CN106310856A - Indoor air purification and dust removal device - Google Patents

Indoor air purification and dust removal device Download PDF

Info

Publication number
CN106310856A
CN106310856A CN201610865254.9A CN201610865254A CN106310856A CN 106310856 A CN106310856 A CN 106310856A CN 201610865254 A CN201610865254 A CN 201610865254A CN 106310856 A CN106310856 A CN 106310856A
Authority
CN
China
Prior art keywords
containment vessel
fixing
drainage screen
circular hole
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610865254.9A
Other languages
Chinese (zh)
Inventor
赵洪珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Guanyu Technology Co Ltd
Original Assignee
Chengdu Guanyu Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Guanyu Technology Co Ltd filed Critical Chengdu Guanyu Technology Co Ltd
Priority to CN201610865254.9A priority Critical patent/CN106310856A/en
Publication of CN106310856A publication Critical patent/CN106310856A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/12Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
    • F24F3/16Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by purification, e.g. by filtering; by sterilisation; by ozonisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F6/00Air-humidification, e.g. cooling by humidification

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The invention relates to an indoor air purification and dust removal device, comprising an air inlet device (1), an air extractor (2), a first protective shell device (3), a first purification filtering device (4), a first connecting device (5), a second protective shell device (6), a second connecting device (7) and a third protective shell device (8), wherein the air inlet device (1) comprises an air inlet frame (11), a blocking frame (12), a first filter screen (13), a second filter screen (14), a rolling ball (15), first bristles (16) and a third filter screen (17); the air extractor (2) comprises an air extraction pipe (21), a first fan (22), a first valve (23), a first support frame (24), a first vertical rod (25) and a first connecting rod (26); the first protective shell device comprises a first protective shell, a first connecting pipe, a water pump, a second valve, a second support frame and a second connecting pipe. The indoor air purification and dust removal device is capable of rapidly, effectively and thoroughly purifying the air.

Description

A kind of indoor air purification dust arrester
Technical field
The present invention relates to technical field of air purification, particularly relate to a kind of indoor air purification dust arrester.
Background technology
Investigation shows, the time live and work of modern average 90% is in indoor, and indoor pollution in modern city Degree then exceed several times than outdoor, therefore, the relation of health is just seemed closely and more important by IAQ (indoor air quality).
Air purifier refers to filter, adsorb, decompose or convert the pollutant in air, is effectively improved room air The product of cleannes, its topmost function is to remove the particulate matter in air, such as pm2.5, pm10, pollen, fiber, hair Deng, the chemical pollutant that simultaneously can introduce due to finishing material, furniture with adsorption cleaning, as formaldehyde, benzene, ammonia etc. pollute Thing, has persistency and probabilistic feature according to the release of the space Air Contamination thing of relative closure, uses air cleaning It is one of internationally recognized method improving IAQ (indoor air quality) that device purifies the air of a room.
Chinese patent CN205481423U discloses a kind of air cleaner, and it specifically includes that enclosure body, and arranges Universal wheel unit in enclosure body lower end;Described enclosure body one side is provided with getter device, described air-breathing dress Putting a side and arrange particle filtering adsorbent equipment, described particle filtering adsorbent equipment one side is provided with ultraviolet sterilization dress Putting, described ultraviolet sterilization apparatus one side is provided with high penetration filtration film device, with described in described enclosure body The equidirectional side of high penetration filtration film device be provided with handspike, it has the beneficial effect that simple and reasonable, easy to use, Conveniently moving, it is possible to realizing effectively purifying room air, dedusting removes haze efficiency advantages of higher.But its filter type Single, filter effect is limited, it is impossible to well adapt to the filtration of varying environment air;And it is only capable of carrying out double filtration, when When particle filtering adsorbent equipment damages, granule foreign can be deposited on described high penetration filtration film device, and then can cause high pass Through the damage that filter membrane device is too early, shorten its service life, and its filter effect can be affected;Can not remove in air simultaneously Some harmful gass, can affect healthy;Simultaneously when air is more dried, it is impossible to air is humidified, and then make Obtain indoor air the driest.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of indoor air purification dust arrester, including air intake installation, dress of bleeding Put, the first containment vessel device, the first filtration equipment for clarifying, the first attachment means, the second containment vessel device, the second attachment means and 3rd containment vessel device, air intake installation include air inlet frame, gear frame, the first drainage screen, the second drainage screen, spin, the first bristle, the Three drainage screens, air extractor includes exhaust tube, the first blower fan, the first valve, the first bracing frame, the first vertical bar, the first connection Bar, the first containment vessel device includes the first containment vessel, the first connecting tube, water pump, the second valve, the second bracing frame, the second connection Pipe, air can be carried out quickly effectively and thoroughly purifying by the present invention.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of indoor air purification dust arrester, including air intake installation, be positioned at the air extractor on the right side of described air intake installation, It is positioned at the first containment vessel device on the right side of described air extractor, is contained in the first purification filtering of described first containment vessel device Device, it is positioned at the first attachment means on the right side of described first containment vessel device, is positioned at second below described first attachment means Containment vessel device, it is positioned at the second attachment means below described second containment vessel device and is positioned at below described second attachment means The 3rd containment vessel device, described air intake installation includes air inlet frame, the gear frame being contained in described air inlet frame, is positioned at described gear frame First drainage screen, second drainage screen being contained in described gear frame of lower section, it is positioned at the spin above described second drainage screen, sets The first bristle of being placed in described spin, be positioned at the 3rd drainage screen above described spin, described air extractor include exhaust tube, The first blower fan, the first valve that are arranged on described exhaust tube, be positioned at the first bracing frame below described exhaust tube, be positioned at described Below first bracing frame first vertically bar, it is positioned at the head rod below the described first vertical bar, is arranged at described first In connecting rod second vertically bar and be arranged at the second connecting rod of the described second vertical bar left and right sides, described first containment vessel Device includes the first containment vessel, is positioned at the first connecting tube on the right side of described first containment vessel, is arranged in described first connecting tube Water pump, the second valve, be positioned at the second bracing frame below described first connecting tube, be positioned at below described first containment vessel Two connecting tubes, the 3rd valve being arranged in described second connecting tube, described first filtration equipment for clarifying includes the first roller, sets It is placed in the second bristle on described first roller, is positioned at the first swash plate below described first roller, is positioned at described first swash plate First sponge block in left side, it is positioned at the 4th drainage screen below described first sponge block, is positioned at above described 4th drainage screen Second sponge block, it is positioned at the first spring above described second sponge block, is positioned at the second spring on the left of described first spring, position Concentrating block and being positioned at the 5th drainage screen above described concentration block below described 4th drainage screen, described first attachment means The 4th valve, the second blower fan that including the 3rd connecting tube, are arranged in described 3rd connecting tube, it is positioned on the left of described second blower fan The 3rd bracing frame, be positioned at the 3rd connecting rod on the left of described 3rd bracing frame, be positioned at the 4th on the left of described 3rd connecting rod Bracing frame, described second containment vessel device includes the second containment vessel, the concentration bucket being contained in described second containment vessel, is positioned at institute State and concentrate baffle plate, the 6th drainage screen being arranged on described baffle plate below bucket, be positioned at the obstruct frame below described baffle plate, be positioned at The 7th drainage screen on the left of described obstruct frame, it is positioned at the 3rd sponge block below described obstruct frame, is positioned at described 3rd sponge block Right side the 8th drainage screen, described second attachment means include the 4th connecting rod, the be arranged in described 4th connecting rod the 5th Connecting rod, it is positioned at the 4th connecting tube on the right side of described 4th connecting rod and is arranged at the 5th valve in described 4th connecting tube, Described 3rd containment vessel device includes the 3rd containment vessel, is positioned at the discharge pipe on the left of described 3rd containment vessel, is arranged at described row Go out the 6th valve on pipe, the 9th drainage screen being contained in described 3rd containment vessel, be positioned on the left of described 9th drainage screen Tenth drainage screen, be positioned at the riser on the left of described tenth drainage screen, be positioned at the second roller on the left of described riser, be arranged at described Third bristle on second roller, being positioned at the 11st drainage screen on the left of described second roller, described air inlet frame is provided with and is positioned at Some first circular holes of its side and be positioned at the second circular hole of its upper surface, described first containment vessel is provided with and is positioned at its upper surface The 3rd circular hole, be positioned at the 4th circular hole on its right surface, be positioned at the 5th circular hole of its lower surface and be positioned at the 6th of its right surface Circular hole, described second containment vessel is provided with the 7th circular hole being positioned at its upper surface and the 8th circular hole being positioned at its lower surface.
Described air inlet frame is hollow cylinder and vertically places, described gear frame be cross section be the cylinder of annulus, described Gear frame is vertically placed, and the upper surface of described gear frame is fixing with the inner surface of described air inlet frame to be connected, and described first drainage screen is horizontal stroke Cross section is the cylinder of annulus, and the upper surface of described first drainage screen is fixing with the lower surface of described gear frame to be connected, described first mistake The lower surface of filter screen is fixing with the inner surface of described air inlet frame to be connected, and described second drainage screen is cylinder and horizontal positioned, institute The inner surface of the side and described gear frame of stating the second drainage screen is fixed and is connected, and described spin is spherical, described spin and described gear Frame axle turns connection, and described first bristle is provided with several and is evenly distributed in described spin, described first bristle and described rolling Ball is fixing to be connected, and described 3rd drainage screen is hollow hemispherical, the upper surface of described 3rd drainage screen and described air inlet frame Inner surface is fixing to be connected, and described 3rd drainage screen is positioned at the lower section of described second circular hole.
The left end of described exhaust tube is directed at described second circular hole and fixing with the upper surface of described air inlet frame is connected, and described the One bracing frame is L-shaped, and one end of described first bracing frame and described first blower fan are fixing to be connected, another of described first bracing frame Holding the side with described air inlet frame to fix to be connected, the described first vertical bar is vertical shape, the upper end of the described first vertical bar and institute Stating the fixing connection of the first bracing frame, the lower end of the described first vertical bar is fixing with the upper surface of described head rod to be connected, institute Stating head rod and be provided with two, described head rod is cuboid and horizontal positioned, the left end of described head rod with Described air inlet frame is fixing to be connected, and the described second vertical bar is vertical shape, and the end of the described second vertical bar is connected with described first Bar is fixing to be connected, and described second connecting rod is provided with two, and described second connecting rod is horizontal, one end of described second connecting rod Fix with the side of the described second vertical bar and be connected.
Described first containment vessel is hollow cuboid and vertically places, described 3rd circle of right-hand member alignment of described exhaust tube Hole and fixing with the upper surface of described first containment vessel being connected, the right-hand member of described head rod and a left side for described first containment vessel Surface is fixing to be connected, and the left end of described first connecting tube is directed at described 4th circular hole and the right surface with described first containment vessel is consolidated Fixed connection, described second bracing frame is L-shaped, and one end of described second bracing frame is fixing with described first containment vessel to be connected, described The other end of the second bracing frame and described water pump are fixing to be connected, upper end described 5th circular hole of alignment of described second connecting tube and with The lower surface of described first containment vessel is fixing to be connected.
Described first roller is cylinder, and described first roller turns be connected with described first protection columella, described second brush Hair is provided with several, and described second bristle is evenly distributed on described first roller and is secured to connect, described first swash plate Inclined shape, the upper end of described first swash plate is fixing with the inner surface of described first containment vessel to be connected, under described first swash plate Holding the right-hand member with described first sponge block to fix to be connected, described first sponge block is cuboid and horizontal positioned, described first sea The left end of continuous block is fixing with the inner surface of described first containment vessel to be connected, and described 4th drainage screen is cuboid and horizontal positioned, The side of described 4th drainage screen and the inner surface of described first containment vessel are fixing to be connected, described second sponge block be cuboid and Horizontal positioned, the side of described second sponge block is fixing with the inner surface of described first containment vessel to be connected, described second sponge block The upper surface of lower surface and described 4th drainage screen fixing be connected, described first spring is vertical shape, described first spring Lower end and described second sponge block are fixing to be connected, and the upper end of described first spring is fixed with described first swash plate and is connected, and described the Two springs are vertical shape, and the lower end of described second spring is fixing with described second sponge block to be connected, the upper end of described second spring Fixing with described first sponge block and be connected, described concentration block is provided with two and lays respectively at the left and right two in described first containment vessel Side, the rectangular triangle of cross section of described concentration block, described concentration block is fixing with the inner surface of described first containment vessel to be connected, Described 5th drainage screen is hollow hemispherical, and the right surface of described 5th drainage screen is solid with the inner surface of described first containment vessel Fixed connection, described 5th drainage screen is positioned at the left side of described 6th circular hole.
The upper end of described 3rd connecting tube is directed at described 6th circular hole and the right surface with described first containment vessel is fixed even Connecing, described 3rd bracing frame is L-shaped, and the upper end of described 3rd bracing frame is fixing with described second blower fan to be connected, and the described 3rd even Extension bar is cuboid and horizontal positioned, and the right-hand member of described 3rd connecting rod is fixing with described 3rd bracing frame to be connected, and the described 3rd The left end of connecting rod is fixing with described 4th bracing frame to be connected, and described 4th bracing frame is L-shaped, the upper end of described 4th bracing frame Fix with the lower surface of described first containment vessel and be connected.
Described second containment vessel is hollow round table-like, the 7th circular hole described in the lower end aligned of described 3rd connecting tube and with The upper surface of described second containment vessel is fixing to be connected, the lower end of described 3rd bracing frame and the 4th bracing frame and described second protection Shell is fixing to be connected, described concentrate bucket in hollow round table-like, the described upper surface concentrating bucket and the interior table of described second containment vessel Face is fixing to be connected, the described lower section concentrating bucket to be positioned at described 7th circular hole, and described baffle plate is horizontal, the side of described baffle plate with The inner surface of described second containment vessel is fixing to be connected, and described baffle plate is provided with the 9th circular hole running through its upper and lower surface, described collection 9th circular hole described in the lower end aligned of middle bucket and fixing with the upper surface of described baffle plate be connected, described 6th drainage screen is cylinder Body, described 6th drainage screen is contained in described 9th circular hole and fixing with described baffle plate is connected, and described obstruct frame is L-shaped, described The lower surface of the upper surface and described baffle plate that intercept frame is fixed and is connected, and described obstruct frame is positioned at the lower section of described 9th circular hole, institute Stating the 7th drainage screen to be cuboid and vertically place, the upper surface of described 7th drainage screen is fixing with the lower surface of described baffle plate even Connecing, the lower surface of described 7th drainage screen is fixing with the inner surface of described second containment vessel to be connected, the left surface of described obstruct frame Fixing with the right surface of described 7th drainage screen and be connected, described 3rd sponge block is cuboid, the upper table of described 3rd sponge block Face is fixing with the lower surface of described obstruct frame to be connected, the lower surface of described 3rd sponge block and the inner surface of described second containment vessel Fixing and connect, the 8th drainage screen described in the described 8th inclined shape of drainage screen is fixing with the inner surface of described second containment vessel to be connected Connecing, described 8th drainage screen is positioned at the top of described 8th circular hole.
Described 4th connecting rod is provided with two, and described 4th connecting rod is cuboid and vertically places, and the described 4th connects The upper end of bar is fixing with the lower surface of described second containment vessel to be connected, and described 5th connecting rod is cuboid and horizontal positioned, institute Stating the 5th connecting rod between described 4th connecting rod, the end of described 5th connecting rod is fixing with described 4th connecting rod even Connecing, the upper end of described 4th connecting tube is directed at described 8th circular hole and fixing with the lower surface of described second containment vessel is connected.
Described 3rd containment vessel is hollow semicylinder shape, and described 3rd containment vessel is provided with the tenth circular hole and the 11st Circular hole, the tenth circular hole described in the lower end aligned of described 4th connecting tube and fixing with the upper surface of described 3rd containment vessel be connected, The lower end of described 4th connecting rod is fixing with the upper surface of described 3rd containment vessel to be connected, and the upper end alignment of described discharge pipe is described 11st circular hole and fixing with the outer surface of described 3rd containment vessel be connected, described 9th drainage screen is bending, and the described 9th Drainage screen is fixing with the inner surface of described 3rd containment vessel to be connected, and described 9th drainage screen is positioned at the lower section of described tenth circular hole, Described tenth drainage screen is bending, and the upper end of described tenth drainage screen is fixing with described 9th drainage screen to be connected, and the described tenth The lower end of drainage screen is fixing with the inner surface of described 3rd containment vessel to be connected, and described riser is vertical shape, and described riser is with described The inner surface of the 3rd containment vessel is fixing to be connected, and the upper end of described riser is provided with groove, and described second roller is cylinder, and described the Second wheel turns be connected with described 3rd protection columella, and described third bristle is provided with several, and described third bristle is evenly distributed on On described second roller and be secured to connect, described 11st drainage screen is vertical shape, and described 11st drainage screen is with described The inner surface of the 3rd containment vessel is fixing to be connected, and described 11st drainage screen is positioned at the right side of described 11st circular hole.
After using technique scheme, the indoor air purification dust arrester that the present invention proposes has the advantage that
The indoor air purification dust arrester simple in construction that the present invention proposes, easy to use, it is possible to air is carried out quickly Effectively and thoroughly purify.First, it can easily and fast by indoor air suction wherein so that indoor air is as early as possible Entrance wherein purify;To enter air first carry out filtration, purification substantially, remove volume therein bigger Grain impurity, granule foreign adsorbs on the first drainage screen, can drop down under gravity, prevent from being deposited on the first drainage screen On;It is purified by the mode then sprayed water air again, and water spray is possible not only to remove most granule in air Impurity, it is also possible to part removes the harmful gas in air, prevents it from working the mischief human body, reduces the pollution of environment, and The humidity of air can also be increased, meet the needs of some special environments;The most again air is carried out multi-filtering, filter effect Preferably, even if the damage of Partial filtration net, air still can effectively be filtered by other drainage screens, such that it is able to adapt to The needs of the air cleaning that some indoor particle impurity concentrations are higher, it is ensured that what it purified is smoothed out, and extends its service life.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the detailed description of the invention of the indoor air purification dust arrester that the present invention proposes is made further Illustrate:
Fig. 1 is the structural representation of the indoor air purification dust arrester that the present invention proposes;
In figure: 1-air intake installation;11-air inlet frame;111-the first circular hole;12-keeps off frame;13-the first drainage screen;14-second Drainage screen;15-spin;16-the first bristle;17-the 3rd drainage screen;2-air extractor;21-exhaust tube;22-the first blower fan;23- First valve;24-the first bracing frame;The vertical bar of 25-first;26-head rod;The vertical bar of 27-second;28-second connects Bar;3-the first containment vessel device;31-the first containment vessel;311-the 3rd circular hole;312-the 4th circular hole;313-the 5th circular hole;314- 6th circular hole;32-the first connecting tube;33-the second valve;34-water pump;35-the second bracing frame;36-the second connecting tube;37- Three valves;4-the first filtration equipment for clarifying;41-the first roller;42-the second bristle;43-the first swash plate;44-the first sponge block; 45-the 4th drainage screen;46-the second sponge block;47-the first spring;48-the second spring;49-concentrates block;40-the 5th drainage screen; 5-the first attachment means;51-the 3rd connecting tube;52-the 4th valve;53-the second blower fan;54-the 3rd bracing frame;55-the 3rd is even Extension bar;56-the 4th bracing frame;6-the second containment vessel device;61-the second containment vessel;611-the 7th circular hole;612-the 8th circular hole; 62-concentrates bucket;63-baffle plate;64-the 6th drainage screen;65-intercepts frame;66-the 7th drainage screen;67-the 3rd sponge block;68-the 8th Drainage screen;7-the second attachment means;71-the 4th connecting rod;72-the 5th connecting rod;73-the 4th connecting tube;74-the 5th valve; 8-the 3rd containment vessel device;81-the 3rd containment vessel;811-the tenth circular hole;812-the 11st circular hole;82-discharge pipe;83-the 6th Valve;84-the 9th drainage screen;85-the tenth drainage screen;86-riser;861-groove;87-the second roller;88-third bristle;89- 11st drainage screen.
Detailed description of the invention
As it is shown in figure 1, the indoor air purification dust arrester that the present invention proposes includes air intake installation 1, is positioned at described air inlet Air extractor 2 on the right side of device 1, it is positioned at the first containment vessel device 3 on the right side of described air extractor 2, is contained in described first and protects The first filtration equipment for clarifying 4 in protection cover device 3, it is positioned at the first attachment means 5 on the right side of described first containment vessel device 3, position The second containment vessel device 6 below described first attachment means 5, it is positioned at second below described second containment vessel device 6 even Connection device 7 and be positioned at the 3rd containment vessel device 8 below described second attachment means 7.
As it is shown in figure 1, described air intake installation 1 includes air inlet frame 11, the gear frame 12 being contained in described air inlet frame 11, is positioned at The first drainage screen 13, the second drainage screen 14 being contained in described gear frame 12 below described gear frame 12, it is positioned at described second mistake Spin 15, the first bristle 16 being arranged in described spin 15 above filter screen 14, it is positioned at the 3rd mistake above described spin 15 Filter screen 17.Described air inlet frame 11 in hollow cylinder and is vertically placed, if described air inlet frame 11 is provided with is positioned at its side Doing the first circular hole 111 and be positioned at the second circular hole of its upper surface, air enters into described air inlet frame 11 from described first circular hole 111 In.Described gear frame 12 is the cylinder of annulus in cross section, and described gear frame 12 is vertically placed, and the upper surface of described gear frame 12 is with described The inner surface of air inlet frame 11 is fixing to be connected, and described gear frame 12 is positioned at the lower section of described second circular hole.Described first drainage screen 13 in Cross section is the cylinder of annulus, and air can be filtered by the side of described first drainage screen 13, described first drainage screen 13 The lower surface of upper surface and described gear frame 12 fixing is connected, the lower surface of described first drainage screen 13 and described air inlet frame 11 Inner surface is fixing to be connected so that entering into the air in described gear frame 12 and have to pass through the filtration of the first drainage screen 13, volume is relatively Big granule foreign drops to the bottom within described air inlet frame 11 under action of gravity after the filtration of the first drainage screen 13 again, Prevent from being deposited on the outer surface of described first drainage screen 13.Described second drainage screen 14 is in cylinder and horizontal positioned, described The side of the second drainage screen 14 is fixing with the inner surface of described gear frame 12 to be connected.Described spin 15 in spherical, described spin 15 with Described gear frame 12 axle turns connection so that described spin 15 can rotate in described gear frame 12, and described spin 15 is connected with motor, And then described spin 15 can be driven to rotate.Described first bristle 16 is provided with several and is evenly distributed in described spin 15, Described first bristle 16 is fixing with described spin 15 to be connected.Described 3rd drainage screen 17 in hollow hemispherical, described 3rd mistake The upper surface of filter screen 17 is fixing with the inner surface of described air inlet frame 11 to be connected, and described 3rd drainage screen 17 is positioned at described second circular hole Lower section.
As it is shown in figure 1, described air extractor 2 includes exhaust tube 21, the first blower fan 22 of being arranged on described exhaust tube 21, First valve 23, it is positioned at the first bracing frame 24 below described exhaust tube 21, is positioned at first below described first bracing frame 24 Vertically bar 25, be positioned at the head rod 26 below the described first vertical bar 25, be arranged on described head rod 26 the Two vertical bars 27 and be arranged at the second connecting rod 28 of described second vertical bar 27 left and right sides.The left end pair of described exhaust tube 21 Accurate described second circular hole and fixing with the upper surface of described air inlet frame 11 being connected, the inside of described exhaust tube 21 and described air inlet frame The inside of 11 communicates.Described first blower fan 22 is connected with power supply.Described first bracing frame 24 is L-shaped, described first bracing frame 24 One end fixing with described first blower fan 22 is connected, the other end of described first bracing frame 24 is consolidated with the side of described air inlet frame 11 Fixed connection.Described first vertical bar 25 is in vertical shape, and the upper end of the described first vertical bar 25 is fixed with described first bracing frame 24 Connecting, the lower end of the described first vertical bar 25 is fixing with the upper surface of described head rod 26 to be connected.Described head rod 26 are provided with two, described head rod 26 in cuboid and horizontal positioned, the left end of described head rod 26 with described enter Air frame 11 is fixing to be connected.Described second vertical bar 27 is in vertical shape, and the described second vertical bar 27 is positioned at described head rod 26 Between, the end of the described second vertical bar 27 is fixing with described head rod 26 to be connected.Described second connecting rod 28 is provided with two Individual, described second connecting rod 28 is horizontal, and one end of described second connecting rod 28 is solid with the side of the described second vertical bar 27 Fixed connection.
As it is shown in figure 1, described first containment vessel device 3 includes the first containment vessel 31, is positioned at described first containment vessel 31 right side First connecting tube 32 of side, water pump the 34, second valve 33 being arranged in described first connecting tube 32, be positioned at described first connect The second bracing frame 35 below pipe 32, it is positioned at the second connecting tube 36 below described first containment vessel 31, is arranged at described second The 3rd valve 37 in connecting tube 36.Described first containment vessel 31 in hollow cuboid and is vertically placed, described first protection Shell 31 is provided with and is positioned at the 3rd circular hole 311 of its upper surface, is positioned at the 4th circular hole 312 on its right surface, is positioned at its lower surface 5th circular hole 313 and be positioned at the 6th circular hole 314 on its right surface, the right-hand member of described exhaust tube 21 is directed at described 3rd circular hole 311 And fixing with the upper surface of described first containment vessel 31 be connected, the inside of described exhaust tube 21 is interior with described first containment vessel 31 Portion communicates, and the right-hand member of described head rod 26 is fixing with the left surface of described first containment vessel 31 to be connected.Described first connects The left end of pipe 32 is directed at described 4th circular hole 312 and fixing with the right surface of described first containment vessel 31 is connected, described first company The inside of adapter 32 communicates with the inside of described first containment vessel 31, and the right-hand member of described first connecting tube 32 can be placed on pond In.Described water pump 34 is connected with power supply.Described second bracing frame 35 is L-shaped, one end of described second bracing frame 35 and described the One containment vessel 31 is fixing to be connected, and the other end of described second bracing frame 35 is fixing with described water pump 34 to be connected.Described second connects The upper end of pipe 36 is directed at described 5th circular hole 313 and fixing with the lower surface of described first containment vessel 31 is connected, described second company The inside of adapter 36 communicates with the inside of described first containment vessel 31.
As it is shown in figure 1, described first filtration equipment for clarifying 4 includes the first roller 41, is arranged on described first roller 41 The second bristle 42, be positioned at the first swash plate 43 below described first roller 41, be positioned at first on the left of described first swash plate 43 Sponge block 44, it is positioned at the 4th drainage screen 45 below described first sponge block 44, is positioned at above described 4th drainage screen 45 Two sponge blocks 46, it is positioned at the first spring 47 above described second sponge block 46, is positioned at second on the left of described first spring 47 Spring 48, it is positioned at and concentrates block 49 and be positioned at the 5th drainage screen above described concentration block 49 below described 4th drainage screen 45 40.Described first roller 41 is in cylinder, and described first roller 41 turns with described first containment vessel 31 axle and is connected so that described One roller 41 can rotate in described first containment vessel 31, and described first roller 41 is connected with driving motor, drives described the One roller 41 rotates.Described second bristle 42 is provided with several, and described second bristle 42 is evenly distributed on described first roller 41 Go up and be secured to connect.The described first inclined shape of swash plate 43, the upper end of described first swash plate 43 and described first containment vessel The inner surface of 31 is fixing to be connected, and the lower end of described first swash plate 43 is fixing with the right-hand member of described first sponge block 44 to be connected.Described First sponge block 44 in cuboid and horizontal positioned, the interior table of the left end of described first sponge block 44 and described first containment vessel 31 Face is fixing to be connected.Described 4th drainage screen 45 in cuboid and horizontal positioned, the side of described 4th drainage screen 45 and described the The inner surface of one containment vessel 31 is fixing to be connected.Described second sponge block 46 is in cuboid and horizontal positioned, described second sponge block The side of 46 is fixing with the inner surface of described first containment vessel 31 to be connected, the lower surface and the described 4th of described second sponge block 46 The upper surface of drainage screen 45 is fixing to be connected, thus plays a supporting role described second sponge block 46.Described first spring 47 in Vertically shape, the lower end of described first spring 47 is fixing with described second sponge block 46 to be connected, the upper end of described first spring 47 and Described first swash plate 43 is fixing to be connected.Described second spring 48 in vertical shape, the lower end and described second of described second spring 48 Sponge block 46 is fixing to be connected, and the upper end of described second spring 48 is fixed with described first sponge block 44 and is connected, thus to described the One sponge block 44 plays the effect of support.Described concentration block 49 is provided with two and lays respectively at the left side in described first containment vessel 31 Right both sides, the rectangular triangle of cross section of described concentration block 49, described concentration block 49 and the interior table of described first containment vessel 31 Face is fixing to be connected, and scavenging solution can be focused on centre by described concentration block 49.Described 5th drainage screen 40 in hollow hemispherical, The right surface of described 5th drainage screen 40 is fixing with the inner surface of described first containment vessel 31 to be connected, described 5th drainage screen 40 Left side in described 6th circular hole 314.
As it is shown in figure 1, described first attachment means 5 includes the 3rd connecting tube 51, is arranged in described 3rd connecting tube 51 The 4th valve the 52, second blower fan 53, be positioned at the 3rd bracing frame 54 on the left of described second blower fan 53, be positioned at described 3rd support The 3rd connecting rod 55 on the left of frame 54, it is positioned at the 4th bracing frame 56 on the left of described 3rd connecting rod 55.Described 3rd connecting tube The upper end of 51 is directed at described 6th circular hole 314 and fixing with the right surface of described first containment vessel 31 is connected, described 3rd connection The inside of pipe 51 communicates with the inside of described first containment vessel 31.Described second blower fan 53 is connected with power supply.Described 3rd supports Frame 54 is L-shaped, and the upper end of described 3rd bracing frame 54 is fixing with described second blower fan 53 to be connected.Described 3rd connecting rod 55 is in length Cube and horizontal positioned, the right-hand member of described 3rd connecting rod 55 is fixing with described 3rd bracing frame 54 to be connected, and the described 3rd connects The left end of bar 55 is fixing with described 4th bracing frame 56 to be connected.Described 4th bracing frame 56 is L-shaped, described 4th bracing frame 56 Upper end is fixing with the lower surface of described first containment vessel 31 to be connected.
As it is shown in figure 1, described second containment vessel device 6 includes the second containment vessel 61, is contained in described second containment vessel 61 In concentrate bucket 62, be positioned at described concentrate bucket 62 below baffle plate 63, the 6th drainage screen 64 being arranged on described baffle plate 63, position Intercepting frame 65, be positioned at the 7th drainage screen 66 on the left of described obstruct frame 65, be positioned at described obstruct frame below described baffle plate 63 The 3rd sponge block 67 below 65, it is positioned at the 8th drainage screen 68 on the right side of described 3rd sponge block 67.Described second containment vessel 61 In hollow round table-like, described second containment vessel 61 is provided with and is positioned at the 7th circular hole 611 of its upper surface and is positioned at its lower surface The 8th circular hole 612, the 7th circular hole 611 described in the lower end aligned of described 3rd connecting tube 51 and with described second containment vessel 61 Upper surface is fixing to be connected, and the inside of described 3rd connecting tube 51 communicates with the inside of described second containment vessel 61, described 3rd The lower end of support 54 and the 4th bracing frame 56 is fixing with described second containment vessel 61 to be connected.Described concentration struggles against 62 in hollow round platform Shape, the described upper and lower surface concentrating bucket 62 communicates, and the upper surface of described concentration bucket 62 is interior with described second containment vessel 61 Surface is fixing to be connected, the described lower section concentrating bucket 62 to be positioned at described 7th circular hole 611.Described baffle plate 63 is horizontal, described gear The side of plate 63 is fixing with the inner surface of described second containment vessel 61 to be connected, and described baffle plate 63 is provided with and runs through its upper and lower surface 9th circular hole, described 9th circular hole is rounded, described concentrate bucket 62 lower end aligned described in the 9th circular hole and with described baffle plate 63 Upper surface fixing connect, described 9th circular hole with described concentrate struggle against 62 inside communicate.Described 6th drainage screen 64 is in cylinder Body, described 6th drainage screen 64 is contained in described 9th circular hole and fixing with described baffle plate 63 is connected.Described obstruct frame 65 is in L Type, the upper surface of described obstruct frame 65 is fixing with the lower surface of described baffle plate 63 to be connected, and described obstruct frame 65 is positioned at the described 9th The lower section of circular hole.Described 7th drainage screen 66 in cuboid and is vertically placed, and the upper surface of described 7th drainage screen 66 is with described The lower surface of baffle plate 63 is fixing to be connected, and the inner surface of the lower surface of described 7th drainage screen 66 and described second containment vessel 61 is fixed Connecting, the left surface of described obstruct frame 65 is fixing with the right surface of described 7th drainage screen 66 to be connected.Described 3rd sponge block 67 In cuboid, the upper surface of described 3rd sponge block 67 is fixing with the lower surface of described obstruct frame 65 to be connected, described 3rd sponge The lower surface of block 67 is fixing with the inner surface of described second containment vessel 61 to be connected.Described in the described 8th inclined shape of drainage screen 68 Eight drainage screens 68 are fixing with the inner surface of described second containment vessel 61 to be connected, and described 8th drainage screen 68 is positioned at described 8th circular hole The top of 612.
As it is shown in figure 1, described second attachment means 7 includes the 4th connecting rod 71, is arranged in described 4th connecting rod 71 The 5th connecting rod 72, be positioned at the 4th connecting tube 73 on the right side of described 4th connecting rod 71 and be arranged at described 4th connecting tube 73 On the 5th valve 74.Described 4th connecting rod 71 is provided with two, and described 4th connecting rod 71 in cuboid and is vertically placed, institute The lower surface of the upper end and described second containment vessel 61 of stating the 4th connecting rod 71 is fixed and is connected.Described 5th connecting rod 72 is in rectangular Body and horizontal positioned, described 5th connecting rod 72 between described 4th connecting rod 71, the end of described 5th connecting rod 72 Fix with described 4th connecting rod 71 and be connected.The upper end of described 4th connecting tube 73 is directed at described 8th circular hole 612 and with described The lower surface of the second containment vessel 61 is fixing to be connected so that the inside of described 4th connecting tube 73 is interior with described second containment vessel 61 Portion communicates.
As it is shown in figure 1, described 3rd containment vessel device 8 includes the 3rd containment vessel 81, is positioned at described 3rd containment vessel 81 left side The discharge pipe 82 of side, the 6th valve 83 being arranged on described discharge pipe 82, be contained in described 3rd containment vessel 81 the 9th Drainage screen 84, be positioned at the tenth drainage screen 85 on the left of described 9th drainage screen 84, be positioned on the left of described tenth drainage screen 85 perpendicular Plate 86, it is positioned at the second roller 87 on the left of described riser 86, the third bristle 88 being arranged on described second roller 87, is positioned at institute State the 11st drainage screen 89 on the left of the second roller 87.Described 3rd containment vessel 81 in hollow semicylinder shape, the described 3rd Containment vessel 81 is provided with the tenth circular hole the 811 and the 11st circular hole 812, the tenth circle described in the lower end aligned of described 4th connecting tube 73 Hole 811 and fixing with the upper surface of described 3rd containment vessel 81 being connected, the inside of described 4th connecting tube 73 and described 3rd guarantor The inside of protective case 81 communicates, and the lower end of described 4th connecting rod 71 is fixing with the upper surface of described 3rd containment vessel 81 to be connected.Institute State the upper end of discharge pipe 82 be directed at described 11st circular hole 812 and fixing with the outer surface of described 3rd containment vessel 81 be connected, institute The inside of the inside and described 3rd containment vessel 81 of stating discharge pipe 82 communicates.Described 9th drainage screen 84 in bending, described Nine drainage screens 84 are fixing with the inner surface of described 3rd containment vessel 81 to be connected, and described 9th drainage screen 84 is positioned at described tenth circular hole The lower section of 811.Described tenth drainage screen 85 is in bending, and the upper end of described tenth drainage screen 85 is solid with described 9th drainage screen 84 Fixed connection, the lower end of described tenth drainage screen 85 is fixing with the inner surface of described 3rd containment vessel 81 to be connected.Described riser 86 in Vertically shape, described riser 86 is fixing with the inner surface of described 3rd containment vessel 81 to be connected, and the upper end of described riser 86 is provided with groove 861.Described second roller 87 is in cylinder, and described second roller 87 turns with described 3rd containment vessel 81 axle and is connected so that described Second roller 87 can rotate in described 3rd containment vessel 81, and described second roller 87 is connected with motor.Described third bristle 88 are provided with several, and described third bristle 88 is evenly distributed on described second roller 87 and is secured to connect.Described tenth One drainage screen 89 is in vertical shape, and described 11st drainage screen 89 is fixing with the inner surface of described 3rd containment vessel 81 to be connected, described 11st drainage screen 89 is positioned at the right side of described 11st circular hole 812.
During as it is shown in figure 1, the indoor air purification dust arrester that the described present invention proposes uses, first place it in room In, then start the first blower fan 22 so that extraneous air around air inlet frame 11 by the first circular hole 111 enter into described in enter In air frame 11, enter in described first drainage screen 13 after being then passed through the filtration of the first drainage screen 13, described first drainage screen The granule foreign that volume in air is bigger can be filtered by 13 so that granule foreign is deposited on described first drainage screen 13 On outer surface, drop the most under gravity in the bottom within described air inlet frame 11, prevent too much the sinking of granule foreign Amass on the outer surface of described first drainage screen 13.Filter through second then into the air in described first drainage screen 13 Enter after the filtration of net 14 above it so that impurity is deposited on the lower surface of described second drainage screen 14, when the second drainage screen When the impurity of the lower surface deposition of 14 is too much, impurity can drop, in order to avoid affecting the filtration to air of second drainage screen 14.Start with The motor that spin 15 connects so that described spin 15 rotates, and then drive the first bristle 16 to rotate with, such that it is able to entrance Air above described second drainage screen 14 filters, the impurity in absorption air.It is then passed through the 3rd drainage screen 17 Enter into after filtration in described exhaust tube 21, open the first valve 23 so that the air in exhaust tube 21 enters into described first In containment vessel 31.Start the motor that is connected with the first roller 41 so that described first roller 41 drive described second bristle 42 with Rotation, and then the air entered in described first containment vessel 31 first can be filtered.Then water pump 34 is started so that Water enters in described first connecting tube 32, opens the second valve 33 so that water enters in described second containment vessel 31, then It flow to the top of described first swash plate 43, the second bristle 42 can be soaked simultaneously, when the second bristle 42 rotates with, permissible Water is got rid of to the inner surface of the first containment vessel 31, such that it is able to air is filtered, the first sponge block can be soaked simultaneously 44 so that the first sponge block 44 is more preferable to the filter effect of air.Enter the air in the first containment vessel 31 through the first sponge Enter into after the filtration of block 44 below, be then passed through after the filtration of the second sponge block 46 and the 4th drainage screen 45 into its next Side, enters in described 3rd connecting tube 51 after being then passed through the filtration of the 5th drainage screen 40.Water flowing on first swash plate 43 On the first sponge block 44, then soak the second sponge block 46 and the 4th drainage screen 45, finally focus on described concentration block 49 it Between, when water is more, open the 3rd valve 37 so that water is discharged from the second connecting tube 36, the second sponge block 46 soaked and Four drainage screens 45 are more preferable to the filter effect of air.Then start the second blower fan 53, open the 4th valve 52 simultaneously so that enter Air in described 3rd connecting tube 51 enters in described second containment vessel 61, focuses in described concentration bucket 62 simultaneously. Enter into the lower section of described baffle plate 63 after being then passed through the filtration of the 6th drainage screen 64, and focus in described obstruct frame 65.So Rear air flows to the left and enters into the lower section of described obstruct frame 65 after the filtration of the 7th drainage screen 66, is then passed through the 3rd sea The filtration of continuous block 67 enters on the right side of it, enters into described 4th connecting tube 73 after being then passed through the filtration of the 8th drainage screen 68 In, open the 5th valve 74 so that enter into the air in described 4th connecting tube 73 and enter in described 3rd containment vessel 81, Enter on the left of it after being then passed through the filtration of the 9th drainage screen 84 and the tenth drainage screen 85, be then passed through groove 861 and enter into The left side of described riser 86, then starts the motor being connected with the second roller 87 so that described second roller 87 rotates, and then band Dynamic described third bristle 88 rotates with, such that it is able to again filter air, adsorbs granule foreign therein.Then warp Enter in described discharge pipe 82 after crossing the filtration of the 11st drainage screen 89, open the 6th valve 83 so that the air after purification Discharge.So far, the indoor air purification dust arrester that the present invention proposes uses process prescription complete.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those skilled in the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (8)

1. an indoor air purification dust arrester, including air intake installation (1), is positioned at bleeding of described air intake installation (1) right side Device (2), be positioned at described air extractor (2) right side the first containment vessel device (3), be contained in described first containment vessel device (3) the first filtration equipment for clarifying (4) in, it is positioned at first attachment means (5) on described first containment vessel device (3) right side, position In described first attachment means (5) lower section the second containment vessel device (6), be positioned at described second containment vessel device (6) lower section Second attachment means (7) and be positioned at described second attachment means (7) lower section the 3rd containment vessel device (8), it is characterised in that: institute State air intake installation (1) to include air inlet frame (11), the gear frame (12) being contained in described air inlet frame (11), be positioned at described gear frame (12) Lower section the first drainage screen (13), the second drainage screen (14) being contained in described gear frame (12), be positioned at described second drainage screen (14) top spin (15), the first bristle (16) being arranged in described spin (15), be positioned at described spin (15) top 3rd drainage screen (17), described air inlet frame (11) is provided with some first circular holes (111) and the position table thereon being positioned at its side Second circular hole in face;Described first containment vessel device (3) includes the first containment vessel (31), is positioned at described first containment vessel (31) right side First connecting tube (32) of side, the water pump (34) being arranged on described first connecting tube (32), the second valve (33), be positioned at described First connecting tube (32) lower section the second bracing frame (35), be positioned at described first containment vessel (31) lower section the second connecting tube (36), the 3rd valve (37) that is arranged on described second connecting tube (36), described first containment vessel (31) is provided with and is positioned at it 3rd circular hole (311) of upper surface, it is positioned at the 4th circular hole (312) on its right surface, is positioned at the 5th circular hole (313) of its lower surface And it is positioned at the 6th circular hole (314) on its right surface;Described first filtration equipment for clarifying (4) includes the first roller (41), is arranged at The second bristle (42) on described first roller (41), it is positioned at first swash plate (43) of described first roller (41) lower section, is positioned at Described first swash plate (43) left side the first sponge block (44), be positioned at described first sponge block (44) lower section the 4th drainage screen (45), it is positioned at second sponge block (46) of described 4th drainage screen (45) top, is positioned at described second sponge block (46) top First spring (47), be positioned at described first spring (47) left side the second spring (48), be positioned under described 4th drainage screen (45) Side concentration block (49) and be positioned at described concentration block (49) top the 5th drainage screen (40).
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described air inlet frame (11) is in hollow Cylinder and vertically place, described gear frame (12) is the cylinder of annulus in cross section, and described gear frame (12) is vertically placed, described The upper surface of gear frame (12) is fixing with the inner surface of described air inlet frame (11) to be connected, and described first drainage screen (13) in cross section is The cylinder of annulus, the upper surface of described first drainage screen (13) is fixing with the lower surface of described gear frame (12) to be connected, and described first The lower surface of drainage screen (13) is fixing with the inner surface of described air inlet frame (11) to be connected, and described second drainage screen (14) is in cylinder And horizontal positioned, the side of described second drainage screen (14) is fixing with the inner surface of described gear frame (12) to be connected.
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described spin (15) in spherical, Described spin (15) turns with described gear frame (12) axle and is connected, and described first bristle (16) is provided with several and is evenly distributed on described In spin (15), described first bristle (16) is fixing with described spin (15) to be connected, and described 3rd drainage screen (17) is in hollow Hemispherical, the upper surface of described 3rd drainage screen (17) is fixing with the inner surface of described air inlet frame (11) to be connected, described 3rd mistake Filter screen (17) is positioned at the lower section of described second circular hole.
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described first containment vessel (31) in Hollow cuboid and vertically placing, the right-hand member of described exhaust tube (21) is directed at described 3rd circular hole (311) and with described first The upper surface of containment vessel (31) is fixing to be connected, the right-hand member of described head rod (26) and the left-handed watch of described first containment vessel (31) Face is fixing to be connected, the left end of described first connecting tube (32) be directed at described 4th circular hole (312) and with described first containment vessel (31) right surface is fixing to be connected.
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described second bracing frame (35) in L-type, one end of described second bracing frame (35) is fixing with described first containment vessel (31) to be connected, described second bracing frame (35) The other end and described water pump (34) are fixing to be connected, upper end described 5th circular hole (313) of alignment of described second connecting tube (36) and Fix with the lower surface of described first containment vessel (31) and be connected.
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described first roller (41) is in circle Cylinder, described first roller (41) turns with described first containment vessel (31) axle and is connected, and described second bristle (42) is provided with several, Described second bristle (42) is evenly distributed on described first roller (41) and its fixing connection of the first roller (41), and described first Swash plate (43) inclined shape, the upper end of described first swash plate (43) is fixing with the inner surface of described first containment vessel (31) to be connected, The right-hand member of the lower end of described first swash plate (43) and described first sponge block (44) is fixing to be connected, described first sponge block (44) in Cuboid and horizontal positioned, the left end of described first sponge block (44) is fixing with the inner surface of described first containment vessel (31) to be connected Connect.
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described 4th drainage screen (45) in Cuboid and horizontal positioned, the side of described 4th drainage screen (45) is fixing with the inner surface of described first containment vessel (31) even Connecing, described second sponge block (46) is in cuboid and horizontal positioned, and the side of described second sponge block (46) is protected with described first The inner surface of protective case (31) is fixing to be connected, the lower surface of described second sponge block (46) and the upper table of described 4th drainage screen (45) Face is fixing to be connected, described first spring (47) in vertical shape, the lower end of described first spring (47) and described second sponge block (46) fixing connection, the upper end of described first spring (47) is fixing with described first swash plate (43) to be connected, described second spring (48) in vertical shape, the lower end of described second spring (48) is fixing with described second sponge block (46) to be connected, described second spring (48) upper end is fixing with described first sponge block (44) to be connected.
Indoor air purification dust arrester the most according to claim 1, it is characterised in that: described concentration block (49) is provided with two Individual and lay respectively at the left and right sides in described first containment vessel (31), the rectangular triangle of cross section of described concentration block (49) Shape, described concentration block (49) is fixing with the inner surface of described first containment vessel (31) to be connected, and described 5th drainage screen (40) is in sky The heart hemispherical, the right surface of described 5th drainage screen (40) is fixing with the inner surface of described first containment vessel (31) to be connected, institute State the 5th drainage screen (40) and be positioned at the left side of described 6th circular hole (314).
CN201610865254.9A 2016-09-30 2016-09-30 Indoor air purification and dust removal device Withdrawn CN106310856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610865254.9A CN106310856A (en) 2016-09-30 2016-09-30 Indoor air purification and dust removal device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610865254.9A CN106310856A (en) 2016-09-30 2016-09-30 Indoor air purification and dust removal device

Publications (1)

Publication Number Publication Date
CN106310856A true CN106310856A (en) 2017-01-11

Family

ID=57820700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610865254.9A Withdrawn CN106310856A (en) 2016-09-30 2016-09-30 Indoor air purification and dust removal device

Country Status (1)

Country Link
CN (1) CN106310856A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106813317A (en) * 2017-02-08 2017-06-09 周末 A kind of multifunctional indoor air cleaning equipment
CN106823655A (en) * 2017-03-05 2017-06-13 王杨 A kind of ore dust dedusting collection device
CN107166578A (en) * 2017-07-07 2017-09-15 黄山市雅龙智能科技有限公司 A kind of air cleaning unit
CN107588467A (en) * 2017-07-07 2018-01-16 泉州市鸿远电子科技有限公司 A kind of practical air cleaning unit
CN107655077A (en) * 2015-05-23 2018-02-02 王金娣 A kind of device that can effectively utilize electrostatic depuration air

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0285247A1 (en) * 1987-04-03 1988-10-05 Industrial Air, Incorporated Continuously operated and cleaned filter apparatus
CN204799009U (en) * 2015-06-19 2015-11-25 黄斌 Can effectively reduce solid particle's in air clarifier
CN105521678A (en) * 2015-12-27 2016-04-27 刘汉佑 An air cleaning device for a pharmaceutical workshop

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0285247A1 (en) * 1987-04-03 1988-10-05 Industrial Air, Incorporated Continuously operated and cleaned filter apparatus
CN204799009U (en) * 2015-06-19 2015-11-25 黄斌 Can effectively reduce solid particle's in air clarifier
CN105521678A (en) * 2015-12-27 2016-04-27 刘汉佑 An air cleaning device for a pharmaceutical workshop

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107655077A (en) * 2015-05-23 2018-02-02 王金娣 A kind of device that can effectively utilize electrostatic depuration air
CN106813317A (en) * 2017-02-08 2017-06-09 周末 A kind of multifunctional indoor air cleaning equipment
CN106823655A (en) * 2017-03-05 2017-06-13 王杨 A kind of ore dust dedusting collection device
CN107166578A (en) * 2017-07-07 2017-09-15 黄山市雅龙智能科技有限公司 A kind of air cleaning unit
CN107588467A (en) * 2017-07-07 2018-01-16 泉州市鸿远电子科技有限公司 A kind of practical air cleaning unit
CN107166578B (en) * 2017-07-07 2018-06-01 江苏锡沂高新区科技发展有限公司 A kind of air cleaning unit

Similar Documents

Publication Publication Date Title
CN106310856A (en) Indoor air purification and dust removal device
CN109173533A (en) A kind of haze cancellation element in vehicle
CN105749682B (en) A kind of environmental-protecting and high-efficient type weaving dust exhaust apparatus
CN208065968U (en) A kind of environmental protection Novel dust collection device
CN106237734B (en) A kind of efficient dedusting and purifying air system
CN110523187A (en) A kind of multi-stag fume gases processing unit
CN105879554B (en) A kind of air cleaning facility
CN105664630B (en) A kind of livestock-raising air cleaning unit
CN106310795B (en) A kind of air filtration purification processing system
CN109589748B (en) A kind of organic waste gas treatment system and solvent recovery process
CN106345212A (en) Industrial smoke purification equipment with high efficiency and environmental friendliness
CN106422634A (en) Improved air purification device
CN209885504U (en) Dust collecting and purifying device for textile workshop
CN107708837B (en) Haze purification device capable of being installed on motor vehicle
CN106237735B (en) A kind of air-purification filter device that can remove haze
CN106352426A (en) Air filtration and purification device
CN106362526A (en) Air hierarchical filtration and purification system
CN206138932U (en) Industrial waste gas filtration treatment ware
CN106268147A (en) A kind of energy filtering dust and the air purifier of fine particle
CN206138931U (en) Efficient exhaust gases filter clarifier
CN209696671U (en) It is a kind of to facilitate the bio-trickling filter cleaned to filler
CN202376862U (en) Air purifier
CN208809636U (en) A kind of air purifier filter core
CN206168152U (en) Boiler exhaust gas purification device
CN106237777A (en) A kind of boiler waste gas purification device that can carry out multi-filtering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170111