- CN106606913A CN106606913A CN201611117975.8A CN201611117975A CN106606913A CN 106606913 A CN106606913 A CN 106606913A CN 201611117975 A CN201611117975 A CN 201611117975A CN 106606913 A CN106606913 A CN 106606913A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- framework
- drainage screen
- bar
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/60—Combinations of devices covered by groups B01D46/00 and B01D47/00
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Ventilation (AREA)
Abstract
The invention relates to dust purification equipment for furniture and building material production. The equipment comprises an air intake device, a cleaning device, a first pipeline device, a frame device, a purification device, a second pipeline device, a filtering device and a discharge device. The air intake device comprises an air intake frame, an air intake hopper, a baffle plate, a first positioning rod, a concentration frame and a first filter screen. The cleaning device consists of an electric cylinder, a first fixed rod, a second fixed rod, a push rod, a movable rod and bristle. The first pipeline device consists of a first pipeline, a fan, a first valve, a third fixed rod and a first support. The frame device comprises a first frame, a second pipeline, a second valve, a second filter screen and a third filter screen. The purification device includes a first support rod, a fourth filter screen, a connecting plate, a first fixed block, a first spring, and a first stay wire. The second pipeline device consists of a fourth pipeline, a fourth fixed rod, a third support, and a third valve. The dust purification equipment provided by the invention can realize effective purification of air in furniture and building material production workshops, and has the characteristics of high purification efficiency and fast speed.
Description
Technical field
The present invention relates to building materials dust disposal technical field, net with dust more particularly, to a kind of furniture production of construction materials
Change equipment.
Background technology
Furniture building materials can produce substantial amounts of dust in production and processing, and which can not only pollute the environment of job shop, to work
The healthy of people threatens, and can also cause fire explosion when serious, threatens the life security of workman.Therefore, furniture is built
The workshop of material carry out dust removal process be safety in production important prerequisite, existing cleaner unit exist efficiency of dust collection it is low, discharge
Shortcoming not up to standard, it is impossible to meet the needs of dedusting well.
Therefore, it is necessary to provide a kind of new technical scheme to overcome drawbacks described above.
The content of the invention
It is an object of the invention to provide it is a kind of can effectively solving above-mentioned technical problem furniture production of construction materials dust it is net
Change equipment.
To reach the purpose of the present invention, adopt the following technical scheme that:
A kind of furniture production of construction materials dust purification device, the furniture production of construction materials dust purification device include air inlet
Device, the clearing apparatus being contained in the air intake installation, the first plumbing installation below the air intake installation, positioned at institute
State the frame device on the right side of the first plumbing installation, the purifier being arranged on the frame device, positioned at the frame device
The second pipe device on right side, the defecator below the second pipe device and below the defecator
Discharger, the air intake installation include into air frame, positioned at it is described enter air frame below air inlet bucket, be contained in the air inlet inframe
Baffle plate, the first locating rod below the baffle plate, the collection center being contained in the air inlet bucket and be located at the concentration
The first drainage screen above frame, the clearing apparatus includes electric cylinders, the first fix bar on the right side of the electric cylinders, positioned at described
The second fix bar below electric cylinders, the catch bar on the left of the electric cylinders, the mobile bar on the left of the catch bar and position
Bristle below the mobile bar, first plumbing installation include the first pipeline, the wind being arranged on first pipeline
Machine, the first valve, the 3rd fix bar above the blower fan and the first support on the right side of the 3rd fix bar, institute
Stating frame device includes the first framework, the second pipe below first framework, is arranged on the second pipe
Second valve, the second drainage screen being contained in first framework, the 3rd drainage screen on the right side of second drainage screen,
The purifier includes first support bar, the 4th drainage screen above the first support bar, positioned at the 4th mistake
It is the connecting plate of the filter screen left and right sides, the first fixed block below the 4th drainage screen, left positioned at first fixed block
First spring of side, the first bracing wire above the connecting plate, the motor above first bracing wire, it is arranged at institute
The output shaft on motor and the second support on the left of the motor are stated, the second pipe device includes the 4th pipeline, sets
The 4th fix bar that is placed on the 4th pipeline, the 3rd support on the right side of the 4th fix bar, it is arranged at described
The 3rd valve on four pipelines, the second support bar on the left of the 4th pipeline and it is arranged in the second support bar
First cross bar, the defecator includes second framework, the 3rd pipeline being contained in the second framework, positioned at the described 3rd
The 5th drainage screen below pipeline, the second spring below the 5th drainage screen, on the left of the 5th drainage screen
Riser, the 5th fix bar on the left of the riser, the sponge block below the riser, the discharger includes
Discharge pipe and the 4th valve being arranged on the discharge pipe.
In hollow round table-like, the lower surface of the air inlet bucket is provided with first through hole to the air inlet bucket, it is described enter air frame be in
Cylinder of the cross section for annulus, it is described enter air frame vertically place, it is described enter air frame lower surface and the air inlet bucket upper surface
Be fixedly connected, the baffle plate is in cylinder and horizontal positioned, the side of the baffle plate with it is described enter air frame inner surface fix and connect
Connect, the baffle plate is provided with some the second through holes through its upper and lower surface, first locating rod is in cuboid and vertically puts
Put, the upper end of first locating rod is fixedly connected with the lower surface of the baffle plate, the collection center is in hollow round table-like, institute
State first through hole described in the lower end aligned of collection center and be fixedly connected with the inner surface of the air inlet bucket, first drainage screen is in
Cylinder and horizontal positioned, the lower surface of first drainage screen are fixedly connected with the upper surface of the collection center.
First fix bar is horizontal, and the left end of first fix bar is fixedly connected with the electric cylinders, and described
The right-hand member of one fix bar with it is described enter air frame inner surface be fixedly connected, second fix bar is in vertical shape, and described second is solid
The lower end of fixed pole is fixedly connected with the inner surface of the air inlet bucket, the upper end of second fix bar and the lower surface of the electric cylinders
It is fixedly connected, the catch bar is in cuboid and horizontal positioned, and the catch bar is through the left and right surface of first locating rod
And be slidably connected with which, the left end of the catch bar is fixedly connected with the right surface of the mobile bar, and the mobile bar is in rectangular
Body and vertically placement, the bristle are provided with several, and the bristle is in vertical shape, and the upper end of the bristle is with the mobile bar admittedly
Fixed to connect, the lower end of the bristle is acted against on first drainage screen.
The upper end of first pipeline is directed at the first through hole and is fixedly connected with the lower surface of the air inlet bucket, described
In vertical shape, the upper end of the 3rd fix bar is fixedly connected 3rd fix bar with the lower surface of the air inlet bucket, and the described 3rd
The lower end of fix bar is fixedly connected with the blower fan, and the first support is L-shaped, the upper end of the first support and the air inlet
The side of bucket is fixedly connected, and the other end of the first support is in vertical shape.
First framework is in hollow cuboid and horizontal positioned, and first framework is provided with positioned at its lower surface
Third through-hole, the fourth hole positioned at its left surface, positioned at the fifth hole on its right surface, the lower end aligned of first pipeline
The fourth hole and it is fixedly connected with the left surface of first framework, the first support and first framework are fixed and connected
Connect, the second pipe is in vertical shape, the upper end of the second pipe be aligned the third through-hole and with first framework
Lower surface is fixedly connected, and second drainage screen is oblique, and second drainage screen is solid with the inner surface of first framework
Fixed to connect, second drainage screen is located at the right side of the fourth hole, and the 3rd drainage screen is in cuboid and vertically places,
The upper surface of the 3rd drainage screen is fixedly connected with the inner surface of first framework.
The first support bar is in cuboid and vertical placement, the lower end of the first support bar and first framework
Inner surface is fixedly connected, and the upper end of the first support bar is provided with the first groove, and first fixed block is in semicylinder shape, institute
The upper surface for stating the first fixed block is fixedly connected with the lower surface of the 4th drainage screen, and first fixed block is contained in described
In first groove and pivotally connected with the first support bar, the 4th drainage screen is in cuboid, the 4th drainage screen position
In the lower section of the 3rd drainage screen, the connecting plate is provided with two and respectively positioned at the left and right sides of the 4th drainage screen,
In cuboid, one end of the connecting plate is fixedly connected the connecting plate with the end of the 4th drainage screen, first bullet
Spring is in vertical shape, and the upper end of first spring is fixedly connected with the connecting plate, the lower end of first spring and described the
The inner surface of one framework is fixedly connected, and the lower end of first bracing wire is fixedly connected with the connecting plate, first bracing wire
Upper end is fixedly connected with the output shaft, first bracing wire through first framework surfaces externally and internally and with its company of slip
Connect, the lower surface of the motor is fixedly connected with the upper surface of first framework, the output shaft be in cylinder, the output
One end of axle and the motor connection, one end of the second support are fixedly connected with the side of the motor, described second
The other end of frame is fixedly connected with the upper surface of first framework.
The upper end of the 4th pipeline is directed at the fifth hole and is fixedly connected with the right surface of first framework, institute
The 4th fix bar is stated in cuboid and horizontal positioned, the left end of the 4th fix bar is fixed with the right surface of first framework
Connection, the 4th pipeline run through the upper and lower surface of the 4th fix bar and are secured to connection, and the 3rd support is in L
Type, the upper end of the 3rd support are fixedly connected with the right-hand member of the 4th fix bar, and the lower end of the 3rd support is in vertical
Shape, the second support bar are provided with two, and the second support bar is in cuboid and vertically places, the second support bar it is upper
End is fixedly connected with the lower surface of first framework, and first cross bar is located between the second support bar, and described first
Cross bar is in cuboid and horizontal positioned, and the end of first cross bar is fixedly connected with the side of the second support bar.
In hollow semicylinder shape, the second framework is provided with the clematis stem on surface disposed thereon to the second framework
Hole and the 7th through hole positioned at its lower surface, clematis stem hole described in the lower end aligned of the 4th pipeline and with the second framework
Upper surface be fixedly connected, the lower end of the 3rd support is fixedly connected with the upper surface of the second framework, described second
The lower end of strut is fixedly connected with the upper surface of the second framework, and the 3rd pipeline is contained in the second framework, institute
The upper end for stating the 3rd pipeline is directed at the clematis stem hole and is fixedly connected with the inner surface of the second framework, and the described 5th filters
Net is horizontal, and the right-hand member of the 5th drainage screen is fixedly connected with the inner surface of the second framework, the 3rd pipeline
Lower end is acted against on the upper surface of the 5th drainage screen and is slidably connected with which, and the second spring is in vertical shape, and described the
The upper end of two springs is fixedly connected with the 5th drainage screen, the inner surface of the lower end of the second spring and the second framework
It is fixedly connected, the riser is in vertical shape, and the upper end of the riser is fixedly connected with the inner surface of the second framework, described the
The left end of five drainage screens is acted against on the right surface of the riser and is slidably connected with which, and the 5th fix bar is oblique,
The lower end of the 5th fix bar is fixedly connected with the riser, in the upper end of the 5th fix bar and the second framework
Surface is fixedly connected, and the lower surface of the sponge block is fixedly connected with the inner surface of the second framework, the sponge block it is upper
Surface is horizontal, and the sponge block is located at the top of the 7th through hole.
The upper end of the discharge pipe is directed at the 7th through hole and is fixedly connected with the lower surface of the second framework.
Compared with prior art, the present invention has the advantages that:Furniture production of construction materials of the present invention is set with dust purification
Standby that the air in the workshop of furniture building materials effectively can be purified, purification efficiency is high and quick, and purifies effect
It is really good, most granule foreign in air can be disposed, it is ensured that the air of discharge can be up to standard, and blocking can be prevented
Generation so as to can continue carry out dustproof function, long service life.
Description of the drawings
Fig. 1 is the structural representation of furniture production of construction materials dust purification device of the present invention.
Specific embodiment
Clearly complete explanation is made to furniture production of construction materials dust purification device of the present invention below in conjunction with accompanying drawing.
As shown in figure 1, furniture production of construction materials dust purification device of the present invention include air intake installation 1, be contained in it is described enter
Clearing apparatus 2 in device of air 1, the first plumbing installation 3 below the air intake installation 1, positioned at first pipeline fill
Put the frame device 4 on the right side of in the of 3, the purifier 5 being arranged on the frame device 4, on the right side of the frame device 4
Two plumbing installations 6, the defecator 7 below the second pipe device 6 and the discharge below the defecator 7
Device 8.
As shown in figure 1, the air intake installation 1 include into air frame 12, positioned at it is described enter air frame 12 below air inlet bucket 11, receive
Be dissolved in it is described enter air frame 12 in baffle plate 13, the first locating rod 14 below the baffle plate 13, be contained in the air inlet bucket
Collection center 15 in 11 and the first drainage screen 16 above the collection center 15.The air inlet bucket 11 is in hollow round platform
Shape, the cross section of the air inlet bucket 11 is in concave shape, and the lower surface of the air inlet bucket 11 is provided with first through hole 111, and described first
Through hole 111 is rounded and communicates with the inside of the air inlet bucket 11.It is described enter air frame 12 in cross section for annulus cylinder, it is described
Enter air frame 12 vertically to place, it is described enter air frame 12 lower surface be fixedly connected with the upper surface of the air inlet bucket 11 so that it is described
The inside for entering air frame 12 is communicated with the inside of the air inlet bucket 11.The baffle plate 13 is in cylinder and horizontal positioned, the baffle plate
13 side with it is described enter air frame 12 inner surface be fixedly connected, the baffle plate 13 is provided with some through the of its upper and lower surface
Two through holes 131, second through hole 131 are rounded.First locating rod 14 is in cuboid and vertically places, and described first is fixed
The upper end of position bar 14 is fixedly connected with the lower surface of the baffle plate 13.The collection center 15 is in hollow round table-like, the concentration
The upper and lower surface of frame 15 is communicated, it is described collection center 15 lower end aligned described in first through hole 111 and with the air inlet bucket 11 in
Surface is fixedly connected so that the first through hole 111 is communicated with the inside of the collection center 15.First drainage screen 16 is in circle
Cylinder and horizontal positioned, the lower surface of first drainage screen 16 are fixedly connected with the upper surface of the collection center 15.
As shown in figure 1, the clearing apparatus 2 includes electric cylinders 21, the first fix bar 22, position on the right side of the electric cylinders 21
In the second fix bar 23 below the electric cylinders 21, the catch bar 24 on the left of the electric cylinders 21, positioned at the catch bar 24
The mobile bar 25 and the bristle 26 below the mobile bar 25 in left side.The electric cylinders 21 are connected with power supply so as to Ke Yizheng
Often run, the electric cylinders 21 are provided with switch, convenient use person opens or closes.First fix bar 22 is horizontal,
The left end of first fix bar 22 is fixedly connected with the electric cylinders 21, the right-hand member of first fix bar 22 with it is described enter air frame
12 inner surface is fixedly connected.Second fix bar 23 be in vertical shape, lower end and the air inlet of second fix bar 23
The inner surface of bucket 11 is fixedly connected, and the upper end of second fix bar 23 is fixedly connected with the lower surface of the electric cylinders 21.It is described
Catch bar 24 is in cuboid and horizontal positioned, and the catch bar 24 is slided through the left and right surface of first locating rod 14 and with which
Dynamic connection so that the catch bar 24 can be moved left and right, the right surface of the left end of the catch bar 24 and the mobile bar 25
It is fixedly connected.The mobile bar 25 is in cuboid and vertically places.The bristle 26 is provided with several, and the bristle 26 is in vertical
Shape, the upper end of the bristle 26 are fixedly connected with the mobile bar 25, and the lower end of the bristle 26 acts against described first and filters
On net 16, such that it is able to play a part of cleaning to the first drainage screen 16.
As shown in figure 1, first plumbing installation 3 includes the first pipeline 31, the wind being arranged on first pipeline 31
Machine 32, the first valve 33, the 3rd fix bar 34 above the blower fan 32 and on the right side of the 3rd fix bar 34
First support 35.The upper end of first pipeline 31 is directed at the first through hole 111 and is consolidated with the lower surface of the air inlet bucket 11
It is fixed to connect so that the inside of first pipeline 31 is communicated with the inside of the air inlet bucket 11.The blower fan 32 is connected with power supply,
Which is normally run, the blower fan 32 is provided with switch, facilitate which to open or close.First valve 33 is used to control
Make the flow of gas in first pipeline 31.3rd fix bar 34 be in vertical shape, the upper end of the 3rd fix bar 34
It is fixedly connected with the lower surface of the air inlet bucket 11, the lower end of the 3rd fix bar 34 is fixedly connected with the blower fan 32.Institute
State that first support 35 is L-shaped, the upper end of the first support 35 is fixedly connected with the side of the air inlet bucket 11, described first
The other end of frame 35 is in vertical shape.
As shown in figure 1, the frame device 4 includes the first framework 41, the second pipe below first framework 41
Road 42, the second valve 43 being arranged on the second pipe 42, the second drainage screen 44 being contained in first framework 41,
The 3rd drainage screen 45 on the right side of second drainage screen 44.First framework 41 is in that hollow cuboid and level are put
Put, first framework 41 is provided with the third through-hole 411 positioned at its lower surface, the fourth hole 412, position positioned at its left surface
In the fifth hole 413 on its right surface, the third through-hole 411, fourth hole 412 and fifth hole 413 it is rounded and with institute
The inside for stating the first framework 41 communicates, fourth hole 412 described in the lower end aligned of first pipeline 31 and with first frame
The left surface of body 41 is fixedly connected so that communicate with the inside of first framework 41 inside first pipeline 31, and described
One support 35 is fixedly connected with first framework 41.The second pipe 42 be in vertical shape, the upper end of the second pipe 42
Be directed at the third through-hole 411 and be fixedly connected with the lower surface of first framework 41 so that the second pipe 42 it is interior
Portion is communicated with the inside of first framework 41.Second valve 43 is used for the flow for controlling water in the second pipe 42.
Second drainage screen 44 is oblique, and second drainage screen 44 is fixedly connected with the inner surface of first framework 41, institute
State the right side that the second drainage screen 44 is located at the fourth hole 412.3rd drainage screen 45 is in cuboid and vertically places, institute
The upper surface for stating the 3rd drainage screen 45 is fixedly connected with the inner surface of first framework 41.
As shown in figure 1, the purifier 5 include first support bar 51, above the first support bar 51
Four drainage screens 52, the connecting plate 53 positioned at 52 left and right sides of the 4th drainage screen, below the 4th drainage screen 52
First fixed block 54, the first spring 55 on the left of first fixed block 54, above the connecting plate 53 first
Bracing wire 56, the motor 57 above first bracing wire 56, the output shaft 58 being arranged on the motor 57 and be located at it is described
Second support 59 on the left of motor 57.The first support bar 51 is in cuboid and vertically places, the first support bar 51
Lower end is fixedly connected with the inner surface of first framework 41, and the upper end of the first support bar 51 is provided with the first groove, described
First groove is in rectangular-shape.First fixed block 54 is in semicylinder shape, the upper surface of first fixed block 54 and institute
The lower surface for stating the 4th drainage screen 52 is fixedly connected, and first fixed block 54 is contained in first groove and with described the
One support bar 51 is pivotally connected so that first fixed block 54 can be rotated in first groove.Described 4th filters
Net 52 is in cuboid, and the 4th drainage screen 52 is located at the lower section of the 3rd drainage screen 45, before the 4th drainage screen 52
Surface is slidably connected with the inner surface of first framework 41 afterwards.The connecting plate 53 is provided with two and is located at the described 4th respectively
The left and right sides of drainage screen 52, the connecting plate 53 are in cuboid, one end of the connecting plate 53 and the 4th drainage screen 52
End be fixedly connected, the front and rear surfaces of the connecting plate 53 are slidably connected with the inner surface of first framework 41.Described
In vertical shape, the upper end of first spring 55 is fixedly connected one spring 55 with the connecting plate 53, first spring 55
Lower end is fixedly connected with the inner surface of first framework 41.The lower end of first bracing wire 56 is fixed with the connecting plate 53 and is connected
Connect, the upper end of first bracing wire 56 is fixedly connected with the output shaft 58, first bracing wire 56 runs through first framework
41 surfaces externally and internally and it is slidably connected with which.The motor 57 is connected with power supply so as to normally can be run, the motor 57
Lower surface is fixedly connected with the upper surface of first framework 41, and the motor 57 is provided with switch, convenient use person open or
Person closes.In cylinder, one end of the output shaft 58 is connected the output shaft 58 with the motor 57 so that the motor 57
The output shaft 58 is driven to rotate.The second support 59 is L-shaped, the side of one end of the second support 59 and the motor 57
Face is fixedly connected, and the other end of the second support 59 is fixedly connected with the upper surface of first framework 41.
As shown in figure 1, the second pipe device 6 include the 4th pipeline 61, be arranged on the 4th pipeline 61
Four fix bars 62, the 3rd support 63 on the right side of the 4th fix bar 62, the 3rd be arranged on the 4th pipeline 61
Valve 64, the second support bar 65 on the left of the 4th pipeline 61 and be arranged in the second support bar 65 it is first horizontal
Bar 66.The upper end of the 4th pipeline 61 is directed at the fifth hole 413 and fixes company with the right surface of first framework 41
Connect so that the inside of the 4th pipeline 61 is communicated with the inside of first framework 41.4th fix bar 62 is in rectangular
Body and horizontal positioned, the left end of the 4th fix bar 62 are fixedly connected with the right surface of first framework 41, and the described 4th
Pipeline 61 runs through the upper and lower surface of the 4th fix bar 62 and is secured to connection, props up so as to play to the 4th pipeline 61
Support is acted on.3rd valve 64 is used for the flow for controlling gas in the 4th pipeline 61.3rd support 63 is L-shaped,
The upper end of the 3rd support 63 is fixedly connected with the right-hand member of the 4th fix bar 62, and the lower end of the 3rd support 63 is in perpendicular
Straight shape.The second support bar 65 is provided with two, and the second support bar 65 is in cuboid and vertically places, and described second supports
The upper end of bar 65 is fixedly connected with the lower surface of first framework 41.First cross bar 66 is located at the second support bar 65
Between, first cross bar 66 is in cuboid and horizontal positioned, end and the second support bar 65 of first cross bar 66
Side be fixedly connected.
As shown in figure 1, the defecator 7 includes second framework 71, the 3rd pipe being contained in the second framework 71
Road 72, the 5th drainage screen 73 below the 3rd pipeline 72, the second spring below the 5th drainage screen 73
74th, on the left of the 5th drainage screen 73 riser 75, the 5th fix bar 76 on the left of the riser 75, positioned at described
Sponge block 77 below riser 75.In hollow semicylinder shape, the second framework 71 is provided with position to the second framework 71
The clematis stem hole 711 on surface and the 7th through hole 712 positioned at its lower surface thereon, the lower end aligned institute of the 4th pipeline 61
State clematis stem hole 711 and be fixedly connected with the upper surface of the second framework 71 so that the inside of the 4th pipeline 61 and institute
The inside for stating second framework 71 communicates, and the lower end of the 3rd support 63 is fixedly connected with the upper surface of the second framework 71,
The lower end of the second support bar 65 is fixedly connected with the upper surface of the second framework 71.3rd pipeline 72 is contained in institute
State in second framework 71, the upper end of the 3rd pipeline 72 be aligned the clematis stem hole 711 and with the second framework 71 in
Surface is fixedly connected so that the clematis stem hole 711 is communicated with the inside of the 3rd pipeline 72.5th drainage screen 73 is in
Horizontal, the right-hand member of the 5th drainage screen 73 is fixedly connected with the inner surface of the second framework 71, the 3rd pipeline 72
Lower end act against on the upper surface of the 5th drainage screen 73 and be slidably connected with which, the 5th drainage screen 73 is using elasticity
Material is made so as to can occur bending and deformation.The second spring 74 is in vertical shape, the upper end of the second spring 74 and institute
State the 5th drainage screen 73 to be fixedly connected, the lower end of the second spring 74 is fixedly connected with the inner surface of the second framework 71.
In vertical shape, the upper end of the riser 75 is fixedly connected the riser 75 with the inner surface of the second framework 71, and the described 5th
The left end of drainage screen 73 is acted against on the right surface of the riser 75 and is slidably connected with which.5th fix bar 76 is inclined
Shape, the lower end of the 5th fix bar 76 are fixedly connected with the riser 75, the upper end of the 5th fix bar 76 and described
The inner surface of two frameworks 71 is fixedly connected.The lower surface of the sponge block 77 is connected with the inner surface fixation of the second framework 71
Connect, the upper surface of the sponge block 77 is horizontal, the sponge block 77 is located at the top of the 7th through hole 712.
As shown in figure 1, the discharger 8 includes discharge pipe 81 and the 4th valve being arranged on the discharge pipe 81
82.The upper end of the discharge pipe 81 is directed at the 7th through hole 712 and is fixedly connected with the lower surface of the second framework 71, is made
The inside for obtaining the discharge pipe 81 is communicated with the inside of the second framework 71.4th valve 82 is used to control the discharge
The flow of gas in pipe 81.
As shown in figure 1, when the furniture production of construction materials of the present invention is used with dust purification device, first by second pipe
42 and water pump outside water can be pumped in first framework 41 so that the 4th drainage screen 52 is in horizontal
During body, the water surface in the first framework 41 can be then shut off the second valve 43 with the 4th drainage screen 52 of submergence, and which belongs to existing skill
Art, therefore will not be described here.Then furniture production of construction materials workshop is moved into, the switch and the first valve of blower fan 32 is then opened
Door 33, now user can be opened with handss or using existing some control devices openings, as which belongs to prior art,
Therefore will not be described here, and the unfolding mode is equally applicable to motor 57, the 3rd valve 64, electric cylinders 21 etc. so that in workshop
Dust together with air through the second through hole 131 enter into it is described enter air frame 12 in, then in the air inlet bucket 11, by
In the setting of the second through hole 131 so that the excessive impurity of some volumes cannot be introduced into it is described enter air frame 12 in.Enter into described
Air in air inlet bucket 11 is entered in the collection center 15 through first drainage screen 16, and enters into the air inlet bucket
Dust fractions in 11 are entered in the collection center 15 after the filtration of the first drainage screen 16, and remaining rests on the air inlet
On the inner surface of bucket 11, and due to collecting the setting of center 15 so which cannot move up and through the mistake of the first drainage screen 16
Filter is entered in the collection center 15, so the first drainage screen 16 can play certain mistake with the cooperation of collection center 15 to dust
Filter is acted on.Then open the switch of motor 57 so that the output shaft 58 rotates.When the output shaft 58 rotates, described first
Bracing wire 56 is tightened up, and the connecting plate 53 positioned at right side is moved up, and the 4th drainage screen 52 surrounds the first support bar 51
Upper end rotate counterclockwise, until be located at right side connecting plate 53 act against on the upper inner surface of first framework 41, due to
Before opening motor 57, the 4th drainage screen 52 has been wetted, while having water on the connecting plate 53, is starting motor 57
Afterwards, the right-hand member of the 4th drainage screen 52 is no longer immersed in the water surface, while excessively described 4th mistake of the neatly on connecting plate 53
The upper surface backflow of filter screen 52, such that it is able to form moisture film on the 4th drainage screen 52.Enter in the collection center 15
Gas and dust enter in first pipeline 31, then in first framework 41, through the second drainage screen
Enter into after 44 filtration on the right side of which, then after the water film filtering on the 4th drainage screen 52, can filter out big in air
The granule foreign of partial small volume, then in the 4th pipeline 61, when the impurity that the 4th drainage screen 52 is filtered
When more, the moisture film for being formed originally thereon can disappear, and now close the switch of motor 57 so that the 4th drainage screen 52 is in institute
State the upper end under the thrust of the first spring 55 around the first support bar 51 to turn clockwise so that the 4th drainage screen 52
And connecting plate 53 is again submerged in water, the switch of motor 57 is then again turned on so that the output shaft 58 rotates, Ran Housuo
State the first bracing wire 56 to be tightened up, then so that the 4th drainage screen 52 is revolved counterclockwise around the upper end of the first support bar 51
Turn, then the upper surface of excessively described 4th drainage screen 52 of the neatly on connecting plate 53 and can be in the 4th drainage screen 52 again
Moisture film is formed, to continue that dust is filtered.The 3rd valve 64 is opened, the air entered in the 4th pipeline 61 enters
Enter in the 3rd pipeline 72, then enter in the second framework 71 after the filtration of the 5th drainage screen 73, when
When air pressure in three pipelines 72 is larger, the left end of the 5th drainage screen 73 is bent downwardly deformation, so as to play a part of decompression.
Then air opens the 4th valve 82 so as to discharge from discharge pipe 81 after the filtration and water adsorption effect of sponge block 77.
When the impurity deposited on first drainage screen 16 is more, electric cylinders 21 are opened so that the catch bar 24 constantly move by left and right
It is dynamic, and then the mobile bar 25 and bristle 26 are constantly moved left and right, the bristle 26 can clean out first mistake
The impurity deposited on filter screen 16, prevent block the first drainage screen 16, period of delay service life.3rd drainage screen 45 can be right
The air entered in first framework 41 plays the filtration of part, and prevents from entering in first framework 41
Directly the fit upper inner surface of first framework 41 of air and dust move to right side, the 3rd drainage screen 45 is to air
Certain drag effect is played with dust, so as to facilitate the 4th drainage screen 52 to filter air.So far, furniture of the present invention is built
Material production dust purification device is finished using process description.
Claims (9)
1. a kind of furniture production of construction materials dust purification device, it is characterised in that:The furniture production of construction materials is set with dust purification
It is standby to include air intake installation, the clearing apparatus being contained in the air intake installation, the first pipeline below the air intake installation
Device, the frame device on the right side of first plumbing installation, the purifier being arranged on the frame device, positioned at institute
State the second pipe device on the right side of frame device, the defecator below the second pipe device and be located at the filtration
Discharger below device, the air intake installation include into air frame, positioned at it is described enter air frame below air inlet bucket, be contained in institute
State baffle plate, the first locating rod below the baffle plate, the collection center being contained in the air inlet bucket and the position of air inlet inframe
The first drainage screen above the collection center, the clearing apparatus include electric cylinders, the first fixation on the right side of the electric cylinders
Bar, the second fix bar below the electric cylinders, the catch bar on the left of the electric cylinders, on the left of the catch bar
Mobile bar and the bristle below the mobile bar, first plumbing installation include the first pipeline, are arranged at described first
Blower fan, the first valve on pipeline, the 3rd fix bar above the blower fan and on the right side of the 3rd fix bar
First support, the frame device include the first framework, the second pipe below first framework, are arranged at described
The second valve, the second drainage screen being contained in first framework on two pipelines, on the right side of second drainage screen
3rd drainage screen, the purifier include first support bar, the 4th drainage screen above the first support bar, are located at
The connecting plate of the 4th drainage screen left and right sides, the first fixed block below the 4th drainage screen, positioned at described
The first spring on the left of one fixed block, the first bracing wire above the connecting plate, the electricity above first bracing wire
Machine, the output shaft being arranged on the motor and the second support on the left of the motor, the second pipe device include
4th pipeline, the 4th fix bar being arranged on the 4th pipeline, the 3rd support on the right side of the 4th fix bar, set
The 3rd valve that is placed on the 4th pipeline, the second support bar on the left of the 4th pipeline and it is arranged at described second
The first cross bar on support bar, the defecator include second framework, the 3rd pipeline being contained in the second framework, position
The 5th drainage screen, the second spring below the 5th drainage screen below the 3rd pipeline, positioned at the described 5th
Riser on the left of drainage screen, the 5th fix bar on the left of the riser, the sponge block below the riser, the row
Going out device includes discharge pipe and the 4th valve being arranged on the discharge pipe.
2. furniture production of construction materials dust purification device as claimed in claim 1, it is characterised in that:The air inlet bucket is in hollow
It is round table-like, the lower surface of the air inlet bucket is provided with first through hole, it is described enter cylinder of the air frame in cross section for annulus, it is described enter
Air frame is vertically placed, it is described enter air frame lower surface be fixedly connected with the upper surface of the air inlet bucket, the baffle plate be in cylinder
And horizontal positioned, the side of the baffle plate with it is described enter air frame inner surface be fixedly connected, the baffle plate is provided with some running through
Second through hole of its upper and lower surface, first locating rod are in cuboid and vertically place, the upper end of first locating rod with
The lower surface of the baffle plate is fixedly connected, the collection center in hollow round table-like, the described in the lower end aligned of the collection center
One through hole and it is fixedly connected with the inner surface of the air inlet bucket, first drainage screen is in cylinder and horizontal positioned, described the
The lower surface of one drainage screen is fixedly connected with the upper surface of the collection center.
3. furniture production of construction materials dust purification device as claimed in claim 2, it is characterised in that:First fix bar is in
Horizontal, the left end of first fix bar is fixedly connected with the electric cylinders, right-hand member and the air inlet of first fix bar
The inner surface of frame is fixedly connected, and second fix bar is in vertical shape, the lower end of second fix bar and the air inlet bucket
Inner surface is fixedly connected, and the upper end of second fix bar is fixedly connected with the lower surface of the electric cylinders, and the catch bar is in length
Cube and horizontal positioned, the catch bar are slidably connected through the left and right surface of first locating rod and with which, the promotion
The left end of bar is fixedly connected with the right surface of the mobile bar, and the mobile bar is in cuboid and vertically places, and the bristle sets
There are several, in vertical shape, the upper end of the bristle is fixedly connected the bristle with the mobile bar, the lower end top of the bristle
Lean against on first drainage screen.
4. furniture production of construction materials dust purification device as claimed in claim 3, it is characterised in that:First pipeline it is upper
End is directed at the first through hole and is fixedly connected with the lower surface of the air inlet bucket, and the 3rd fix bar is in vertical shape, described
The upper end of the 3rd fix bar is fixedly connected with the lower surface of the air inlet bucket, and the lower end of the 3rd fix bar is solid with the blower fan
Fixed to connect, the first support is L-shaped, and the upper end of the first support is fixedly connected with the side of the air inlet bucket, and described the
The other end of one support is in vertical shape.
5. furniture production of construction materials dust purification device as claimed in claim 4, it is characterised in that:First framework is in sky
The cuboid and horizontal positioned of the heart, first framework is provided with the third through-hole positioned at its lower surface, positioned at its left surface
Fourth hole, positioned at the fifth hole on its right surface, fourth hole described in the lower end aligned of first pipeline and with described
The left surface of one framework is fixedly connected, and the first support is fixedly connected with first framework, and the second pipe is in vertical
Shape, the upper end of the second pipe are directed at the third through-hole and are fixedly connected with the lower surface of first framework, and described the
Two drainage screens are oblique, and second drainage screen is fixedly connected with the inner surface of first framework, second drainage screen
Positioned at the right side of the fourth hole, the 3rd drainage screen is in cuboid and vertically places, the upper table of the 3rd drainage screen
Face is fixedly connected with the inner surface of first framework.
6. furniture production of construction materials dust purification device as claimed in claim 5, it is characterised in that:The first support bar is in
Cuboid and vertically placement, the lower end of the first support bar are fixedly connected with the inner surface of first framework, and described first
The upper end of support bar is provided with the first groove, and first fixed block is in semicylinder shape, the upper surface of first fixed block with
The lower surface of the 4th drainage screen is fixedly connected, and first fixed block is contained in first groove and with described first
Support bar is pivotally connected, and in cuboid, the 4th drainage screen is located at the lower section of the 3rd drainage screen to the 4th drainage screen,
The connecting plate is provided with two and respectively positioned at the left and right sides of the 4th drainage screen, the connecting plate is in cuboid, described
One end of connecting plate is fixedly connected with the end of the 4th drainage screen, first spring be in vertical shape, first spring
Upper end be fixedly connected with the connecting plate, the lower end of first spring is fixedly connected with the inner surface of first framework,
The lower end of first bracing wire is fixedly connected with the connecting plate, and the upper end of first bracing wire is fixed with the output shaft and connected
Connect, first bracing wire through first framework surfaces externally and internally and be slidably connected with which, the lower surface of the motor and institute
The upper surface for stating the first framework is fixedly connected, the output shaft be in cylinder, one end of the output shaft and the motor connection,
One end of the second support is fixedly connected with the side of the motor, the other end of the second support and first framework
Upper surface be fixedly connected.
7. furniture production of construction materials dust purification device as claimed in claim 6, it is characterised in that:4th pipeline it is upper
End is directed at the fifth hole and is fixedly connected with the right surface of first framework, and the 4th fix bar is in cuboid and water
Placing flat, the left end of the 4th fix bar are fixedly connected with the right surface of first framework, and the 4th pipeline runs through institute
State the upper and lower surface of the 4th fix bar and be secured to connection, the 3rd support is L-shaped, the upper end of the 3rd support and institute
The right-hand member for stating the 4th fix bar is fixedly connected, and in vertical shape, the second support bar is provided with two for the lower end of the 3rd support,
The second support bar is in cuboid and vertically places, and the upper end of the second support bar is solid with the lower surface of first framework
Fixed to connect, first cross bar is located between the second support bar, and first cross bar is in cuboid and horizontal positioned, described
The end of the first cross bar is fixedly connected with the side of the second support bar.
8. furniture production of construction materials dust purification device as claimed in claim 7, it is characterised in that:The second framework is in sky
The semicylinder shape of the heart, the second framework are provided with the clematis stem hole on surface disposed thereon and lead to positioned at the 7th of its lower surface
Hole, clematis stem hole described in the lower end aligned of the 4th pipeline and is fixedly connected with the upper surface of the second framework, described
The lower end of three supports is fixedly connected with the upper surface of the second framework, the lower end of the second support bar and the second framework
Upper surface be fixedly connected, the 3rd pipeline is contained in the second framework, and the upper end of the 3rd pipeline alignment is described
Clematis stem hole and it is fixedly connected with the inner surface of the second framework, the 5th drainage screen is horizontal, the described 5th filters
The right-hand member of net is fixedly connected with the inner surface of the second framework, and the lower end of the 3rd pipeline acts against the 5th drainage screen
Upper surface on and be slidably connected with which, the second spring is in vertical shape, the upper end of the second spring and the five faults in diagnosis and treatment
Filter screen is fixedly connected, and the lower end of the second spring is fixedly connected with the inner surface of the second framework, and the riser is in vertical
Shape, the upper end of the riser are fixedly connected with the inner surface of the second framework, and the left end of the 5th drainage screen acts against institute
State on the right surface of riser and be slidably connected with which, the 5th fix bar is oblique, the lower end of the 5th fix bar with
The riser is fixedly connected, and the upper end of the 5th fix bar is fixedly connected with the inner surface of the second framework, the sponge
The lower surface of block is fixedly connected with the inner surface of the second framework, and the upper surface of the sponge block is horizontal, the sponge
Block is located at the top of the 7th through hole.
9. furniture production of construction materials dust purification device as claimed in claim 8, it is characterised in that:The upper end of the discharge pipe
It is directed at the 7th through hole and is fixedly connected with the lower surface of the second framework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611117975.8A CN106606913A (en) | 2016-12-07 | 2016-12-07 | Dust purification equipment for furniture and building material production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611117975.8A CN106606913A (en) | 2016-12-07 | 2016-12-07 | Dust purification equipment for furniture and building material production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106606913A true CN106606913A (en) | 2017-05-03 |
Family
ID=58636589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611117975.8A Pending CN106606913A (en) | 2016-12-07 | 2016-12-07 | Dust purification equipment for furniture and building material production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106606913A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107413710A (en) * | 2017-06-19 | 2017-12-01 | 周舜 | A kind of cleaner of lithium battery |
CN107537264A (en) * | 2017-09-27 | 2018-01-05 | 权伟机械(江苏)有限公司 | A kind of air-filtering equipment used for air compressor |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6174350B1 (en) * | 1999-04-23 | 2001-01-16 | Rexair, Inc. | Vacuum cleaner |
CN2877832Y (en) * | 2006-01-17 | 2007-03-14 | 林记元 | Sieve pipe immersion highly effective wet dust collector |
CN103505998A (en) * | 2013-10-16 | 2014-01-15 | 国家电网公司 | SO2 and NOx gas absorption device for coal heating value test room |
CN203648318U (en) * | 2013-10-24 | 2014-06-18 | 梁柱环 | Filter cartridge assembly of air purification device |
CN204502701U (en) * | 2015-04-01 | 2015-07-29 | 石家庄泽辰新能源科技有限公司 | A kind of weld fumes purifier |
CN204543874U (en) * | 2015-01-12 | 2015-08-12 | 成都冠禹科技有限公司 | A kind of house exhaust dust arrester |
CN105771530A (en) * | 2016-05-28 | 2016-07-20 | 周末 | Dust removal system for mineral production workshop |
CN105879510A (en) * | 2016-06-14 | 2016-08-24 | 王杨 | Environment-friendly and efficient industrial-dust removing device |
-
2016
- 2016-12-07 CN CN201611117975.8A patent/CN106606913A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6174350B1 (en) * | 1999-04-23 | 2001-01-16 | Rexair, Inc. | Vacuum cleaner |
CN2877832Y (en) * | 2006-01-17 | 2007-03-14 | 林记元 | Sieve pipe immersion highly effective wet dust collector |
CN103505998A (en) * | 2013-10-16 | 2014-01-15 | 国家电网公司 | SO2 and NOx gas absorption device for coal heating value test room |
CN203648318U (en) * | 2013-10-24 | 2014-06-18 | 梁柱环 | Filter cartridge assembly of air purification device |
CN204543874U (en) * | 2015-01-12 | 2015-08-12 | 成都冠禹科技有限公司 | A kind of house exhaust dust arrester |
CN204502701U (en) * | 2015-04-01 | 2015-07-29 | 石家庄泽辰新能源科技有限公司 | A kind of weld fumes purifier |
CN105771530A (en) * | 2016-05-28 | 2016-07-20 | 周末 | Dust removal system for mineral production workshop |
CN105879510A (en) * | 2016-06-14 | 2016-08-24 | 王杨 | Environment-friendly and efficient industrial-dust removing device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107413710A (en) * | 2017-06-19 | 2017-12-01 | 周舜 | A kind of cleaner of lithium battery |
CN107537264A (en) * | 2017-09-27 | 2018-01-05 | 权伟机械(江苏)有限公司 | A kind of air-filtering equipment used for air compressor |
CN107537264B (en) * | 2017-09-27 | 2022-12-06 | 权伟机械集团(江苏)有限公司 | Air filtering equipment for air compressor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105935681A (en) | Dust removal device for power equipment | |
CN105771444B (en) | A kind of efficient flue gas dust collecting system | |
CN105771529A (en) | Efficient environment-friendly indoor air purifying device | |
CN105854487A (en) | Chemical plant waste gas purification treatment device | |
CN106582173B (en) | A kind of water-saving processing of stone dust collection processing equipment | |
CN106606913A (en) | Dust purification equipment for furniture and building material production | |
CN106890527A (en) | A kind of air cleaning facility of handware atelier environmental protection | |
CN106731393B (en) | A kind of environment friendly dedusting device | |
CN105879510A (en) | Environment-friendly and efficient industrial-dust removing device | |
CN106345212A (en) | Industrial smoke purification equipment with high efficiency and environmental friendliness | |
CN106975313A (en) | A kind of haze fine particle cleaning equipment | |
CN106902606A (en) | A kind of environment-friendly type haze cleaning system for economizing on resources | |
CN106268148B (en) | A kind of air cleaning system suitable for painting workshop | |
CN105944460A (en) | Waste gas purifying device for boiler | |
CN104826438A (en) | Dust waste gas treatment device | |
CN106731394A (en) | A kind of Environmental-protecting dust-removing equipment of building engineering construction | |
CN107854913A (en) | A kind of environmentally friendly waste gas purification impurity removing equipment | |
CN207708740U (en) | A kind of air-filtering equipment used for air compressor | |
CN106606915A (en) | High efficiency industrial flue dust energy-saving purification system | |
CN106582174B (en) | A kind of efficient indoor environmentally-friendly air filter | |
CN105727671B (en) | A kind of dust arrester in chemical pharmaceutical workshop | |
CN206549378U (en) | A kind of ore dust dedusting collection device | |
CN106823654A (en) | A kind of high-efficiency dust removal system of building field | |
CN206473910U (en) | A kind of circulating water treatment device | |
CN106725091A (en) | A kind of New Building Materials dust cleaning equipment of environmental protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |