CN206168152U - Boiler exhaust gas purification device - Google Patents

Boiler exhaust gas purification device Download PDF

Info

Publication number
CN206168152U
CN206168152U CN201621038713.8U CN201621038713U CN206168152U CN 206168152 U CN206168152 U CN 206168152U CN 201621038713 U CN201621038713 U CN 201621038713U CN 206168152 U CN206168152 U CN 206168152U
Authority
CN
China
Prior art keywords
framework
screen pack
support
fixedly connected
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621038713.8U
Other languages
Chinese (zh)
Inventor
张国辉
王春霞
崔国英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wulanchabu Institute Of Environmental Science
Original Assignee
Wulanchabu Institute Of Environmental Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wulanchabu Institute Of Environmental Science filed Critical Wulanchabu Institute Of Environmental Science
Priority to CN201621038713.8U priority Critical patent/CN206168152U/en
Application granted granted Critical
Publication of CN206168152U publication Critical patent/CN206168152U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a boiler exhaust gas purification device, including first framework device (1), water installations (2), second framework device (3), connecting device (4), first plumbing installation (5), third framework device (6), second plumbing installation (7) and filter equipment (8), first framework device (1) is including first framework (11), first pipeline (12), first fan (13), first support (14), first valve (15), first filter screen (16), first dead lever (17), first spring (18), water installations (2) are including third pipeline (21), third valve (22), first water pump (23) and second support (24), second framework device (3) is including fourth pipeline (31), four valves (32), second framework (33), first sponge piece (34), second spring (35), second filter screen (36), third filter screen (37), first swash plate (38), the utility model discloses can carry out multiple filtration to waste gas.

Description

A kind of boiler waste gas purification device
Technical field
The utility model is related to waste gas purification processing technology field, more particularly to a kind of boiler waste gas purification device.
Background technology
Existing steam boiler exhaust gas and smoke purification techniques, is substantially directly discharged into boiler waste gas in air, or adopts With simple spray cleaning technology, technique is simple and crude single, the effect on driving birds is not good of purification, does not reach purification and requires, it is impossible to removes smoke abatement, Serious environment pollution.
Chinese patent CN205279131U discloses a kind of boiler waste gas purification device, including boiler shell, the boiler Housing upper end is provided with smoke evacuation shell, and smoke evacuation flabellum is provided with inside the smoke evacuation shell, and the smoke evacuation shell side is provided with smoke exhaust pipe, described Smoke exhaust pipe is connected with clarifying smoke case, and the clarifying smoke case upper end is provided with delivery pump, the delivery pump and purification pipe middle part Case connects, and the clarifying smoke case lower end is provided with closure, and the closure is provided with delivery pipe, the clarifying smoke case side Escaping pipe is provided with, it can in time be drained into boiler internal flue dust inside clarifying smoke case in the presence of smoke evacuation flabellum, Delivery pump by hydraulic pressure enter through purification pipe spray flue dust is rinsed, the pernicious gas and impurity in flue dust is sunk Drop, has effectively purified flue dust, reduces that air is polluted down can in time to collect heat and conveys.But its is net Change mode is more single, and treatment facilities is simple, it is impossible to which haze is effectively purified, and clean-up effect is undesirable;And water with The limited time of exhaust gas contact, and then water is limited to the effect of waste gas purification, it is impossible to the impurity in effective scavenging;Simultaneously It is only capable of carrying out substance filtration to waste gas, it is impossible to carry out multi-filtering to waste gas, filter effect is limited, and when impurity content is higher When, it is impossible to the impurity in waste gas is removed clean.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Utility model content
Problem to be solved in the utility model is to provide a kind of boiler waste gas purification device, including the first frame device, enters Water installations, second framework device, attachment means, the first plumbing installation, the 3rd frame device, second pipe device and filtration dress Put, the first frame device include the first framework, the first pipeline, the first blower fan, first support, the first valve, the first screen pack, the One fix bar, the first spring, water feed apparatus include the 3rd pipeline, the 3rd valve, the first water pump and second support, second framework dress Put including the 4th pipeline, the 4th valve, second framework, the first sponge block, second spring, the second screen pack, the 3rd screen pack, One swash plate, the utility model can carry out multi-filtering to waste gas.
In order to solve above-mentioned technical problem, the utility model is adopted the following technical scheme that:
A kind of boiler waste gas purification device, including the first frame device, the water inlet that is arranged on first frame device Device, the second framework device on the right side of first frame device, the connection dress on the left of the second framework device Put, the first plumbing installation below the second framework device, the 3rd framework below first plumbing installation Device, the second pipe device on the right side of the 3rd frame device and the filtration below second pipe device dress Put, first frame device includes the first framework, the first pipeline on the left of first framework, is arranged at described first The first blower fan on pipeline, the first support above first blower fan, the first valve being arranged on first pipeline Door, be contained in first framework the first screen pack, the first fix bar on the left of first screen pack, positioned at institute State the first spring on the right side of the first screen pack, the second pipe below first framework and be arranged at the second pipe On the second valve, the water feed apparatus include the 3rd pipeline, the 3rd valve, the first water pump that are arranged on the 3rd pipeline And the second support below first water pump, the second framework device include the 4th pipeline, be arranged at the described 4th The 4th valve on pipeline, the second framework below the 4th pipeline, first be contained in the second framework are extra large Continuous block, the second spring below first sponge block, the second screen pack below the second spring, positioned at institute State the 3rd screen pack below the second screen pack, the first swash plate below the 3rd screen pack, oblique positioned at described first The 4th screen pack on the left of plate and the 5th screen pack below first swash plate, the attachment means include the 4th Frame, the first brace below the 4th support and the first cross bar on the left of the 4th support, the first pipe Duct device includes the 5th pipeline, the 5th valve being arranged on the 5th pipeline, the second blower fan, left positioned at second blower fan 5th support of side, the 6th support positioned at the 5th bracket side, the second cross bar being arranged on the 6th support, it is located at The 7th support and the 8th support on the right side of the 7th support on the right side of 5th pipeline, the 3rd frame device bag Include the 3rd framework, the 6th screen pack being contained in the 3rd framework, the 3rd spring above the 6th screen pack, Cylinder, the catch bar above the cylinder below the 6th screen pack, the on the left of the cylinder the 3rd Cross bar, the baffle plate on the right side of the cylinder, the first roller on the right side of the baffle plate, it is arranged on first roller Second bristle and the 7th screen pack above first roller, the second pipe device includes the 6th pipeline, arranges The 3rd blower fan, the first fixed mount below the 3rd blower fan on the 6th pipeline, it is arranged at described first and consolidates Determine the second montant on frame, the second fixed mount above second montant, below first fixed mount Three fixed mounts and the 4th cross bar on the left of the 3rd fixed mount, the filter includes the 4th framework, is contained in institute State the second roller in the 4th framework, the third bristle being arranged on second roller, below second roller It is 8th screen pack, the second support bar below the 8th screen pack, below the second support bar second extra large Continuous block, the 4th fixed mount, the discharge pipe below the 4th framework and the 6th valve being arranged on the discharge pipe, institute State the first framework and be provided with first through hole, the second through hole, third through-hole and fourth hole, the second framework is provided with positioned at it The fifth hole of upper surface and the 6th through hole positioned at its lower surface, the 3rd framework is provided with the 7th of surface disposed thereon Through hole and the 8th through hole positioned at its right surface.
First framework is in hollow semicylinder shape, one end of first pipeline be aligned the first through hole and with The left surface of first framework is fixedly connected, and the first support is L-shaped, one end of the first support and first wind Machine is fixedly connected, and the other end of the first support is fixedly connected with the left surface of first framework, first screen pack In bending, the upper end of first screen pack is fixedly connected with the inner surface of first framework, the first screen pack position In the right side of the first through hole, first fix bar is horizontal, the left end of first fix bar and first frame The inner surface of body is fixedly connected, and the right-hand member of first fix bar is fixedly connected with first screen pack, first spring Horizontal, the right-hand member of first spring is fixedly connected with the inner surface of first framework, the left end of first spring It is fixedly connected with the right surface of first screen pack, the upper end of the second pipe is directed at second through hole and with described the The outer surface of one framework is fixedly connected.
One end of 3rd pipeline is directed at the third through-hole and is fixedly connected with the outer surface of first framework, institute State that second support is L-shaped, one end of the second support is fixedly connected with first water pump, the other end of the second support It is fixedly connected with first framework.
The second framework is in hollow cuboid, and the second framework is vertically placed, one end pair of the 4th pipeline The accurate fourth hole and it is fixedly connected with the outer surface of first framework, the other end alignment of the 4th pipeline described the Five through holes and it is fixedly connected with the upper surface of the second framework, first sponge block is described in cuboid and horizontal positioned The side and its upper surface of the first sponge block is fixedly connected with the inner surface of the second framework, the first sponge block bumping post institute State fifth hole, the second spring is provided with three, the second spring is in vertical shape, the lower end of the second spring with it is described The upper surface of the second screen pack is fixedly connected, and the upper end of the second spring is fixed with the lower surface of first sponge block and connected Connect, second screen pack is in cuboid and horizontal positioned, the side of second screen pack and the interior table of the second framework Face is fixedly connected, the 3rd screen pack in wavy, the side of the 3rd screen pack and the inner surface of the second framework It is fixedly connected, drier is placed between the 3rd screen pack and second screen pack, first swash plate is oblique, The right-hand member of first swash plate is fixedly connected with the inner surface of the second framework, the left end of first swash plate and the described 4th The right-hand member of screen pack is fixedly connected, first swash plate be provided be positioned above some first bristles, be disposed below 3rd support and the first support bar below the 3rd support, first bristle is provided with several, first brush Hair lower end be fixedly connected with the upper surface of first swash plate, the 3rd support is L-shaped, one end of the 3rd support with First swash plate is fixedly connected, and the other end of the 3rd support is fixedly connected with the inner surface of the second framework, described First support bar is in cuboid and vertically places, and the lower end of the first support bar is fixed with the inner surface of the second framework and connected Connect, the upper end of the first support bar is fixedly connected with the 3rd support, the 4th screen pack is horizontal, the described 4th The left end of screen pack is fixedly connected with the inner surface of the second framework, and the 5th screen pack is in cuboid and vertically places, The lower surface of the 5th screen pack is fixedly connected with the inner surface of the second framework.
4th support is L-shaped, and one end of the 4th support is fixedly connected with the left surface of the second framework, institute The other end for stating the 4th support is fixedly connected with first framework, and first brace is oblique, first brace Lower end is fixedly connected with the left surface of the second framework, and the upper end of first brace is fixedly connected with the 4th support, First cross bar is horizontal, and the right-hand member of first cross bar is fixedly connected with the 4th support, first cross bar Left end is fixedly connected with the second pipe.
5th pipeline is in vertical shape, the upper end of the 5th pipeline be aligned the 6th through hole and with second frame The lower surface of body is fixedly connected, and the 5th support is L-shaped, and one end of the 5th support is fixed with second blower fan and connected Connect, the other end of the 5th support is fixedly connected with the lower surface of the second framework, the 6th support is L-shaped, described The upper end of the 6th support is horizontal and is fixedly connected with the left surface of the second framework, and the lower end of the 6th support is in perpendicular Straight shape, second cross bar is in cuboid and horizontal positioned, and the left end of second cross bar is fixedly connected with the 6th support, The right-hand member of second cross bar is fixedly connected with the 5th support, and the 7th support is L-shaped, the upper end of the 7th support Horizontal and be fixedly connected with the 8th support, the lower end of the 7th support is in vertical shape, and the 8th support is in L Type, the upper end of the 8th support is horizontal and right surface of with the second framework is fixedly connected, the 8th support Lower end is in vertical shape.
3rd framework be in hollow cuboid, the 7th through hole described in the lower end aligned of the 5th pipeline and with it is described The upper surface of the 3rd framework is fixedly connected, lower end and the 3rd framework of the 6th support, the 7th support and the 8th support Upper surface be fixedly connected, the baffle plate is in cuboid and vertically places, in the side of the baffle plate and the 3rd framework Surface is fixedly connected, and the lower end of the baffle plate is provided with the first groove, and the 6th screen pack is described in cuboid and horizontal positioned The left surface of the 6th screen pack is slidably connected with the inner surface of the 3rd framework, the right surface of the 6th screen pack with it is described The left surface of baffle plate is slidably connected, and the 3rd spring is in vertical shape, lower end and the 6th screen pack of the 3rd spring Upper surface be fixedly connected, the upper end of the 3rd spring is fixedly connected with the inner surface of the 3rd framework, the cylinder Lower surface is fixedly connected with the inner surface of the 3rd framework, and the catch bar is in cuboid and vertically places, the catch bar Lower end be connected with the cylinder, the upper end of the catch bar is fixedly connected with the lower surface of the 6th screen pack, described Three cross bars are fixedly connected in cuboid and horizontal positioned, the right-hand member of the 3rd cross bar with the left surface of the cylinder, and described the The left end of three cross bars is fixedly connected with the inner surface of the 3rd framework, and first roller is in cylinder and horizontal positioned, institute State the first roller to turn to be connected with the 3rd framework axle, second bristle is provided with several, and second bristle is uniformly distributed On first roller and be secured to connection, the 7th screen pack be in bending, the left end of the 7th screen pack with The right surface of the baffle plate is fixedly connected, and the right surface of the 7th screen pack is fixed with the inner surface of the 3rd framework and connected Connect, the 7th screen pack is located at the lower section of the 8th through hole, the 7th screen pack is provided with first for being positioned above Montant, the upper end of first montant is fixedly connected with the 3rd framework, the lower end of first montant and the 7th mistake Filter screen is fixedly connected.
The left end of the 6th pipeline is directed at the 8th through hole and is fixedly connected with the right surface of the 3rd framework, institute State that the first fixed mount is L-shaped, one end of first fixed mount is fixedly connected with the 3rd blower fan, first fixed mount The other end is fixedly connected with the right surface of the 3rd framework, and second montant is in cuboid and vertically places, described second The lower end of montant is fixedly connected with first fixed mount, the 6th pipeline through second montant left and right surface and with It is fixedly connected, and second fixed mount is L-shaped, and one end of second fixed mount is fixed with the upper end of second montant and connected Connect, the other end of second fixed mount is fixedly connected with the 8th support, the 3rd fixed mount is L-shaped, the described 3rd The upper end of fixed mount is fixedly connected with first fixed mount, and the lower end of the 3rd fixed mount is horizontal, and the described 4th is horizontal Bar is fixedly connected in cuboid and horizontal positioned, the left end of the 4th cross bar with the right surface of the 3rd framework, and described the The right-hand member of four cross bars is fixedly connected with the 3rd fixed mount.
4th framework is in hollow cylindrical shape, and the 4th framework horizontal positioned, the 4th framework is provided with 9th through hole and the tenth through hole, the 9th through hole described in the lower end aligned of the 6th pipeline and with the outer surface of the 4th framework It is fixedly connected, the lower end of the 3rd fixed mount is fixedly connected with the 4th framework, second roller is in cylinder and water Placing flat, second roller turns to be connected with the 4th framework axle, and the third bristle is evenly distributed on second roller Connection is gone up and is secured to, second roller is located at the lower section of the 9th through hole, and the 8th screen pack is horizontal, institute The side for stating the 8th screen pack is fixedly connected with the inner surface of the 4th framework, and the second support bar is provided with two, described The upper end of second support bar is fixedly connected with the lower surface of the 8th screen pack, the lower end of the second support bar and described The upper surface of two sponge blocks is fixedly connected, and the lower surface of second sponge block is fixed with the inner surface of the 4th framework and connected Connect, second sponge block is located at the top of the tenth through hole, and the discharge pipe is in vertical shape, the upper end pair of the discharge pipe Accurate tenth through hole and it is fixedly connected with the outer surface of the 4th framework, the 4th fixed mount is L-shaped, and the described 4th consolidates The one end for determining frame is fixedly connected with the 4th framework, and the other end of the 4th fixed mount is fixed with the side of the discharge pipe Connection.
After above-mentioned technical proposal, the utility model boiler waste gas purification device has the advantage that:
The utility model boiler waste gas purification device simple structure, it is easy to use, fully connecing for waste gas and water can be realized Touch, so that water is sufficiently purified to waste gas, clean-up effect is preferable;And multiple mistake can be carried out to waste gas Filter, filter type variation, such that it is able to adapt to different waste gas purifications, expands use range of the present utility model, while can With the effect for ensureing to filter, filter effect is notable, and then can prevent the discharge pollution on the environment of waste gas, and environment is risen Preferable protective effect is arrived.
Description of the drawings
The specific embodiment of the utility model boiler waste gas purification device is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the utility model boiler waste gas purification device;
In figure:The frame devices of 1- first;The frameworks of 11- first;111- first through hole;The through holes of 112- second;113- threeways Hole;114- fourth holes;The pipelines of 12- first;The blower fans of 13- first;14- first supports;The valves of 15- first;16- first is filtered Net;The fix bars of 17- first;The springs of 18- first;19- second pipes;The valves of 10- second;2- water feed apparatus;The pipelines of 21- the 3rd; The valves of 22- the 3rd;The water pumps of 23- first;24- second supports;3- second framework devices;The pipelines of 31- the 4th;The valves of 32- the 4th; 33- second frameworks;331- fifth holes;The through holes of 332- the 6th;The sponge blocks of 34- first;35- second springs;36- second is filtered Net;The screen packs of 37- the 3rd;The swash plates of 38- first;The bristles of 381- first;The supports of 382- the 3rd;383- first support bars;39- the 4th Screen pack;The screen packs of 30- the 5th;4- attachment means;The supports of 41- the 4th;The braces of 42- first;The cross bars of 43- first;5- first pipes Duct device;The pipelines of 51- the 5th;The valves of 52- the 5th;The blower fans of 53- second;The supports of 54- the 5th;The supports of 55- the 6th;56- second is horizontal Bar;The supports of 57- the 7th;The frame devices of 6- the 3rd;The frameworks of 61- the 3rd;The through holes of 611- the 7th;The through holes of 612- the 8th;The mistakes of 62- the 6th Filter screen;The springs of 63- the 3rd;64- cylinders;65- catch bars;The cross bars of 66- the 3rd;67- baffle plates;The grooves of 671- first;68- first is rolled Wheel;The bristles of 69- second;The screen packs of 60- the 7th;The montants of 601- first;7- second pipe devices;The pipelines of 71- the 6th;72- the 3rd Blower fan;The fixed mounts of 73- first;The montants of 74- second;The fixed mounts of 75- second;The fixed mounts of 76- the 3rd;The cross bars of 77- the 4th;8- is filtered Device;The frameworks of 81- the 4th;The through holes of 811- the 9th;The through holes of 812- the tenth;The rollers of 82- second, 83- third bristles;The mistakes of 84- the 8th Filter screen;85- second support bars;The sponge blocks of 86- second;The fixed mounts of 87- the 4th;88- discharge pipes;The valves of 89- the 6th.
Specific embodiment
As shown in figure 1, the utility model boiler waste gas purification device includes the first frame device 1, is arranged at described first Water feed apparatus 2 on frame device 1, the second framework device 3 positioned at the right side of first frame device 1, positioned at described second The attachment means 4 in the left side of frame device 3, the first plumbing installation 5 positioned at the lower section of the second framework device 3, positioned at described the 3rd frame device 6 of the lower section of one plumbing installation 5, the second pipe device 7 positioned at the right side of the 3rd frame device 6 and it is located at The filter 8 of the lower section of the second pipe device 7.
As shown in figure 1, first frame device 1 include the first framework 11, positioned at the of the left side of first framework 11 One pipeline 12, the first blower fan 13 being arranged on first pipeline 12, the first support above first blower fan 13 14th, the first valve 15 being arranged on first pipeline 12, the first screen pack 16, position being contained in first framework 11 The first fix bar 17 in the left side of first screen pack 16, the first spring 18, position on the right side of first screen pack 16 In the second pipe 19 and the second valve 10 for being arranged on the second pipe 19 of the lower section of first framework 11.Described first Framework 11 is in hollow semicylinder shape, and first framework 11 is provided with first through hole 111, the second through hole 112, third through-hole 113 and fourth hole 114, the first through hole 111, the second through hole 112, third through-hole 113 and fourth hole 114 and described The inside of one framework 11 communicates.One end of first pipeline 12 be aligned the first through hole 111 and with first framework 11 Left surface be fixedly connected so that the inside of first pipeline 12 communicates with the inside of first framework 11, described first The other end of pipeline 12 is placed on the outlet of boiler waste gas, for causing waste gas to enter in first pipeline 12.Described One blower fan 13 is electrically connected with the power supply, and waste gas can be pumped in first pipeline 12.The first support 14 is L-shaped, One end of the first support 14 is fixedly connected with first blower fan 13, the other end of the first support 14 and described first The left surface of framework 11 is fixedly connected.First valve 15 is used to control the flow of gas in first pipeline 12.It is described First screen pack 16 is in bending, and the upper end of first screen pack 16 is fixedly connected with the inner surface of first framework 11, First screen pack 16 is located at the right side of the first through hole 111.First fix bar 17 is horizontal, and described first consolidates The left end of fixed pole 17 is fixedly connected with the inner surface of first framework 11, the right-hand member of first fix bar 17 and described first Screen pack 16 is fixedly connected, so as to play a supporting role to first screen pack 16.First spring 18 is horizontal, institute The right-hand member for stating the first spring 18 is fixedly connected with the inner surface of first framework 11, the left end of first spring 18 with it is described The right surface of the first screen pack 16 is fixedly connected.The upper end of the second pipe 19 be aligned second through hole 112 and with it is described The outer surface of the first framework 11 is fixedly connected so that the inside phase of the inside of the second pipe 19 and first framework 11 It is logical.Second valve 10 is used to control the flow of water in the second pipe 19.
As shown in figure 1, the water feed apparatus 2 include the 3rd pipeline 21, the 3rd valve being arranged on the 3rd pipeline 21 The 22, first water pump 23 of door and the second support 24 positioned at the lower section of first water pump 23.One end alignment of the 3rd pipeline 21 The third through-hole 113 and be fixedly connected with the outer surface of first framework 11 so that the inside of the 3rd pipeline 21 with The inside of first framework 11 communicates, and the other end of the 3rd pipeline 21 is placed in pond.3rd valve 22 is used In the flow for controlling water in the 3rd pipeline 21.First water pump 23 is electrically connected with the power supply, and first water pump 23 is used It is pumped in the 3rd pipeline 21 in Jiang Shui.The second support 24 is L-shaped, one end of the second support 24 and described One water pump 23 is fixedly connected, and the other end of the second support 24 is fixedly connected with first framework 11.
As shown in figure 1, the second framework device 3 include the 4th pipeline 31, be arranged on the 4th pipeline 31 the Four valves 32, the second framework 33 positioned at the lower section of the 4th pipeline 31, the first sponge being contained in the second framework 33 Block 34, the second spring 35 positioned at the lower section of first sponge block 34, the second screen pack below the second spring 35 36th, positioned at the lower section of second screen pack 36 the 3rd screen pack 37, the first swash plate below the 3rd screen pack 37 38th, positioned at the 4th screen pack 39 and the 5th screen pack positioned at the lower section of first swash plate 38 in the left side of first swash plate 38 30.The second framework 33 is in hollow cuboid, and the second framework 33 is vertically placed, and the second framework 33 is provided with position The fifth hole 331 on surface and the 6th through hole 332 positioned at its lower surface thereon, the through hole of the fifth hole 331 and the 6th 332 is rounded and communicate with the inside of the second framework 33.One end of 4th pipeline 31 is directed at the fourth hole 114 And be fixedly connected with the outer surface of first framework 11 so that the inside of the 4th pipeline 31 and first framework 11 Inside communicates, the other end of the 4th pipeline 31 be aligned the fifth hole 331 and with the upper surface of the second framework 33 It is fixedly connected so that the inside of the 4th pipeline 31 communicates with the inside of the second framework 33.4th valve 32 is used In the flow for controlling gas in the 4th pipeline 31.First sponge block 34 in cuboid and horizontal positioned, described first The side and its upper surface of sponge block 34 is fixedly connected with the inner surface of the second framework 33, the bumping post of the first sponge block 34 The fifth hole 331.The second spring 35 is provided with three, and the second spring 35 is in vertical shape, the second spring 35 Lower end be fixedly connected with the upper surface of second screen pack 36, the upper end of the second spring 35 and first sponge block 34 lower surface is fixedly connected, so as to play a supporting role to first sponge block 34.Second screen pack 36 is in rectangular Body and horizontal positioned, the side of second screen pack 36 is fixedly connected with the inner surface of the second framework 33.Described 3rd Screen pack 37 is in wavy, and the side of the 3rd screen pack 37 is fixedly connected with the inner surface of the second framework 33, described Drier is placed between 3rd screen pack 37 and second screen pack 36.First swash plate 38 is oblique, and described the The right-hand member of one swash plate 38 is fixedly connected with the inner surface of the second framework 33, the left end of first swash plate 38 and the described 4th The right-hand member of screen pack 39 is fixedly connected, first swash plate 38 be provided be positioned above some first bristles 381, positioned at it 3rd support 382 of lower section and the first support bar 383 positioned at the lower section of the 3rd support 382, first bristle 381 is provided with Several, the lower end of first bristle 381 is fixedly connected with the upper surface of first swash plate 38, first bristle 381 Air can be filtered.3rd support 382 is L-shaped, one end and first swash plate 38 of the 3rd support 382 It is fixedly connected, the other end of the 3rd support 382 is fixedly connected with the inner surface of the second framework 33, described first supports Bar 383 is in cuboid and vertically places, and the lower end of the first support bar 383 is fixed with the inner surface of the second framework 33 and connected Connect, the upper end of the first support bar 383 is fixedly connected with the 3rd support 382.4th screen pack 39 is horizontal, The left end of the 4th screen pack 39 is fixedly connected with the inner surface of the second framework 33.5th screen pack 30 is in rectangular Body and vertically placement, the lower surface of the 5th screen pack 30 is fixedly connected with the inner surface of the second framework 33.
As shown in figure 1, the attachment means 4 include the 4th support 41, positioned at the first oblique of the lower section of the 4th support 41 Bar 42 and the first cross bar 43 positioned at the left side of the 4th support 41.4th support 41 is L-shaped, the 4th support 41 One end is fixedly connected with the left surface of the second framework 33, and the other end of the 4th support 41 is solid with first framework 11 Fixed connection.First brace 42 is oblique, and the lower end of first brace 42 is solid with the left surface of the second framework 33 Fixed connection, the upper end of first brace 42 is fixedly connected with the 4th support 41.First cross bar 43 is horizontal, institute The right-hand member for stating the first cross bar 43 is fixedly connected with the 4th support 41, left end and the second pipe of first cross bar 43 19 are fixedly connected.
As shown in figure 1, first plumbing installation 5 include the 5th pipeline 51, be arranged on the 5th pipeline 51 the Five valves 52, the second blower fan 53, the 5th support 54 positioned at the left side of second blower fan 53, positioned at the left side of the 5th support 54 The 6th support 55, be arranged on the 6th support 55 the second cross bar 56, positioned at the 7th of the right side of the 5th pipeline 51 the Support 57 and the 8th support positioned at the right side of the 7th support 57.5th pipeline 51 is in vertical shape, the 5th pipeline 51 upper end is directed at the 6th through hole 332 and is fixedly connected with the lower surface of the second framework 33 so that the 5th pipe The inside in road 51 communicates with the inside of the second framework 33.5th valve 52 is used to control gas in the 5th pipeline 51 The flow of body.Second blower fan 53 is electrically connected with the power supply, and can be used for being pumped into the air in the second framework 33 In 5th pipeline 51.5th support 54 is L-shaped, and one end and second blower fan 53 of the 5th support 54 are fixed Connection, the other end of the 5th support 54 is fixedly connected with the lower surface of the second framework 33.6th support 55 is in L Type, the upper end of the 6th support 55 is horizontal and is fixedly connected with the left surface of the second framework 33, described 6th The lower end of frame 55 is in vertical shape.Second cross bar 56 is in cuboid and horizontal positioned, the left end of second cross bar 56 and institute State the 6th support 55 to be fixedly connected, the right-hand member of second cross bar 56 is fixedly connected with the 5th support 54.Described 7th Frame 57 is L-shaped, and the upper end of the 7th support 57 is horizontal and is fixedly connected with the 8th support, the 7th support 57 Lower end be in vertical shape.8th support is L-shaped, the upper end of the 8th support it is horizontal and with the second framework 33 Right surface be fixedly connected, the lower end of the 8th support is in vertical shape.
As shown in figure 1, the 3rd frame device 6 include the 3rd framework 61, be contained in the 3rd framework 61 the Six screen packs 62, the 3rd spring 63 positioned at the top of the 6th screen pack 62, the gas below the 6th screen pack 62 Cylinder 64, the catch bar 65 positioned at the top of the cylinder 64, the 3rd cross bar 66 positioned at the left side of the cylinder 64, positioned at the cylinder Baffle plate 67 on the right side of in the of 64, the first roller 68 positioned at the right side of the baffle plate 67, the second brush being arranged on first roller 68 Hair 69 and the 7th screen pack 60 positioned at the top of first roller 68.3rd framework 61 is in hollow cuboid, described 3rd framework 61 is provided with the 7th through hole 611 and the 8th through hole 612 positioned at its right surface on surface disposed thereon, and the described 7th The through hole 612 of through hole 611 and the 8th is rounded and communicates with the inside of the 3rd framework 61, the lower end pair of the 5th pipeline 51 Accurate 7th through hole 611 and it is fixedly connected with the upper surface of the 3rd framework 61 so that the inside of the 5th pipeline 51 Communicate with the inside of the 3rd framework 61, the lower end of the 6th support 55, the 7th support 57 and the 8th support and described The upper surface of three frameworks 61 is fixedly connected.The baffle plate 67 is in cuboid and vertically places, the side of the baffle plate 67 with it is described The inner surface of the 3rd framework 61 is fixedly connected, and the space in the 3rd framework 61 is divided into left and right two parts by the baffle plate 67, The lower end of the baffle plate 67 is provided with the first groove 671, and first groove 671 is in rectangular-shape, and the baffle plate 67 is located at described The right side of the 7th through hole 611.6th screen pack 62 is in cuboid and horizontal positioned, the left surface of the 6th screen pack 62 It is slidably connected with the inner surface of the 3rd framework 61, the right surface of the 6th screen pack 62 and the left surface of the baffle plate 67 It is slidably connected so that the 6th screen pack 62 can be moved up and down.3rd spring 63 is in vertical shape, the 3rd spring 63 lower end is fixedly connected with the upper surface of the 6th screen pack 62, upper end and the 3rd framework of the 3rd spring 63 61 inner surface is fixedly connected, so as to play a supporting role to the 6th screen pack 62.The lower surface of the cylinder 64 and institute The inner surface for stating the 3rd framework 61 is fixedly connected, and the cylinder 64 is located at the lower section of the 6th screen pack 62.The catch bar 65 is in cuboid and vertically placement, and the lower end of the catch bar 65 is connected with the cylinder 64 so that the cylinder 64 drives institute State catch bar 65 to move up and down, the upper end of the catch bar 65 is fixedly connected with the lower surface of the 6th screen pack 62, and then The 6th screen pack 62 can be driven to move up and down.3rd cross bar 66 is in cuboid and horizontal positioned, and the described 3rd is horizontal The right-hand member of bar 66 is fixedly connected with the left surface of the cylinder 64, left end and the 3rd framework 61 of the 3rd cross bar 66 Inner surface is fixedly connected.First roller 68 is in cylinder and horizontal positioned, first roller 68 and the 3rd framework 61 axles turn connection so that first roller 68 can be in the interior rotation of the 3rd framework 61, first roller 68 and motor Connection, drives first roller 68 to rotate.Second bristle 69 is provided with several, and second bristle 69 is evenly distributed on On first roller 68 and be secured to connection.7th screen pack 60 is in bending, a left side for the 7th screen pack 60 End is fixedly connected with the right surface of the baffle plate 67, the right surface of the 7th screen pack 60 and the interior table of the 3rd framework 61 Face is fixedly connected, and the 7th screen pack 60 is located at the lower section of the 8th through hole 612, and the 7th screen pack 60 is provided with position The first square thereon montant 601, the upper end of first montant 601 is fixedly connected with the 3rd framework 61, and described first The lower end of montant 601 is fixedly connected with the 7th screen pack 60.
As shown in figure 1, the second pipe device 7 include the 6th pipeline 71, be arranged on the 6th pipeline 71 the Three blower fans 72, the first fixed mount 73 positioned at the lower section of the 3rd blower fan 72, second be arranged on first fixed mount 73 Montant 74, the second fixed mount 75 positioned at the top of second montant 74, the below first fixed mount 73 the 3rd consolidate Determine frame 76 and the 4th cross bar 77 positioned at the left side of the 3rd fixed mount 76.The left end alignment the described 8th of the 6th pipeline 71 Through hole 612 and it is fixedly connected with the right surface of the 3rd framework 61 so that the inside and the described 3rd of the 6th pipeline 71 The inside of framework 61 communicates.3rd blower fan 72 is electrically connected with the power supply, for the gas in the 3rd framework 61 to be taken out Enter in the 6th pipeline 71.First fixed mount 73 is L-shaped, one end of first fixed mount 73 and the 3rd wind Machine 72 is fixedly connected, and the other end of first fixed mount 73 is fixedly connected with the right surface of the 3rd framework 61.Described Two montants 74 are in cuboid and vertically place, and the lower end of second montant 74 is fixedly connected with first fixed mount 73, institute The 6th pipeline 71 is stated through the left and right surface of second montant 74 and connection is secured to.Second fixed mount 75 is L-shaped, One end of second fixed mount 75 is fixedly connected with the upper end of second montant 74, the other end of second fixed mount 75 It is fixedly connected with the 8th support.3rd fixed mount 76 is L-shaped, the upper end and described first of the 3rd fixed mount 76 Fixed mount 73 is fixedly connected, and the lower end of the 3rd fixed mount 76 is horizontal.4th cross bar 77 is in cuboid and level Place, the left end of the 4th cross bar 77 is fixedly connected with the right surface of the 3rd framework 61, the right side of the 4th cross bar 77 End is fixedly connected with the 3rd fixed mount 76.
As shown in figure 1, the filter 8 includes the 4th framework 81, second be contained in the 4th framework 81 rolling The wheel 82, third bristle 83 that is arranged on second roller 82, the 8th screen pack 84 positioned at the lower section of second roller 82, Second support bar 85 positioned at the lower section of the 8th screen pack 84, the second sponge block below the second support bar 85 86th, positioned at the lower section of the 4th framework 81 the 4th fixed mount 87, discharge pipe 88 and be arranged on the discharge pipe 88 the 6th Valve 89.4th framework 81 is in hollow cylindrical shape, the horizontal positioned of the 4th framework 81, in the 4th framework 81 The 9th through hole 811 and the tenth through hole 812 are provided with, in the 9th through hole 811 and the tenth through hole 812 and the 4th framework 81 Portion communicates, and the 9th through hole 811 described in the lower end aligned of the 6th pipeline 71 and fixes with the outer surface of the 4th framework 81 Connection so that the inside of the 6th pipeline 71 communicates with the inside of the 4th framework 81, under the 3rd fixed mount 76 End is fixedly connected with the 4th framework 81.Second roller 82 in cylinder and horizontal positioned, second roller 82 with The axle of 4th framework 81 turns connection so that second roller 82 can rotate in the 4th framework 81, and described second Roller 82 and motor connection, drive second roller 82 to rotate.The third bristle 83 is provided with several, the third bristle 83 are evenly distributed on second roller 82 and are secured to connection, and second roller 82 is located at the 9th through hole 811 Lower section.8th screen pack 84 is horizontal, the side of the 8th screen pack 84 and the interior table of the 4th framework 81 Face is fixedly connected.The second support bar 85 is provided with two, the upper end of the second support bar 85 and the 8th screen pack 84 Lower surface be fixedly connected, the lower end of the second support bar 85 is fixedly connected with the upper surface of second sponge block 86.Institute The lower surface for stating the second sponge block 86 is fixedly connected with the inner surface of the 4th framework 81, and second sponge block 86 is located at institute State the top of the tenth through hole 812.The discharge pipe 88 is in vertical shape, and the upper end of the discharge pipe 88 is directed at the tenth through hole 812 and it is fixedly connected with the outer surface of the 4th framework 81 so that the inside of the discharge pipe 88 and the 4th framework 81 Inside communicate.6th valve 89 is used to control the flow of gas in the discharge pipe 88.4th fixed mount 87 is in L Type, one end of the 4th fixed mount 87 is fixedly connected with the 4th framework 81, the other end of the 4th fixed mount 87 with The side of the discharge pipe 88 is fixedly connected.
As shown in figure 1, when the utility model boiler waste gas purification device is used, the first water pump 23 is started first, and Open the 3rd valve 22 so that the water in pond is drawn in the 3rd pipeline 21, is then entered through third through-hole 113 To in first framework 11, the fix bar 17 of first screen pack 16 and first is then soaked, be then gathered in described first Bottom in framework 11, when the water of aggregation is more, can open the second valve 10 so that water row from the second pipe 19 Go out.Then start the first blower fan 13, and open the first valve 15 so that the waste gas that boiler is produced enters into first pipeline 12 It is interior, then enter in first screen pack 16 through first through hole 111, then the mistake of the first screen pack 16 through soaking The right side of first screen pack 16 is entered into after filter, now can then be passed through with most granule foreign in scavenging Fourth hole 114 is entered in the 4th pipeline 31, opens the 4th valve 32, and then waste gas enters the second framework 33 It is interior.Then the lower section of first sponge block 34, first sponge block 34 are entered into after the filtration of the first sponge block 34 Can filter out the most of impurity in air, and due to just contacting with the first screen pack 16 for soaking so that in air Moisture content is higher, can soak first sponge block 34 so that the filter effect of the first sponge block 34 is more preferable.Then air Contact with drier after the filtration of second screen pack 36 again, can be with the steam in scavenging, then through the 3rd The lower section of the 3rd screen pack 37 is entered into after the filtration of screen pack 37, the 3rd screen pack 37 can be with band in scavenging Some drier, and preferable filtration can be played to air.Then air again on first swash plate 38 The left side of first swash plate 38 is focused on after the filtration of one bristle 381, is then entered after the filtration of the 4th screen pack 39 To the lower section of the 4th screen pack 39.Then portion gas enter into described after the filtration of the 5th screen pack 30 The right side of five screen packs 30, such that it is able to play a part of Partial filtration, can effectively reduce pressure, and efficiency be improved, while may be used also To play a part of filtration.Then waste gas is entered in the 5th pipeline 51, now starts the second blower fan 53, and opening the 5th Valve 52 so that the waste gas in the 5th pipeline 51 enters into the lower section of the 5th pipeline 51, then into the 3rd frame In body 61.Now start cylinder 64 so that the catch bar 65 drives the 6th screen pack 62 constantly to move up and down, and then Allow the 6th screen pack 62 to carry out dynamic filtration to waste gas, prevent impurity from blocking the 6th screen pack 62, while The efficiency of filtration can be improved.Then air enters into the right side of the baffle plate 67 through first groove 671, now starts The motor being connected with the first roller 68 so that first roller 68 rotates, and then drive second bristle 69 to rotate with, Partial impurities in such that it is able to adsorb air, remove the impurity in air.Then through the filtration of the 7th screen pack 60 After enter in the 6th pipeline 71.Then the 3rd blower fan 72 is started so that the air in the 6th pipeline 71 enters into described In 4th framework 81, now start the motor being connected with the second roller 82 so that second roller 82 drives the 3rd brush Hair 83 is rotated with, and such that it is able to filter to the waste gas entered from the 9th through hole 811, adsorbs impurity therein, so Afterwards after the filtration of the 8th screen pack 84, and after the filtration of second sponge block 86 enter into the discharge again In pipe 88, the 6th valve 89 is then opened so that the waste gas after filtration is discharged, and now waste gas is sufficiently purified, and meets state Family's discharge standard, prevents to environment, and preferable protective effect is served to environment.So far, the utility model boiler Waste gas purification apparatus is finished using process description.
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to In this, any those skilled in the art can readily occur in change or replace in the technical scope that the utility model is disclosed Change, all should cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be wanted with the right The protection domain asked is defined.

Claims (6)

1. a kind of boiler waste gas purification device, including the first frame device (1), it is arranged on first frame device (1) Water feed apparatus (2), the second framework device (3) on the right side of first frame device (1), positioned at the second framework device (3) attachment means (4) on the left of, the first plumbing installation (5) below the second framework device (3), positioned at described The 3rd frame device (6) below one plumbing installation (5), the second pipe device on the right side of the 3rd frame device (6) (7) filter (8) and below the second pipe device (7), it is characterised in that:First frame device (1) Including the first framework (11), the first pipeline (12) on the left of first framework (11), it is arranged at first pipeline (12) the first blower fan (13) on, the first support (14) above first blower fan (13), it is arranged at the first pipe The first valve (15) on road (12), the first screen pack (16) being contained in first framework (11), positioned at described first The first fix bar (17) on the left of screen pack (16), the first spring (18) on the right side of first screen pack (16), it is located at Second pipe (19) below first framework (11) and the second valve (10) being arranged on the second pipe (19), institute State the first framework (11) and be provided with first through hole (111), the second through hole (112), third through-hole (113) and fourth hole (114).
2. boiler waste gas purification device according to claim 1, it is characterised in that:The second framework device (3) includes 4th pipeline (31), the 4th valve (32) being arranged on the 4th pipeline (31), positioned at the 4th pipeline (31) lower section Second framework (33), be contained in the second framework (33) the first sponge block (34), positioned at first sponge block (34) second spring (35) below, the second screen pack (36) below the second spring (35), positioned at described second The 3rd screen pack (37), the first swash plate (38) below the 3rd screen pack (37) below screen pack (36), it is located at The 4th screen pack (39) and the 5th screen pack below first swash plate (38) on the left of first swash plate (38) (30), the second framework (33) is provided with the fifth hole (331) on surface disposed thereon and leads to positioned at the 6th of its lower surface Hole (332).
3. boiler waste gas purification device according to claim 1, it is characterised in that:First plumbing installation (5) includes 5th pipeline (51), the 5th valve (52) being arranged on the 5th pipeline (51), the second blower fan (53), positioned at described second The 5th support (54), the 6th support (55) on the left of the 5th support (54) on the left of blower fan (53), be arranged at it is described The second cross bar (56), the 7th support (57) on the right side of the 5th pipeline (51) on 6th support (55) and positioned at described The 8th support on the right side of 7th support (57).
4. boiler waste gas purification device according to claim 1, it is characterised in that:The filter (8) is including the 4th Framework (81), the second roller (82) being contained in the 4th framework (81), be arranged on second roller (82) Three bristles (83), the 8th screen pack (84) below second roller (82), under the 8th screen pack (84) Side second support bar (85), the second sponge block (86) below the second support bar (85), positioned at the 4th frame The 4th fixed mount (87), discharge pipe (88) below body (81) and the 6th valve (89) being arranged on the discharge pipe (88).
5. boiler waste gas purification device according to claim 1, it is characterised in that:First framework (11) is in hollow Semicylinder shape, one end of first pipeline (12) be aligned the first through hole (111) and with first framework (11) Left surface is fixedly connected, and the first support (14) is L-shaped, one end of the first support (14) and first blower fan (13) It is fixedly connected, the other end of the first support (14) is fixedly connected with the left surface of first framework (11), described first Screen pack (16) in bending, with the inner surface of first framework (11) fix and connect by the upper end of first screen pack (16) Connect, right side of first screen pack (16) positioned at the first through hole (111).
6. boiler waste gas purification device according to claim 1, it is characterised in that:First fix bar (17) is in level Shape, the left end of first fix bar (17) is fixedly connected with the inner surface of first framework (11), first fix bar (17) right-hand member is fixedly connected with first screen pack (16), and first spring (18) is horizontal, first spring (18) right-hand member is fixedly connected with the inner surface of first framework (11), the left end and described first of first spring (18) The right surface of screen pack (16) is fixedly connected, the upper end of the second pipe (19) be aligned second through hole (112) and with institute The outer surface for stating the first framework (11) is fixedly connected.
CN201621038713.8U 2016-09-06 2016-09-06 Boiler exhaust gas purification device Expired - Fee Related CN206168152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621038713.8U CN206168152U (en) 2016-09-06 2016-09-06 Boiler exhaust gas purification device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621038713.8U CN206168152U (en) 2016-09-06 2016-09-06 Boiler exhaust gas purification device

Publications (1)

Publication Number Publication Date
CN206168152U true CN206168152U (en) 2017-05-17

Family

ID=58675507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621038713.8U Expired - Fee Related CN206168152U (en) 2016-09-06 2016-09-06 Boiler exhaust gas purification device

Country Status (1)

Country Link
CN (1) CN206168152U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108302936A (en) * 2018-01-17 2018-07-20 山东齐明炭素有限公司 A kind of calcining furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108302936A (en) * 2018-01-17 2018-07-20 山东齐明炭素有限公司 A kind of calcining furnace

Similar Documents

Publication Publication Date Title
CN105771518B (en) Dust treatment plant in a kind of ore processing
CN106310856A (en) Indoor air purification and dust removal device
CN106474832A (en) A kind of industrial smoke purifying equipment
CN206168152U (en) Boiler exhaust gas purification device
CN206138932U (en) Industrial waste gas filtration treatment ware
CN206138931U (en) Efficient exhaust gases filter clarifier
CN109011880A (en) Interior decoration air cleaning unit
CN106731393A (en) A kind of environment friendly dedusting device
CN105944460A (en) Waste gas purifying device for boiler
CN216295635U (en) Quick purifier is used in exhaust-gas treatment
CN106268148B (en) A kind of air cleaning system suitable for painting workshop
CN106310854A (en) Environmental-friendly effective exhaust gas purifying treatment system
CN106606915B (en) A kind of efficient industrial fumes energy-saving and purifying system
CN106178797A (en) A kind of boiler waste gas purification filtration system
CN106268141A (en) A kind of industrial waste gas purifying processing means
CN207950996U (en) A kind of cleaner for building of filter cylinder filtering
CN106422634A (en) Improved air purification device
CN106731394A (en) A kind of Environmental-protecting dust-removing equipment of building engineering construction
CN108295618A (en) A kind of double-layer active carbon exhaust gas purification device
CN105999885A (en) Purifying device for asphalt flue gas
CN106403061B (en) A kind of medical air disinfector
CN216175186U (en) Portable waste gas adsorption equipment
CN219670294U (en) Airflow type test water mist generator capable of filtering water
CN219630951U (en) Multifunctional waste gas tower heat preservation room
CN207933239U (en) A kind of advanced treatment of wastewater combination unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20170906