CN206008324U - A kind of industrial plant waste gas purification dust arrester - Google Patents
A kind of industrial plant waste gas purification dust arrester Download PDFInfo
- Publication number
- CN206008324U CN206008324U CN201620563393.1U CN201620563393U CN206008324U CN 206008324 U CN206008324 U CN 206008324U CN 201620563393 U CN201620563393 U CN 201620563393U CN 206008324 U CN206008324 U CN 206008324U
- Authority
- CN
- China
- Prior art keywords
- framework
- fixedly connected
- spring
- movable block
- montant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Filtration Of Liquid (AREA)
Abstract
A kind of industrial plant waste gas purification dust arrester,Including air extractor (1)、First frame device (2)、First filter (3)、Air cylinder device (4)、Second framework device (5)、Second filter (6)、Plumbing installation (7)、3rd frame device (8) and part flow arrangement (9),Air extractor (1) includes first support (11)、First blower fan (12)、Exhaust tube (13)、First valve (14)、Pumping bucket (15),First frame device (2) includes the first framework (21)、First pipeline (22)、First water pump (23)、Second support (24)、Second valve (25)、Second pipe (26)、3rd valve (27) and first baffle (28),First filter (3) includes sponge ring (31)、3rd pipeline (32) etc.,The particle that the utility model can be produced to workshop、Pernicious gas carries out sufficient purification filtering.
Description
Technical field
The utility model is related to technical field of air purification, more particularly to a kind of industrial plant waste gas purification dust arrester.
Background technology
In workshop, brush coating operation endlessly produces various easily volatile pernicious gases, and these gases all will be to people
The health of body brings greatly harm, considerably increases the probability that employee suffers from occupational disease.In order to improve the working environment in workshop, dimension
The legitimate rights and interests of shield worker, some producers are waved to production process using large-scale ventilation equipment and corresponding pipeline exhausting system
The pernicious gas that sends out is collected, and is vented directly to outside workshop by pipeline, although working environment of this way to workshop
Certain improvement result is played, but the environment of outside can be polluted, and not environmentally, it is impossible to the pernicious gas that workshop produces is entered
The sufficient filtration treatment of row, while it is big to take up room.
Chinese patent CN205191744U discloses a kind of industrial plant waste gas purification dust arrester, and which includes shell, gas
Cabin, magazine and intake stack, the magazine are located in the gas cabin, and the gas freight space is in the inside the shell, the shell both sides
It is equipped with baffle plate, the baffle plate is provided with for installing the first draw-in groove of the intake stack, and described intake stack one end is provided with suction
Air port, the other end are connected with the magazine, be provided with the honeycomb fashion filter screen for purify air, set on the baffle plate in the magazine
There is shutter.Which is mainly absorbed to pernicious gas using activated carbon, and absorption pattern is limited, and absorption efficiency is relatively low;With
When filter type single, filter effect is undesirable;And when air-flow is larger, it is impossible to play preferable shunting action to air-flow, from
And be easily damaged.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Utility model content
Problem to be solved in the utility model is to provide a kind of industrial plant waste gas purification dust arrester.
In order to solve above-mentioned technical problem, the utility model is adopted the following technical scheme that:
A kind of industrial plant waste gas purification dust arrester, including air extractor, be located at the air extractor on the right side of first
Frame device, the first filter being contained in first frame device, the gas being located at below first filter
Cylinder assembly, the second framework device being located on the right side of first frame device, second be contained in the second framework device
Filter, the plumbing installation being located at below the second framework device, the 3rd framework dress being located at below the air cylinder device
The part flow arrangement in the 3rd frame device is put and is contained in, the air extractor includes first support, is located at described first
The first blower fan, the exhaust tube being arranged on first blower fan, the first valve being arranged on the exhaust tube below support,
The pumping bucket being located on the left of the exhaust tube, first frame device include the first framework, are located above first framework
The first pipeline, the first water pump being arranged on first pipeline, be located at the starting stave on the left of second support, setting
In the second valve on first pipeline, the second pipe being located on the left of first framework, it is arranged at the second pipe
On the 3rd valve and the first baffle being contained in first framework, first filter includes sponge ring, is located at
The 3rd pipeline, the first spring being arranged on the sponge ring on the left of the sponge ring, the be located on the right side of the sponge ring
Two springs, the 3rd spring being located above the sponge ring, the air cylinder device include the first cylinder, are located at first cylinder
Top catch bar, be located at the catch bar above push pedal, the sealing ring being arranged in the push pedal, be located at the push pedal under
4th spring of side, the corner block being located above the push pedal and the 3rd support positioned at the first cylinder left and right sides, institute
Stating second framework device includes the 4th pipeline, the second framework being located at below the 4th pipeline, is located under the second framework
3rd framework of side, the second baffle being contained in the second framework, the first roller being located on the left of the second baffle, position
In the first screen pack below first roller, the 5th spring being located at below first screen pack, it is located at described second
The first cross bar on the left of framework and the second cross bar below first cross bar, second filter include the 6th bullet
Spring, be located at the 6th spring below the second screen pack, be located at second screen pack below the second roller, be located at described
The 3rd screen pack below second roller, the 7th spring being located at below the 3rd screen pack, it is located at the 3rd screen pack
The third baffle on right side and the first sponge block below the 7th spring, the plumbing installation include the 5th pipeline, set
The 5th valve that is placed on the 5th pipeline, the 3rd cross bar being located on the left of the 5th pipeline, it is located at the 3rd cross bar
First montant in left side, the 4th support being located above first montant, the second framework device include the 4th framework, position
The 6th pipeline, the 6th valve being arranged on the 6th pipeline above the 4th framework, it is located at the 6th pipeline
Second montant on right side, the 4th screen pack being contained in the 4th framework, the 8th be located on the right side of the 4th screen pack
Spring, the first fixed block being located on the left of the 4th screen pack, the part flow arrangement include the second cylinder, are located at described second
Mobile bar on the right side of cylinder, the first movable block on the right side of the mobile bar, second be contained in first movable block
Sponge block, be located at first movable block below the second movable block, the 3rd sponge block being contained in second movable block,
Be located at the second movable block side the 3rd montant, be located at the 3rd montant on the right side of restriction bar, be located at described second move
The 4th cross bar, the 5th cross bar being located on the left of the 4th cross bar and the 5th mistake on the left of the 5th cross bar on the left of block
Filter screen.
The first support is L-shaped, and the lower end of the first support is fixedly connected with first blower fan, described first
The upper end of frame is horizontal, and the exhaust tube is horizontal, and the pumping bucket is in hollow round table-like, the right table of the pumping bucket
Face is fixedly connected with the left surface of the exhaust tube.
First framework in hollow cuboid, vertically place, and first framework is provided with position by first framework
Second through hole of first through hole, surface disposed thereon in its right surface, the third through-hole and fourth hole that are located at its left surface,
The right-hand member of the exhaust tube is directed at the third through-hole and is fixedly connected with the left surface of first framework, the first support
Upper end be fixedly connected with the left surface of first framework, one end of first pipeline be aligned second through hole and with institute
The upper surface for stating the first framework is fixedly connected, and the second support is L-shaped, one end of the second support and first framework
Upper surface be fixedly connected, the other end of the second support is fixedly connected with first water pump, the right side of the second pipe
End is directed at the fourth hole and is fixedly connected with the left surface of first framework, and the first baffle is in cuboid, described
First baffle is vertically placed, and the upper end of the first baffle is fixedly connected with the inner surface of first framework, the first gear
Plate is located at the left side of the first through hole.
In annular shape, the 3rd pipeline is horizontal, the left end pair of the 3rd pipeline for the cross section of the sponge ring
The accurate third through-hole and it is fixedly connected with the inner surface of first framework, the right-hand member of the 3rd pipeline and the sponge ring
Left surface be fixedly connected, first spring is horizontal, and first spring is contained in the sponge ring, described first
The two ends of spring are fixedly connected with the sponge ring, and the second spring is provided with three, and the second spring is horizontal, described
The right-hand member of second spring is fixedly connected with the inner surface of first framework, and the left end of the second spring is solid with the sponge ring
Fixed connection, in vertical shape, the upper end of the 3rd spring is fixedly connected the 3rd spring with the inner surface of first framework,
The lower end of the 3rd spring is fixedly connected with the sponge ring.
First cylinder is located at the lower section of first framework, and, in cylinder, the catch bar is vertical for the catch bar
Place, the lower end of the catch bar is connected with first cylinder, the upper end of the catch bar is solid with the lower surface of the push pedal
Fixed connect, the catch bar through first framework surfaces externally and internally and be slidably connected with which, the push pedal is in cuboid, institute
Push pedal horizontal positioned is stated, the sealing ring is annular in shape, and the inner surface of the sealing ring is fixedly connected with the side of the push pedal, institute
The outer surface for stating sealing ring is fixedly connected with the inner surface of first framework, and the 4th spring is provided with two and is located at respectively
The left and right sides of the catch bar, the 4th spring are in vertical shape, and the upper end of the 4th spring is fixed with the push pedal and connected
Connect, the lower end of the 4th spring is fixedly connected with the inner surface of first framework, and the cross section of the corner block is rectangular
Triangle, the lower surface of the corner block are fixedly connected with the upper surface of the push pedal, the right surface of the corner block with described
The inner surface of the first framework is slidably connected, and the 3rd support is provided with two and is located at the left and right two of first cylinder respectively
Side, one end of the 3rd support are fixedly connected with the side of first cylinder, the other end of the 3rd support with described
The lower surface of the first framework is fixedly connected.
In hollow round table-like, the upper surface of the second framework is provided with fifth hole to the second framework, and the described 4th
The upper end of pipeline is directed at the first through hole and is fixedly connected with the right surface of first framework, the 4th pipeline another
End is directed at the fifth hole and is fixedly connected with the upper surface of the second framework, and the 4th pipeline is provided with the 4th valve
Door, the upper surface of the 3rd framework is fixedly connected with the lower surface of the second framework, and the second baffle is in vertical shape, institute
The upper end for stating second baffle is fixedly connected with the inner surface of the second framework, first roller be in cylinder, described first
Roller is contained in the second framework and turns to be connected with the second framework axle, and first roller is provided with some first brushes
Hair, first bristle are evenly distributed on first roller, and first bristle is fixedly connected with first roller, institute
State that the first screen pack is horizontal, the right surface of first screen pack is fixedly connected with the left surface of the second baffle, institute
The left surface for stating the first screen pack is fixedly connected with the inner surface of the second framework, and the 5th spring is in vertical shape, described
The upper end of the 5th spring is fixedly connected with the lower surface of first screen pack, and first cross bar is horizontal, and described first
The left end of cross bar is fixedly connected with the right surface of first framework, the right-hand member of first cross bar and the side of the second framework
Face is fixedly connected, and second cross bar is horizontal, and the right-hand member of second cross bar is fixedly connected with the 3rd framework, described
The left end of the second cross bar is fixedly connected with the right surface of first framework, and the 3rd framework is provided with the 6th through hole.
6th spring is in vertical shape, and the upper end of the 6th spring is connected with the inner surface fixation of the second framework
Connect, the lower end of the 6th spring is fixedly connected with the upper surface of second screen pack, second screen pack is horizontal,
The left end of second screen pack is fixedly connected with the right surface of the second baffle, the right-hand member of second screen pack with described
The inner surface of second framework is fixedly connected, second roller be in cylinder, the second roller horizontal positioned, described second rolling
Wheel is contained in the 3rd framework and turns to be connected with the 3rd framework axle, and second roller is provided with the second bristle, institute
State the second bristle to be evenly distributed on second roller and be secured to connect, the cross section of the 3rd screen pack is in V words
Shape, the left surface of the 3rd screen pack are slidably connected with the right surface of the second baffle, the right table of the 3rd screen pack
Face is slidably connected with the left surface of the third baffle, and the 7th spring is provided with two, the 7th spring be in vertical shape, institute
The upper end for stating the 7th spring is fixedly connected with the 3rd screen pack, and the lower end of the 7th spring is solid with first sponge block
Fixed connection, the lower surface of first sponge block is fixedly connected with the inner surface of the 3rd framework, under the second baffle
End is fixedly connected with the upper surface of first sponge block, and the lower end of the 5th spring is fixed with first sponge block and connected
Connect, the third baffle is in vertical shape, and the lower end of the third baffle is fixedly connected with the inner surface of the 3rd framework, described
The upper end of third baffle is fixedly connected with the lower surface of second screen pack.
The upper end of the 5th pipeline is directed at the 6th through hole and is fixedly connected with the outer surface of the 3rd framework, institute
State that the 3rd cross bar is horizontal, the right-hand member of the 3rd cross bar is fixedly connected with the 5th pipeline, a left side for the 3rd cross bar
End is fixedly connected with the right surface of first montant, and first montant in cuboid, vertically place, institute by first montant
The upper end for stating the first montant is fixedly connected with the lower surface of the 4th support, and the 4th support is L-shaped, the 4th support
One end be fixedly connected with the 3rd framework, the side of the other end of the 4th support and the 3rd support is fixed and is connected
Connect.
4th framework is in hollow cuboid, and the 4th framework horizontal positioned, the 4th framework are provided with position
In the 7th through hole and the 8th through hole on surface disposed thereon on its right surface, described in the lower end aligned of the 6th pipeline, the 8th leads to
Hole and it is fixedly connected with the upper surface of the 4th framework, second montant is in cuboid, second montant is vertically placed,
The upper end of second montant is fixedly connected with the lower surface of first cylinder, the lower end of second montant and the described 4th
The upper surface of framework is fixedly connected, and the lower end of first montant is fixedly connected with the upper surface of the 4th framework, and described
7th through hole described in the lower end aligned of five pipelines and it is fixedly connected with the right surface of the 4th framework, the 4th screen pack is in
Cuboid, the 4th screen pack is in vertical shape, and the inner surface of the side of the 4th screen pack and the 4th framework slides
Connection, the 8th spring are horizontal, and the right-hand member of the 6th spring is fixedly connected with the inner surface of the 4th framework, institute
The left end for stating the 6th spring is fixedly connected with the right surface of the 4th screen pack, and first fixed block is in cuboid, described
The upper surface of the first fixed block is fixedly connected with the inner surface of the 4th framework.
The upper surface of second cylinder is fixedly connected with the inner surface of the 4th framework, and the mobile bar is in rectangular
Body, the mobile bar horizontal positioned, the left end of the mobile bar are connected with second cylinder, the right-hand member of the mobile bar and institute
The left surface for stating the first movable block is fixedly connected, and the cross section of first movable block is in a rectangular trapezoid, first movable block
Lower surface oblique, first movable block is provided with the first circular hole positioned at its left and right surface, second sponge block
Cross section in a rectangular trapezoid, second sponge block is contained in first movable block, second sponge block with described
The inner surface of the first movable block is fixedly connected, and the 3rd montant in cuboid, vertically place by the 3rd montant, and the described 3rd
The lower end of montant is fixedly connected with the inner surface of the 4th framework, and the lower end of the 3rd montant is provided with the first groove, described
It is in cuboid to limit bar, and the restriction bar horizontal positioned, the right surface of the left end of the restriction bar and the 3rd montant are fixed
Connection, the cross section of second movable block are in a rectangular trapezoid, and the upper surface of second movable block is oblique, and described second
The upper surface of movable block is slidably connected with the lower surface of first movable block, and second movable block is provided with positioned at its left and right
Second circular hole on surface, the 3rd sponge block cross section are in a rectangular trapezoid, and the 3rd sponge block is contained in described second and moves
Motion block is interior and is secured to connect, and the right surface of second movable block is slidably connected with the left surface of the 3rd montant, institute
The 4th cross bar is stated in cuboid, the 4th cross bar horizontal positioned, the right-hand member of the 4th cross bar and second movable block
Left surface is fixedly connected, and the 4th cross bar is provided with the 9th spring being disposed below, and the 9th spring is provided with two, institute
The 9th spring is stated in vertical shape, the upper end of the 9th spring is fixedly connected with the 4th cross bar, under the 9th spring
End be fixedly connected with the inner surface of the 4th framework, the 5th cross bar be in cuboid, the 5th cross bar horizontal positioned, institute
State the 5th cross bar and be provided with the 4th montant on the right side of which and the 5th montant on the left of which, the 4th montant is in rectangular
Body, the 4th montant are vertically placed, and the lower end of the 4th montant is fixedly connected with the inner surface of the 4th framework, described
The right-hand member of the 5th cross bar is fixedly connected with the left end of the 4th montant, and the lower end of the 4th montant is provided with the second groove, institute
The left end for stating the 4th cross bar is acted against on the right surface of the 4th montant and is slidably connected with which, and the 5th montant is in rectangular
Body, the 5th montant are vertically placed, and the lower end of the 5th montant is fixedly connected with the inner surface of the 4th framework, described
The upper end of the 5th montant is fixedly connected with the lower surface of second cylinder, the left end of the 5th cross bar and the 5th montant
Right surface be fixedly connected, the lower end of the 5th montant is provided with the 3rd groove, and the 5th screen pack is in bending, described the
Five screen pack horizontal positioneds, the 5th screen pack are provided with the 7th pipeline being positioned above and the tenth bullet being disposed below
Spring, the upper end of the 7th pipeline are directed at the 8th through hole and are fixedly connected with the inner surface of the 4th framework, and described the
The lower end of seven pipelines is fixedly connected with the upper surface of the 5th screen pack, and the tenth spring is provided with two, the tenth bullet
Spring is in vertical shape, and the lower end of the tenth spring is fixedly connected with the inner surface of the 4th framework, the tenth spring upper
End is fixedly connected with the lower surface of the 5th screen pack.
After using above-mentioned technical proposal, the utility model pharmacy drying machine has the advantage that:
The utility model industrial plant waste gas purification dust arrester simple structure, easy to use, workshop can be produced
Particle, pernicious gas carry out sufficient purification filtering, dispose granule foreign therein, pernicious gas, prevent from polluting environment;And
And filter type is diversified, filter effect is notable so that the gas of discharge meets the standard of discharge;Simultaneously when air-flow is larger,
Shunting can be played a part of, prevent the utility model is caused to damage.
Description of the drawings
Structural representations of the Fig. 1 for the utility model industrial plant waste gas purification dust arrester;
In figure:1- air extractors;11- first supports;The first blower fans of 12-;13- exhaust tubes;The first valves of 14-;15- is evacuated
Bucket;The first frame devices of 2-;The first frameworks of 21-;211- first through hole;The second through holes of 212-;213- third through-holes;214- the 4th
Through hole;The first pipelines of 22-;The first water pumps of 23-;24- second supports;The second valves of 25-;26- second pipes;The 3rd valves of 27-;
28- first baffles;The first filters of 3-;31- sponge rings;The 3rd pipelines of 32-;The first springs of 33-;34- second springs;4- gas
Cylinder assembly;The first cylinders of 41-;42- catch bars;43- push pedals;44- sealing rings;The 4th springs of 45-;46- corner blocks;47- the 3rd
Support;5- second framework devices;The 4th pipelines of 51-;The 4th valves of 511-;52- second frameworks;521- fifth holes;53- the 3rd
Framework;The 6th open-works of 531-;54- second baffles;The first rollers of 55-;The first screen packs of 57-;The 5th springs of 58-;59- first is horizontal
Bar;The second cross bars of 50-;The second filters of 6-;The 6th springs of 61-;The second screen packs of 62-;The second rollers of 63-;The 3rd mistakes of 64-
Filter screen;The 7th springs of 65-;66- third baffles;The first sponge blocks of 67-;7- plumbing installations;The 5th pipelines of 71-;The 5th valves of 72-
Door;The 3rd cross bars of 73-;The first montants of 74-;The 4th supports of 75-;The 3rd frame devices of 8-;The 4th frameworks of 81-;811- the 7th leads to
Hole;The 8th through holes of 812-;The 6th pipelines of 82-;The 6th valves of 83-;The second montants of 84-;The 4th screen packs of 85-;The 8th bullets of 86-
Spring;The first fixed blocks of 87-;9- part flow arrangements;The second cylinders of 91-;92- mobile bars;The first movable blocks of 93-;The first circular holes of 931-;
The second sponge blocks of 94-;The 3rd montants of 95-;96- limits bar;The second movable blocks of 97-;The second circular holes of 971-;The 4th cross bars of 98-;
The 9th springs of 981-;The 5th cross bars of 99-;The 4th montants of 991-;The 5th montants of 992-;The 5th screen packs of 90-;901- the 7th is managed
Road;The tenth springs of 902-.
Specific embodiment
As shown in figure 1, the utility model proposes industrial plant waste gas purification dust arrester include air extractor 1, be located at
The first frame device 2, the first filter 3, position being contained in first frame device 2 on the right side of the air extractor 1
In the air cylinder device 4 below first filter 3, be located at first frame device 2 on the right side of second framework device 5,
It is contained in the second filter 6 in the second framework device 5, the plumbing installation being located at below the second framework device 5
7th, the 3rd frame device 8 and the part flow arrangement 9 being contained in the 3rd frame device 8 being located at below the air cylinder device 4.
As shown in figure 1, the air extractor 1 includes first support 11, the first wind being located at below the first support 11
Machine 12, the exhaust tube 13 being arranged on first blower fan 12, the first valve 14 being arranged on the exhaust tube 13, be located at institute
State the pumping bucket 15 on the left of exhaust tube 13.The first support 11 is L-shaped, the lower end of the first support 11 and first wind
Machine 12 is fixedly connected, and the upper end of the first support 11 is horizontal.The exhaust tube 13 is horizontal.The pumping bucket 15 is in
Hollow is round table-like, and the right surface of the pumping bucket 15 is fixedly connected with the left surface of the exhaust tube 13 so that the pumping
The inside of bucket 15 is communicated with the inside of the exhaust tube 13.
As shown in figure 1, first frame device 2 include the first framework 21, be located above first framework 21 the
One pipeline 22, the first water pump 23 being arranged on first pipeline 22, the second support being located on the left of first water pump 23
24th, the second valve 25 on first pipeline 22, the second pipe 26 being located on the left of first framework 21 are arranged at, are arranged
In the 3rd valve 27 and the first baffle 28 being contained in first framework 21 on the second pipe 26.First frame
Body 21 is in hollow cuboid, and first framework, 21 vertical placement, first framework 21 are provided with positioned at its right surface
First through hole 211, second through hole 212 on surface disposed thereon, the third through-hole 213 and fourth hole 214 for being located at its left surface,
The inside phase of the first through hole 211, the second through hole 212, third through-hole 213 and fourth hole 214 and first framework 21
Logical, the right-hand member of the exhaust tube 13 is directed at the third through-hole 213 and is fixedly connected with the left surface of first framework 21, institute
The upper end for stating first support 11 is fixedly connected with the left surface of first framework 21.One end alignment institute of first pipeline 22
State the second through hole 212 and be fixedly connected with the upper surface of first framework 21 so that the inside of first pipeline 22 and institute
The inside for stating the first framework 21 communicates, and the other end of first pipeline 22 is placed in pond.The second support 24 is in L
Type, one end of the second support 24 are fixedly connected with the upper surface of first framework 21, the second support 24 another
End is fixedly connected with first water pump 23.The right-hand member of the second pipe 26 is directed at the fourth hole 214 and with described the
The left surface of one framework 21 is fixedly connected.The first baffle 28 is in cuboid, 28 vertical placement of the first baffle, and described the
The upper end of one baffle plate 28 is fixedly connected with the inner surface of first framework 21, and the first baffle 28 is located at the first through hole
211 left side.
As shown in figure 1, first filter 3 includes sponge ring 31, the 3rd pipe being located on the left of the sponge ring 31
Road 32, the first spring 33 being arranged on the sponge ring 31, be located at the sponge ring 31 on the right side of second spring 34, be located at institute
State the 3rd spring above sponge ring 31.The cross section of the sponge ring 31 is in annular shape, 31 vertical placement of the sponge ring.Institute
State that the 3rd pipeline 32 is horizontal, the left end of the 3rd pipeline 32 be aligned the third through-hole 213 and with first framework
21 inner surface is fixedly connected, and the right-hand member of the 3rd pipeline 32 is fixedly connected with the left surface of the sponge ring 31 so that from
The gas that 3rd pipeline 32 is discharged needs the filtration through sponge ring 31.First spring 33 is horizontal, and described
One spring 33 is contained in the sponge ring 31, and the two ends of first spring 33 are fixedly connected with the sponge ring 31.Described
Second spring 34 is provided with three, and the second spring 34 is horizontal, the right-hand member of the second spring 34 and first framework
21 inner surface is fixedly connected, and the left end of the second spring 34 is fixedly connected with the sponge ring 31, so as to the sponge
Ring 31 is played a supporting role.3rd spring is in vertical shape, the upper end of the 3rd spring and first framework 21
Surface is fixedly connected, and the lower end of the 3rd spring is fixedly connected with the sponge ring 31.
As shown in figure 1, the air cylinder device 4 includes the first cylinder 41, the catch bar being located above first cylinder 41
42nd, the push pedal 43 above the catch bar 42, the sealing ring 44 being arranged in the push pedal 43 are located at, are located under the push pedal 43
4th spring 45 of side, the corner block 46 and the positioned at 41 left and right sides of the first cylinder the 3rd being located above the push pedal 43
Support 47.First cylinder 41 is located at the lower section of first framework 21.The catch bar 42 be in cylinder, the catch bar
42 vertical placements, the lower end of the catch bar 42 are connected with first cylinder 41 so that first cylinder 41 drives described
Catch bar 42 is moved up and down, and the upper end of the catch bar 42 is fixedly connected with the lower surface of the push pedal 43, the catch bar 42
Run through the surfaces externally and internally of first framework 21 and be slidably connected with which.The push pedal 43 be in cuboid, 43 level of the push pedal
Place.The sealing ring 44 is annular in shape, and the inner surface of the sealing ring 44 is fixedly connected with the side of the push pedal 43, described close
The outer surface of seal ring 44 is fixedly connected with the inner surface of first framework 21, so that the water above the push pedal 43 cannot
Enter into the lower section of push pedal 43.4th spring 45 is provided with two and is located at the left and right sides of the catch bar 42, institute respectively
The 4th spring 45 is stated in vertical shape, the upper end of the 4th spring 45 is fixedly connected with the push pedal 43, the 4th spring 45
Lower end be fixedly connected with the inner surface of first framework 21, so as to play a supporting role to the push pedal 43.The triangle
The rectangular triangle in the cross section of block 46, the lower surface of the corner block 46 are fixedly connected with the upper surface of the push pedal 43, institute
The right surface and the inner surface of first framework 21 for stating corner block 46 is slidably connected.3rd support 47 is provided with two and divides
Not Wei Yu first cylinder 41 the left and right sides, one end of the 3rd support 47 is fixed with the side of first cylinder 41
Connection, the other end of the 3rd support 47 are fixedly connected with the lower surface of first framework 21.
As shown in figure 1, the second framework device 5 include the 4th pipeline 51, be located at below the 4th pipeline 51 the
Two frameworks 52, the 3rd framework 53 being located at below the second framework 52, the second baffle being contained in the second framework 52
54th, first roller 55 second baffle 54 on the left of, first screen pack 57, position that be located at first roller 55 below are located at
In the 5th spring 58 below first screen pack 57, the first cross bar 59 being located on the left of the second framework 52 and positioned at institute
State the second cross bar 50 below the first cross bar 59.The second framework 52 in hollow round table-like, the second framework 52 upper
Surface is provided with fifth hole 521, and the fifth hole 521 is communicated with the inside of the second framework 52.4th pipeline 51
Upper end be directed at the first through hole 211 and be fixedly connected with the right surface of first framework 21 so that the 4th pipeline
51 inside is communicated with the inside of first framework 21, and the other end of the 4th pipeline 51 is directed at the fifth hole 521
And be fixedly connected with the upper surface of the second framework 52 so that the inside of the 4th pipeline 51 and the second framework 52
Inside communicates, and the 4th pipeline 51 is provided with the 4th valve 511.3rd framework 53 is in hollow hemisphere, and described the
The upper surface of three frameworks 53 is fixedly connected with the lower surface of the second framework 52 so that the inside of the 3rd framework 53 and institute
The inside for stating second framework 52 communicates.The second baffle 54 be in vertical shape, the upper end of the second baffle 54 and described second
The inner surface of framework 52 is fixedly connected.In cylinder, first roller 55 is contained in second frame to first roller 55
Turn be connected in body 52 and with 52 axle of the second framework, first roller 55 and motor connection, drive first roller 55
Rotation, first roller 55 are provided with some first bristles, and first bristle is evenly distributed on first roller 55,
First bristle is fixedly connected with first roller 55.First screen pack 57 is horizontal, first screen pack
57 right surface is fixedly connected with the left surface of the second baffle 54, the left surface of first screen pack 57 and described second
The inner surface of framework 52 is fixedly connected.5th spring 58 be in vertical shape, the upper end and described first of the 5th spring 58
The lower surface of screen pack 57 is fixedly connected.First cross bar 59 is horizontal, the left end of first cross bar 59 and described
The right surface of one framework 21 is fixedly connected, and the right-hand member of first cross bar 59 is fixedly connected with the side of the second framework 52.
Second cross bar 50 is horizontal, and the right-hand member of second cross bar 50 is fixedly connected with the 3rd framework 53, and described second
The left end of cross bar 50 is fixedly connected with the right surface of first framework 21.3rd framework 53 is provided with the 6th through hole 531,
6th through hole 531 is communicated with the inside of the 3rd framework 53.
As shown in figure 1, second filter 6 include the 6th spring 61, be located at below the 6th spring 61 the
Two screen packs 62, the second roller 63 being located at below second screen pack 62, the 3rd be located at below second roller 63
Screen pack 64, the 7th spring 65 being located at below the 3rd screen pack 64, the 3rd be located on the right side of the 3rd screen pack 64
Baffle plate 66 and the first sponge block 67 below the 7th spring 65.6th spring 61 be in vertical shape, the described 6th
The upper end of spring 61 is fixedly connected with the inner surface of the second framework 52, the lower end of the 6th spring 61 and second mistake
The upper surface of filter screen 62 is fixedly connected.Second screen pack 62 is horizontal, the left end of second screen pack 62 with described
The right surface of second baffle 54 is fixedly connected, and the right-hand member of second screen pack 62 is fixed with the inner surface of the second framework 52
Connection.Second roller 63 is in cylinder, and 63 horizontal positioned of the second roller, second roller 63 are contained in described the
Turn be connected in three frameworks 53 and with 53 axle of the 3rd framework, second roller 63 and motor connection drive described second to roll
Wheel 63 rotates, and second roller 63 is provided with the second bristle, and second bristle is evenly distributed on second roller 63
And be secured to connect.The cross section of the 3rd screen pack 64 is in the shape of the letter V, the left surface of the 3rd screen pack 63 with described
The right surface of second baffle 54 is slidably connected, and the left surface of the right surface of the 3rd screen pack 63 and the third baffle 66 is slided
Dynamic connection so that the 3rd screen pack 63 can be moved up and down.7th spring 65 is provided with two, the 7th spring 65
In vertical shape, the upper end of the 7th spring 65 is fixedly connected with the 3rd screen pack 64, the lower end of the 7th spring 65
It is fixedly connected with first sponge block 67.The lower surface of the one the first sponge block 67 and the interior table of the 3rd framework 53
Face is fixedly connected, and the lower end of the second baffle 54 is fixedly connected with the upper surface of first sponge block 67.5th bullet
The lower end of spring 58 is fixedly connected with first sponge block 67.The third baffle 66 is in vertical shape, the third baffle 66
Lower end is fixedly connected with the inner surface of the 3rd framework 53, the upper end of the third baffle 66 and second screen pack 62
Lower surface is fixedly connected.
As shown in figure 1, the plumbing installation 7 includes the 5th pipeline 71, the 5th valve being arranged on the 5th pipeline 71
Door 72, the 3rd cross bar 73 being located on the left of the 5th pipeline 71, the first montant 74, position being located on the left of the 3rd cross bar 73
The 4th support 75 above first montant 74.The upper end of the 5th pipeline 71 be aligned the 6th through hole 531 and with
The outer surface of the 3rd framework 53 is fixedly connected so that the inside of the 5th pipeline 71 and the inside of the 3rd framework 53
Communicate.3rd cross bar 73 is horizontal, and the right-hand member of the 3rd cross bar 73 is fixedly connected with the 5th pipeline 71, described
The left end of the 3rd cross bar 73 is fixedly connected with the right surface of first montant 74.First montant 74 is in cuboid, described
First montant, 74 vertical placement, the upper end of first montant 74 is fixedly connected with the lower surface of the 4th support 75.Described
4th support 75 is L-shaped, and one end of the 4th support 75 is fixedly connected with the 3rd framework 53, the 4th support 75
The other end is fixedly connected with the side of the 3rd support 47.
As shown in figure 1, the 3rd frame device 8 include the 4th framework 81, be located above the 4th framework 81 the
Six pipelines 82, the 6th valve 83 being arranged on the 6th pipeline 82, the second montant being located on the right side of the 6th pipeline 82
84th, be contained in the 4th screen pack 85 in the 4th framework 81, be located at the 4th screen pack 85 on the right side of the 8th spring 86,
The first fixed block 87 being located on the left of the 4th screen pack 85.4th framework 81 be in hollow cuboid, the described 4th
81 horizontal positioned of framework, the 4th framework 81 are provided with the 7th through hole 811 and surface disposed thereon positioned at its right surface
8th through hole 812, the 7th through hole 811 and the 8th through hole 812 are communicated with the inside of the 4th framework 81.6th pipe
8th through hole 812 described in the lower end aligned in road 82 and it is fixedly connected with the upper surface of the 4th framework 81.Second montant
84 is in cuboid, second montant, 84 vertical placement, the following table of the upper end of second montant 84 and first cylinder 41
Face is fixedly connected, and the lower end of second montant 84 is fixedly connected with the upper surface of the 4th framework 81.First montant
74 lower end is fixedly connected with the upper surface of the 4th framework 81.7th through hole described in the lower end aligned of the 5th pipeline 71
811 and it is fixedly connected with the right surface of the 4th framework 81.4th screen pack 85 be in cuboid, the 4th screen pack
85 is in vertical shape, and the side of the 4th screen pack 85 is slidably connected with the inner surface of the 4th framework 81 so that described the
Four screen packs 85 can be moved left and right.8th spring 86 is horizontal, the right-hand member and the described 4th of the 6th spring 86
The inner surface of framework 81 is fixedly connected, and the left end of the 6th spring 86 is connected with the right surface fixation of the 4th screen pack 85
Connect.First fixed block 87 is in cuboid, the inner surface of the upper surface of first fixed block 87 and the 4th framework 81
It is fixedly connected, first fixed block 87 can prevent the 4th screen pack 85 to be excessively moved to the left.
As shown in figure 1, the part flow arrangement 9 includes the second cylinder 91, the mobile bar being located on the right side of second cylinder 91
92nd, be located at the mobile bar 92 on the right side of the first movable block 93, the second sponge block 94 being contained in first movable block 93,
Be located at first movable block 93 below the second movable block 97, the 3rd sponge block being contained in second movable block 97,
It is located at the 3rd montant 95 on the right side of second movable block 97, the restriction bar 96 being located on the right side of the 3rd montant 95, is located at institute
State the 4th cross bar 98 on the left of the second movable block 97, the 5th cross bar 99 being located on the left of the 4th cross bar 98 and be located at described the
The 5th screen pack 90 on the left of five cross bars 99.The inner surface of the upper surface of second cylinder 91 and the 4th framework 81 is fixed
Connection.The mobile bar 92 is in cuboid, 92 horizontal positioned of the mobile bar, the left end of the mobile bar 92 and second gas
Cylinder 91 connects, and the right-hand member of the mobile bar 92 is fixedly connected with the left surface of first movable block 93.First movable block
93 in hollow shape, and the cross section of the movable block 93 is in a rectangular trapezoid, and the lower surface of first movable block 93 is oblique, institute
State the first movable block 93 and be provided with the first circular hole 931 positioned at its left and right surface, first circular hole 931 and the described first movement
The inside of block 93 communicates.The cross section of second sponge block 94 is in a rectangular trapezoid, and second sponge block 94 is contained in described
In first movable block 93, second sponge block 94 is fixedly connected with the inner surface of first movable block 93.Described 3rd erects
Bar 95 is in cuboid, and the 95 vertical placement of the 3rd montant, in the lower end of the 3rd montant 95 and the 4th framework 81
Surface is fixedly connected, and the lower end of the 3rd montant 95 is provided with the first groove, and first groove is in rectangular-shape.The restriction
Bar 96 is in cuboid, 96 horizontal positioned of restriction bar, the right surface of the left end of the restriction bar 96 and the 3rd montant 95
It is fixedly connected, the restriction bar 96 can prevent the 4th screen pack 85 to be excessively moved to the left, to the 4th screen pack 85
Play a part of restriction., in hollow shape, the cross section of second movable block 97 is in a rectangular trapezoid, institute for second movable block 97
The upper surface for stating the second movable block 97 is oblique, under the upper surface of second movable block 97 and first movable block 93
Surface is slidably connected, and second movable block 97 is provided with the second circular hole 971 positioned at its left and right surface, second circular hole
971 are communicated with the inside of second movable block 97.The 3rd sponge block cross section is in a rectangular trapezoid, the 3rd sponge block
It is contained in second movable block 97 and is secured to connect, the right surface of second movable block 97 and the 3rd montant
95 left surface is slidably connected.4th cross bar 98 be in cuboid, 98 horizontal positioned of the 4th cross bar, the 4th cross bar
98 right-hand member is fixedly connected with the left surface of second movable block 97, and the 4th cross bar 98 is provided with for being disposed below
Nine springs 981, the 9th spring 981 are provided with two, the 9th spring 981 be in vertical shape, the 9th spring 981 upper
End is fixedly connected with the 4th cross bar 98, and the lower end of the 9th spring 981 is fixed with the inner surface of the 4th framework 81
Connection, so as to play a supporting role to the 4th cross bar 98.5th cross bar 99 be in cuboid, 99 water of the 5th cross bar
Placing flat, the 5th cross bar 99 are provided with the 4th montant 991 on the right side of which and the 5th montant 992 on the left of which,
4th montant 991 is in cuboid, the 991 vertical placement of the 4th montant, the lower end of the 4th montant 991 and described the
The inner surface of four frameworks 81 is fixedly connected, and the right-hand member of the 5th cross bar 99 is fixedly connected with the left end of the 4th montant 991,
The lower end of the 4th montant 991 is provided with the second groove, and the left end of the 4th cross bar 98 acts against the 4th montant 991
It is slidably connected on right surface and with which so that the 4th cross bar 98 and the second movable block 97 can be moved up and down, the described 5th
Montant 992 is in cuboid, the 992 vertical placement of the 5th montant, the lower end of the 5th montant 992 and the 4th framework 81
Inner surface be fixedly connected, the upper end of the 5th montant 992 is fixedly connected with the lower surface of second cylinder 91, described
The left end of five cross bars 99 is fixedly connected with the right surface of the 5th montant 992, and the lower end of the 5th montant 992 is provided with the 3rd
Groove.5th screen pack 90 is in bending, and 90 horizontal positioned of the 5th screen pack, the 5th screen pack 90 are provided with
The 7th pipeline 901 being positioned above and the tenth spring 902 being disposed below, the upper end alignment institute of the 7th pipeline 901
State the 8th through hole 812 and be fixedly connected with the inner surface of the 4th framework 81, the lower end of the 7th pipeline 901 and described
The upper surface of five screen packs 90 is fixedly connected so that the air entered in the 7th pipeline 901 is needed through the 5th filtration
The filtration of net 90, the tenth spring 902 are provided with two, and the tenth spring 902 is in vertical shape, the tenth spring 902
Lower end is fixedly connected with the inner surface of the 4th framework 81, the upper end of the tenth spring 902 and the 5th screen pack 90
Lower surface be fixedly connected.
As shown in figure 1, the utility model proposes industrial plant waste gas purification dust arrester use when, placed first
In workshop, then start the first blower fan 12, and open the first valve 14 so that the air in workshop is through pumping bucket
15 enter in exhaust tube 13, then in the 3rd pipeline 32.Now start the first water pump 23, open the second valve 25,
So that the water in pond is entered in the first pipeline 22, then in the first framework 21, such that it is able to soak sponge block 31,
Effect is more preferable for the filtering absorption of under the state of soaking of sponge block 31, and then water is concentrated and dripped in push pedal 43.
The air entered in the 3rd pipeline 32 is entered in the first framework 21 after the double filtration of sponge ring 31, by
Be wetted in sponge ring 31, and the water flowed out from the first pipeline 22 be to whereabouts, such that it is able to from the 3rd pipeline 32 out
Air carries out sufficient filtration, purification, removes most granule foreign therein and pernicious gas.Then gas is through first
The right side of baffle plate 28 is entered in first through hole 211, then in the 4th pipeline 51.The more need of water above the push pedal 43
When to be discharged, the 3rd valve 27 is opened, then starts the first cylinder 41 so that catch bar 42 drives the push pedal 43 to move upwards
Dynamic, then so that the water in push pedal 43 is moved up, then enter in second pipe 26 through fourth hole 214, Ran Houpai
Go out, until discharge all of only.Then the 4th valve 511 is opened so that the air entered in the 4th pipeline 51 enters into the
In two frameworks 52, start the motor being connected with the first roller 55 so that the first roller 55 is rotated in second framework 52, while band
Dynamic first bristle is rotated with, and carries out filtration, purification such that it is able to the air to spraying from the 4th pipeline 51, and absorption is fallen wherein to remain
Remaining granule foreign.Then enter into after the filtration of the first screen pack 57 in the 3rd framework 53, through the first sponge block 67
Filtration after enter into the right side of second baffle 54.Then, after the filtration of the 3rd screen pack 64, start and the second roller 63
The motor of connection, drives second roller 63 to rotate in the 3rd framework 53, and then drives second bristle to rotate with,
Such that it is able to be filtered to the air after the 3rd screen pack 63 is filtered again, granule foreign therein is fallen in absorption.Work as warp
Cross the first sponge block 67 filter after air pressure larger when, the 3rd screen pack 63 can be moved up, such that it is able to play buffering
Effect, and when the 3rd screen pack 64 is contacted with the second bristle, second bristle can clean out speckle with thereon miscellaneous
Matter.Then air enters into the right side of third baffle 66 after the filtration of the second screen pack 62, then into the 6th through hole
531, then in the 5th pipeline 71, the 5th valve 72 is opened, then in the 4th framework 81.Filter through the 4th
It is moved to the left after the filtration of net 85, when air pressure is larger, the 4th screen pack 85 is moved to the left, and plays a part of buffering, prevents
Only the 4th screen pack 85 is caused to damage.When air pressure is little, start the second cylinder 91 so that mobile bar 92 moves right
Dynamic so that the first movable block 93 moves right, due to the upper table of lower surface and second movable block 97 of the first movable block 93
Face is slidably connected and obliquely, and then the second movable block 97 is moved down, until second movable block 97 is moved to
Bottom and first groove is blocked, be then shut off the second cylinder 91, now the air after the filtration of the 4th screen pack 85
Part is entered in second circular hole 971 on 97 right surface of the second movable block, then through the 3rd sponge through the first groove
Discharge from the second circular hole 971 of 97 left surface of the second movable block after the filtration of block, then through the second groove and the 3rd groove to
Move left, remaining air enters into the first movable block 93 through the first circular hole 931 for being located at first movable block, 93 right surface
Interior, the first circular hole through 93 left surface of the first movable block after the filtration of the second sponge block 94 is discharged, and then air is passed through
Enter into after the filtration of the 5th screen pack 90 in the 7th pipeline 901, then in the 6th pipeline 82, open the 6th valve 83
It is then discharged out;When air pressure is larger, through the 4th screen pack 85 filter after air through the first groove, the second groove, the 3rd
Enter into after the filtration of groove and the 5th screen pack 90 in the 7th pipeline 901, then into discharge in the 6th pipeline 82.So as to
The less air of air pressure can sufficiently be filtered, and can the air larger to air pressure quickly discharged, prevent
Only equipment is caused to damage.So far, the utility model industrial plant waste gas purification dust arrester is finished using process description.
Claims (4)
1. a kind of industrial plant waste gas purification dust arrester, including air extractor (1), is located on the right side of the air extractor (1)
First frame device (2), the first filter (3) being contained in the first frame device (2), positioned at described first filter
Air cylinder device (4) below device (3), the second framework device (5) being located on the right side of the first frame device (2), it is contained in
The second filter (6), the plumbing installation being located at below second framework device (5) in second framework device (5)
(7), it is located at the 3rd frame device (8) below the air cylinder device (4) and is contained in dividing in the 3rd frame device (8)
Stream device (9), described air extractor (1) include first support (11), the first blower fan being located at below the first support (11)
(12) exhaust tube (13), being arranged on the first blower fan (12), the first valve being arranged on the exhaust tube (13)
(14) the pumping bucket (15), being located on the left of the exhaust tube (13);Described first frame device (2) include the first framework (21),
The first pipeline (22) being located above the first framework (21), it is characterised in that:Described first filter (3) include sponge
Ring (31), the 3rd pipeline (32) being located on the left of sponge ring (31), the first spring being arranged on sponge ring (31)
(33) second spring (34) on the right side of sponge ring (31), the 3rd spring being located above sponge ring (31), are located at;Institute
Part flow arrangement (9) is stated including the second cylinder (91), the mobile bar (92) being located on the right side of the second cylinder (91), positioned at the shifting
The first movable block (93), the second sponge block (94) being contained in the first movable block (93) on the right side of lever (92), it is located at
The second movable block (97), the 3rd sponge being contained in the second movable block (97) below first movable block (93)
Block, the 3rd montant (95) being located on the right side of the second movable block (97), the restriction bar being located on the right side of the 3rd montant (95)
(96), be located at the second movable block (97) on the left of the 4th cross bar (98), be located at the 4th cross bar (98) on the left of the 5th
Cross bar (99) and the 5th screen pack (90) being located on the left of the 5th cross bar (99).
2. industrial plant waste gas purification dust arrester according to claim 1, it is characterised in that:First support (11)
L-shaped, the lower end of first support (11) is fixedly connected with the first blower fan (12), the upper end of first support (11)
Horizontal, exhaust tube (13) are horizontal, pumping bucket (15) in hollow round table-like, pumping bucket (15)
Right surface is fixedly connected with the left surface of the exhaust tube (13).
3. industrial plant waste gas purification dust arrester according to claim 1, it is characterised in that:Second spring (34)
Three are provided with, second spring (34) are horizontal, the right-hand member of second spring (34) and the first framework (21)
Inner surface is fixedly connected, and the left end of second spring (34) is fixedly connected with sponge ring (31), and the 3rd spring is in
Vertical shape, the upper end of the 3rd spring is fixedly connected with the inner surface of the first framework (21), under the 3rd spring
End is fixedly connected with sponge ring (31).
4. industrial plant waste gas purification dust arrester according to claim 1, it is characterised in that:Restriction bar (96)
It is in cuboid, restriction bar (96) horizontal positioned, the right table of the left end of restriction bar (96) and the 3rd montant (95)
Face is fixedly connected, and the cross section of the second movable block (97) is in a rectangular trapezoid, and the upper surface of the second movable block (97) is in
Skewed, the upper surface of the second movable block (97) is slidably connected with the lower surface of the first movable block (93), and described
Two movable blocks (97) are provided with the second circular hole (971) positioned at its left and right surface, and the 3rd sponge block cross section is at right angles terraced
Shape, the 3rd sponge block are contained in the second movable block (97) and are secured to connect, the second movable block (97)
Right surface be slidably connected with the left surface of the 3rd montant (95).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620563393.1U CN206008324U (en) | 2016-06-12 | 2016-06-12 | A kind of industrial plant waste gas purification dust arrester |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620563393.1U CN206008324U (en) | 2016-06-12 | 2016-06-12 | A kind of industrial plant waste gas purification dust arrester |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206008324U true CN206008324U (en) | 2017-03-15 |
Family
ID=58241719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620563393.1U Expired - Fee Related CN206008324U (en) | 2016-06-12 | 2016-06-12 | A kind of industrial plant waste gas purification dust arrester |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206008324U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106237734A (en) * | 2016-09-09 | 2016-12-21 | 成都菲斯普科技有限公司 | A kind of efficient dedusting and purifying air system |
-
2016
- 2016-06-12 CN CN201620563393.1U patent/CN206008324U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106237734A (en) * | 2016-09-09 | 2016-12-21 | 成都菲斯普科技有限公司 | A kind of efficient dedusting and purifying air system |
CN106237734B (en) * | 2016-09-09 | 2018-06-26 | 盐城市吉盛达环保工程有限公司 | A kind of efficient dedusting and purifying air system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105854497B (en) | A kind of industrial waste-gas purifier | |
CN105771518B (en) | Dust treatment plant in a kind of ore processing | |
CN104998503B (en) | The environment-protecting type exhaust air cleaning equipment that a kind of purification efficiency is high | |
CN206274191U (en) | A kind of indoor air-purification device | |
CN208161282U (en) | A kind of environment-friendly type building fugitive dust processing unit | |
CN105879554B (en) | A kind of air cleaning facility | |
CN105854440B (en) | A kind of industrial waste gas filtration purifier | |
CN105771529A (en) | Efficient environment-friendly indoor air purifying device | |
CN210385259U (en) | Dust removal and purification device for food workshop | |
CN206008324U (en) | A kind of industrial plant waste gas purification dust arrester | |
CN105833615A (en) | Air filtration and purification device | |
CN104722151B (en) | Industrial waste gas washer | |
CN109692538A (en) | Purification device for diesel engine vent gas processing | |
CN107461870A (en) | Air-exchange type air purification device capable of accelerating air flow | |
CN209791110U (en) | Central dust removal equipment | |
CN206229118U (en) | A kind of air cleaning facility for workshop | |
CN210050923U (en) | Air purification device for water quality modifier production workshop | |
CN108579336B (en) | High-efficient environmental protection's organic waste gas adsorbs concentrator | |
CN113713569A (en) | Flue gas purification device of steel sintering machine | |
CN208260450U (en) | A kind of environment protection treating dedusting pusher gear | |
CN207076311U (en) | Factory indoor fume purifying apparatus | |
CN104958989A (en) | High-efficiency filtering and automatic cycle dust remover | |
CN117884206B (en) | Ventilation device for experiment operation table | |
CN208583130U (en) | A kind of public arena indoor air-purification device | |
CN104998476B (en) | Waste gas treatment device with damping function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20200612 |