CN105771518B - Dust treatment plant in a kind of ore processing - Google Patents
Dust treatment plant in a kind of ore processing Download PDFInfo
- Publication number
- CN105771518B CN105771518B CN201610281265.2A CN201610281265A CN105771518B CN 105771518 B CN105771518 B CN 105771518B CN 201610281265 A CN201610281265 A CN 201610281265A CN 105771518 B CN105771518 B CN 105771518B
- Authority
- CN
- China
- Prior art keywords
- support
- framework
- fixedly connected
- pipeline
- screen pack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/60—Combinations of devices covered by groups B01D46/00 and B01D47/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/10—Combinations of devices covered by groups B01D45/00, B01D46/00 and B01D47/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2258/00—Sources of waste gases
- B01D2258/02—Other waste gases
- B01D2258/025—Other waste gases from metallurgy plants
Abstract
Dust treatment plant in a kind of ore processing, including air extractor, plumbing installation, first filter, second filter, attachment means and purifier, air extractor includes the first framework, first pipeline, air inlet bucket, first support, second pipe, first roller, first screen pack, second support, second screen pack and the 3rd pipeline, plumbing installation includes the 4th pipeline, 3rd support, second blower fan, first cross bar, first brace, first bent stick, 4th support, first filter includes second framework, 3rd screen pack, 4th screen pack, first spring, first cushion block, second filter includes the 3rd framework, first baffle, attachment means include the 5th pipeline, 7th support, 8th support, 9th support, tenth support, 6th pipeline and the 11st support, purifier includes purifying box, 6th screen pack, 4th framework, the present invention is enough to suck dust wherein, then thoroughly purification filtering is carried out to it, clean-up effect is notable.
Description
Technical field
The present invention relates to dust treatment plant in dust processing technology field, more particularly to a kind of ore processing.
Background technology
During dust is industrial production, a kind of especially product common in mineral products processing, dust not only brings the damage of mineral
Lose, and bring serious environmental pollution.Cause the soil and air on periphery in mining and process by serious pollution,
By atmospheric air circulation, dust enters in water body, while causing the pollution of water body, causes the destruction of whole ecological environment.Produce
Substantial amounts of dust flies away in atmosphere, causes the bad weathers such as dense fog occur, causes the diseases such as human respiratory system.Exploitation,
The processing such as broken, screening, conveying scene, dust causes serious infringement to the healthy of workman first, secondly plant area
Production environment export be airborne dust and to fall ash.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
The content of the invention
It is an object of the invention to provide dust treatment plant in a kind of ore processing that can effectively solve above-mentioned technical problem.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:
Dust treatment plant includes air extractor, position in dust treatment plant in a kind of ore processing, the ore processing
Plumbing installation on the right side of the air extractor, the first filter below the plumbing installation, positioned at described first
The second filter below filter, the attachment means below second filter and positioned at it is described connection dress
The purifier of lower section is put, the air extractor includes the first framework, the first pipeline being arranged in first framework, is located at
Air inlet bucket on the left of first pipeline, the first support above first pipeline, above first framework
Second pipe, the first roller being contained in first framework, the first screen pack on the left of first roller, position
Second support on the right side of first screen pack, the second screen pack on the right side of the second support and positioned at described first
The 3rd pipeline below framework, the plumbing installation includes the 4th pipeline, the 3rd support above the 4th pipeline, set
The second blower fan for being placed on the 4th pipeline, the first cross bar on the left of the 4th pipeline, positioned at first cross bar
First brace of lower section, the first bent stick above first brace, the 4th below first brace
Frame, the 5th support on the right side of the 4th pipeline and the 6th support on the left of the 4th pipeline, first mistake
Filter device includes second framework, is contained in the 3rd screen pack of the left and right sides in the second framework, positioned at the 3rd filtering
The 4th screen pack between net, the first spring below the 4th screen pack, below first spring
One cushion block, second filter includes the 3rd framework, the first baffle being contained in the 3rd framework, positioned at described the
The first support block below one baffle plate and the 5th screen pack below first support block, the attachment means include the
Five pipelines, the 7th support on the right side of the 5th pipeline, the 8th support on the left of the 5th pipeline, positioned at described
The 9th support on the left of 8th support, the tenth support below the 9th support, below the 5th pipeline
6th pipeline and the 11st support below the 5th pipeline, the purifier include purifying box, be contained in it is described
The 6th screen pack in purifying box, the 4th framework below the 6th screen pack, below the 4th framework
Second bent stick and the second spring above the 4th framework.
First framework is in hollow cuboid, and the first framework horizontal positioned, first framework is provided with position
First through hole in its right surface, the second through hole positioned at its lower surface and the third through-hole on surface disposed thereon, described first
Pipeline is horizontal, and the right-hand member of first pipeline is extended in first framework through the surfaces externally and internally of first framework
Portion, first pipeline is fixedly connected with first framework, and first pipeline is provided with the first blower fan, first pipeline
Left end be fixedly connected with the right surface of the air inlet bucket, the air inlet bucket is in hollow round table-like, and the first support is in L
Type, one end of the first support is fixedly connected with first blower fan, the other end of the first support and first frame
The left surface of body is fixedly connected, one end of the second pipe be aligned the third through-hole and with the upper surface of first framework
It is fixedly connected, the second pipe is provided with water pump, the water pump is provided with the first montant, and first montant is in vertical shape,
The lower end of first montant is fixedly connected with first framework, and the upper end of first montant is fixed with the water pump to be connected
Connect.
The cross section of first roller is oval, and first roller turns to be connected with the first framework axle, described
First roller is provided with the bristle positioned at its two ends, and the bristle is provided with several and is fixedly connected with first roller, institute
State the first screen pack to be in the shape of the letter V, the upper end of first screen pack is in vertical shape, and the lower end of first screen pack is inclined
Shape, the right-hand member of first pipeline is fixedly connected with the left surface of first screen pack, and the second support is L-shaped, described
One end of second support is fixedly connected with the inner surface of first framework, the other end of the second support and first mistake
Filter screen is fixedly connected, and second screen pack is in bending, the upper and lower ends of second screen pack and first framework
Inner surface is fixedly connected, and second screen pack is located at the left side of the first through hole, and the 3rd pipeline is in vertical shape, described
The upper end of 3rd pipeline is directed at second through hole and is fixedly connected with the lower surface of first framework, on the 3rd pipeline
Provided with the first valve.
The upper end of 4th pipeline is directed at the first through hole and is fixedly connected with the right surface of first framework, institute
The lower end for stating the 4th pipeline is in vertical shape, and the 3rd support is in concave shape, one end and first frame of the 3rd support
Body is fixedly connected, and the other end of the 3rd support is fixedly connected with the 4th pipeline, and first cross bar is horizontal, institute
The left end for stating the first cross bar is fixedly connected with the right surface of first framework, the right-hand member of first cross bar and described first curved
Curved bar is fixedly connected, and first brace is oblique, and the upper end of first brace and the right surface of first framework are consolidated
Fixed connection, the lower end of first brace is fixedly connected with second blower fan, and first bent stick is in bending, and described the
The lower end of one bent stick is fixedly connected with first brace, and the 4th pipeline runs through the upper and lower surface of first bent stick
And connection is secured to, the 4th support is L-shaped, and one end of the 4th support is fixedly connected with first brace, institute
The other end for stating the 4th support is fixedly connected with the 4th pipeline, and the 5th support is L-shaped, one end of the 5th support
It is fixedly connected with the 4th pipeline, the other end of the 5th support is in vertical shape, the 6th support is L-shaped, described the
The upper end of six supports is fixedly connected with the 4th support, and the lower end of the 6th support is in vertical shape.
The second framework is cylinder of the cross section in isosceles trapezoid, the second framework horizontal positioned, second frame
Body is provided with the fourth hole on surface disposed thereon, fourth hole described in the lower end aligned of the 4th pipeline and with described second
The upper surface of framework is fixedly connected, and the lower end of the 5th support and the 6th support is fixedly connected with the second framework, described
3rd screen pack is provided with two and is located at the left and right sides in the second framework respectively, and the 3rd screen pack is in cuboid,
3rd screen pack is placed vertically, and the upper surface of the 3rd screen pack is fixedly connected with the inner surface of the second framework.
4th screen pack is in cuboid, and the 4th screen pack horizontal positioned, the 4th screen pack is located at described
Between 3rd screen pack, the side and the side of the 3rd screen pack of the 4th screen pack are slidably connected, first bullet
Spring is in vertical shape, and the upper end of first spring is fixedly connected with the 4th screen pack, the lower end of first spring and institute
The upper surface for stating the first cushion block is fixedly connected, and first cushion block is in cuboid, and first cushion block is located at the described 3rd filtering
Between net, the first cushion block horizontal positioned, the side of first cushion block is fixedly connected with the side of the 3rd screen pack,
The lower surface of first cushion block, the 3rd screen pack and second framework is in same plane.
3rd framework is in the cylinder that cross section is isosceles trapezoid, the 3rd framework horizontal positioned, the 3rd frame
The upper surface of body is fixedly connected with the lower surface of the second framework, and the lower surface of the 3rd framework is provided with fifth hole, institute
State that first baffle is horizontal, the side of the first baffle is fixedly connected with the inner surface of the 3rd framework, described first
The upper surface of baffle plate and the upper surface of the 3rd framework are in same plane, under the 3rd screen pack and the first cushion block
Surface is fixedly connected with the upper surface of the first baffle, and the first baffle is provided with the 6th through hole, first support block
In cuboid, the first support block horizontal positioned, the upper surface of first support block and the lower surface of the first baffle
It is fixedly connected, the 5th screen pack is in bending, the two ends of the 5th screen pack and the lower surface of first support block
It is fixedly connected, the 5th screen pack is located at the top of the fifth hole, the 5th screen pack acts against the 3rd frame
On the inner surface of body.
One end of 5th pipeline is directed at the fifth hole and is fixedly connected with the lower surface of the 3rd framework, institute
The other end for stating the 5th pipeline is fixedly connected with the upper end of the 6th pipeline, and the 7th support is L-shaped, the 7th support
One end be fixedly connected with the lower surface of the 3rd framework, the other end of the 7th support is fixed with the 5th pipeline to be connected
Connect, the 8th support is L-shaped, one end of the 8th support is fixedly connected with the 3rd framework, the 8th support
The other end is fixedly connected with the 5th pipeline, and the 9th support is L-shaped, one end of the 9th support with described 8th
Frame is fixedly connected, and the other end of the 9th support is fixedly connected with the tenth support, and the tenth support is in concave shape, institute
The one end for stating the tenth support is fixedly connected with the 5th pipeline, and the other end and the 6th pipeline of the tenth support are fixed
Connection, the 11st support is L-shaped, and one end of the 11st support is fixedly connected with the 5th pipeline, and the described tenth
The other end of one support is horizontal.
The purifying box is in hollow cuboid, and the cross section of the purifying box is in concave shape, the 11st support with
The right surface of the purifying box is fixedly connected, and the 6th screen pack is in cuboid, and the 6th screen pack horizontal positioned is described
The side of 6th screen pack is fixedly connected with the inner surface of the purifying box, upper surface and the purification of the 6th screen pack
The upper surface of case is in same plane, upper and lower surface and be secured to company of the 6th pipeline through the 6th screen pack
Connect, the lower end of the 6th pipeline is contained in the 4th framework, the 4th framework is U-shaped cylinder, institute in cross section
The 4th framework horizontal positioned is stated, second bent stick is provided with two and respectively positioned at the left and right sides of the 4th framework, institute
The second bent stick is stated in bending, the lower end of second bent stick is fixedly connected with the inner surface of the purifying box, described the
The upper end of two bent sticks is fixedly connected with the 4th framework, and the second spring is provided with two, and the second spring is in vertical
Shape, the lower end of the second spring is fixedly connected with the 4th framework, the upper end of the second spring and the described 6th filtering
The lower surface of net is fixedly connected.
After adopting the above technical scheme, the invention has the advantages that:
Dust treatment plant is simple in construction in ore processing of the present invention, easy to use, can be drawn into dust wherein, so
Thoroughly purification filtering is carried out to it afterwards, clean-up effect is notable, and purification efficiency is high, effectively can remove in industrial production
The dust of generation, purifies the environment of production, ensures the safety of the healthy of workman and production.
Brief description of the drawings
The embodiment to dust treatment plant in ore processing of the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of dust treatment plant in ore processing of the present invention;
Embodiment
As shown in figure 1, dust treatment plant includes air extractor 1, positioned at the air extractor 1 in ore processing of the present invention
The plumbing installation 2 on right side, the first filter 3 positioned at the lower section of the plumbing installation 2, under first filter 3
Second filter 4 of side, the attachment means 5 positioned at the lower section of second filter 4 and positioned at the lower section of attachment means 5
Purifier 6.
As shown in figure 1, the air extractor 1 includes the first framework 11, first be arranged in first framework 11 pipe
Road 12, the air inlet bucket 14 positioned at the left side of first pipeline 12, the first support 15 positioned at the top of the first pipeline 12, it is located at
The second pipe 16 of the top of first framework 11, the first roller 17 being contained in first framework 11, positioned at described the
First screen pack 18 in the left side of one roller 17, the second support 19 positioned at the right side of the first screen pack 18, positioned at described second
Second screen pack 10 on the right side of support 19 and the 3rd pipeline 13 positioned at the lower section of the first framework 11.First framework 11 is in
Hollow cuboid, the horizontal positioned of the first framework 11, first framework 11 is provided with leads to positioned at the first of its right surface
Hole 111, the second through hole 112 and the third through-hole 113 on surface disposed thereon positioned at its lower surface, the first through hole 111,
Two through holes 112 and third through-hole 113 are rounded and communicated with the inside of first framework 11.First pipeline 12 is in level
Shape, the right-hand member of first pipeline 12 is extended to inside first framework 11 through the surfaces externally and internally of first framework 11,
First pipeline 12 is fixedly connected with first framework 11, and first pipeline 12 is provided with the first blower fan 121.Described
The left end of one pipeline 12 is fixedly connected with the right surface of the air inlet bucket 14, and the air inlet bucket 14 is in hollow round table-like.It is described
First support 15 is L-shaped, and one end of the first support 15 is fixedly connected with first blower fan 121, the first support 15
The other end be fixedly connected with the left surface of first framework 11.One end of the second pipe 16 is directed at the third through-hole
113 and it is fixedly connected with the upper surface of first framework 11 so that the inside of the second pipe 16 and first framework
11 inside is communicated, and the other end of the second pipe 16 is placed in pond, and the second pipe 16 is provided with water pump 161,
The water pump 161 is provided with the first montant, and first montant is in vertical shape, the lower end of first montant and first frame
Body 11 is fixedly connected, and the upper end of first montant is fixedly connected with the water pump 161.The cross section of first roller 17 is in
Ellipse, first roller 17 turns to be connected with the axle of the first framework 11, first roller 17 and motor connection so that institute
Stating the first roller 17 can rotate in first framework 11, and first roller 17 is provided with the bristle 171 positioned at two ends,
The bristle 171 is fixedly connected provided with several and with first roller 17.First screen pack 18 is in the shape of the letter V, described
The upper end of first screen pack 18 is in vertical shape, and the lower end of first screen pack 18 is oblique, the right side of first pipeline 12
End is fixedly connected with the left surface of first screen pack 18.The second support 19 is L-shaped, one end of the second support 19
It is fixedly connected with the inner surface of first framework 11, the other end of the second support 19 is fixed with first screen pack 18
Connection.Second screen pack 10 is in bending, and the upper and lower ends of second screen pack 10 are interior with first framework 11
Surface is fixedly connected, and second screen pack 10 is located at the left side of the first through hole 111.3rd pipeline 13 is in vertical
Shape, the upper end of the 3rd pipeline 13 is directed at second through hole 112 and is fixedly connected with the lower surface of first framework 11,
So that the inside of the 3rd pipeline 13 is communicated with the inside of first framework 11, the 3rd pipeline 13 is provided with the first valve
Door 131, the flow for controlling water in the 3rd pipeline 13.
As shown in figure 1, the plumbing installation 2 include the 4th pipeline 21, the 3rd positioned at the top of the 4th pipeline 21
Frame 22, the second blower fan 23 being arranged on the 4th pipeline 21, the first cross bar 24 positioned at the left side of the 4th pipeline 21, position
In the first brace 25 of the lower section of the first cross bar 24, the first bent stick 26 above first brace 25, positioned at institute
State the 4th support 27 below the first brace 25, the 5th support 28 positioned at the right side of the 4th pipeline 21 and positioned at the described 4th
6th support 29 in the left side of pipeline 21.The upper end of 4th pipeline 21 be aligned the first through hole 111 and with first frame
The right surface of body 11 is fixedly connected so that the inside of the 4th pipeline 21 is communicated with the inside of first framework 11, described
The lower end of 4th pipeline 21 is in vertical shape.3rd support 22 is in concave shape, one end of the 3rd support 22 and described the
One framework 11 is fixedly connected, and the other end of the 3rd support 22 is fixedly connected with the 4th pipeline 21.Second blower fan
23 are used to the gas in first framework 11 being pumped into the 4th pipeline 21.First cross bar 24 is horizontal,
The left end of first cross bar 24 is fixedly connected with the right surface of first framework 11, the right-hand member of first cross bar 24 and institute
The first bent stick 26 is stated to be fixedly connected.First brace 25 is oblique, the upper end of first brace 25 and described first
The right surface of framework 11 is fixedly connected, and the lower end of first brace 25 is fixedly connected with second blower fan 23.Described first
Bent stick 26 is in bending, and the lower end of first bent stick 26 is fixedly connected with first brace 25, the 4th pipeline
21 run through the upper and lower surface of first bent stick 26 and are secured to connection, make so as to play support to the 4th pipeline 21
With.4th support 27 is L-shaped, and one end of the 4th support 27 is fixedly connected with first brace 25, and the described 4th
The other end of support 27 is fixedly connected with the 4th pipeline 21.5th support 28 is L-shaped, and the one of the 5th support 28
End is fixedly connected with the 4th pipeline 21, and the other end of the 5th support 28 is in vertical shape.6th support 29 is in L
Type, the upper end of the 6th support 29 is fixedly connected with the 4th support 27, and the lower end of the 6th support 29 is in vertical shape.
As shown in figure 1, first filter 3 includes second framework 31, is contained in left and right in the second framework 31
3rd screen pack 32 of both sides, the 4th screen pack 33 between the 3rd screen pack 32, positioned at the 4th screen pack
First spring 34 of 33 lower sections, the first cushion block 35 positioned at the lower section of the first spring 34.The second framework 31 is cross section
In the cylinder of isosceles trapezoid, the horizontal positioned of second framework 31, the horizontal positioned of second framework 31, the second framework 31
Be provided with surface disposed thereon fourth hole 311, the fourth hole 311 it is rounded and with the inside of the second framework 31
Communicate, fourth hole 311 described in the lower end aligned of the 4th pipeline 21 and being fixed with the upper surface of the second framework 31 connects
Connect so that the inside of the 4th pipeline 21 is communicated with the inside of the second framework 31, the 5th support 28 and the 6th
The lower end of frame 29 is fixedly connected with the second framework 31, and the second framework 31 is in hollow shape.3rd screen pack 32 is set
There are two and be located at the left and right sides in the second framework 31 respectively, the 3rd screen pack 32 is in cuboid, the described 3rd
Screen pack 32 is placed vertically, and the upper surface of the 3rd screen pack 32 is fixedly connected with the inner surface of the second framework 31.Institute
The 4th screen pack 33 is stated in cuboid, the horizontal positioned of the 4th screen pack 33, the 4th screen pack 33 is located at the described 3rd
Between screen pack 32, the side and the side of the 3rd screen pack 32 of the 4th screen pack 33 are slidably connected so that described
4th screen pack 33 can be moved up and down.First spring 34 is provided with two, and first spring 34 is in vertical shape, described the
The upper end of one spring 34 is fixedly connected with the 4th screen pack 33, the lower end of first spring 34 and first cushion block 35
Upper surface be fixedly connected.First cushion block 35 be in cuboid, first cushion block 35 be located at the 3rd screen pack 32 it
Between, the horizontal positioned of the first cushion block 35, the side fixation of the side of first cushion block 35 and the 3rd screen pack 32 connects
Connect, the lower surface of first cushion block 35, the 3rd screen pack 32 and second framework 31 is in same plane.
As shown in figure 1, second filter 4 includes the 3rd framework 41, be contained in the 3rd framework 41 the
One baffle plate 42, the first support block 43 positioned at the lower section of first baffle 42 and the 5th positioned at the lower section of the first support block 43
Screen pack 44.3rd framework 41 is in the cylinder that cross section is isosceles trapezoid, the horizontal positioned of the 3rd framework 41, described the
Three frameworks 41 are in hollow shape, and the upper surface of the 3rd framework 41 is fixedly connected with the lower surface of the second framework 31 so that
The inside of 3rd framework 41 and second framework 31 is communicated, and the lower surface of the 3rd framework 41 is provided with fifth hole 411, institute
State fifth hole 411 rounded and communicated with the inside of the 3rd framework 41.The first baffle 42 is horizontal, and described
The side of one baffle plate 42 is fixedly connected with the inner surface of the 3rd framework 41, the upper surface of the first baffle 42 and described the
The upper surface of three frameworks 41 is in same plane, the lower surface and described first of the 3rd screen pack 32 and the first cushion block 35
The upper surface of baffle plate 42 is fixedly connected, and the first baffle 42 is provided with the 6th through hole 421, and the 6th through hole 421 is provided with two
Upper and lower surface individual and through the first baffle 42.First support block 43 is in cuboid, the water of the first support block 43
Placing flat, the upper surface of first support block 43 is fixedly connected with the lower surface of the first baffle 42.5th filtering
Net 44 is in bending, and the two ends of the 5th screen pack 44 are fixedly connected with the lower surface of first support block 43, and described the
Five screen packs 44 are located at the top of the fifth hole 411, and the 5th screen pack 44 acts against the interior of the 3rd framework 41
On surface.
As shown in figure 1, the attachment means 5 include the 5th pipeline 51, the 7th positioned at the right side of the 5th pipeline 51
Frame 52, the 8th support 53 positioned at the left side of the 5th pipeline 51, the 9th support 54 positioned at the left side of the 8th support 53, position
In the tenth support 55 of the lower section of the 9th support 54, the 6th pipeline 56 below the 5th pipeline 51 and positioned at described
11st support 57 of the lower section of the 5th pipeline 51.One end of 5th pipeline 51 be aligned the fifth hole 411 and with it is described
The lower surface of 3rd framework 41 is fixedly connected so that the inside of the 5th pipeline 51 and the inside phase of the 3rd framework 41
Logical, the other end of the 5th pipeline 51 is fixedly connected with the upper end of the 6th pipeline 56 so that the 5th pipeline 51
The internal inside with the 6th pipeline 56 is communicated.7th support 52 is L-shaped, one end of the 7th support 52 with it is described
The lower surface of 3rd framework 41 is fixedly connected, and the other end of the 7th support 52 is fixedly connected with the 5th pipeline 51.Institute
State that the 8th support 53 is L-shaped, one end of the 8th support 53 is fixedly connected with the 3rd framework 41, the 8th support 53
The other end be fixedly connected with the 5th pipeline 51.9th support 54 is L-shaped, one end of the 9th support 54 and institute
State the 8th support 53 to be fixedly connected, the other end of the 9th support 54 is fixedly connected with the tenth support 55.Described tenth
Support 55 is in concave shape, and one end of the tenth support 55 is fixedly connected with the 5th pipeline 51, the tenth support 55
The other end is fixedly connected with the 6th pipeline 56.11st support 57 is L-shaped, one end of the 11st support 57 with
5th pipeline 51 is fixedly connected, and the other end of the 11st support 57 is horizontal.
As shown in figure 1, the purifier 6 includes purifying box 61, the 6th screen pack being contained in the purifying box 61
62nd, positioned at the lower section of the 6th screen pack 62 the 4th framework 63, the second bent stick 64 positioned at the lower section of the 4th framework 63
And the second spring 65 positioned at the top of the 4th framework 63.The purifying box 61 is in hollow cuboid, the purifying box 61
Cross section be in concave shape, the 11st support 57 is fixedly connected with the right surface of the purifying box 61.6th filtering
Net 62 is in cuboid, the horizontal positioned of the 6th screen pack 62, side and the purifying box 61 of the 6th screen pack 62
Inner surface is fixedly connected, and the upper surface of the 6th screen pack 62 is in same plane with the upper surface of the purifying box 61,
6th pipeline 56 runs through the upper and lower surface of the 6th screen pack 62 and is secured under connection, the 6th pipeline 56
End is contained in the 4th framework 63.4th framework 63 is U-shaped cylinder, the level of the 4th framework 63 in cross section
Place, water is placed with the 4th framework 63, to be purified to the gas sprayed from the 6th pipeline 56.Described second is curved
Curved bar 64 is provided with two and respectively positioned at the left and right sides of the 4th framework 63, and second bent stick 64 is in bending, institute
The lower end for stating the second bent stick 64 is fixedly connected with the inner surface of the purifying box 61, the upper end of second bent stick 64 and institute
State the 4th framework 63 to be fixedly connected, so as to play a supporting role to the 4th framework 63.The second spring 65 is provided with two,
The second spring 65 is in vertical shape, and the lower end of the second spring 65 is fixedly connected with the 4th framework 63, and described second
The upper end of spring 65 is fixedly connected with the lower surface of the 6th screen pack 62.
As shown in figure 1, dust treatment plant adds in use, placing it in ore first in the ore processing of the present invention
During work under the larger environment of dust, then start the first blower fan 121 so that dust is entered in air inlet bucket 14, Ran Houjin
Enter into the first pipeline 12, then sprayed from the right-hand member of the first pipeline 12, then part is entered by the filtering of the first screen pack 18
Enter to the right side of the first screen pack 18, partly by the lower section of the first screen pack 18, then pass around the lower section of the first screen pack 18
The right side of the first screen pack 18 is entered, so that shunting can be played a part of when air pressure is larger, is prevented to the first screen pack
18 cause to damage.Start water pump 161 simultaneously so that the water in pond is entered in second pipe 16, then into the first frame
In body 11, the lower section then soaked the first screen pack 18 and focused on inside the first framework 11, so as to adsorb in air
Most dust, and start the motor being connected with the first roller 17 so that the first roller 17 rotates, and then drives the brush
Hair 171 is rotated with, can be by the water inside the first framework 11 when the bristle 171 rotates with first roller 17
Constantly splash so that water is constantly splashed on the first screen pack 18 and the second screen pack 10, can not only soak the first mistake
The screen pack 19 of filter screen 18 and second, can also rinse out impurity thereon, while the impurity in air can be purified.Enter
The air on the right side of one screen pack 18 is entered in the 4th pipeline 21 after the filtering of the second screen pack 10, then starts the second wind
Machine 23 so that the air being cleaned in the first framework 11 is constantly drawn into the 4th pipeline 21, it is now most of in air
Dust be cleaned.The gas entered in the 4th pipeline 21 is entered in second framework 31, by the 4th screen pack
The 33 backward both sides flowing of filtering, when air pressure is larger, the 4th screen pack 33 is moved down, and is prevented to the 4th screen pack 33
Cause to damage.Then air after the filtering of the 3rd screen pack 32 and enters first baffle 42 through the 6th through hole 421
Lower section, is then entered in the 5th pipeline 51 after the filtering of the 5th screen pack 44, then into the 6th pipeline 56, so
Fully contacted with the water in the 4th framework 63 afterwards, to dispose remaining dust in air, then air is by the 6th filtering
Discharged after the filtering of net 62, the dust in air content now discharged is very low.When the water in first framework 11 is more, beat
Open the first valve 131 so that the water in the first framework 11 is discharged by the 3rd pipeline 13.So far, powder in ore processing of the present invention
Dirt processing unit is finished using process description.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be covered
Within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.
Claims (9)
1. dust treatment plant in a kind of ore processing, it is characterised in that:Dust treatment plant includes taking out in the ore processing
Device of air, the plumbing installation on the right side of the air extractor, the first filter below the plumbing installation, it is located at
The second filter below first filter, the attachment means below second filter and positioned at institute
The purifier below attachment means is stated, the air extractor includes the first framework, first be arranged in first framework
Pipeline, the air inlet bucket on the left of first pipeline, the first support above first pipeline, positioned at described first
Second pipe above framework, the first roller being contained in first framework, first on the left of first roller
Screen pack, the second support on the right side of first screen pack, the second screen pack on the right side of the second support and position
The 3rd pipeline below first framework, the plumbing installation includes the 4th pipeline, above the 4th pipeline
3rd support, the second blower fan being arranged on the 4th pipeline, the first cross bar on the left of the 4th pipeline, positioned at institute
State the first brace below the first cross bar, the first bent stick above first brace, under first brace
The 4th support, the 5th support on the right side of the 4th pipeline and the 6th support on the left of the 4th pipeline of side,
First filter includes second framework, is contained in the 3rd screen pack of the left and right sides in the second framework, positioned at institute
State the 4th screen pack between the 3rd screen pack, the first spring below the 4th screen pack, positioned at first bullet
The first cushion block below spring, second filter include the 3rd framework, be contained in the 3rd framework first baffle,
The first support block below the first baffle and the 5th screen pack below first support block, the connection
Device include the 5th pipeline, the 7th support on the right side of the 5th pipeline, the 8th on the left of the 5th pipeline
Frame, the 9th support on the left of the 8th support, the tenth support below the 9th support, positioned at the described 5th
The 6th pipeline below pipeline and the 11st support below the 5th pipeline, the purifier include purifying box,
It is contained in the 6th screen pack in the purifying box, the 4th framework below the 6th screen pack, positioned at the described 4th
The second bent stick below framework and the second spring above the 4th framework.
2. dust treatment plant in ore processing according to claim 1, it is characterised in that:First framework is in hollow
Cuboid, the first framework horizontal positioned, first framework be provided with positioned at its right surface first through hole, positioned at it
Second through hole of lower surface and the third through-hole on surface disposed thereon, first pipeline are horizontal, first pipeline
Right-hand member is extended to inside first framework through the surfaces externally and internally of first framework, first pipeline and first frame
Body is fixedly connected, and first pipeline is provided with the first blower fan, the right surface of the left end of first pipeline and the air inlet bucket
Be fixedly connected, the air inlet bucket is in hollow round table-like, and the first support is L-shaped, one end of the first support with it is described
First blower fan is fixedly connected, and the other end of the first support is fixedly connected with the left surface of first framework, and described second
One end of pipeline is directed at the third through-hole and is fixedly connected with the upper surface of first framework, and the second pipe is provided with
Water pump, the water pump is provided with the first montant, and first montant is in vertical shape, the lower end of first montant and described first
Framework is fixedly connected, and the upper end of first montant is fixedly connected with the water pump.
3. dust treatment plant in ore processing according to claim 2, it is characterised in that:First roller it is transversal
Face is oval, and first roller turns to be connected with the first framework axle, and first roller is provided with positioned at its two ends
Bristle, the bristle is fixedly connected provided with several and with first roller, and first screen pack is in the shape of the letter V, and described the
The upper end of one screen pack is in vertical shape, and the lower end of first screen pack is oblique, the right-hand member of first pipeline with it is described
The left surface of first screen pack is fixedly connected, and the second support is L-shaped, one end of the second support and first framework
Inner surface be fixedly connected, the other end of the second support is fixedly connected with first screen pack, second screen pack
In bending, the upper and lower ends of second screen pack are fixedly connected with the inner surface of first framework, second filtering
Net is located at the left side of the first through hole, and the 3rd pipeline is in vertical shape, the upper end alignment described second of the 3rd pipeline
Through hole and it is fixedly connected with the lower surface of first framework, the 3rd pipeline is provided with the first valve.
4. dust treatment plant in ore processing according to claim 3, it is characterised in that:The upper end of 4th pipeline
It is directed at the first through hole and is fixedly connected with the right surface of first framework, the lower end of the 4th pipeline is in vertical shape,
3rd support is in concave shape, and one end of the 3rd support is fixedly connected with first framework, the 3rd support
The other end is fixedly connected with the 4th pipeline, and first cross bar is horizontal, the left end of first cross bar and described the
The right surface of one framework is fixedly connected, and the right-hand member of first cross bar is fixedly connected with first bent stick, and described first is oblique
Bar is oblique, and the upper end of first brace is fixedly connected with the right surface of first framework, under first brace
End is fixedly connected with second blower fan, and first bent stick is in bending, the lower end of first bent stick and described the
One brace is fixedly connected, the 4th pipeline through first bent stick upper and lower surface and be secured to connection, described the
Four supports are L-shaped, and one end of the 4th support is fixedly connected with first brace, the other end of the 4th support and institute
State the 4th pipeline to be fixedly connected, the 5th support is L-shaped, one end of the 5th support is fixed with the 4th pipeline to be connected
Connect, the other end of the 5th support is in vertical shape, the 6th support is L-shaped, the upper end of the 6th support and described the
Four supports are fixedly connected, and the lower end of the 6th support is in vertical shape.
5. dust treatment plant in ore processing according to claim 4, it is characterised in that:The second framework is transversal
Face is in the cylinder of isosceles trapezoid, and the second framework horizontal positioned, the second framework is provided with the 4th of surface disposed thereon
Through hole, fourth hole described in the lower end aligned of the 4th pipeline and is fixedly connected with the upper surface of the second framework, described
The lower end of 5th support and the 6th support is fixedly connected with the second framework, and the 3rd screen pack is provided with two and respectively position
The left and right sides in the second framework, the 3rd screen pack is in cuboid, and the 3rd screen pack is placed vertically, described
The upper surface of 3rd screen pack is fixedly connected with the inner surface of the second framework.
6. dust treatment plant in ore processing according to claim 5, it is characterised in that:4th screen pack is in length
Cube, the 4th screen pack horizontal positioned, the 4th screen pack is located between the 3rd screen pack, the 4th filtering
The side of net and the side of the 3rd screen pack are slidably connected, first spring be in vertical shape, first spring it is upper
End is fixedly connected with the 4th screen pack, and the lower end of first spring is fixedly connected with the upper surface of first cushion block,
First cushion block is in cuboid, and first cushion block is located between the 3rd screen pack, the first cushion block horizontal positioned,
The side of first cushion block is fixedly connected with the side of the 3rd screen pack, first cushion block, the 3rd screen pack and
The lower surface of two frameworks is in same plane.
7. dust treatment plant in ore processing according to claim 6, it is characterised in that:3rd framework is in transversal
Face is the cylinder of isosceles trapezoid, the 3rd framework horizontal positioned, upper surface and the second framework of the 3rd framework
Lower surface is fixedly connected, and the lower surface of the 3rd framework is provided with fifth hole, and the first baffle is horizontal, and described first
The side of baffle plate is fixedly connected with the inner surface of the 3rd framework, the upper surface of the first baffle and the 3rd framework
Upper surface is in same plane, and the lower surface of the 3rd screen pack and the first cushion block is consolidated with the upper surface of the first baffle
Fixed connection, the first baffle is provided with the 6th through hole, and first support block is in cuboid, and the first support block level is put
Put, the upper surface of first support block is fixedly connected with the lower surface of the first baffle, the 5th screen pack is in bending
Shape, the two ends of the 5th screen pack are fixedly connected with the lower surface of first support block, and the 5th screen pack is located at institute
The top of fifth hole is stated, the 5th screen pack is acted against on the inner surface of the 3rd framework.
8. dust treatment plant in ore processing according to claim 7, it is characterised in that:One end of 5th pipeline
It is directed at the fifth hole and is fixedly connected with the lower surface of the 3rd framework, the other end of the 5th pipeline and described the
The upper end of six pipelines is fixedly connected, and the 7th support is L-shaped, one end of the 7th support and the following table of the 3rd framework
Face is fixedly connected, and the other end of the 7th support is fixedly connected with the 5th pipeline, and the 8th support is L-shaped, described
One end of 8th support is fixedly connected with the 3rd framework, and the other end of the 8th support is fixed with the 5th pipeline to be connected
Connect, the 9th support is L-shaped, one end of the 9th support is fixedly connected with the 8th support, the 9th support
The other end is fixedly connected with the tenth support, and the tenth support is in concave shape, one end of the tenth support and described the
Five pipelines are fixedly connected, and the other end of the tenth support is fixedly connected with the 6th pipeline, and the 11st support is in L
Type, one end of the 11st support is fixedly connected with the 5th pipeline, and the other end of the 11st support is horizontal.
9. dust treatment plant in ore processing according to claim 8, it is characterised in that:The purifying box is in hollow
Cuboid, the cross section of the purifying box is in concave shape, and the 11st support is fixedly connected with the right surface of the purifying box,
6th screen pack is in cuboid, the 6th screen pack horizontal positioned, side and the purification of the 6th screen pack
The inner surface of case is fixedly connected, and the upper surface of the 6th screen pack is in same plane with the upper surface of the purifying box,
6th pipeline runs through the upper and lower surface of the 6th screen pack and is secured to connection, and the lower end of the 6th pipeline is housed
In in the 4th framework, the 4th framework is U-shaped cylinder in cross section, the 4th framework horizontal positioned, described the
Two bent sticks are provided with two and respectively positioned at the left and right sides of the 4th framework, and second bent stick is in bending, described
The lower end of second bent stick is fixedly connected with the inner surface of the purifying box, the upper end of second bent stick and the 4th frame
Body is fixedly connected, the second spring be provided with two, the second spring be in vertical shape, the lower end of the second spring with it is described
4th framework is fixedly connected, and the upper end of the second spring is fixedly connected with the lower surface of the 6th screen pack.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710651655.9A CN107376561B (en) | 2016-04-29 | 2016-04-29 | The working method of dust treatment device in a kind of ore processing |
CN201610281265.2A CN105771518B (en) | 2016-04-29 | 2016-04-29 | Dust treatment plant in a kind of ore processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610281265.2A CN105771518B (en) | 2016-04-29 | 2016-04-29 | Dust treatment plant in a kind of ore processing |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710651655.9A Division CN107376561B (en) | 2016-04-29 | 2016-04-29 | The working method of dust treatment device in a kind of ore processing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105771518A CN105771518A (en) | 2016-07-20 |
CN105771518B true CN105771518B (en) | 2017-10-27 |
Family
ID=56399182
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710651655.9A Active CN107376561B (en) | 2016-04-29 | 2016-04-29 | The working method of dust treatment device in a kind of ore processing |
CN201610281265.2A Expired - Fee Related CN105771518B (en) | 2016-04-29 | 2016-04-29 | Dust treatment plant in a kind of ore processing |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710651655.9A Active CN107376561B (en) | 2016-04-29 | 2016-04-29 | The working method of dust treatment device in a kind of ore processing |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107376561B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106362509A (en) * | 2016-08-31 | 2017-02-01 | 廖淑梅 | Novel efficient dust remover for agricultural machinery |
CN106237734B (en) * | 2016-09-09 | 2018-06-26 | 盐城市吉盛达环保工程有限公司 | A kind of efficient dedusting and purifying air system |
CN106268146A (en) * | 2016-09-29 | 2017-01-04 | 成都恒力达科技有限公司 | A kind of waste gas cleaning system being applicable to Industrial Boiler |
CN106237777A (en) * | 2016-09-29 | 2016-12-21 | 成都恒力达科技有限公司 | A kind of boiler waste gas purification device that can carry out multi-filtering |
CN106268147A (en) * | 2016-09-29 | 2017-01-04 | 成都恒力达科技有限公司 | A kind of energy filtering dust and the air purifier of fine particle |
CN106606912A (en) * | 2016-12-07 | 2017-05-03 | 长泰惠龙新材料科技有限公司 | Concrete asphalt mixing and dedusting device for building |
US11633689B2 (en) * | 2017-12-11 | 2023-04-25 | Clean Technology Co., Ltd. | Dust-containing gas treatment apparatus |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5509946A (en) * | 1995-01-27 | 1996-04-23 | Chu; Kung-Ming | Indoor air filter |
KR100398687B1 (en) * | 2001-07-19 | 2003-09-19 | 삼성광주전자 주식회사 | Grille assembly for a cyclone-type dust collecting apparatus for a vacuum cleaner |
JP5366738B2 (en) * | 2009-09-25 | 2013-12-11 | 株式会社アンレット | Mist and dust collector |
CN102698548A (en) * | 2012-03-22 | 2012-10-03 | 梁嘉麟 | Air purifying device for adsorbing by taking water as main body |
CN104815513B (en) * | 2015-05-27 | 2016-08-17 | 国润生物科技(深圳)有限公司 | A kind of Household air purifier |
CN204816092U (en) * | 2015-06-01 | 2015-12-02 | 王杨 | Exhaust treatment device sprays paint |
CN104958980A (en) * | 2015-06-30 | 2015-10-07 | 江苏双盈纺织科技有限公司 | Printing and dyeing waste gas filtering and dust removing device |
CN105311910B (en) * | 2015-11-08 | 2017-02-01 | 衢州学院 | Industrial gas purification dust-removal equipment |
CN105311919A (en) * | 2015-12-01 | 2016-02-10 | 张萍 | Electric wire burning gas purification treatment device |
CN105521678B (en) * | 2015-12-27 | 2017-05-10 | 薛彩霞 | An air cleaning device for a pharmaceutical workshop |
CN105507366A (en) * | 2015-12-29 | 2016-04-20 | 张萍 | Air-into-water drinking water system |
CN105477944B (en) * | 2016-01-21 | 2017-08-29 | 六安同辉智能科技有限公司 | It is a kind of can conveniently treating deposited dust air cleaning unit |
-
2016
- 2016-04-29 CN CN201710651655.9A patent/CN107376561B/en active Active
- 2016-04-29 CN CN201610281265.2A patent/CN105771518B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105771518A (en) | 2016-07-20 |
CN107376561B (en) | 2019-10-08 |
CN107376561A (en) | 2017-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105771518B (en) | Dust treatment plant in a kind of ore processing | |
CN207769439U (en) | A kind of UTILIZATION OF VESIDUAL HEAT IN and flue gas purification system for aluminium smelting furnace | |
CN106422624A (en) | Gas purifier for purifying the air and working method thereof | |
CN207076280U (en) | A kind of comminutor flue gas processing device | |
CN107441863A (en) | A kind of air cleaning unit of high-efficiency environment friendly | |
CN209451553U (en) | A kind of Environmental-protecting dust-removing equipment based on plant produced | |
CN103877804A (en) | Water tank for filtering tail gas dust | |
CN208065968U (en) | A kind of environmental protection Novel dust collection device | |
CN105854497B (en) | A kind of industrial waste-gas purifier | |
CN204723900U (en) | A kind of dust-filtering net cleaning equipment | |
CN103816763A (en) | Haze sweeper | |
CN105854440B (en) | A kind of industrial waste gas filtration purifier | |
CN105879554B (en) | A kind of air cleaning facility | |
CN109692538A (en) | Purification device for diesel engine vent gas processing | |
CN108246053A (en) | A kind of waste gas purification chamber | |
CN105944460A (en) | Waste gas purifying device for boiler | |
CN207169359U (en) | End fume purifying apparatus | |
CN206934998U (en) | A kind of integral type dust collection processing unit | |
CN206008330U (en) | A kind of dust arrester | |
CN105536420B (en) | A kind of environment-friendly type dust recycling and processing device | |
CN211585847U (en) | Flue gas dust removal device | |
CN203790768U (en) | Tail gas dust filter water tank | |
CN206549378U (en) | A kind of ore dust dedusting collection device | |
CN206055791U (en) | A kind of multifunctional purifying machine | |
CN202165110U (en) | Dust-removing blower for mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171027 Termination date: 20200429 |
|
CF01 | Termination of patent right due to non-payment of annual fee |