dust is longer, and clean-up effect shows Write, then the water after purification can be reclaimed, prevent that directly discharge pollutes to environment, then can be carried out to dust It fully filtering, can effectively prevent dust from blocking screen pack in the filtering of filtering, and dust can be brought together, Prevent it is deposited on screen pack from causing to block screen pack, preferable protective effect is served to screen pack, extends it and uses the longevity Life.
Brief description of the drawings
Below in conjunction with the accompanying drawings to the embodiment of the air cleaning system proposed by the present invention suitable for painting workshop It is described further:
Fig. 1 is the structural representation of the air cleaning system proposed by the present invention suitable for painting workshop;
In figure:The frame devices of 1- first;The frameworks of 11- first;111- first through hole;The through holes of 112- second;113- threeways Hole;114- fourth holes;The pipelines of 12- first;The cross bars of 13- first;14- first supports;The blower fans of 15- first;The valves of 16- first; 17- second pipes;The water pumps of 18- first;The valves of 19- second;The pipelines of 10- the 3rd;The valves of 101- the 3rd;The preliminary filters of 2-; 21- first baffles;211- fifth holes;The spongy layers of 22- first;The screen packs of 23- first;The screen packs of 24- second;25- first is rolled Wheel;3- water purification installations;The transverse slats of 31- first;The grooves of 311- first;The sponge blocks of 32- first;The springs of 33- first;The mistakes of 34- the 3rd Filter screen;The sponge blocks of 35- second;The transverse slats of 36- second;The grooves of 361- second;37- second springs;The plumbing installations of 4- first;41- Four pipelines;42- second supports;The valves of 43- the 4th;The fix bars of 44- first;The braces of 45- first;The supports of 46- the 3rd;The frames of 5- second Body device;51- second frameworks;The through holes of 511- the 6th;The through holes of 512- the 7th;The supports of 53- the 4th;The braces of 54- second;55- the 3rd Brace;The montants of 56- first;The montants of 57- second;The pipelines of 58- the 5th;The valves of 59- the 5th;The filters of 6- first;61- second is rolled Wheel;62- third bristles;The elastic plates of 63- first;The screen packs of 64- the 4th;The elastic plates of 65- second;The springs of 66- the 3rd;67- the 5th Screen pack;The transverse slats of 68- the 3rd;The through holes of 681- the 8th;The filters of 7- second;The swash plates of 71- first;72- second baffles;721- Nine through holes;73- third baffles;The screen packs of 74- the 6th;The screen packs of 75- the 7th;The springs of 76- the 4th;The rollers of 77- the 3rd;78- is convex Block;8- retracting devices;The cross bars of 81- second;The cross bars of 82- the 3rd;The springs of 83- the 5th;The springs of 84- the 6th;85- collection boxes;9- Three filters;The frameworks of 91- the 3rd;The circular holes of 911- first;The circular holes of 912- second;92- discharge pipes;The valves of 921- the 6th;93- Eight screen packs;94- bracing wires;95- collecting boards;The springs of 951- the 8th;96- motors;961- output shafts;97- supporting plates;971- the 3rd Circular hole;The springs of 98- the 7th.
Embodiment
As shown in figure 1, the air cleaning system proposed by the present invention suitable for painting workshop include the first frame device 1, It is contained in the preliminary filter 2 in first frame device 1, the Water warfare dress positioned at the preliminary right side of filter 2 Put 3, the first plumbing installation 4 positioned at the right side of the first frame device 1, second positioned at the lower section of the first plumbing installation 4 Frame device 5, the first filter 6 being contained in the second framework device 5, positioned at the lower section of first filter 6 The second filter 7, the retracting device 8 positioned at the left side of the second framework device 5 and positioned at the lower section of retracting device 8 3rd filter 9.
As shown in figure 1, first frame device 1 includes the first framework 11, the positioned at the left side of first framework 11 One pipeline 12, the first blower fan 15 being arranged on first pipeline 12, the first valve 16, positioned at the right side of first blower fan 15 The first cross bar 13, the first support 14 positioned at the lower section of first cross bar 13, second above first framework 11 Pipeline 17, the first water pump 18 being arranged on the second pipe 17, the second valve 19 and positioned at the lower section of first framework 11 The 3rd pipeline 10.First framework 11 is in hollow shape, and the cross section of first framework 11 is in isosceles trapezoid, and described first Framework 11 is provided with the first through hole 111 positioned at its left surface, second through hole 112 on surface disposed thereon, positioned at its right surface Third through-hole 113 and the fourth hole 114 positioned at its lower surface, the first through hole 111, the second through hole 112, third through-hole 113 and fourth hole 114 it is rounded and communicated with the inside of first framework 11.The right-hand member alignment institute of first pipeline 12 State first through hole 11 and be fixedly connected with the left surface of first framework 11 so that the inside of first pipeline 12 with it is described The inside of first framework 11 communicates.First blower fan 15 is electrically connected with the power supply, and first blower fan 15 is used for the external world Air is pumped into first pipeline 12.First valve 16 is used for the flow for controlling gas in first pipeline 12. First cross bar 13 is horizontal, and the left end of first cross bar 13 is fixedly connected with first blower fan 15, and described first The right-hand member of cross bar 13 is fixedly connected with the left surface of first framework 11.The first support 14 is L-shaped, the first support 14 one end is fixedly connected with first cross bar 13, the other end of the first support 14 and the left-handed watch of first framework 11 Face is fixedly connected.Second through hole 112 described in the lower end aligned of the second pipe 17 and with the upper surface of first framework 11 It is fixedly connected so that the inside of the second pipe 17 communicates with the inside of first framework 11, the second pipe 17 The other end is placed in pond.First water pump 18 is electrically connected with the power supply so that the water in pond can be drawn into institute State in second pipe 17.Second valve 19 is used for the flow for controlling water in the second pipe 17.3rd pipeline 10 In vertical shape, the upper end of the 3rd pipeline 10 is directed at the fourth hole 114 and consolidated with the lower surface of first framework 11 Fixed connection so that the inside of the 3rd pipeline 10 communicates with the inside of first framework 11, is set on the 3rd pipeline 10 There is the 3rd valve 101, it is used for the flow for controlling water in the 3rd pipeline 10.
As shown in figure 1, the preliminary filter 2 includes first baffle 21, the positioned at the left side of first baffle 21 One spongy layer 22, the first screen pack 23 positioned at the lower section of first spongy layer 22, positioned at the lower section of the first screen pack 23 If the second screen pack 24, the first roller 25 being contained in second screen pack 24 and being arranged on first roller 25 Dry first bristle.The first baffle 21 is placed in vertical, and the first baffle 21 and the inner surface of first framework 11 are consolidated Fixed connection, the first baffle 21 are located at the left side of fourth hole 114, and the first baffle 21 is by first framework 11 Space is divided into left and right two parts, and the first baffle 21 is provided with the fifth hole 211 through its left and right surface, and the described 5th is logical Hole 211 is square.First spongy layer 22 is horizontal, the left surface of first spongy layer 22 and first framework 11 Inner surface be fixedly connected, the right surface of first spongy layer 22 is fixedly connected with the left surface of the first baffle 21.Institute State that the first screen pack 23 is horizontal, the left surface of the right surface of first screen pack 23 and the first baffle 21, which is fixed, to be connected Connect, the right surface of first screen pack 23 is fixedly connected with the left surface of the first baffle 21, first spongy layer 22 Lower surface be fixedly connected with the upper surface of first screen pack 23.Second screen pack 24 is in hollow round table-like, institute The lower surface for stating the second screen pack 24 is fixedly connected with the inner surface of first framework 11, and second screen pack 24 can be right Air is filtered.First roller 25 in spherical, first roller 25 be contained in second screen pack 24 and with Its axle turns connection so that first roller 25 can be in the internal rotation of the second screen pack 24, first roller 25 and electricity Machine connects, and drives first roller 25 to rotate.First bristle is provided with several, and first bristle is evenly distributed on institute State on the first roller 25 and be secured to connect, first bristle can contact with the inner surface of second screen pack 24.
As shown in figure 1, the water purification installation 3 includes the first transverse slat 31, first positioned at the lower section of the first transverse slat 31 Sponge block 32, the first spring 33 positioned at the lower section of the first sponge block 32, the 3rd mistake positioned at the left side of the first spring 33 Filter screen 34, the second sponge block 35 above first transverse slat 31, the second bullet positioned at the left side of the second sponge block 35 Spring 37, the second bristle, the second transverse slat 36 above second sponge block 35 positioned at the right side of the second sponge ring 35. First transverse slat 31 is horizontal, and the left end of first transverse slat 31 is fixedly connected with the right surface of the first baffle 21, The right-hand member of first transverse slat 31 is fixedly connected with the inner surface of first framework 11, and the right-hand member of first transverse slat 31 is provided with First groove 311.First sponge block 32 is horizontal, the right surface of first sponge block 32 and first framework 11 Inner surface be fixedly connected, the upper surface of first sponge block 32 is fixedly connected with the lower surface of first transverse slat 31, institute The lower section that the first sponge block 32 is located at first groove 311 is stated, so as to block first groove 311.Described first Spring 33 is provided with two, and first spring 33 is in vertical shape, the lower end of first spring 33 and first framework 11 Inner surface is fixedly connected, and the upper end of first spring 33 is fixedly connected with the lower surface of first sponge block 32, so as to right First sponge block 32 is played a supporting role.The cross section of 3rd screen pack 34 is in semi-annular shape, the 3rd filtering The upper surface of net 34 is fixedly connected with the lower surface of first transverse slat 31, and the 3rd screen pack 34 acts against first frame On the inner surface of body 11 so that the air in the left side of the 3rd screen pack 34 needs just enter its right side after it is filtered Side.The cross section of second sponge block 35 is in ellipticity, and second sponge block 35 is in first transverse slat 31 and second It is slidably connected between transverse slat 36 and with it so that what second sponge block 35 can be stablized moves left and right.The second spring 37 are provided with two, and the second spring 37 is horizontal, the right table of the left end of the second spring 37 and the first baffle 21 Face is fixedly connected, and the right-hand member of the second spring 37 is fixedly connected with second sponge block 35, so as to second sponge Block 35 is played a supporting role.Second bristle is provided with several, and second bristle is horizontal, a left side for second bristle End is fixedly connected with second sponge block 35.Second transverse slat 36 is horizontal, the right-hand member of second transverse slat 36 and institute The inner surface for stating the first framework 11 is fixedly connected, and the right surface of the left end of second transverse slat 36 and the first baffle 21 is fixed Connection, the left end of second transverse slat 36 are provided with the second groove 361.
As shown in figure 1, first plumbing installation 4 includes the 4th pipeline 41, be arranged on the 4th pipeline 41 the Two supports 42, the 4th valve 43, the first fix bar 44, the first brace 45 positioned at the lower section of first fix bar 44, positioned at institute State the 3rd support 46 in the left side of the first brace 45.The upper end of 4th pipeline 41 be aligned the third through-hole 113 and with it is described The right surface of first framework 11 is fixedly connected so that the inside of the 4th pipeline 41 and the inside phase of the 4th pipeline 41 Logical, the lower end of the 4th pipeline 41 is in vertical shape.The second support 42 is L-shaped, the lower end of the second support 42 and institute The right surface for stating the first framework 11 is fixedly connected, and the upper end of the second support 42 is in vertical shape, and the 4th pipeline 41 runs through The left and right surface of the second support 42 and it is secured to connect.4th valve 43 is used to control in the 4th pipeline 41 The flow of gas.First fix bar 44 is horizontal, the left end of first fix bar 44 and first framework 11 Right surface is fixedly connected, and the 4th pipeline 41 runs through the upper and lower surface of first fix bar 44 and is secured to connect, from And fixation is played to the 4th pipeline 41.First brace 45 is oblique, the upper end of first brace 45 with The lower surface of first framework 11 is fixedly connected.3rd support 46 is L-shaped, the upper end of the 3rd support 46 with it is described The lower surface of first framework 11 is fixedly connected, and the lower end of the 3rd support 46 is horizontal.
As shown in figure 1, the second framework device 5 includes second framework 51, the positioned at the lower section of the second framework 51 Four supports 53, the second brace 54 positioned at the right side of the 4th support 53, the 3rd brace positioned at the left side of the 4th support 53 55th, positioned at the first montant 56 of the lower section of the 3rd brace 55, the second montant 57 above the 3rd brace 55, be located at 5th pipeline 58 in the left side of second framework 51, the 5th valve 59 being arranged on the 5th pipeline 58.Second frame Body 51 is in hollow cuboid, and the second framework 51 is placed vertically, and the second framework 51 is provided with surface disposed thereon 6th through hole 511 and the 7th through hole 512 positioned at its left surface, the 6th through hole 511 and the 7th through hole 512 it is rounded and with The inside of the second framework 51 communicates, the 6th through hole 511 described in the lower end aligned of the 4th pipeline 41 and with described second The upper surface of framework 51 is fixedly connected so that the inside of the 4th pipeline 41 communicates with the inside of the second framework 51, institute The lower end for stating the first brace 45 is fixedly connected with the upper surface of the second framework 51, the lower end of the 3rd support 46 with it is described The left surface of second framework 51 is fixedly connected.4th support 53 is L-shaped, the upper end and described second of the 4th support 53 The lower surface of framework 51 is fixedly connected, and the lower end of the 4th support 53 is horizontal.Second brace 54 is oblique, institute The upper end for stating the second brace 54 is fixedly connected with the lower surface of the second framework 51, the lower end of second brace 54 with it is described The right surface of 4th support 53 is fixedly connected.3rd brace 55 is oblique, the upper end of the 3rd brace 55 with it is described The lower surface of second framework 51 is fixedly connected.First montant 56 is in vertical shape, the upper end of first montant 56 with it is described 3rd brace 55 is fixedly connected, and the lower end of first montant 56 is fixedly connected with the 4th support 53.Second montant 57 be in vertical shape, and the upper end of second montant 57 is fixedly connected with the lower surface of the 3rd support 46, second montant 57 lower end is fixedly connected with the 3rd brace 55.The right-hand member of 5th pipeline 58 be aligned the 7th through hole 512 and with The left surface of the second framework 51 is fixedly connected so that the inside of the 5th pipeline 58 and the inside of the second framework 51 Communicate.5th valve 59 is used for the flow for controlling gas in the 5th pipeline 58.
As shown in figure 1, first filter 6 includes being contained in the second rolling of the left and right sides in the second framework 51 Wheel 61, the third bristle 62 that is arranged on second roller 61, the first elastic plate 63 between second roller 61, The 4th screen pack 64 positioned at the left and right sides of the first elastic plate 63, the second elasticity between the 4th screen pack 64 Plate 65, the 3rd spring 66 above second elastic plate 65, the 5th filtering positioned at the lower section of the second elastic plate 65 Net 67 and the 3rd transverse slat 68 positioned at the lower section of the 5th screen pack 67.Second roller 61 is provided with two, second rolling Wheel 61 is in cylinder, and second roller 61 is contained in the second framework 51 and turns connection with the axle of second framework 51, Second roller 61 allow in the internal rotation of second framework 51, second roller 61 and motor connection, drive institute The second roller 61 is stated to rotate.The third bristle 62 is provided with several, and the third bristle 62 is evenly distributed on second rolling On wheel 61 and it is secured to connect.First elastic plate 63 is in cuboid and horizontal positioned, before first elastic plate 63 Surface and the inner surface of the second framework 51 are slidably connected afterwards, and first elastic plate 63 is located at the 6th through hole 511 Lower section.4th screen pack 64 is provided with two, and the 4th screen pack 64 is oblique, the lower end of the 4th screen pack 64 It is fixedly connected with the inner surface of the second framework 51, the upper end of the 4th screen pack 64 and the right side of first elastic plate 63 End is fixedly connected, so as to be played a supporting role to first elastic plate 63.Second elastic plate 65 is in cuboid and level Place, first elastic plate 63 is made using elastomeric material with second elastic plate 65 and elastic deformation can be occurred.Institute The 3rd spring 66 is stated provided with two, the 3rd spring 66 is in vertical shape, the upper end of the 3rd spring 66 and first bullet Property plate 63 lower surface be fixedly connected, the upper surface of the lower end of the 3rd spring 66 and second elastic plate 65, which is fixed, to be connected Connect.5th screen pack 67 is in the cylinder that cross section is annulus, and the 5th screen pack 67 is in vertical shape, the 5th filtering The upper surface of net 67 is fixedly connected with the lower surface of second elastic plate 65, the lower surface of the 5th screen pack 67 with it is described The upper surface of 3rd transverse slat 68 is fixedly connected, and the 5th screen pack 67 can filter to air.3rd transverse slat 68 In cuboid and horizontal positioned, the side of the 3rd transverse slat 68 is fixedly connected with the inner surface of the second framework 51, described 3rd transverse slat 68 is provided with the 8th through hole 681 through its upper and lower surface, and the 8th through hole 681 is located at the 5th screen pack 67 lower section.
As shown in figure 1, second filter 7 includes the first swash plate 71, the positioned at the left side of first swash plate 71 Two baffle plates 72, the third baffle 73 positioned at the left side of second baffle 72, the 6th filtering positioned at the right side of the first swash plate 71 Net 74, the 7th screen pack 75 positioned at the lower section of the first swash plate 71, the 4th spring positioned at the left side of the 7th screen pack 75 76th, the 3rd roller 77 on the right side of the 7th screen pack 75 and some projections 78 being arranged on the 3rd roller 77. The second baffle 72 is in cuboid and vertical placement, the upper surface of the second baffle 72 and the following table of the 3rd transverse slat 68 Face is fixedly connected, and the lower surface of the second baffle 72 is fixedly connected with the inner surface of the second framework 51, the second gear The space of the lower section of 3rd transverse slat 68 can be divided into left and right two parts by plate 72, and the second baffle 72 is provided with left through it 9th through hole 721 on right surface.The third baffle 73 in cuboid and horizontal positioned, the left surface of the third baffle 73 with The inner surface of the second framework 51 is fixedly connected, the right surface of the third baffle 73 and the left surface of the second baffle 72 It is fixedly connected.First swash plate 71 is oblique, the upper end of first swash plate 71 and the right surface of the second baffle 72 It is fixedly connected, first swash plate 71 is located at the lower section of the 8th through hole 681.6th screen pack 74 is in wavy, institute The left end for stating the 6th screen pack 74 is fixedly connected with first swash plate 71, the right-hand member and described second of the 6th screen pack 74 The inner surface of framework 51 is fixedly connected, and the 6th screen pack 74 is made of elastomeric material so that the 6th screen pack 74 Elastic deformation can occur.7th screen pack 75 is in bending, lower end and second frame of the 7th screen pack 75 The inner surface of body 51 is fixedly connected, and the upper end of the 7th screen pack 75 is fixedly connected with first swash plate 71, and the described 7th Screen pack 75 is made of elastomeric material so that elastic deformation can occur for the 7th screen pack 75.4th spring 76 Provided with two, the 4th spring 76 is horizontal, and the right-hand member of the 4th spring 76 is fixed with the 7th screen pack 75 to be connected Connect, the left end of the 4th screen pack 76 is fixedly connected with the right surface of the second baffle 72.3rd roller 77 is in circle Cylinder, the 3rd roller 77 turn connection with the axle of second framework 51 so that the 3rd roller 77 can be described second Framework 51 rotates, the 3rd roller 77 and motor connection, drives the 3rd roller 77 to rotate.The projection 78 is provided with some Individual, the projection 78 is evenly distributed on the 3rd roller 77 and is secured to connect.
As shown in figure 1, the retracting device 8 includes the second cross bar 81, the 3rd horizontal stroke positioned at the left side of the second cross bar 81 Bar 82, the 5th spring 83, the 6th spring 84 above the 3rd cross bar 82, position positioned at the lower section of the 3rd cross bar 82 Collection box 85 in the left side of the 6th spring 84.Second cross bar 81 is in cuboid and horizontal positioned, second cross bar 81 right-hand member is fixedly connected with the left surface of the second framework 51, the left end of second cross bar 81 and second montant 57 Right surface be fixedly connected.3rd cross bar 82 in cuboid and horizontal positioned, the right-hand member of the 3rd cross bar 82 with it is described The left surface of second montant 57 is fixedly connected.5th spring 83 is in vertical shape, the upper end of the 5th spring 83 with it is described The lower surface of 3rd cross bar 82 is fixedly connected, and the lower end of the 5th spring 83 is fixedly connected with the 5th pipeline 58, so as to 5th pipeline 58 is played a supporting role.6th spring 84 is horizontal, the right-hand member of the 6th spring 84 and institute The left surface for stating the second montant 57 is fixedly connected, and the left end of the 6th spring 84 is fixedly connected with the collection box 85.It is described Collection box 85 is in hollow cuboid, and the cross section of the collection box 85 is in concave shape, the lower surface of the collection box 85 and institute The upper surface slide connection of the 3rd cross bar 82 is stated, the collection box 85 is located at the lower section of the 3rd pipeline 10 so that discharge Liquid is entered in the collection box 85.
As shown in figure 1, the 3rd filter 9 includes the 3rd framework 91, the row positioned at the lower section of the 3rd framework 91 Outlet pipe 92, the 8th screen pack 93 being contained in the 3rd framework 91, the bracing wire 94 positioned at the lower section of the 8th screen pack 93, Collecting board 95 positioned at the lower section of the 8th screen pack 93 left and right sides, the motor 96 positioned at the lower section of bracing wire 94, positioned at institute State the supporting plate 97 of the lower section of motor 96, the 7th spring 98 positioned at the lower section of supporting plate 97.3rd framework 91 is in hollow Cylinder, the 3rd framework 91 is provided with the first circular hole 911 and the second circular hole 912, and first circular hole 911 and second is justified Hole 912 communicates with the inside of the 3rd framework 91, the left end of the 5th pipeline 58 be aligned the first through hole 911 and with institute The outer surface for stating the 3rd framework 91 is fixedly connected so that the inside of the 5th pipeline 58 and the inside phase of the 3rd framework 91 Logical, the lower end of the 4th support 53 is fixedly connected with the 3rd framework 91, the lower end of the 3rd brace 55 and described the Three frameworks 91 are fixedly connected.The discharge pipe 92 is in vertical shape, the upper end of the discharge pipe 92 be aligned second circular hole 912 and It is fixedly connected with the outer surface of the 3rd framework 91 so that the inside of the discharge pipe 92 and the inside of the 3rd framework 91 Communicate, the discharge pipe 92 is provided with the 6th valve 921, and it is used for the flow for controlling gas in the discharge pipe 92.Described The cross section of eight screen packs 93 is in inverted V-shaped, the side of the 8th screen pack 93 and the interior table of the 3rd framework 91 Face is slidably connected.The collecting board 95 is provided with two and the respectively left and right sides in the 3rd framework 91, the collection Plate 95 is oblique, and the lower end of the collecting board 95 is fixedly connected with the inner surface of the 3rd framework 91, the collecting board 95 Front and rear surfaces be fixedly connected with the inner surface of the 3rd framework 91, the collecting board 95 be provided be positioned above the 8th Spring 951, the 8th spring 951 are in vertical shape, and the lower end of the 8th spring 951 is fixedly connected with the collecting board 95, The upper end of 8th spring 951 is fixedly connected with the lower surface of the 8th screen pack 93, so as to the 8th screen pack 93 are played a supporting role so that the 8th screen pack 93 steadily is acted against on the inner surface of the 3rd framework 91 so that The air of the top of 8th screen pack 93 must meet its filtering could be into its next square.The supporting plate 97 is horizontal and position Between the collecting board 95, the side of the supporting plate 97 is fixedly connected with the collecting board 95.Set in the supporting plate 97 There are some the 3rd circular holes 971 through its upper and lower surface.The motor 96 is electrically connected with the power supply, the lower surface of the motor 96 It is fixedly connected with the upper surface of the supporting plate 97, the motor 96 is provided with output shaft 961, and the output shaft 961 is in cylinder Body and it is connected with the motor 96 so that the motor 96 drives the output shaft 961 to rotate.The upper end of the bracing wire 94 and institute State the 8th screen pack 93 to be fixedly connected, the lower end of the bracing wire 94 is fixedly connected with the output shaft 961.7th spring 98 Provided with two, the 7th spring 98 is in vertical shape, and the upper end and the lower surface of the supporting plate 97 of the 7th spring 98 are consolidated Fixed connection, the lower end of the 7th spring 98 are fixedly connected with the inner surface of the 3rd framework 91, so as to the supporting plate 97 play a supporting role.
As shown in figure 1, the air cleaning system proposed by the present invention suitable for painting workshop is in use, described first is managed The position of the left end alignment spray painting in road 12, opens the first blower fan 15 and the first valve 16 so that dust is drawn into caused by spray painting Into the first pipeline 12, then entered by first through hole 111 in first framework 11, its coating cloud first passes around described The filtering of one spongy layer 22, then the lower section of the first screen pack 23 is and then entered by the filtering of first screen pack 23, The air pressure being had just enter into due to coating cloud during into the first framework 11 is larger so that the dust in gas is not easy to be deposited in described first On spongy layer 22, so as to be not easy that it is resulted in blockage, the screen pack 23 of the first spongy layer 22 and first can enter to air The preliminary filtering of row, disposes the larger impurity of wherein volume.Then it is right that it is entered after the filtering of the second screen pack 24 Side, the right side of the first baffle 21 is then entered by the fifth hole 211, while start and be connected with the first roller 25 Motor so that first roller 25 rotates, and drive the first bristle rotate with, so as to second screen pack 24 inner surface is cleaned, and disposes the impurity speckled with thereon, prevents it from blocking the second screen pack 24, and can be to air Play certain filtration.Now start the first water pump 18, and open the second valve 19 so that the water in pond is drawn into In the second pipe 17, then water is entered in first framework 11 by second through hole 112, then focuses on institute State on the second transverse slat 36, the lower section of second transverse slat 36 is entered by second groove 361, then gradually soak Two sponge blocks 35, the first sponge block 32 then is soaked by the first groove 311, then water is deposited on the right side of first baffle 21 And in the space of the lower section of the first transverse slat 31, and soaked the 3rd screen pack 34.When deposition in the first framework 11 When water is more, the 3rd valve 101 is opened so that the water in the first framework 11 is entered in the 3rd pipeline 10, is discharged it back Receive in case 85, it is convenient that it is reclaimed, reduce the waste of resource.The air on the right side of first baffle 21 is entered by leaching Enter the top of first transverse slat 31 after the filtering of the 3rd wet screen pack 34 by the filtering of the first sponge block 32 again, and It can fully be contacted with water, so as to sufficiently be purified to air, dispose the impurity in air.Then air passes through Its left side is entered after the filtering of second bristle and the second sponge block 35 soaked, then enters the by the second groove 361 The top of two transverse slats 36, now water constantly entered in first framework 11 from the second through hole 112, so as to water can to from The air that second groove 361 enters the top of the second transverse slat 36 is sufficiently filtered.Enter by the abundant filtered air of water Into the 4th pipeline 41, the 4th valve 43 is opened so that the water in the 4th pipeline 41 is drawn into the second framework 51 It is interior.Due to the setting of the first elastic plate 63, the gas sprayed from the 6th through hole 511 is directly impinging on the first elastic plate 63, made The first elastic plate 63 can occur up and down elastic deformation vibrate, then to the left and right both sides flow, startup and the second roller 61 The motor of connection so that the second roller 61 drives third bristle 62 to rotate with, so as to the gas to entering the left and right sides Body is filtered.The vibration of first elastic plate 63 is applied on second elastic plate 65 by the 3rd spring 66, so as to Second elastic plate 65 can be caused to vibrate, and then the 5th screen pack 67 is vibrated.Filtered by the second bristle 62 Gas the lower section of first elastic plate 63 is entered after the filtering of the 4th screen pack 64 still further below, then pass through The inside of the 5th screen pack 67 is entered after the filtering of 5th screen pack 67, then passes through the 8th through hole 681 Enter the lower section of the 3rd transverse slat 68.Because the vibration of the first elastic plate 63 can also drive the 4th screen pack 64 to vibrate, So as to prevent the impurity in air to be deposited on the 4th screen pack 64, while the vibration of the 5th screen pack 67 can also The impurity in air is prevented to be deposited on the 5th screen pack 67.The air of the lower section of the 3rd transverse slat 68 is entered to bottom right Fang Liudong, then moved down after the filtering of the 6th screen pack 74, by the lower section of the first swash plate 71 again by the The left side of the 7th screen pack 75 is entered after the filtering of seven screen packs 75.Start the motor being connected with the 3rd roller 77, make Obtain the 3rd roller 77 to rotate, and then the projection 78 is rotated with, when projection 78 as the 3rd roller 77 revolves When turning, the projection 78 can touch the lower end of first swash plate 71 so that first swash plate 71 vibrates, and then causes institute State the 6th screen pack 74 and the 7th screen pack 75 vibrates, so as to prevent the dust deposit in air above it, make it can To carry out normal and efficient filtration operation to air.Then air enters by the 9th through hole 721 and the 7th through hole 512 Into the 5th pipeline 58, the 5th valve 59 is then opened so that the air in the 5th pipeline 58 enters described the In three frameworks 91, the lower section of the 8th screen pack 93 is then entered after the filtering of the 8th screen pack 93, then The lower section of the supporting plate 97 is entered through the 3rd circular hole 971, then into the discharge pipe 92, opens the 6th Valve 921 so that the gas discharge in discharge pipe 92.When the impurity of the top of the 8th screen pack 93 is more, start motor 96 so that the output shaft 961 is rotated, and then the bracing wire 94 is tightened up so that the 8th screen pack 93 is to moving down It is dynamic, because the 8th screen pack 93 is in inverted V-shaped so that the impurity on the 8th screen pack 93 is along the described 8th filtering The upper surface of net 93 is slipped on the collecting board 95, prevents dust deposit on the 8th screen pack 93 so that the 8th mistake Filter screen 93 can carry out normal filtration operation to air, extend its service life.So far it is proposed by the present invention to be applied to spray painting The air cleaning system in workshop is finished using process description.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be covered Within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (7)

1. a kind of air cleaning system suitable for painting workshop, including the first frame device(1), be contained in first framework Device(1)Interior preliminary filter(2), positioned at the preliminary filter(2)The water purification installation on right side(3), positioned at institute State the first frame device(1)First plumbing installation on right side(4), positioned at first plumbing installation(4)The second framework of lower section Device(5), be contained in the second framework device(5)The first interior filter(6), positioned at first filter(6) Second filter of lower section(7), positioned at the second framework device(5)The retracting device in left side(8)And positioned at the recovery Device(8)3rd filter of lower section(9), first frame device(1)Including the first framework(11), positioned at described first Framework(11)First pipeline in left side(12), be arranged at first pipeline(12)On the first blower fan(15), the first valve (16), positioned at first blower fan(15)First cross bar on right side(13), positioned at first cross bar(13)First of lower section Frame(14), positioned at first framework(11)The second pipe of top(17), be arranged at the second pipe(17)On first Water pump(18), the second valve(19)And positioned at first framework(11)3rd pipeline of lower section(10), first framework (11)It is provided with the first through hole positioned at its left surface(111), surface disposed thereon the second through hole(112), positioned at its right table The third through-hole in face(113)And the fourth hole positioned at its lower surface(114);The preliminary filter(2)Including first gear Plate(21), positioned at the first baffle(21)First spongy layer in left side(22), positioned at first spongy layer(22)Lower section First screen pack(23), positioned at first screen pack(23)Second screen pack of lower section(24), be contained in it is described second filtering Net(24)The first interior roller(25)And it is arranged at first roller(25)On some first bristles, the first baffle (21)It is provided with the fifth hole through its left and right surface(211);The second framework device(5)Including second framework(51)With Positioned at the second framework(51)4th support of lower section(53);First filter(6)Including being contained in described second Framework(51)Second roller of the interior left and right sides(61), be arranged at second roller(61)On third bristle(62), be located at Second roller(61)Between the first elastic plate(63), positioned at first elastic plate(63)4th filtering of the left and right sides Net(64), positioned at the 4th screen pack(64)Between the second elastic plate(65), positioned at second elastic plate(65)Top The 3rd spring(66), positioned at second elastic plate(65)5th screen pack of lower section(67)And positioned at the 5th screen pack (67)3rd transverse slat of lower section(68);Second filter(7)Including the first swash plate(71), positioned at first swash plate (71)The second baffle in left side(72), positioned at the second baffle(72)The third baffle in left side(73), it is oblique positioned at described first Plate(71)6th screen pack on right side(74), positioned at first swash plate(71)7th screen pack of lower section(75), positioned at described 7th screen pack(75)4th spring in left side(76), positioned at the 7th screen pack(75)3rd roller on right side(77)And set It is placed in the 3rd roller(77)On some projections(78);3rd filter(9)Including the 3rd framework(91), be located at 3rd framework(91)The discharge pipe of lower section(92), be contained in the 3rd framework(91)The 8th interior screen pack(93), position In the 8th screen pack(93)The bracing wire of lower section(94), positioned at the 8th screen pack(93)Collecting board at left and right sides of lower section (95), positioned at the bracing wire(94)The motor of lower section(96), positioned at the motor(96)The supporting plate of lower section(97), positioned at described Supporting plate(97)7th spring of lower section(98), it is characterised in that:4th screen pack(64)Provided with two, the 4th mistake Filter screen(64)Obliquely, the 4th screen pack(64)Lower end and the second framework(51)Inner surface be fixedly connected, 4th screen pack(64)Upper end and first elastic plate(63)Right-hand member be fixedly connected, second elastic plate(65) In cuboid and horizontal positioned, the 3rd spring(66)Provided with two, the 3rd spring(66)In vertical shape, the described 3rd Spring(66)Upper end and first elastic plate(63)Lower surface be fixedly connected, the 3rd spring(66)Lower end and institute State the second elastic plate(65)Upper surface be fixedly connected.
2. the air cleaning system according to claim 1 suitable for painting workshop, it is characterised in that:5th filtering Net(67)In the cylinder that cross section is annulus, the 5th screen pack(67)In vertical shape, the 5th screen pack(67)It is upper Surface and second elastic plate(65)Lower surface be fixedly connected, the 5th screen pack(67)Lower surface and the described 3rd Transverse slat(68)Upper surface be fixedly connected, the 3rd transverse slat(68)In cuboid and horizontal positioned, the 3rd transverse slat(68) Side and the second framework(51)Inner surface be fixedly connected, the 3rd transverse slat(68)It is provided with and runs through its upper and lower surface The 8th through hole(681), the 8th through hole(681)Positioned at the 5th screen pack(67)Lower section.
3. the air cleaning system according to claim 1 suitable for painting workshop, it is characterised in that:The second baffle (72)In cuboid and vertical placement, the second baffle(72)Upper surface and the 3rd transverse slat(68)Lower surface fix Connection, the second baffle(72)Lower surface and the second framework(51)Inner surface be fixedly connected, the second baffle (72)It is provided with the 9th through hole through its left and right surface(721).
4. the air cleaning system according to claim 1 suitable for painting workshop, it is characterised in that:The third baffle (73)In cuboid and horizontal positioned, the third baffle(73)Left surface and the second framework(51)Inner surface fix Connection, the third baffle(73)Right surface and the second baffle(72)Left surface be fixedly connected;First swash plate (71)Obliquely, first swash plate(71)Upper end and the second baffle(72)Right surface be fixedly connected.
5. the air cleaning system according to claim 1 suitable for painting workshop, it is characterised in that:6th filtering Net(74)In wavy, the 6th screen pack(74)Left end and first swash plate(71)It is fixedly connected, the 6th mistake Filter screen(74)Right-hand member and the second framework(51)Inner surface be fixedly connected, the 7th screen pack(75)In bending, 7th screen pack(75)Lower end and the second framework(51)Inner surface be fixedly connected, the 7th screen pack(75) Upper end and first swash plate(71)It is fixedly connected.
6. the air cleaning system according to claim 1 suitable for painting workshop, it is characterised in that:4th spring (76)Provided with two, the 4th spring(76)It is horizontal, the 4th spring(76)Right-hand member and the 7th screen pack (75)It is fixedly connected, the 4th screen pack(76)Left end and the second baffle(72)Right surface be fixedly connected, it is described 3rd roller(77)In cylinder, the 3rd roller(77)With the second framework(51)Axle turns connection, the projection(78) Provided with several, the projection(78)It is evenly distributed on the 3rd roller(77)Above and it is secured to connect.
7. the air cleaning system according to claim 1 suitable for painting workshop, it is characterised in that:The collecting board (95)It is located at provided with two and respectively the 3rd framework(91)The interior left and right sides, the collecting board(95)Obliquely, institute State collecting board(95)Lower end and the 3rd framework(91)Inner surface be fixedly connected;The collecting board(95)It is provided with and is located at The 8th spring above it(951), the 8th spring(951)In vertical shape, the 8th spring(951)Lower end with it is described Collecting board(95)It is fixedly connected, the 8th spring(951)Upper end and the 8th screen pack(93)Lower surface fix connect Connect.
CN201610874224.4A 2016-10-03 2016-10-03 A kind of air cleaning system suitable for painting workshop Active CN106268148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610874224.4A CN106268148B (en) 2016-10-03 2016-10-03 A kind of air cleaning system suitable for painting workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610874224.4A CN106268148B (en) 2016-10-03 2016-10-03 A kind of air cleaning system suitable for painting workshop

Publications (2)

Publication Number Publication Date
CN106268148A CN106268148A (en) 2017-01-04
CN106268148B true CN106268148B (en) 2018-03-27

Family

ID=57717062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610874224.4A Active CN106268148B (en) 2016-10-03 2016-10-03 A kind of air cleaning system suitable for painting workshop

Country Status (1)

Country Link
CN (1) CN106268148B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106902606B (en) * 2017-04-13 2019-04-05 江苏首德环境科技有限公司 A kind of environment-friendly type haze purification system to economize on resources
CN107008091A (en) * 2017-04-18 2017-08-04 深圳市玖品空气净化科技有限公司 A kind of Air haze cleaning system of high-efficiency environment friendly

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203123792U (en) * 2013-01-31 2013-08-14 东莞市绿羽环保净化工程有限公司 Biological waste gas treatment device
CN104998503A (en) * 2015-07-16 2015-10-28 张萍 Environmental protection type exhaust gas purification equipment high in purification efficiency
CN105749682A (en) * 2016-04-15 2016-07-13 安双志 Environment-friendly efficient dust suction device for textile spinning
CN105749678A (en) * 2016-03-09 2016-07-13 张舒维 Air purifying equipment for treating haze

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2004205335B2 (en) * 2004-08-31 2006-08-10 Kosta Kapitoures Filtration and Purification Systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203123792U (en) * 2013-01-31 2013-08-14 东莞市绿羽环保净化工程有限公司 Biological waste gas treatment device
CN104998503A (en) * 2015-07-16 2015-10-28 张萍 Environmental protection type exhaust gas purification equipment high in purification efficiency
CN105749678A (en) * 2016-03-09 2016-07-13 张舒维 Air purifying equipment for treating haze
CN105749682A (en) * 2016-04-15 2016-07-13 安双志 Environment-friendly efficient dust suction device for textile spinning

Also Published As

Publication number Publication date
CN106268148A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN108889757A (en) A kind of dust-extraction unit of the computer production convenient for adjusting
CN105771518B (en) Dust treatment plant in a kind of ore processing
CN104998503B (en) The environment-protecting type exhaust air cleaning equipment that a kind of purification efficiency is high
CN208493668U (en) A kind of Automobile flywheel manufacturing shop special environment protection dust-extraction unit
CN106268148B (en) A kind of air cleaning system suitable for painting workshop
CN105771444A (en) Efficient fuel gas dust removal system
CN105854497B (en) A kind of industrial waste-gas purifier
CN108160915A (en) A kind of Environmental-protecting dust-removing molding sand crusher
CN105879554B (en) A kind of air cleaning facility
CN105854440B (en) A kind of industrial waste gas filtration purifier
CN106731393B (en) A kind of environment friendly dedusting device
CN111437677A (en) Rotary type dust collector for construction
CN209828575U (en) Hydrodynamics is real to be used harmful gas adsorption equipment
CN106334403A (en) Industrial dust grading filtration system for paint spraying environment
CN106606913A (en) Dust purification equipment for furniture and building material production
CN106310857A (en) Industrial air purifying device capable of filtering paint, mist and dust
CN106334402A (en) Air purification system for paint spraying operation
CN106422634A (en) Improved air purification device
CN106731394A (en) A kind of Environmental-protecting dust-removing equipment of building engineering construction
CN206138931U (en) Efficient exhaust gases filter clarifier
CN208049649U (en) A kind of dust-extraction unit for the production of polymer lightweight wall plate
CN206168152U (en) Boiler exhaust gas purification device
CN206138932U (en) Industrial waste gas filtration treatment ware
CN104857804A (en) Paint spraying exhaust gas treatment device
CN206008324U (en) A kind of industrial plant waste gas purification dust arrester

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Jiang Kangyi

Inventor after: Xu Shuping

Inventor before: Xu Ziqiang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180214

Address after: Hangzhou City, Zhejiang province Yuhang District 311100 West Street Wuchang No. 998 Building 5 room 803

Applicant after: Zhejiang Yu Yu Environmental Protection Technology Co., Ltd.

Address before: Pixian Deyuan town Chengdu City, Sichuan province 611730 (Jing Rong town) Yu Road No. 66 Building 1 floor 2, No. 16 (1-2-16)

Applicant before: CHENGDU GUANYU TECHNOLOGY CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant