CN106345212A - Industrial smoke purification equipment with high efficiency and environmental friendliness - Google Patents

Industrial smoke purification equipment with high efficiency and environmental friendliness Download PDF

Info

Publication number
CN106345212A
CN106345212A CN201610880835.XA CN201610880835A CN106345212A CN 106345212 A CN106345212 A CN 106345212A CN 201610880835 A CN201610880835 A CN 201610880835A CN 106345212 A CN106345212 A CN 106345212A
Authority
CN
China
Prior art keywords
fixedly connected
framework
drainage screen
hole
sponge block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610880835.XA
Other languages
Chinese (zh)
Inventor
王杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610880835.XA priority Critical patent/CN106345212A/en
Publication of CN106345212A publication Critical patent/CN106345212A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00

Abstract

The invention relates to industrial smoke purification equipment with high efficiency and environmental friendliness. The industrial smoke purification equipment comprises a first frame body, an air exhaust device, a pumping device, a water purification device, a first filter device, a pipeline device, a second frame body, a second filter device and a third filter device, wherein a first through hole, a second through hole, a third through hole, a fourth through hole, a first pipeline and a first valve are formed in and arranged on the first frame body, the air exhaust device comprises an air exhaust pipe, a first fan and a second valve, the pumping device comprises a pumping pipe, a first water pump, a third valve and a first support rod, the water purification device comprises a blocking frame, a first sponge block, a first spring, a sponge column, a first filter screen, second springs, a second filter screen, a collecting bucket and a first cross rod, and the first filter device comprises a first roller, a first bristle, a first vertical plate, a second sponge block, a third sponge block and a third filter screen. The industrial smoke purification equipment can be used for thoroughly and effectively purifying smoke generated by industrial boilers.

Description

A kind of industrial clarifying smoke processing equipment of high-efficiency environment friendly
Technical field
The present invention relates to environmental technology field, the industrial clarifying smoke processing equipment of more particularly, to a kind of high-efficiency environment friendly.
Background technology
Increasingly in short supply with the disposable energy, industrial biomass boiler gradually increases, because its fuel is many and can Regeneration, obtains in small-sized industrial boiler and widely uses, but small-sized Industrial Boiler often ignores the air dirt that flue dust brings Dye, the purification filtering consideration to flue dust is less, causes very big destruction to ecological environment, and some use in the Industrial Boiler of Daxing Udst separation technology often because of high cost, performance difficulty, practical application is less.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Content of the invention
It is an object of the invention to provide a kind of can effectively solving above-mentioned technical problem high-efficiency environment friendly industrial flue dust net Change processing equipment.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of industrial clarifying smoke processing equipment of high-efficiency environment friendly, the industrial clarifying smoke of described high-efficiency environment friendly is processed Equipment includes the first framework, is located at the air extractor on the left of described first framework, the dress that draws water above described first framework The water purification installation that put, is contained in described first framework, it is located at the first defecator below described water purification installation, is located at Plumbing installation below described first framework, it is located at second framework below described plumbing installation, is contained in described second framework The second interior defecator and the 3rd defecator on the right side of described second defecator, described first framework is provided with position In its left surface first through hole, be located at its upper surface the second through hole, be located at its right surface third through-hole, be located at its following table The fourth hole in face, the first pipeline on the right side of it, the first valve being arranged on described first pipeline, described air extractor The first blower fan of including exhaust tube, being arranged on described exhaust tube, the second valve, described water plug includes drinking-water pipe, setting In the first water pump on described drinking-water pipe, the 3rd valve and be located at first support bar below described first water pump, described water is net Gasifying device includes keeping off frame, is arranged at described the first sponge block keeping off above frame, the first bullet on the left of described first sponge block Spring, it is located at sponge column below described first spring, is located at the first drainage screen on the right side of described first sponge block, is located at described the The second spring of the left and right sides above one drainage screen, it is located at the second drainage screen below described first drainage screen, is located at described the Concentrating bucket and being located at described the first cross bar concentrating bucket right side below two drainage screens, described first defecator includes the first rolling Wheel, the first bristle being arranged on described first roller, it is located at starting stave on the left of described first roller, is arranged at described the The second sponge block on one riser, it is located at the 3rd sponge block on the left of described starting stave and is located at below described 3rd sponge block The 3rd drainage screen, described plumbing installation includes second pipe, the 4th valve being arranged on described second pipe, the second wind Machine, be located at described second blower fan on the right side of first support, be located at described first support below the first brace, be located at described first The 4th cross bar on the right side of support, be located at the first montant on the right side of described 4th cross bar, be located on the right side of described first montant second Brace and the second support below described second brace, described second framework is provided with the clematis stem positioned at its upper surface Hole, the 7th through hole being located at its lower surface, the discharge pipe being disposed below, the 5th valve being arranged on described discharge pipe, institute State the second defecator to include collecting center, be located at described the 4th drainage screen collecting below center, be located at the described 4th drainage screen right side The twisted plate of side, be located at described twisted plate on the left of the second cross bar, be located at described twisted plate below the 4th sponge block, be located at institute State the 3rd spring on the left of the 4th sponge block, the 3rd cross bar on the right side of described twisted plate, be located on the right side of described 3rd cross bar The 5th drainage screen, described 3rd defecator includes the second roller, the second bristle being arranged on described second roller, is located at Baffle plate on the right side of described second roller, the 6th drainage screen being arranged on described baffle plate, be located at described baffle plate on the right side of fixed frame, The 7th drainage screen above described fixed frame, it is contained in the 8th drainage screen of described fixing inframe and is located at described 8th mistake Second support bar below filter screen.
The left end of described first pipeline is directed at described third through-hole and the right surface with described first framework is fixedly connected.
The right-hand member of described exhaust tube is directed at described first through hole and the left surface with described first framework is fixedly connected.
The left end of described drinking-water pipe is directed at described second through hole and the upper surface with described first framework is fixedly connected, described First support bar is in vertical shape, and the lower end of described first support bar is fixedly connected with the upper surface of described first framework, and described the The upper end of one support bar is fixedly connected with described first water pump.
The cross section of described gear frame is in l type, and the left surface of described gear frame is fixedly connected with the inner surface of described first framework, Described gear frame is located at the right side of described first through hole, and the upper surface of described gear frame is fixing with the inner surface of described first framework even Connect, the upper end of described gear frame is provided with groove, and described first sponge block is in cuboid, and described first sponge block is contained in described groove Interior and with described gear frame be fixedly connected, the upper surface of described first sponge block is fixedly connected with the inner surface of described first framework, Described first spring is in vertical shape, and the upper end of described first spring is fixedly connected with the lower surface of described first framework, and described the The lower end of one spring is fixedly connected with described sponge column, and described sponge column is in cylinder, described sponge column and described first framework And gear frame is slidably connected, the cross section of described first drainage screen is in herringbone, and described first drainage screen is located at described second through hole Lower section, described second spring is provided with two, and described second spring is in vertical shape, the upper end of described second spring and described first The inner surface of framework is fixedly connected, and the lower end of described second spring is fixedly connected with described first drainage screen, described second filtration Net is in cuboid and horizontal positioned, and the right surface of described second drainage screen is fixedly connected with the inner surface of described first framework, institute The left surface stating the second drainage screen is fixedly connected with the right surface of described gear frame, and described concentration is struggled against in hollow shape, described concentration bucket It is fixedly connected with described first framework and gear frame, described first cross bar is horizontal, the right-hand member of described first cross bar and described the The inner surface of one framework is fixedly connected, and the left end of described first cross bar is fixedly connected with the described right surface concentrating bucket.
Described first roller is in cylinder, and described first roller is turned with described first framework axle and is connected, described first roller Positioned at the described lower section concentrating bucket, described first bristle is provided with several, and described first bristle is evenly distributed on described first rolling On wheel and be secured to connect, described starting stave be in cuboid and vertical place, the upper surface of described starting stave with described The lower surface of gear frame is fixedly connected, and the lower surface of described starting stave is fixedly connected with the inner surface of described first framework, described Starting stave is provided with the fifth hole running through surface around, and described second sponge block is in cylinder, described second sponge block It is contained in described fifth hole and is fixedly connected with described starting stave, described 3rd sponge block is in cuboid and level is put Put, the left surface of described 3rd sponge block is fixedly connected with the inner surface of described first framework, the right table of described 3rd sponge block Face is fixedly connected with the left surface of described starting stave, the lower surface of described 3rd sponge block and the upper table of described 3rd drainage screen Face is fixedly connected, and described 3rd drainage screen is in cuboid and horizontal positioned, the left surface and described first of described 3rd drainage screen The inner surface of framework is fixedly connected, and the right surface of described 3rd drainage screen is fixedly connected with the left surface of described starting stave.
Described second pipe is in vertical shape, the upper end of described second pipe be aligned described fourth hole and with described first frame The lower surface of body is fixedly connected, and described first support is in l type, the lower surface of one end of described first support and described first framework It is fixedly connected, the other end of described first support is fixedly connected with described second blower fan, described first brace is oblique, described The upper end of the first brace is fixedly connected with the lower surface of described first support, and described 4th cross bar is in cuboid and horizontal positioned, The described left end of the 4th cross bar is fixedly connected with the right surface of described first support, the right-hand member and described first of described 4th cross bar The left surface of montant is fixedly connected, described first montant be in cuboid and vertical place, the upper end of described first montant with described The lower surface of the first framework is fixedly connected, and described second brace is oblique, the upper end of described second brace and described first frame The lower surface of body is fixedly connected, and the lower end of described second brace is fixedly connected with the upper surface of described second support, and described second Support is in l type, and the left end of described second support is fixedly connected with the right surface of described first montant, the right-hand member of described second support In vertical shape.
Clematis stem hole described in the lower end aligned of the described second pipe and upper surface with described second framework is fixedly connected, institute State the first brace, the lower end of the first montant is fixedly connected with the upper surface of described second framework, the right-hand member of described second support with The upper surface of described second framework is fixedly connected, and described discharge pipe is in vertical shape, the upper end be aligned the described 7th of described discharge pipe The through hole and lower surface with described second framework is fixedly connected.
The cross section of described collection center is in l type, and described collection center is fixedly connected with the inner surface of described second framework, described Collection center is located at the lower section in described clematis stem hole, and the lower surface of described collection center is provided with the 8th through hole, and described 4th drainage screen is in Cuboid and vertical placement, the upper surface of described 4th drainage screen is fixedly connected with the lower surface of described collection center, and the described 4th The lower surface of drainage screen is fixedly connected with the inner surface of described second framework, and described twisted plate is in bending, described twisted plate Upper surface is fixedly connected with the inner surface of described second framework, the upper table of the lower surface of described twisted plate and described 4th sponge block Face is slidably connected, and described second cross bar is horizontal, and the right-hand member of described second cross bar is fixedly connected with described twisted plate, and described The left end of two cross bars is fixedly connected with the right surface of described collection center, and described 4th sponge block is in cuboid and horizontal positioned, institute State the lower surface of the 4th sponge block and the inner surface of described second framework is slidably connected, the right surface of described 4th sponge block and institute The left surface stating the 5th drainage screen is slidably connected, and described 3rd spring is horizontal, the left end of described 3rd spring and described the The right surface of four drainage screens is fixedly connected, and the right-hand member of described 3rd spring is fixedly connected with described 4th sponge block, and the described 3rd Cross bar is horizontal, and the left end of described 3rd cross bar is fixedly connected with described twisted plate, the right-hand member of described 3rd cross bar with described The left surface of the 5th drainage screen is fixedly connected, and described 5th drainage screen is in cuboid and the vertical side placing described 5th drainage screen Face is fixedly connected with the inner surface of described second framework.
Described second roller is in cylinder, and described second roller is turned with described second framework axle and is connected, described second bristle It is provided with several, described second bristle is evenly distributed on described second roller and is secured to connect, and described baffle plate is in bending Shape, described baffle plate is fixedly connected with the inner surface of described second framework, and described baffle plate is provided with and runs through the 9th of surface around Through hole, described 6th drainage screen is contained in the described 9th in through hole and is fixedly connected with described baffle plate, described fixed frame transversal Face is in l type, and described fixed frame is fixedly connected with the inner surface of described second framework, and the upper surface of described fixed frame is provided with the tenth and leads to Hole, described 7th drainage screen is in cuboid and vertical placement, the lower surface of described 7th drainage screen and the upper table of described fixed frame Face is fixedly connected, and the upper surface of described 7th drainage screen is fixedly connected with the inner surface of described second framework, described 8th filtration Net is in cuboid and horizontal positioned, and the left surface of described 8th drainage screen is fixedly connected with the inner surface of described fixed frame, described The right surface of the 8th drainage screen is fixedly connected with the inner surface of described second framework, and described second support bar is provided with two, described Second support bar is in cuboid and vertical placement, and the lower end of described second support bar is fixing with the inner surface of described second framework even Connect, the upper end of described second support bar is fixedly connected with the lower surface of described 8th drainage screen.
After technique scheme, the present invention has the advantage that
The industrial clarifying smoke processing equipment structure of high-efficiency environment friendly of the present invention is simple, easy to use, can be to industrial pot The flue dust that stove produces thoroughly effectively is purified, and prevents its directly discharge pollution on the environment, simultaneously can be to environment Play preferable protective effect, and the air pressure of suction can be reduced, prevent the damage that it causes to internal structure.
Brief description
Below in conjunction with the accompanying drawings the specific embodiment of the industrial clarifying smoke processing equipment of high-efficiency environment friendly of the present invention is made Further illustrate:
Fig. 1 is the structural representation of the industrial clarifying smoke processing equipment of high-efficiency environment friendly of the present invention;
Specific embodiment
As shown in figure 1, the industrial clarifying smoke processing equipment of high-efficiency environment friendly of the present invention includes the first framework 1, is located at institute State the air extractor 2 in the first framework 1 left side, be located at the water plug 3 of described first framework 1 top, be contained in described first frame Water purification installation 4 in body 1, it is located at the first defecator 5 of described water purification installation 4 lower section, is located under described first framework 1 The plumbing installation 6 of side, the second framework 7 being located at described plumbing installation 6 lower section, the second mistake being contained in described second framework 7 Filter device 8 and the 3rd defecator 9 being located at described second defecator 8 right side.
As shown in figure 1, described first framework 1 is in hollow cuboid, described first framework 1 is vertically placed, described first Framework 1 is provided with first through hole 11 positioned at its left surface, the second through hole 12 being located at its upper surface, is located at the of its right surface Three through holes 13, be located at its lower surface fourth hole 14, be located at its on the right side of the first pipeline 15, be arranged at described first pipeline 15 On the first valve 16.Described first through hole 11, the second through hole 12, third through-hole 13 and fourth hole 14 rounded and with described The inside of the first framework 1 communicates.The left end of described first pipeline 15 be aligned described third through-hole 13 and with described first framework 1 Right surface is fixedly connected so that the inside of described first pipeline 15 is communicated with the inside of described first framework 1.Described first valve 16 are used for controlling the flow of water in described first pipeline 15.
As shown in figure 1, described air extractor 2 include exhaust tube 21, the first blower fan 22 being arranged on described exhaust tube 21, Second valve 23.The right-hand member of described exhaust tube 21 is directed at described first through hole 11 and the left surface with described first framework 1 is fixed Connect so that the inside of described exhaust tube 21 is communicated with the inside of described first framework 1.Described first blower fan 22 is electrical with power supply Connect so that described first blower fan 22 can work.Described second valve 23 is used for controlling the stream of gas in described exhaust tube 21 Amount.
As shown in figure 1, described water plug 3 include drinking-water pipe 31, the first water pump 32 being arranged on described drinking-water pipe 31, 3rd valve 33 and the first support bar 34 being located at described first water pump 32 lower section.The left end be aligned described the of described drinking-water pipe 31 Two through holes 12 and the upper surface with described first framework 1 are fixedly connected so that the inside of described drinking-water pipe 31 and described first frame The inside of body 1 communicates, and the other end of described drinking-water pipe 31 is placed in pond.Described 3rd valve 33 draws water described in being used for controlling The flow of water in pipe 31.Described first water pump 32 is electrically connected with the power supply, its can by the water in pond be pumped into described in draw water In pipe 31.Described first support bar 34 is in vertical shape, the upper surface of the lower end of described first support bar 34 and described first framework 1 It is fixedly connected, the upper end of described first support bar 34 is fixedly connected with described first water pump 32.
As Fig. 1 vegetarian diet, described water purification installation 4 includes keeping off frame 41, is arranged at the first sponge block of described gear frame 41 top 42nd, it is located at first spring 43 in described first sponge block 42 left side, be located at the sponge column 44 of described first spring 43 lower section, be located at First drainage screen 45 on described first sponge block 42 right side, the second spring positioned at the described first drainage screen 45 top left and right sides 46th, it is located at the second drainage screen 47 of described first drainage screen 45 lower section, being located at the concentration bucket 48 below described second drainage screen 47 And it is located at described the first cross bar 49 concentrating bucket 48 right side.The cross section of described gear frame 41 is in l type, the left surface of described gear frame 41 It is fixedly connected with the inner surface of described first framework 1, described gear frame 41 is located at the right side of described first through hole 11, described gear frame 41 Front and rear surfaces be fixedly connected with the inner surface of described first framework 1, upper surface and described first framework 1 of described gear frame 41 Inner surface is fixedly connected, and the upper end of described gear frame 41 is provided with groove 411, and described groove 411 is in cuboid.Described first sponge block 42 is in cuboid, and described first sponge block 42 is contained in described groove 411 and is fixedly connected with described gear frame 41, described first The upper surface of sponge block 42 is fixedly connected with the inner surface of described first framework 1.Described first spring 43 is in vertical shape, and described the The upper end of one spring 43 is fixedly connected with the lower surface of described first framework 1, the lower end of described first spring 43 and described sponge Post 44 is fixedly connected.Described sponge column 44 is in cylinder, and described sponge column 44 is slided even with described first framework 1 and gear frame 41 Connect so that described sponge column 44 can move up and down.The cross section of described first drainage screen 45 is in herringbone, described first filtration Net 45 can purify to water, and described first drainage screen 45 is located at the lower section of described second through hole 12.Described second spring 46 It is provided with two, described second spring 46 is in vertical shape, the upper end of described second spring 46 is solid with the inner surface of described first framework 1 Fixed connection, the lower end of described second spring 46 is fixedly connected with described first drainage screen 45, thus to described first drainage screen 45 Play a supporting role.Described second drainage screen 47 is in cuboid and horizontal positioned, the right surface of described second drainage screen 47 and institute The inner surface stating the first framework 1 is fixedly connected, and the left surface of described second drainage screen 47 is fixed with the described right surface keeping off frame 41 Connect.Described concentrate bucket 48 to be in hollow shape, the upper and lower surface of described concentration bucket 48 communicates, and described concentrates bucket 48 and described first frame Body 1 and gear frame 41 are fixedly connected, thus concentrating bucket 48 to play a supporting role to described.Described first cross bar 49 is horizontal, institute The right-hand member stating the first cross bar 49 is fixedly connected with the inner surface of described first framework 1, the left end of described first cross bar 49 with described The right surface concentrating bucket 48 is fixedly connected, thus concentrating bucket 48 to play a supporting role to described.
As shown in figure 1, described first defecator 5 include the first roller 51, be arranged on described first roller 51 One bristle 52, the starting stave 53 being located at described first roller 51 left side, the second sponge being arranged on described starting stave 53 Block 54, the 3rd sponge block 55 being located at described starting stave 53 left side and the 3rd filtration being located at described 3rd sponge block 55 lower section Net 56.Described first roller 51 is in cylinder, and described first roller 51 is turned with described first framework 1 axle and is connected so that described the One roller 51 can rotate in described first framework 1, described first roller 51 and motor connection, drives described first roller 51 Rotation, described first roller 51 is located at the described lower section concentrating bucket 48.Described first bristle 52 is provided with several, described first brush Hair 52 is evenly distributed on described first roller 51 and is secured to connect, and described first bristle 52 can adsorb the miscellaneous of in the air Matter.Described starting stave 53 is in cuboid and vertical placement, the following table of the upper surface of described starting stave 53 and described gear frame 41 Face is fixedly connected, and the lower surface of described starting stave 53 is fixedly connected with the inner surface of described first framework 1, described starting stave 53 front and rear surfaces are fixedly connected with the inner surface of described first framework 1, and described starting stave 53 is provided with and runs through table around The fifth hole 531 in face, described fifth hole 531 is rounded.Described second sponge block 54 is in cylinder, described second sponge block 54 are contained in described fifth hole 531 and are fixedly connected with described starting stave 53.Described 3rd sponge block 55 is in cuboid And horizontal positioned, the left surface of described 3rd sponge block 55 is fixedly connected with the inner surface of described first framework 1, described 3rd sea The right surface of continuous block 55 is fixedly connected with the left surface of described starting stave 53, the lower surface of described 3rd sponge block 55 with described The upper surface of the 3rd drainage screen 56 is fixedly connected.Described 3rd drainage screen 56 is in cuboid and horizontal positioned, described 3rd filtration The left surface of net 56 is fixedly connected with the inner surface of described first framework 1, the right surface of described 3rd drainage screen 56 and described the The left surface of one riser 53 is fixedly connected.
As shown in figure 1, described plumbing installation 6 includes second pipe 61, the 4th valve being arranged on described second pipe 61 Door the 62, second blower fan 63, it is located at the first support 64 on described second blower fan 63 right side, is located at the of described first support 64 lower section One brace 65, the 4th cross bar 66 being located at described first support 64 right side, the first montant positioned at described 4th cross bar 66 right side 67th, it is located at second brace 68 on described first montant 67 right side and the second support 69 being located at described second brace 68 lower section.Institute Stating second pipe 61 is in vertical shape, the upper end of described second pipe 61 be aligned described fourth hole 14 and with described first framework 1 Lower surface be fixedly connected so that the inside of described second pipe 61 is communicated with the inside of described first framework 1.Described 4th valve Door 62 is used for controlling the flow of gas in described second pipe 61.Described second blower fan 63 is electrically connected with the power supply, and it can be by Gas in first framework 1 is pumped in described second pipe 61.Described first support 64 is in l type, described first support 64 One end is fixedly connected with the lower surface of described first framework 1, and the other end of described first support 64 is solid with described second blower fan 63 Fixed connection.Described first brace 65 is oblique, and the upper end of described first brace 65 is solid with the lower surface of described first support 64 Fixed connection.Described 4th cross bar 66 is in cuboid and horizontal positioned, the left end of described 4th cross bar 66 and described first support 64 Right surface be fixedly connected, the right-hand member of described 4th cross bar 66 is fixedly connected with the left surface of described first montant 67.Described One montant 67 is in cuboid and vertical placement, and the upper end of described first montant 67 is fixing with the lower surface of described first framework 1 even Connect.Described second brace 68 is oblique, and the upper end of described second brace 68 is fixing with the lower surface of described first framework 1 even Connect, the lower end of described second brace 68 is fixedly connected with the upper surface of described second support 69.Described second support 69 is in l type, The left end of described second support 69 is fixedly connected with the right surface of described first montant 67, and the right-hand member of described second support 69 is in perpendicular Straight shape.
As shown in figure 1, described second framework 7 is in hollow cuboid and horizontal positioned, described second framework 7 is provided with position Thereon the clematis stem hole 71 on surface, be located at the 7th through hole 72 of its lower surface, the discharge pipe 73 being disposed below, be arranged at institute State the 5th valve 74 on discharge pipe 73.Described clematis stem hole 71 and the 7th through hole 72 rounded and with described second framework 7 Inside communicates, the clematis stem hole 71 described in lower end aligned of the described second pipe 61 and upper surface with described second framework 7 is fixed Connect so that the inside of described second pipe 61 is communicated with the inside of described second framework 7, described first brace 65, first erects The lower end of bar 67 is fixedly connected with the upper surface of described second framework 7, the right-hand member of described second support 69 and described second framework 7 Upper surface be fixedly connected.Described discharge pipe 73 is in vertical shape, the upper end of described discharge pipe 73 be aligned described 7th through hole 72 and It is fixedly connected the inside so that the inside of described discharge pipe 73 and described second framework 71 with the lower surface of described second framework 71 Communicate.Described 5th valve 74 is used for controlling the flow of gas in described discharge pipe 73.
As shown in figure 1, described second defecator 8 includes collecting center 81, is located at described the 4th mistake collecting center 81 lower section Filter screen 82, the twisted plate 83 being located at described 4th drainage screen 82 right side, the second cross bar 84 being located at described twisted plate 83 left side, position In the 4th sponge block 85 below described twisted plate 83, the 3rd spring 86 on the left of described 4th sponge block 85, it is located at institute State the 3rd cross bar 87 on twisted plate 83 right side, being located at the 5th drainage screen 88 on the right side of described 3rd cross bar 87.Described collection center 81 Cross section be in l type, described collection center 81 is fixedly connected with the inner surface of described second framework 7, and described collection center 81 is positioned at institute State the lower section in clematis stem hole 71, described collection center 81 forms the space closed, described concentration with the inner surface of described second framework 7 The lower surface of frame 81 is provided with the 8th through hole 811, and rounded and with described collection center 81 the inside of described 8th through hole 811 communicates. Described 4th drainage screen 82 is in cuboid and vertical placement, and the upper surface of described 4th drainage screen 82 is collected under center 81 with described Surface is fixedly connected, and the lower surface of described 4th drainage screen 82 is fixedly connected with the inner surface of described second framework 7.Described bending Plate 83 is in bending, and the upper surface of described twisted plate 83 is fixedly connected with the inner surface of described second framework 7, described twisted plate 83 Lower surface be connected with the upper surface slide of described 4th sponge block 85.Described second cross bar 84 is horizontal, and described second is horizontal The right-hand member of bar 84 is fixedly connected with described twisted plate 83, and the left end of described second cross bar 84 is solid with the right surface of described collection center 81 Fixed connection.Described 4th sponge block 85 is in cuboid and horizontal positioned, the lower surface and described second of described 4th sponge block 85 The inner surface of framework 7 is slidably connected, and slides in the left surface of the right surface of described 4th sponge block 85 and described 5th drainage screen 88 Connect.Described 3rd spring 86 is horizontal, and the left end of described 3rd spring 86 is solid with the right surface of described 4th drainage screen 82 Fixed connection, the right-hand member of described 3rd spring 86 is fixedly connected with described 4th sponge block 85, thus to described 4th sponge block 85 Play a supporting role.Described 3rd cross bar 87 is horizontal, and the left end of described 3rd cross bar 87 is fixing with described twisted plate 83 even Connect, the right-hand member of described 3rd cross bar 87 is fixedly connected with the left surface of described 5th drainage screen 88.Described 5th drainage screen 88 is in The side of cuboid and described 5th drainage screen 88 of vertical placement is fixedly connected with the inner surface of described second framework 7.
As shown in figure 1, described 3rd defecator 9 include the second roller 91, be arranged on described second roller 91 Two bristles 92, the baffle plate 93 being located at described second roller 91 right side, the 6th drainage screen 94 being arranged on described baffle plate 93, it is located at The fixed frame 95 on described baffle plate 93 right side, it is located at the 7th drainage screen 96 of described fixed frame 95 top, is contained in described fixed frame The 8th drainage screen 97 in 95 and the second support bar 98 being located at described 8th drainage screen 97 lower section.Described second roller 91 is in circle Cylinder, described second roller 91 is turned with described second framework 7 axle and is connected so that described second roller 91 can be in described second frame Rotation, described second roller 91 and motor connection in body 7, drive described second roller 91 to rotate.Described second bristle 92 is provided with Several, described second bristle 92 is evenly distributed on described second roller 91 and is secured to connect.Described baffle plate 93 is in curved Curved, described baffle plate 93 is fixedly connected with the inner surface of described second framework 7, and described baffle plate 93 is provided with and runs through surface around The 9th through hole 931.Described 6th drainage screen 94 is contained in described 9th through hole 931 and is fixedly connected with described baffle plate 93. The cross section of described fixed frame 95 is in l type, and described fixed frame 95 is fixedly connected with the inner surface of described second framework 7, described solid The inner surface determining frame 95 with described second framework 7 forms the space closed, and the upper surface of described fixed frame 95 is provided with the tenth through hole 951, described tenth through hole 951 is communicated with the inside of described fixed frame 95.Described 7th drainage screen 96 is in cuboid and vertically puts Put, the lower surface of described 7th drainage screen 96 is fixedly connected with the upper surface of described fixed frame 95, described 7th drainage screen 96 Upper surface is fixedly connected with the inner surface of described second framework 7.Described 8th drainage screen 97 is in cuboid and horizontal positioned, described The left surface of the 8th drainage screen 97 is fixedly connected with the inner surface of described fixed frame 95, the right surface of described 8th drainage screen 97 with The inner surface of described second framework 7 is fixedly connected.Described second support bar 98 is provided with two, and described second support bar 98 is in rectangular Body and vertical placement, the lower end of described second support bar 98 is fixedly connected with the inner surface of described second framework 7, described second The upper end of strut 98 is fixedly connected with the lower surface of described 8th drainage screen 97.
As shown in figure 1, when the industrial clarifying smoke processing equipment of described high-efficiency environment friendly of the present invention uses, being put first Put in the more place of industrial fumes, then start the first blower fan 22, and open the second valve 23 so that the flue dust of industry is taken out Enter in described exhaust tube 21, then in described first framework 1, and focus in described gear frame 41, be then passed through sea The top of described sponge column 44 is entered into, when air pressure is larger, described sponge column 44 moves up, permissible after the filtration of continuous post 44 Flue dust is played with the effect of blood pressure lowering.Then air enters into the right side of described gear frame 41 after the filtration of described first sponge block 42 Side.Then start the first water pump 32, and open the 3rd valve 33 so that the water in pond is drawn in described drinking-water pipe 31, Then in described first framework 1, and it is sprayed on described first drainage screen 45, because the first drainage screen 45 is in herringbone Shape, so that water is sprayed on described first drainage screen 45 rear and flows to its both sides, then flows and moves described second drainage screen 47 On.Flue dust then into described gear frame 41 right side is fully contacted with water, and flue dust is played with the effect of purification.It is then passed through Enter into below after the filtration of two drainage screens 47, be then passed through concentrating bucket 48 to enter into the described lower section concentrating bucket 48.Then Start the motor being connected with the first roller 51 so that described first roller 51 rotates, drive described first bristle 52 to rotate with. Water on second drainage screen 47 flows downward and can soak the first bristle 52 so that the first bristle 52 of rotation can be carried out to flue dust Effectively purify.The water purifying is concentrated to the right side of described starting stave 53, when the water on starting stave 53 right side is more, can To open the first valve 16 so that water is discharged through the first pipeline 15.Then start the second blower fan 63, open the 4th valve simultaneously 62, the air on starting stave 53 right side is entered into after the filtration of described second sponge block 54 left side for described starting stave 53 Side, enters into described second pipe after being then passed through the filtration of described 3rd sponge block 55 and after the filtration of the 3rd drainage screen 56 In 61.Then in described second framework 7, and enter in described collection center 81, be then passed through the 8th through hole 811 and enter To the lower section of described collection center 81, enter on the right side of it after the filtration being then passed through described 4th drainage screen 82, be then passed through institute Described 5th drainage screen 88 is entered into after the filtration of described 5th drainage screen 88 again after stating the filtration of the 4th sponge block 85 Right side, then starts the motor being connected with the second roller 91 so that described second roller 91 rotates, and then drives described second brush Hair 92 rotates with, such that it is able to filter to air.Then enter into institute after the filtration entering described 6th drainage screen 94 State the right side of baffle plate 93, enter into through described tenth through hole 951 described after being then passed through the filtration of described 7th drainage screen 96 In fixed frame 95, enter in described discharge pipe 93 after the filtration being then passed through the 8th drainage screen 97, opening the 5th valve 74 makes It is discharged.So far, the industrial clarifying smoke processing equipment of high-efficiency environment friendly of the present invention is finished using process description.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, and any Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, all should cover Within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by described scope of the claims.

Claims (10)

1. a kind of high-efficiency environment friendly industrial clarifying smoke processing equipment it is characterised in that: the industrial cigarette of described high-efficiency environment friendly Dirt purification apparatus include the first framework, the air extractor on the left of described first framework, are located in described first framework The water plug of side, the water purification installation being contained in described first framework, the first mistake below described water purification installation Filter device, be located at the plumbing installation below described first framework, the second framework below described plumbing installation, be contained in institute State the second defecator in second framework and the 3rd defecator on the right side of described second defecator, described first frame Body be provided with first through hole positioned at its left surface, the second through hole being located at its upper surface, be located at its right surface third through-hole, Positioned at its lower surface fourth hole, be located at its on the right side of the first pipeline, the first valve being arranged on described first pipeline, institute State air extractor and include exhaust tube, the first blower fan being arranged on described exhaust tube, the second valve, described water plug includes taking out Water pipe, the first water pump being arranged on described drinking-water pipe, the 3rd valve and the first support bar below described first water pump, Described water purification installation includes keeping off frame, is arranged at described the first sponge block keeping off above frame, is located on the left of described first sponge block The first spring, be located at described first spring below sponge column, be located at described first sponge block on the right side of the first drainage screen, position Above described first drainage screen second spring of the left and right sides, be located at the second drainage screen below described first drainage screen, position Concentrating bucket and being located at described the first cross bar concentrating bucket right side, described first defecator bag below described second drainage screen Include the first roller, the first bristle being arranged on described first roller, the starting stave on the left of described first roller, setting In the second sponge block on described starting stave, it is located at the 3rd sponge block on the left of described starting stave and is located at described 3rd sea The 3rd drainage screen below continuous block, described plumbing installation include second pipe, the 4th valve being arranged on described second pipe, Second blower fan, be located at described second blower fan on the right side of first support, be located at described first support below the first brace, be located at institute State the 4th cross bar on the right side of first support, the first montant on the right side of described 4th cross bar, be located on the right side of described first montant The second brace and be located at second support below described second brace, described second framework is provided with the positioned at its upper surface Clematis stem hole, the 7th through hole being located at its lower surface, the discharge pipe being disposed below, the 5th valve being arranged on described discharge pipe Door, described second defecator includes collecting center, is located at described the 4th drainage screen collecting below center, is located at described 4th filtration The twisted plate on net right side, the second cross bar on the left of described twisted plate, the 4th sponge block below described twisted plate, position The 3rd spring on the left of described 4th sponge block, it is located at the 3rd cross bar on the right side of described twisted plate, is located at described 3rd cross bar Right side the 5th drainage screen, described 3rd defecator include the second roller, the second bristle being arranged on described second roller, Baffle plate on the right side of described second roller, the 6th drainage screen being arranged on described baffle plate, consolidating on the right side of described baffle plate Determine frame, the 7th drainage screen above described fixed frame, be contained in the 8th drainage screen of described fixing inframe and be located at described Second support bar below 8th drainage screen.
2. high-efficiency environment friendly according to claim 1 industrial clarifying smoke processing equipment it is characterised in that: described first The left end of pipeline is directed at described third through-hole and the right surface with described first framework is fixedly connected.
3. high-efficiency environment friendly according to claim 2 industrial clarifying smoke processing equipment it is characterised in that: described pumping The right-hand member of pipe is directed at described first through hole and the left surface with described first framework is fixedly connected.
4. high-efficiency environment friendly according to claim 3 industrial clarifying smoke processing equipment it is characterised in that: described draw water The left end of pipe is directed at described second through hole and the upper surface with described first framework is fixedly connected, and described first support bar is in vertically Shape, the lower end of described first support bar is fixedly connected with the upper surface of described first framework, the upper end of described first support bar with Described first water pump is fixedly connected.
5. high-efficiency environment friendly according to claim 4 industrial clarifying smoke processing equipment it is characterised in that: described gear frame Cross section be in l type, the left surface of described gear frame is fixedly connected with the inner surface of described first framework, and described gear frame is positioned at described The right side of first through hole, the upper surface of described gear frame is fixedly connected with the inner surface of described first framework, the upper end of described gear frame It is provided with groove, described first sponge block is in cuboid, described first sponge block is contained in described groove and solid with described gear frame Fixed connection, the upper surface of described first sponge block is fixedly connected with the inner surface of described first framework, and described first spring is in perpendicular Straight shape, the upper end of described first spring is fixedly connected with the lower surface of described first framework, the lower end of described first spring and institute State sponge column to be fixedly connected, described sponge column is in cylinder, described sponge column is slidably connected with described first framework and gear frame, institute The cross section stating the first drainage screen is in herringbone, and described first drainage screen is located at the lower section of described second through hole, described second bullet Spring is provided with two, and described second spring is in vertical shape, and the inner surface of the upper end of described second spring and described first framework is fixed Connect, the lower end of described second spring is fixedly connected with described first drainage screen, described second drainage screen is in cuboid and level Place, the right surface of described second drainage screen is fixedly connected with the inner surface of described first framework, a left side for described second drainage screen Surface is fixedly connected with the right surface of described gear frame, described concentrate bucket to be in hollow shape, described concentration bucket and described first framework and Gear frame is fixedly connected, and described first cross bar is horizontal, and the right-hand member of described first cross bar is solid with the inner surface of described first framework Fixed connection, the left end of described first cross bar is fixedly connected with the described right surface concentrating bucket.
6. high-efficiency environment friendly according to claim 5 industrial clarifying smoke processing equipment it is characterised in that: described first Roller is in cylinder, described first roller turns with described first framework axle and is connected, and described first roller is located at described concentration and struggles against Lower section, described first bristle is provided with several, and described first bristle is evenly distributed on described first roller and the company of being secured to Connect, described starting stave is in cuboid and vertical placement, the upper surface of described starting stave is fixed with the described lower surface keeping off frame Connect, the lower surface of described starting stave is fixedly connected with the inner surface of described first framework, and described starting stave is provided with and passes through Wear the fifth hole on surface around, described second sponge block is in cylinder, described second sponge block is contained in the described 5th and leads to In the hole and being fixedly connected with described starting stave, described 3rd sponge block is in cuboid and horizontal positioned, described 3rd sponge block Left surface be fixedly connected with the inner surface of described first framework, the right surface of described 3rd sponge block and described starting stave Left surface is fixedly connected, and the lower surface of described 3rd sponge block is fixedly connected with the upper surface of described 3rd drainage screen, and described Three drainage screens are in cuboid and horizontal positioned, and the left surface of described 3rd drainage screen is fixing with the inner surface of described first framework even Connect, the right surface of described 3rd drainage screen is fixedly connected with the left surface of described starting stave.
7. high-efficiency environment friendly according to claim 6 industrial clarifying smoke processing equipment it is characterised in that: described second Pipeline is in vertical shape, and the upper end of described second pipe is directed at described fourth hole and the lower surface with described first framework is fixed even Connect, described first support is in l type, and one end of described first support is fixedly connected with the lower surface of described first framework, described the The other end of one support is fixedly connected with described second blower fan, and described first brace is oblique, the upper end of described first brace It is fixedly connected with the lower surface of described first support, described 4th cross bar is in cuboid and horizontal positioned, described 4th cross bar Left end is fixedly connected with the right surface of described first support, and the right-hand member of described 4th cross bar is solid with the left surface of described first montant Determine to connect, described first montant is in cuboid and vertical placement, the following table of the upper end of described first montant and described first framework Face is fixedly connected, and described second brace is oblique, and the lower surface of the upper end of described second brace and described first framework is fixed Connect, the lower end of described second brace is fixedly connected with the upper surface of described second support, described second support is in l type, described The left end of second support is fixedly connected with the right surface of described first montant, and the right-hand member of described second support is in vertical shape.
8. high-efficiency environment friendly according to claim 7 industrial clarifying smoke processing equipment it is characterised in that: described second Clematis stem hole described in the lower end aligned of the pipeline and upper surface with described second framework is fixedly connected, described first brace, first The lower end of montant is fixedly connected with the upper surface of described second framework, and the right-hand member of described second support is upper with described second framework Surface is fixedly connected, and described discharge pipe is in vertical shape, and the upper end of described discharge pipe is directed at described 7th through hole and with described second The lower surface of framework is fixedly connected.
9. high-efficiency environment friendly according to claim 8 industrial clarifying smoke processing equipment it is characterised in that: described concentration The cross section of frame is in l type, and described collection center is fixedly connected with the inner surface of described second framework, and described collection center is positioned at described the The lower section in clematis stem hole, the lower surface of described collection center is provided with the 8th through hole, and described 4th drainage screen is in cuboid and vertical placement, The upper surface of described 4th drainage screen is fixedly connected with the lower surface of described collection center, the lower surface of described 4th drainage screen and institute The inner surface stating second framework is fixedly connected, and described twisted plate is in bending, the upper surface of described twisted plate and described second frame The inner surface of body is fixedly connected, and the lower surface of described twisted plate is connected with the upper surface slide of described 4th sponge block, and described Two cross bars are horizontal, and the right-hand member of described second cross bar is fixedly connected with described twisted plate, the left end of described second cross bar and institute The right surface stating collection center is fixedly connected, and described 4th sponge block is in cuboid and horizontal positioned, under described 4th sponge block Surface is slidably connected with the inner surface of described second framework, the right surface of described 4th sponge block and a left side for described 5th drainage screen Surface is slidably connected, and described 3rd spring is horizontal, the left end of described 3rd spring and the right surface of described 4th drainage screen It is fixedly connected, the right-hand member of described 3rd spring is fixedly connected with described 4th sponge block, described 3rd cross bar is horizontal, described The left end of the 3rd cross bar is fixedly connected with described twisted plate, the right-hand member of described 3rd cross bar and the left surface of described 5th drainage screen It is fixedly connected, described 5th drainage screen is in cuboid and the vertical side placing described 5th drainage screen and described second framework Inner surface is fixedly connected.
10. high-efficiency environment friendly according to claim 9 industrial clarifying smoke processing equipment it is characterised in that: described Second wheel is in cylinder, and described second roller is turned with described second framework axle and is connected, and described second bristle is provided with several, described Second bristle is evenly distributed on described second roller and is secured to connect, and described baffle plate is in bending, described baffle plate and institute The inner surface stating second framework is fixedly connected, and described baffle plate is provided with the 9th through hole running through surface around, described 6th mistake Filter screen is contained in described 9th through hole and is fixedly connected with described baffle plate, and the cross section of described fixed frame is in l type, described fixation Frame is fixedly connected with the inner surface of described second framework, and the upper surface of described fixed frame is provided with the tenth through hole, described 7th filtration Net is in cuboid and vertical placement, and the lower surface of described 7th drainage screen is fixedly connected with the upper surface of described fixed frame, described The upper surface of the 7th drainage screen is fixedly connected with the inner surface of described second framework, and described 8th drainage screen is in cuboid and level Place, the left surface of described 8th drainage screen is fixedly connected with the inner surface of described fixed frame, the right table of described 8th drainage screen Face is fixedly connected with the inner surface of described second framework, and described second support bar is provided with two, and described second support bar is in rectangular Body and vertical placement, the lower end of described second support bar is fixedly connected with the inner surface of described second framework, described second support The upper end of bar is fixedly connected with the lower surface of described 8th drainage screen.
CN201610880835.XA 2016-10-07 2016-10-07 Industrial smoke purification equipment with high efficiency and environmental friendliness Pending CN106345212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610880835.XA CN106345212A (en) 2016-10-07 2016-10-07 Industrial smoke purification equipment with high efficiency and environmental friendliness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610880835.XA CN106345212A (en) 2016-10-07 2016-10-07 Industrial smoke purification equipment with high efficiency and environmental friendliness

Publications (1)

Publication Number Publication Date
CN106345212A true CN106345212A (en) 2017-01-25

Family

ID=57865476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610880835.XA Pending CN106345212A (en) 2016-10-07 2016-10-07 Industrial smoke purification equipment with high efficiency and environmental friendliness

Country Status (1)

Country Link
CN (1) CN106345212A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106624383A (en) * 2017-02-24 2017-05-10 湖州浩森科技股份有限公司 Laser cutting machine air filter unit
CN107042136A (en) * 2017-03-05 2017-08-15 王杨 A kind of quick Traditional Chinese medicine tamping device
CN111609721A (en) * 2020-06-07 2020-09-01 刘巨光 Fume extractor for environment-friendly aluminum alloy melting furnace

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105833615A (en) * 2016-06-12 2016-08-10 成都恒力达科技有限公司 Air filtration and purification device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105833615A (en) * 2016-06-12 2016-08-10 成都恒力达科技有限公司 Air filtration and purification device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106624383A (en) * 2017-02-24 2017-05-10 湖州浩森科技股份有限公司 Laser cutting machine air filter unit
CN107042136A (en) * 2017-03-05 2017-08-15 王杨 A kind of quick Traditional Chinese medicine tamping device
CN111609721A (en) * 2020-06-07 2020-09-01 刘巨光 Fume extractor for environment-friendly aluminum alloy melting furnace

Similar Documents

Publication Publication Date Title
CN105771518B (en) Dust treatment plant in a kind of ore processing
CN105771529A (en) Efficient environment-friendly indoor air purifying device
CN208694521U (en) A kind of energy saving and environment friendly weldering fume purifier
CN109985480A (en) Exhaust treatment system
CN106345212A (en) Industrial smoke purification equipment with high efficiency and environmental friendliness
CN106582173B (en) A kind of water-saving processing of stone dust collection processing equipment
CN106731393B (en) A kind of environment friendly dedusting device
CN201154284Y (en) Air filter
CN105597471A (en) Wet net type dust collection device
CN209392937U (en) A kind of environmental protection air filter
CN105944460A (en) Waste gas purifying device for boiler
CN106606915B (en) A kind of efficient industrial fumes energy-saving and purifying system
CN208082774U (en) A kind of spray room ventilation equipment
CN202683582U (en) Dust and waste gas treatment device
CN106606913A (en) Dust purification equipment for furniture and building material production
CN107081035A (en) A kind of flue gas purifying equipment of biomass boiler high-efficiency environment friendly
CN206138932U (en) Industrial waste gas filtration treatment ware
CN209519497U (en) A kind of waste gas treatment equipment for industry environmental protection
CN206055791U (en) A kind of multifunctional purifying machine
CN207871816U (en) A kind of simple waste gas treatment equipment
CN207214281U (en) A kind of air purifier for being easy to use and there is gas alarm function
CN206138931U (en) Efficient exhaust gases filter clarifier
CN206454444U (en) A kind of environmentally friendly flue-gas purification treatment device
CN202122893U (en) Oil smoke-removing and dust-removing dual-purpose machine
CN206867887U (en) A kind of environmentally friendly building engineering construction air cleaning facility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170125