A kind of efficient Waste gas filtering purifier
Technical field
This utility model is related to waste gas purification processing technology field, more particularly to a kind of efficient Waste gas filtering purifier.
Background technology
Existing steam boiler exhaust gas and smoke purification techniques, is substantially directly discharged into boiler waste gas in air, or adopts
With simple spray cleaning technology, technique is simple and crude single, the effect on driving birds is not good of purification, does not reach purification and requires, it is impossible to removes smoke abatement,
Serious environment pollution.
Chinese patent CN205279131U discloses a kind of efficient Waste gas filtering purifier, including boiler shell, described
Boiler shell upper end is provided with smoke evacuation shell, and smoke evacuation flabellum is provided with inside the smoke evacuation shell, and the smoke evacuation shell side is provided with smoke exhaust pipe,
The smoke exhaust pipe is connected with clarifying smoke case, and the clarifying smoke case upper end is provided with delivery pump, the delivery pump and purification pipe
Middle part case connection, the clarifying smoke case lower end is provided with closure, and the closure is provided with delivery pipe, the clarifying smoke case
Side is provided with escape pipe, and it can in time be drained into boiler internal flue dust in clarifying smoke case in the presence of smoke evacuation flabellum
Portion, delivery pump by hydraulic pressure enter through purification pipe spray flue dust is rinsed, the harmful gass and impurity in flue dust are carried out
Sedimentation, has effectively purified flue dust, reduces that air is polluted down can in time to collect heat and conveys.But its
Purification style is more single, and treatment facilities are simple, it is impossible to which haze is effectively purified, and clean-up effect is undesirable;And water
It is limited to the effect of waste gas purification with the limited time of exhaust gas contact, and then water, it is impossible to the impurity in effective scavenging;Together
When be only capable of carrying out substance filtration to waste gas, it is impossible to multi-filtering is carried out to waste gas, filter effect is limited, and when impurity content compared with
Gao Shi, it is impossible to the impurity in waste gas is removed clean.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Utility model content
Problem to be solved in the utility model is to provide a kind of efficient Waste gas filtering purifier, including the first framework dress
Put, water feed apparatus, second framework device, attachment means, the first plumbing installation, the 3rd frame device, second pipe device and mistake
Filter device, the first frame device includes that the first framework, the first pipeline, the first blower fan, first support, the first valve, first are filtered
Net, the first fix bar, the first spring, water feed apparatus include the 3rd pipeline, the 3rd valve, the first water pump and second support, second
Frame device includes the 4th pipeline, the 4th valve, second framework, the first sponge block, second spring, the second drainage screen, the 3rd mistake
Filter screen, the first swash plate, this utility model can carry out multi-filtering to waste gas.
In order to solve above-mentioned technical problem, this utility model is adopted the following technical scheme that:
A kind of efficient Waste gas filtering purifier, including the first frame device, be arranged on first frame device
Water feed apparatus, the second framework device on the right side of first frame device, the company on the left of the second framework device
Connection device, the first plumbing installation below the second framework device, the below first plumbing installation the 3rd
Frame device, the second pipe device on the right side of the 3rd frame device and the mistake below the second pipe device
Filter device, first frame device is including the first framework, the first pipeline on the left of first framework, described in being arranged at
The first blower fan on first pipeline, the first support above first blower fan, be arranged on first pipeline
One valve, the first drainage screen being contained in first framework, the first fix bar, position on the left of first drainage screen
The first spring on the right side of first drainage screen, the second pipe below first framework and it is arranged at described second
The second valve on pipeline, the water feed apparatus include the 3rd pipeline, be arranged on the 3rd pipeline the 3rd valve, first
Water pump and the second support below first water pump, the second framework device is including the 4th pipeline, described in being arranged at
The 4th valve on 4th pipeline, the second framework below the 4th pipeline, be contained in the second framework
One sponge block, the second spring below first sponge block, the second drainage screen below the second spring, position
The 3rd drainage screen below second drainage screen, the first swash plate below the 3rd drainage screen, positioned at described
The 4th drainage screen on the left of one swash plate and the 5th drainage screen below first swash plate, the attachment means include the 4th
Support, the first brace below the 4th support and the first cross bar on the left of the 4th support, described first
Plumbing installation include the 5th pipeline, be arranged on the 5th pipeline the 5th valve, the second blower fan, positioned at second blower fan
5th support in left side, the 6th support positioned at the 5th bracket side, the second cross bar, the position that are arranged on the 6th support
The 7th support and the 8th support on the right side of the 7th support on the right side of the 5th pipeline, the 3rd frame device
Including the 3rd framework, the 6th drainage screen, the 3rd bullet above the 6th drainage screen that are contained in the 3rd framework
Spring, the cylinder below the 6th drainage screen, the catch bar above the cylinder, on the left of the cylinder
Three cross bars, the baffle plate on the right side of the cylinder, the first roller on the right side of the baffle plate, it is arranged on first roller
The second bristle and the 7th drainage screen above first roller, the second pipe device include the 6th pipeline, set
The 3rd blower fan that is placed on the 6th pipeline, the first fixed mount below the 3rd blower fan, it is arranged at described first
The second montant on fixed mount, the second fixed mount above second montant, below first fixed mount
3rd fixed mount and the 4th cross bar on the left of the 3rd fixed mount, the defecator includes the 4th framework, is contained in
The second roller in 4th framework, the third bristle being arranged on second roller, positioned at second roller lower section
The 8th drainage screen, the second support bar below the 8th drainage screen, below the second support bar second
Sponge block, the 4th fixed mount, the discharge pipe below the 4th framework and the 6th valve being arranged on the discharge pipe,
First framework is provided with first through hole, the second through hole, third through-hole and fourth hole, and the second framework is provided with and is located at
The fifth hole of its upper surface and the clematis stem hole positioned at its lower surface, the 3rd framework is provided with the of surface disposed thereon
Seven through holes and the 8th through hole positioned at its right surface.
First framework is in hollow semicylinder shape, one end of first pipeline be aligned the first through hole and with
The left surface of first framework is fixedly connected, and the first support is L-shaped, one end of the first support and first wind
Machine is fixedly connected, and the other end of the first support is fixedly connected with the left surface of first framework, first drainage screen
In bending, the upper end of first drainage screen is fixedly connected with the inner surface of first framework, the first drainage screen position
In the right side of the first through hole, first fix bar is horizontal, the left end of first fix bar and first frame
The inner surface of body is fixedly connected, and the right-hand member of first fix bar is fixedly connected with first drainage screen, first spring
Horizontal, the right-hand member of first spring is fixedly connected with the inner surface of first framework, the left end of first spring
It is fixedly connected with the right surface of first drainage screen, the upper end of the second pipe is directed at second through hole and with described the
The outer surface of one framework is fixedly connected.
One end of 3rd pipeline is directed at the third through-hole and is fixedly connected with the outer surface of first framework, institute
State that second support is L-shaped, one end of the second support is fixedly connected with first water pump, the other end of the second support
It is fixedly connected with first framework.
The second framework is in hollow cuboid, and the second framework is vertically placed, one end pair of the 4th pipeline
The accurate fourth hole and it is fixedly connected with the outer surface of first framework, the other end alignment of the 4th pipeline described the
Five through holes and it is fixedly connected with the upper surface of the second framework, first sponge block is described in cuboid and horizontal positioned
The side of the first sponge block and its upper surface are fixedly connected with the inner surface of the second framework, the first sponge block bumping post institute
State fifth hole, the second spring is provided with three, the second spring is in vertical shape, the lower end of the second spring with it is described
The upper surface of the second drainage screen is fixedly connected, and the upper end of the second spring is fixed with the lower surface of first sponge block and connected
Connect, second drainage screen is in cuboid and horizontal positioned, the side of second drainage screen and the interior table of the second framework
Face is fixedly connected, the 3rd drainage screen in wavy, the side of the 3rd drainage screen and the inner surface of the second framework
It is fixedly connected, desiccant is placed between the 3rd drainage screen and second drainage screen, first swash plate is oblique,
The right-hand member of first swash plate is fixedly connected with the inner surface of the second framework, the left end of first swash plate and the described 4th
The right-hand member of drainage screen is fixedly connected, first swash plate be provided be positioned above some first bristles, be disposed below
3rd support and the first support bar below the 3rd support, first bristle is provided with several, first brush
Hair lower end be fixedly connected with the upper surface of first swash plate, the 3rd support is L-shaped, one end of the 3rd support with
First swash plate is fixedly connected, and the other end of the 3rd support is fixedly connected with the inner surface of the second framework, described
First support bar is in cuboid and vertically places, and the lower end of the first support bar is fixed with the inner surface of the second framework and connected
Connect, the upper end of the first support bar is fixedly connected with the 3rd support, the 4th drainage screen is horizontal, the described 4th
The left end of drainage screen is fixedly connected with the inner surface of the second framework, and the 5th drainage screen is in cuboid and vertically places,
The lower surface of the 5th drainage screen is fixedly connected with the inner surface of the second framework.
4th support is L-shaped, and one end of the 4th support is fixedly connected with the left surface of the second framework, institute
The other end for stating the 4th support is fixedly connected with first framework, and first brace is oblique, first brace
Lower end is fixedly connected with the left surface of the second framework, and the upper end of first brace is fixedly connected with the 4th support,
First cross bar is horizontal, and the right-hand member of first cross bar is fixedly connected with the 4th support, first cross bar
Left end is fixedly connected with the second pipe.
5th pipeline is in vertical shape, the upper end of the 5th pipeline be aligned the clematis stem hole and with second frame
The lower surface of body is fixedly connected, and the 5th support is L-shaped, and one end of the 5th support is fixed with second blower fan and connected
Connect, the other end of the 5th support is fixedly connected with the lower surface of the second framework, the 6th support is L-shaped, described
The upper end of the 6th support is horizontal and is fixedly connected with the left surface of the second framework, and the lower end of the 6th support is in perpendicular
Straight shape, second cross bar is in cuboid and horizontal positioned, and the left end of second cross bar is fixedly connected with the 6th support,
The right-hand member of second cross bar is fixedly connected with the 5th support, and the 7th support is L-shaped, the upper end of the 7th support
Horizontal and be fixedly connected with the 8th support, the lower end of the 7th support is in vertical shape, and the 8th support is in L
Type, the upper end of the 8th support is horizontal and right surface of with the second framework is fixedly connected, the 8th support
Lower end is in vertical shape.
3rd framework be in hollow cuboid, the 7th through hole described in the lower end aligned of the 5th pipeline and with it is described
The upper surface of the 3rd framework is fixedly connected, lower end and the 3rd framework of the 6th support, the 7th support and the 8th support
Upper surface be fixedly connected, the baffle plate is in cuboid and vertically places, in the side of the baffle plate and the 3rd framework
Surface is fixedly connected, and the lower end of the baffle plate is provided with the first groove, and the 6th drainage screen is described in cuboid and horizontal positioned
The left surface of the 6th drainage screen is slidably connected with the inner surface of the 3rd framework, the right surface of the 6th drainage screen with it is described
The left surface of baffle plate is slidably connected, and the 3rd spring is in vertical shape, lower end and the 6th drainage screen of the 3rd spring
Upper surface be fixedly connected, the upper end of the 3rd spring is fixedly connected with the inner surface of the 3rd framework, the cylinder
Lower surface is fixedly connected with the inner surface of the 3rd framework, and the catch bar is in cuboid and vertically places, the catch bar
Lower end be connected with the cylinder, the upper end of the catch bar is fixedly connected with the lower surface of the 6th drainage screen, described
Three cross bars are fixedly connected in cuboid and horizontal positioned, the right-hand member of the 3rd cross bar with the left surface of the cylinder, and described the
The left end of three cross bars is fixedly connected with the inner surface of the 3rd framework, and first roller is in cylinder and horizontal positioned, institute
State the first roller to turn to be connected with the 3rd framework axle, second bristle is provided with several, and second bristle is uniformly distributed
On first roller and be secured to connection, the 7th drainage screen be in bending, the left end of the 7th drainage screen with
The right surface of the baffle plate is fixedly connected, and the right surface of the 7th drainage screen is fixed with the inner surface of the 3rd framework and connected
Connect, the 7th drainage screen is located at the lower section of the 8th through hole, the 7th drainage screen is provided with first for being positioned above
Montant, the upper end of first montant is fixedly connected with the 3rd framework, the lower end of first montant and the 7th mistake
Filter screen is fixedly connected.
The left end of the 6th pipeline is directed at the 8th through hole and is fixedly connected with the right surface of the 3rd framework, institute
State that the first fixed mount is L-shaped, one end of first fixed mount is fixedly connected with the 3rd blower fan, first fixed mount
The other end is fixedly connected with the right surface of the 3rd framework, and second montant is in cuboid and vertically places, described second
The lower end of montant is fixedly connected with first fixed mount, the 6th pipeline through second montant left and right surface and with
It is fixedly connected, and second fixed mount is L-shaped, and one end of second fixed mount is fixed with the upper end of second montant and connected
Connect, the other end of second fixed mount is fixedly connected with the 8th support, the 3rd fixed mount is L-shaped, the described 3rd
The upper end of fixed mount is fixedly connected with first fixed mount, and the lower end of the 3rd fixed mount is horizontal, and the described 4th is horizontal
Bar is fixedly connected in cuboid and horizontal positioned, the left end of the 4th cross bar with the right surface of the 3rd framework, and described the
The right-hand member of four cross bars is fixedly connected with the 3rd fixed mount.
4th framework is in hollow cylindrical shape, and the 4th framework horizontal positioned, the 4th framework is provided with
9th through hole and the tenth through hole, the 9th through hole described in the lower end aligned of the 6th pipeline and with the outer surface of the 4th framework
It is fixedly connected, the lower end of the 3rd fixed mount is fixedly connected with the 4th framework, second roller is in cylinder and water
Placing flat, second roller turns to be connected with the 4th framework axle, and the third bristle is evenly distributed on second roller
Connection is gone up and is secured to, second roller is located at the lower section of the 9th through hole, and the 8th drainage screen is horizontal, institute
The side for stating the 8th drainage screen is fixedly connected with the inner surface of the 4th framework, and the second support bar is provided with two, described
The upper end of second support bar is fixedly connected with the lower surface of the 8th drainage screen, the lower end of the second support bar and described
The upper surface of two sponge blocks is fixedly connected, and the lower surface of second sponge block is fixed with the inner surface of the 4th framework and connected
Connect, second sponge block is located at the top of the tenth through hole, and the discharge pipe is in vertical shape, the upper end pair of the discharge pipe
Accurate tenth through hole and it is fixedly connected with the outer surface of the 4th framework, the 4th fixed mount is L-shaped, and the described 4th consolidates
The one end for determining frame is fixedly connected with the 4th framework, and the other end of the 4th fixed mount is fixed with the side of the discharge pipe
Connection.
After above-mentioned technical proposal, the efficient Waste gas filtering purifier of this utility model has the advantage that:
The efficient Waste gas filtering purifier simple structure of this utility model, it is easy to use, filling for waste gas and water can be realized
Tap is touched, so that water is sufficiently purified to waste gas, clean-up effect is preferable;And waste gas can be carried out multiple
Filter, filter type variation, such that it is able to adapt to different waste gas purifications, expands use range of the present utility model, while
The effect of filtration is can ensure that, filter effect is notable, and then the discharge pollution on the environment of waste gas can be prevented, to environment
Serve preferable protective effect.
Description of the drawings
The specific embodiment of the efficient Waste gas filtering purifier of this utility model is made furtherly below in conjunction with the accompanying drawings
It is bright:
Fig. 1 is the structural representation of the efficient Waste gas filtering purifier of this utility model;
In figure:The frame devices of 1- first;The frameworks of 11- first;111- first through hole;The through holes of 112- second;113- threeways
Hole;114- fourth holes;The pipelines of 12- first;The blower fans of 13- first;14- first supports;The valves of 15- first;16- first is filtered
Net;The fix bars of 17- first;The springs of 18- first;19- second pipes;The valves of 10- second;2- water feed apparatus;The pipelines of 21- the 3rd;
The valves of 22- the 3rd;The water pumps of 23- first;24- second supports;3- second framework devices;The pipelines of 31- the 4th;The valves of 32- the 4th;
33- second frameworks;331- fifth holes;332- clematis stem hole;The sponge blocks of 34- first;35- second springs;36- second is filtered
Net;The drainage screens of 37- the 3rd;The swash plates of 38- first;The bristles of 381- first;The supports of 382- the 3rd;383- first support bars;39- the 4th
Drainage screen;The drainage screens of 30- the 5th;4- attachment means;The supports of 41- the 4th;The braces of 42- first;The cross bars of 43- first;5- first pipes
Duct device;The pipelines of 51- the 5th;The valves of 52- the 5th;The blower fans of 53- second;The supports of 54- the 5th;The supports of 55- the 6th;56- second is horizontal
Bar;The supports of 57- the 7th;The frame devices of 6- the 3rd;The frameworks of 61- the 3rd;The through holes of 611- the 7th;The through holes of 612- the 8th;The mistakes of 62- the 6th
Filter screen;The springs of 63- the 3rd;64- cylinders;65- catch bars;The cross bars of 66- the 3rd;67- baffle plates;The grooves of 671- first;68- first is rolled
Wheel;The bristles of 69- second;The drainage screens of 60- the 7th;The montants of 601- first;7- second pipe devices;The pipelines of 71- the 6th;72- the 3rd
Blower fan;The fixed mounts of 73- first;The montants of 74- second;The fixed mounts of 75- second;The fixed mounts of 76- the 3rd;The cross bars of 77- the 4th;8- is filtered
Device;The frameworks of 81- the 4th;The through holes of 811- the 9th;The through holes of 812- the tenth;The rollers of 82- second, 83- third bristles;The mistakes of 84- the 8th
Filter screen;85- second support bars;The sponge blocks of 86- second;The fixed mounts of 87- the 4th;88- discharge pipes;The valves of 89- the 6th.
Specific embodiment
As shown in figure 1, the efficient Waste gas filtering purifier of this utility model is including the first frame device 1, described in being arranged at
Water feed apparatus 2 on first frame device 1, the second framework device 3 positioned at the right side of first frame device 1, positioned at described
The attachment means 4 in the left side of second framework device 3, the first plumbing installation 5 positioned at the lower section of the second framework device 3, positioned at institute
State the 3rd frame device 6 of the lower section of the first plumbing installation 5, the second pipe device 7 positioned at the right side of the 3rd frame device 6 and
Positioned at the defecator 8 of the lower section of the second pipe device 7.
As shown in figure 1, first frame device 1 include the first framework 11, positioned at the of the left side of first framework 11
One pipeline 12, the first blower fan 13 being arranged on first pipeline 12, the first support above first blower fan 13
14th, the first valve 15 being arranged on first pipeline 12, the first drainage screen 16, position being contained in first framework 11
The first fix bar 17 in the left side of first drainage screen 16, the first spring 18, position on the right side of first drainage screen 16
In the second pipe 19 and the second valve 10 for being arranged on the second pipe 19 of the lower section of first framework 11.Described first
Framework 11 is in hollow semicylinder shape, and first framework 11 is provided with first through hole 111, the second through hole 112, third through-hole
113 and fourth hole 114, the first through hole 111, the second through hole 112, third through-hole 113 and fourth hole 114 and described
The inside of one framework 11 communicates.One end of first pipeline 12 be aligned the first through hole 111 and with first framework 11
Left surface be fixedly connected so that the inside of first pipeline 12 communicates with the inside of first framework 11, described first
The other end of pipeline 12 is placed on the outlet of boiler waste gas, for causing waste gas to enter in first pipeline 12.Described
One blower fan 13 is electrically connected with the power supply, and waste gas can be pumped in first pipeline 12.The first support 14 is L-shaped,
One end of the first support 14 is fixedly connected with first blower fan 13, the other end of the first support 14 and described first
The left surface of framework 11 is fixedly connected.First valve 15 is used to control the flow of gas in first pipeline 12.It is described
First drainage screen 16 is in bending, and the upper end of first drainage screen 16 is fixedly connected with the inner surface of first framework 11,
First drainage screen 16 is located at the right side of the first through hole 111.First fix bar 17 is horizontal, and described first consolidates
The left end of fixed pole 17 is fixedly connected with the inner surface of first framework 11, the right-hand member of first fix bar 17 and described first
Drainage screen 16 is fixedly connected, so as to play a supporting role to first drainage screen 16.First spring 18 is horizontal, institute
The right-hand member for stating the first spring 18 is fixedly connected with the inner surface of first framework 11, the left end of first spring 18 with it is described
The right surface of the first drainage screen 16 is fixedly connected.The upper end of the second pipe 19 be aligned second through hole 112 and with it is described
The outer surface of the first framework 11 is fixedly connected so that the inside phase of the inside of the second pipe 19 and first framework 11
It is logical.Second valve 10 is used to control the flow of water in the second pipe 19.
As shown in figure 1, the water feed apparatus 2 include the 3rd pipeline 21, the 3rd valve being arranged on the 3rd pipeline 21
The 22, first water pump 23 of door and the second support 24 positioned at the lower section of first water pump 23.One end alignment of the 3rd pipeline 21
The third through-hole 113 and be fixedly connected with the outer surface of first framework 11 so that the inside of the 3rd pipeline 21 with
The inside of first framework 11 communicates, and the other end of the 3rd pipeline 21 is placed in pond.3rd valve 22 is used
In the flow for controlling water in the 3rd pipeline 21.First water pump 23 is electrically connected with the power supply, and first water pump 23 is used
It is pumped in the 3rd pipeline 21 in Jiang Shui.The second support 24 is L-shaped, one end of the second support 24 and described
One water pump 23 is fixedly connected, and the other end of the second support 24 is fixedly connected with first framework 11.
As shown in figure 1, the second framework device 3 include the 4th pipeline 31, be arranged on the 4th pipeline 31 the
Four valves 32, the second framework 33 positioned at the lower section of the 4th pipeline 31, the first sponge being contained in the second framework 33
Block 34, the second spring 35 positioned at the lower section of first sponge block 34, the second drainage screen below the second spring 35
36th, positioned at the lower section of second drainage screen 36 the 3rd drainage screen 37, the first swash plate below the 3rd drainage screen 37
38th, positioned at the 4th drainage screen 39 and the 5th drainage screen positioned at the lower section of first swash plate 38 in the left side of first swash plate 38
30.The second framework 33 is in hollow cuboid, and the second framework 33 is vertically placed, and the second framework 33 is provided with position
The fifth hole 331 on surface and the clematis stem hole 332 positioned at its lower surface thereon, the fifth hole 331 and clematis stem hole
332 is rounded and communicate with the inside of the second framework 33.One end of 4th pipeline 31 is directed at the fourth hole 114
And be fixedly connected with the outer surface of first framework 11 so that the inside of the 4th pipeline 31 and first framework 11
Inside communicates, the other end of the 4th pipeline 31 be aligned the fifth hole 331 and with the upper surface of the second framework 33
It is fixedly connected so that the inside of the 4th pipeline 31 communicates with the inside of the second framework 33.4th valve 32 is used
In the flow for controlling gas in the 4th pipeline 31.First sponge block 34 in cuboid and horizontal positioned, described first
The side of sponge block 34 and its upper surface are fixedly connected with the inner surface of the second framework 33, the bumping post of the first sponge block 34
The fifth hole 331.The second spring 35 is provided with three, and the second spring 35 is in vertical shape, the second spring 35
Lower end be fixedly connected with the upper surface of second drainage screen 36, the upper end of the second spring 35 and first sponge block
34 lower surface is fixedly connected, so as to play a supporting role to first sponge block 34.Second drainage screen 36 is in rectangular
Body and horizontal positioned, the side of second drainage screen 36 is fixedly connected with the inner surface of the second framework 33.Described 3rd
Drainage screen 37 is in wavy, and the side of the 3rd drainage screen 37 is fixedly connected with the inner surface of the second framework 33, described
Desiccant is placed between 3rd drainage screen 37 and second drainage screen 36.First swash plate 38 is oblique, and described the
The right-hand member of one swash plate 38 is fixedly connected with the inner surface of the second framework 33, the left end of first swash plate 38 and the described 4th
The right-hand member of drainage screen 39 is fixedly connected, first swash plate 38 be provided be positioned above some first bristles 381, positioned at it
3rd support 382 of lower section and the first support bar 383 positioned at the lower section of the 3rd support 382, first bristle 381 is provided with
Several, the lower end of first bristle 381 is fixedly connected with the upper surface of first swash plate 38, first bristle 381
Air can be filtered.3rd support 382 is L-shaped, one end and first swash plate 38 of the 3rd support 382
It is fixedly connected, the other end of the 3rd support 382 is fixedly connected with the inner surface of the second framework 33, described first supports
Bar 383 is in cuboid and vertically places, and the lower end of the first support bar 383 is fixed with the inner surface of the second framework 33 and connected
Connect, the upper end of the first support bar 383 is fixedly connected with the 3rd support 382.4th drainage screen 39 is horizontal,
The left end of the 4th drainage screen 39 is fixedly connected with the inner surface of the second framework 33.5th drainage screen 30 is in rectangular
Body and vertically placement, the lower surface of the 5th drainage screen 30 is fixedly connected with the inner surface of the second framework 33.
As shown in figure 1, the attachment means 4 include the 4th support 41, positioned at the first oblique of the lower section of the 4th support 41
Bar 42 and the first cross bar 43 positioned at the left side of the 4th support 41.4th support 41 is L-shaped, the 4th support 41
One end is fixedly connected with the left surface of the second framework 33, and the other end of the 4th support 41 is solid with first framework 11
Fixed connection.First brace 42 is oblique, and the lower end of first brace 42 is solid with the left surface of the second framework 33
Fixed connection, the upper end of first brace 42 is fixedly connected with the 4th support 41.First cross bar 43 is horizontal, institute
The right-hand member for stating the first cross bar 43 is fixedly connected with the 4th support 41, left end and the second pipe of first cross bar 43
19 are fixedly connected.
As shown in figure 1, first plumbing installation 5 include the 5th pipeline 51, be arranged on the 5th pipeline 51 the
Five valves 52, the second blower fan 53, the 5th support 54 positioned at the left side of second blower fan 53, positioned at the left side of the 5th support 54
The 6th support 55, be arranged on the 6th support 55 the second cross bar 56, positioned at the 7th of the right side of the 5th pipeline 51 the
Support 57 and the 8th support positioned at the right side of the 7th support 57.5th pipeline 51 is in vertical shape, the 5th pipeline
51 upper end is directed at the clematis stem hole 332 and is fixedly connected with the lower surface of the second framework 33 so that the 5th pipe
The inside in road 51 communicates with the inside of the second framework 33.5th valve 52 is used to control gas in the 5th pipeline 51
The flow of body.Second blower fan 53 is electrically connected with the power supply, and can be used for being pumped into the air in the second framework 33
In 5th pipeline 51.5th support 54 is L-shaped, and one end and second blower fan 53 of the 5th support 54 are fixed
Connection, the other end of the 5th support 54 is fixedly connected with the lower surface of the second framework 33.6th support 55 is in L
Type, the upper end of the 6th support 55 is horizontal and is fixedly connected with the left surface of the second framework 33, described 6th
The lower end of frame 55 is in vertical shape.Second cross bar 56 is in cuboid and horizontal positioned, the left end of second cross bar 56 and institute
State the 6th support 55 to be fixedly connected, the right-hand member of second cross bar 56 is fixedly connected with the 5th support 54.Described 7th
Frame 57 is L-shaped, and the upper end of the 7th support 57 is horizontal and is fixedly connected with the 8th support, the 7th support 57
Lower end be in vertical shape.8th support is L-shaped, the upper end of the 8th support it is horizontal and with the second framework 33
Right surface be fixedly connected, the lower end of the 8th support is in vertical shape.
As shown in figure 1, the 3rd frame device 6 include the 3rd framework 61, be contained in the 3rd framework 61 the
Six drainage screens 62, the 3rd spring 63 positioned at the top of the 6th drainage screen 62, the gas below the 6th drainage screen 62
Cylinder 64, the catch bar 65 positioned at the top of the cylinder 64, the 3rd cross bar 66 positioned at the left side of the cylinder 64, positioned at the cylinder
Baffle plate 67 on the right side of in the of 64, the first roller 68 positioned at the right side of the baffle plate 67, the second brush being arranged on first roller 68
Hair 69 and the 7th drainage screen 60 positioned at the top of first roller 68.3rd framework 61 is in hollow cuboid, described
3rd framework 61 is provided with the 7th through hole 611 and the 8th through hole 612 positioned at its right surface on surface disposed thereon, and the described 7th
The through hole 612 of through hole 611 and the 8th is rounded and communicates with the inside of the 3rd framework 61, the lower end pair of the 5th pipeline 51
Accurate 7th through hole 611 and it is fixedly connected with the upper surface of the 3rd framework 61 so that the inside of the 5th pipeline 51
Communicate with the inside of the 3rd framework 61, the lower end of the 6th support 55, the 7th support 57 and the 8th support and described
The upper surface of three frameworks 61 is fixedly connected.The baffle plate 67 is in cuboid and vertically places, the side of the baffle plate 67 with it is described
The inner surface of the 3rd framework 61 is fixedly connected, and the space in the 3rd framework 61 is divided into left and right two parts by the baffle plate 67,
The lower end of the baffle plate 67 is provided with the first groove 671, and first groove 671 is in rectangular-shape, and the baffle plate 67 is located at described
The right side of the 7th through hole 611.6th drainage screen 62 is in cuboid and horizontal positioned, the left surface of the 6th drainage screen 62
It is slidably connected with the inner surface of the 3rd framework 61, the right surface of the 6th drainage screen 62 and the left surface of the baffle plate 67
It is slidably connected so that the 6th drainage screen 62 can be moved up and down.3rd spring 63 is in vertical shape, the 3rd spring
63 lower end is fixedly connected with the upper surface of the 6th drainage screen 62, upper end and the 3rd framework of the 3rd spring 63
61 inner surface is fixedly connected, so as to play a supporting role to the 6th drainage screen 62.The lower surface of the cylinder 64 and institute
The inner surface for stating the 3rd framework 61 is fixedly connected, and the cylinder 64 is located at the lower section of the 6th drainage screen 62.The catch bar
65 is in cuboid and vertically placement, and the lower end of the catch bar 65 is connected with the cylinder 64 so that the cylinder 64 drives institute
State catch bar 65 to move up and down, the upper end of the catch bar 65 is fixedly connected with the lower surface of the 6th drainage screen 62, and then
The 6th drainage screen 62 can be driven to move up and down.3rd cross bar 66 is in cuboid and horizontal positioned, and the described 3rd is horizontal
The right-hand member of bar 66 is fixedly connected with the left surface of the cylinder 64, left end and the 3rd framework 61 of the 3rd cross bar 66
Inner surface is fixedly connected.First roller 68 is in cylinder and horizontal positioned, first roller 68 and the 3rd framework
61 axles turn connection so that first roller 68 can be in the interior rotation of the 3rd framework 61, first roller 68 and motor
Connection, drives first roller 68 to rotate.Second bristle 69 is provided with several, and second bristle 69 is evenly distributed on
On first roller 68 and be secured to connection.7th drainage screen 60 is in bending, a left side for the 7th drainage screen 60
End is fixedly connected with the right surface of the baffle plate 67, the right surface of the 7th drainage screen 60 and the interior table of the 3rd framework 61
Face is fixedly connected, and the 7th drainage screen 60 is located at the lower section of the 8th through hole 612, and the 7th drainage screen 60 is provided with position
The first square thereon montant 601, the upper end of first montant 601 is fixedly connected with the 3rd framework 61, and described first
The lower end of montant 601 is fixedly connected with the 7th drainage screen 60.
As shown in figure 1, the second pipe device 7 include the 6th pipeline 71, be arranged on the 6th pipeline 71 the
Three blower fans 72, the first fixed mount 73 positioned at the lower section of the 3rd blower fan 72, second be arranged on first fixed mount 73
Montant 74, the second fixed mount 75 positioned at the top of second montant 74, the below first fixed mount 73 the 3rd consolidate
Determine frame 76 and the 4th cross bar 77 positioned at the left side of the 3rd fixed mount 76.The left end alignment the described 8th of the 6th pipeline 71
Through hole 612 and it is fixedly connected with the right surface of the 3rd framework 61 so that the inside and the described 3rd of the 6th pipeline 71
The inside of framework 61 communicates.3rd blower fan 72 is electrically connected with the power supply, for the gas in the 3rd framework 61 to be taken out
Enter in the 6th pipeline 71.First fixed mount 73 is L-shaped, one end of first fixed mount 73 and the 3rd wind
Machine 72 is fixedly connected, and the other end of first fixed mount 73 is fixedly connected with the right surface of the 3rd framework 61.Described
Two montants 74 are in cuboid and vertically place, and the lower end of second montant 74 is fixedly connected with first fixed mount 73, institute
The 6th pipeline 71 is stated through the left and right surface of second montant 74 and connection is secured to.Second fixed mount 75 is L-shaped,
One end of second fixed mount 75 is fixedly connected with the upper end of second montant 74, the other end of second fixed mount 75
It is fixedly connected with the 8th support.3rd fixed mount 76 is L-shaped, the upper end and described first of the 3rd fixed mount 76
Fixed mount 73 is fixedly connected, and the lower end of the 3rd fixed mount 76 is horizontal.4th cross bar 77 is in cuboid and level
Place, the left end of the 4th cross bar 77 is fixedly connected with the right surface of the 3rd framework 61, the right side of the 4th cross bar 77
End is fixedly connected with the 3rd fixed mount 76.
As shown in figure 1, the defecator 8 includes the 4th framework 81, second be contained in the 4th framework 81 rolling
The wheel 82, third bristle 83 that is arranged on second roller 82, the 8th drainage screen 84 positioned at the lower section of second roller 82,
Second support bar 85 positioned at the lower section of the 8th drainage screen 84, the second sponge block below the second support bar 85
86th, positioned at the lower section of the 4th framework 81 the 4th fixed mount 87, discharge pipe 88 and be arranged on the discharge pipe 88 the 6th
Valve 89.4th framework 81 is in hollow cylindrical shape, the horizontal positioned of the 4th framework 81, in the 4th framework 81
The 9th through hole 811 and the tenth through hole 812 are provided with, in the 9th through hole 811 and the tenth through hole 812 and the 4th framework 81
Portion communicates, and the 9th through hole 811 described in the lower end aligned of the 6th pipeline 71 and fixes with the outer surface of the 4th framework 81
Connection so that the inside of the 6th pipeline 71 communicates with the inside of the 4th framework 81, under the 3rd fixed mount 76
End is fixedly connected with the 4th framework 81.Second roller 82 in cylinder and horizontal positioned, second roller 82 with
The axle of 4th framework 81 turns connection so that second roller 82 can rotate in the 4th framework 81, and described second
Roller 82 and motor connection, drive second roller 82 to rotate.The third bristle 83 is provided with several, the third bristle
83 are evenly distributed on second roller 82 and are secured to connection, and second roller 82 is located at the 9th through hole 811
Lower section.8th drainage screen 84 is horizontal, the side of the 8th drainage screen 84 and the interior table of the 4th framework 81
Face is fixedly connected.The second support bar 85 is provided with two, the upper end of the second support bar 85 and the 8th drainage screen 84
Lower surface be fixedly connected, the lower end of the second support bar 85 is fixedly connected with the upper surface of second sponge block 86.Institute
The lower surface for stating the second sponge block 86 is fixedly connected with the inner surface of the 4th framework 81, and second sponge block 86 is located at institute
State the top of the tenth through hole 812.The discharge pipe 88 is in vertical shape, and the upper end of the discharge pipe 88 is directed at the tenth through hole
812 and it is fixedly connected with the outer surface of the 4th framework 81 so that the inside of the discharge pipe 88 and the 4th framework 81
Inside communicate.6th valve 89 is used to control the flow of gas in the discharge pipe 88.4th fixed mount 87 is in L
Type, one end of the 4th fixed mount 87 is fixedly connected with the 4th framework 81, the other end of the 4th fixed mount 87 with
The side of the discharge pipe 88 is fixedly connected.
As shown in figure 1, when the efficient Waste gas filtering purifier of described this utility model is used, the first water pump is started first
23, and open the 3rd valve 22 so that the water in pond is drawn in the 3rd pipeline 21, then through third through-hole
113 enter in first framework 11, then soak the fix bar 17 of first drainage screen 16 and first, are then gathered in institute
The bottom in the first framework 11 is stated, when the water of aggregation is more, the second valve 10 can be opened so that water is from the second pipe
Discharge in 19.Then start the first blower fan 13, and open the first valve 15 so that the waste gas that boiler is produced enters into described first
In pipeline 12, then enter in first drainage screen 16 through first through hole 111, then the first drainage screen through soaking
The right side of first drainage screen 16 is entered into after 16 filtration, now can be with most granule foreign in scavenging, so
Enter in upper 4th pipeline 31 through fourth hole 114 afterwards, open the 4th valve 32, then waste gas enters described second
In framework 33.Then the lower section of first sponge block 34 is entered into after the filtration of the first sponge block 34, described first is extra large
Continuous block 34 can filter out the most of impurity in air, and due to just contacting with the first drainage screen 16 for soaking so that it is empty
Moisture content in gas is higher, can soak first sponge block 34 so that the filter effect of the first sponge block 34 is more preferable.So
Afterwards air is contacted again after the filtration of second drainage screen 36 with desiccant, can be with the steam in scavenging, Ran Houjing
The lower section of the 3rd drainage screen 37 is entered into after the filtration for crossing the 3rd drainage screen 37, the 3rd drainage screen 37 can be removed useless
The desiccant carried in gas, and preferable filtration can be played to air.Then air is again through first swash plate 38
On the first bristle 381 filtration after focus on the left side of first swash plate 38, then through the filtration of the 4th drainage screen 39
The lower section of the 4th drainage screen 39 is entered into afterwards.Then portion gas are entered into after the filtration of the 5th drainage screen 30
The right side of the 5th drainage screen 30, such that it is able to play a part of Partial filtration, can effectively reduce pressure, and improve efficiency, together
When may also operate as filter effect.Then waste gas is entered in the 5th pipeline 51, now starts the second blower fan 53, and is beaten
Open the 5th valve 52 so that the waste gas in the 5th pipeline 51 enters into the lower section of the 5th pipeline 51, then into described
In 3rd framework 61.Now start cylinder 64 so that the catch bar 65 drive the 6th drainage screen 62 constantly on move down
It is dynamic, and then allow the 6th drainage screen 62 to carry out dynamic filtration to waste gas, prevent impurity from blocking the 6th drainage screen
62, while the efficiency of filtration can be improved.Then air enters into the right side of the baffle plate 67 through first groove 671,
Now start the motor being connected with the first roller 68 so that first roller 68 rotates, and then drive second bristle 69
Rotate with, such that it is able to adsorb air in partial impurities, remove air in impurity.Then through the 7th drainage screen
Enter into after 60 filtration in the 6th pipeline 71.Then the 3rd blower fan 72 is started so that the air in the 6th pipeline 71 enters
Enter in the 4th framework 81, now start the motor being connected with the second roller 82 so that second roller 82 drives institute
State third bristle 83 to rotate with, such that it is able to filter to the waste gas entered from the 9th through hole 811, adsorb therein
Impurity, then after the filtration of the 8th drainage screen 84, and enters into after the filtration of second sponge block 86 again
In the discharge pipe 88, the 6th valve 89 is then opened so that the waste gas after filtration is discharged, now waste gas obtains sufficiently net
Change, meet discharging standards, prevent to environment, preferable protective effect is served to environment.So far, this practicality
New and effective Waste gas filtering purifier is finished using process description.
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to
In this, any those skilled in the art can readily occur in change or replace in the technical scope that this utility model is disclosed
Change, all should cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be wanted with the right
The protection domain asked is defined.