CN106582173B - A kind of water-saving processing of stone dust collection processing equipment - Google Patents
A kind of water-saving processing of stone dust collection processing equipment Download PDFInfo
- Publication number
- CN106582173B CN106582173B CN201611165138.2A CN201611165138A CN106582173B CN 106582173 B CN106582173 B CN 106582173B CN 201611165138 A CN201611165138 A CN 201611165138A CN 106582173 B CN106582173 B CN 106582173B
- Authority
- CN
- China
- Prior art keywords
- framework
- fixedly connected
- spring
- filter screen
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/60—Combinations of devices covered by groups B01D46/00 and B01D47/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B15/00—Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
- B08B15/04—Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area from a small area, e.g. a tool
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Filtration Of Liquid (AREA)
Abstract
A kind of water-saving processing of stone dust collection processing equipment, including bottom plate, first frame device, electric cylinders device, second framework device, electric machine, third frame device, purifier, air extractor and watering device, bottom plate is equipped with the first supporting block, first idler wheel, first support bar, first brace, first bent stick, first frame device includes the first framework, first fixed block, first filter screen, first spring, first pipe, first valve, electric cylinders device includes electric cylinders, first support, catch bar, piston, second framework device includes second framework, second pipe, second valve, first baffle, second spring, elastic plate, first sealing block, first connection ring, third spring and corner block, electric machine includes motor, output shaft, second brace, second idler wheel, first bracing wire and third brace.The present invention can suck the dust generated in stone machining processing, then carry out thorough purified treatment to it, dispose the dust in air.
Description
Technical field
The present invention relates to processing of stone machinery technical field, more particularly, to a kind of water-saving processing of stone dust collection
Processing equipment.
Background technology
At present, stone material can generate a large amount of dust in process, if do not handled it, can not only influence stone
The working process of material, but also the health of operating personnel can be endangered.Existing dedusting method mainly uses fan by workshop
Interior dust is blown away, and this dedusting method efficiency is low, but also can cause environmental pollution, not environmentally.
Therefore, it is necessary to a kind of new technical solution is provided to overcome drawbacks described above.
Invention content
The purpose of the present invention is to provide a kind of water-saving processing of stone dust that can effectively solve above-mentioned technical problem
Collect processing equipment.
To reach the purpose of the present invention, adopt the following technical scheme that:
A kind of water-saving processing of stone dust collection processing equipment, the water-saving processing of stone are handled with dust collection
Equipment includes bottom plate, the first frame device above the bottom plate, the electric cylinders dress being set on first frame device
Put, the second framework device above first frame device, the electric machine being set on the second framework device,
Third frame device above the second framework device, the purifier being set in the third frame device, position
Air extractor on the right side of the third frame device and the watering device above the third frame device, the bottom plate
It is equipped with the first supporting block for being disposed below the left and right sides, the first idler wheel below first supporting block, positioned at it
First support bar at left and right sides of top, the first brace on the left of the first support bar, positioned at the first support bar
First bent stick on right side, first frame device include the first framework, are contained in both sides above and below in first framework
First fixed block, the first filter screen on the right side of first fixed block, the first bullet on the right side of first filter screen
Spring, the first pipe below first framework, the first valve being set in the first pipe, the electric cylinders device
Including electric cylinders, positioned at the first support of both sides, the catch bar on the right side of the electric cylinders above and below the electric cylinders, positioned at the promotion
Piston on the right side of bar, the second framework device include second framework, the second pipe on the left of the second framework, setting
In on the second pipe the second valve, be contained in the second framework first baffle, on the first baffle
Side second spring, the elastic plate on the right side of the first baffle, positioned at the elastic plate left end the first sealing block, be located at
The first connection ring below first sealing block, the third spring above the elastic plate and positioned at the third spring
The corner block on right side, the electric machine include motor, the output shaft being set on the motor, below the motor
Second brace, the second idler wheel for being set to the second brace lower end, the first bracing wire being set on the output shaft and it is located at
Third brace below the motor, the third frame device include third framework, the below the third framework
Two filter screens, the third pipeline above second filter screen, the second fixed block, above the third framework into
Bucket, positioned at second bent stick at left and right sides of bucket, the 4th pipeline on the right side of the third framework, be set to
Third valve on 4th pipeline, the purifier include third filter screen, a left side below the third filter screen
Concentrate block, the 4th spring below the concentration block, the first transverse slat below the 4th spring, position in right both sides
The 4th filter screen at left and right sides of first transverse slat, the third idler wheel between the concentration block are set to described the
Bristle on three idler wheels, the air extractor includes exhaust tube, the 4th valve, the wind turbine being set on the exhaust tube, described
Watering device include the first fixed frame, the watering frame being set on first fixed frame, be contained in it is described sprinkle water in frame the
Five springs, the second transverse slat below the 5th spring, positioned at it is described watering frame below the 5th filter screen, positioned at described
Watering frame above the 5th pipeline, be set on the 5th pipeline water pump, the second fixed frame on the left of the water pump,
Fixed link below second fixed frame and the 5th valve being set on the 5th pipeline.
The upper surface of first supporting block is fixedly connected with the lower surface of the bottom plate, the following table of first supporting block
Face is equipped with the first groove, and first idler wheel is in cylinder, first idler wheel be contained in first groove and with it is described
First supporting block is pivotally connected, there are two the first support bar is set, the first support bar in cuboid and it is vertical place, institute
The lower end for stating first support bar is fixedly connected with the bottom plate, and first brace is oblique, the lower end of first brace
It is fixedly connected with the bottom plate, the lower end of first brace is fixedly connected with the bottom plate, and first bent stick is in bending
Shape, the lower end of first bent stick are fixedly connected with the bottom plate.
For first framework in hollow cuboid and horizontal positioned, first framework is equipped with surface disposed thereon
First through hole, the second through-hole positioned at its right surface and the third through-hole positioned at its lower surface, the upper end of the first support bar
It being fixedly connected with the lower surface of first framework, there are two first fixed block is set, first fixed block is in cuboid,
One end of first fixed block is fixedly connected with the inner surface of first framework, and first filter screen is in cuboid and erects
Straight to place, the side of first filter screen and the inner surface of first framework are slidably connected, and first spring is equipped with two
A, first spring is horizontal, and the left end of first spring is fixedly connected with first filter screen, first bullet
The right end of spring is fixedly connected with the inner surface of first framework, the upper end of the first pipe be aligned the third through-hole and with
The lower surface of first framework is fixedly connected, and the upper end of first bent stick is fixedly connected with the first pipe.
The electric cylinders are located at the left side of first framework, and there are two the first support is set, the first support is in recessed
Font, one end of the first support are fixedly connected with the electric cylinders, the other end of the first support and first framework
It is fixedly connected, the upper end of first brace is fixedly connected with the first support, and the catch bar is put in cylinder and level
It puts, the left end of the catch bar is connect with the electric cylinders, and the right end of the catch bar is fixedly connected with the left surface of the piston,
The catch bar runs through the surfaces externally and internally of first framework and is slidably connected with it, and the piston is in cuboid and puts vertically
It puts, the side of the piston and the inner surface of first framework are slidably connected.
The second framework is in hollow cuboid and places vertically, and first is logical described in the lower end aligned of the second framework
It hole and being fixedly connected with the upper surface of first framework, the second framework is equipped with the fourth hole positioned at its left surface,
It fourth hole described in the lower end aligned of the second pipe and is fixedly connected with the left surface of the second framework, the first gear
In cuboid and horizontal positioned, the left end of the first baffle is fixedly connected plate with the inner surface of the second framework, and described the
Two springs are in vertical shape, and the lower end of the second spring is fixedly connected with the first baffle, and the elastic plate is in cuboid, institute
The right end for stating elastic plate is fixedly connected with the inner surface of the second framework, first sealing block be in cuboid, described first
The right surface of sealing block is fixedly connected with the left surface of the elastic plate, left surface and the first gear of first sealing block
The right surface of plate is slidably connected, and first connection ring is in semi-annular shape, the left end of first connection ring and described first close
The lower surface of envelope block is fixedly connected, and the right end of first connection ring is fixedly connected with the elastic plate, the third spring
Lower end is fixedly connected with the elastic plate, the rectangular triangle in cross section of the corner block, the right surface of the corner block with
The inner surface of the second framework is fixedly connected, and the lower surface of the corner block is connect with the upper surface slide of the elastic plate.
The left surface of the motor is fixedly connected with the right surface of the second framework, and the output shaft is in cylinder, institute
The one end for stating output shaft is connect with the motor, and second brace is oblique, the upper end of second brace and described the
The right surface of two frameworks is fixedly connected, and the lower end of second brace is equipped with the second groove, and second idler wheel is in cylinder, institute
The second idler wheel is stated to be contained in second groove and be pivotally connected with second brace, the upper end of first bracing wire and institute
It states output shaft to be fixedly connected, the lower end of first bracing wire is fixedly connected with first connection ring, and first bracing wire runs through
It the surfaces externally and internally of the second framework and is slidably connected with it, the third brace is oblique, the lower end of the third brace
It is fixedly connected with the upper surface of first framework, the upper end of the third brace is fixedly connected with the lower surface of the motor.
For the third framework in hollow cuboid and vertical placement, the lower end of the third framework is contained in described second
It is fixedly connected in framework and with the inner surface of the second framework, the third framework is equipped with leads to positioned at the 5th of its right surface
Hole and the 6th through-hole above the fifth hole, second filter screen is in cuboid and horizontal positioned, and described second
The upper surface of filter screen is fixedly connected with the lower surface of the third framework, the side of second filter screen and second frame
The inner surface of body is fixedly connected, and the upper end of the second spring and third spring is fixedly connected with second filter screen, described
Third pipeline is in bending, and the upper end of the third pipeline is directed at the fifth hole and consolidates with the inner surface of the third framework
Fixed connection, the lower end of the third pipeline are fixedly connected with the upper surface of second filter screen, and second fixed block is in length
Cube, the left end of second fixed block are fixedly connected with the inner surface of the third framework, the lower surface into bucket with
The upper surface of the third framework is fixedly connected, and there are two second bent stick is set, second bent stick is in bending, institute
The upper end for stating the second bent stick is fixedly connected with described into bucket, the lower end of second bent stick and the side of the third framework
Face is fixedly connected, and the 6th through-hole described in the end alignment of the 4th pipeline and being fixed with the right surface of the third framework connects
It connects.
The third filter screen is in bending, and the side of the third filter screen and the inner surface of the third framework are fixed
Connection, the rectangular triangle in cross section for concentrating block are described that the side of block and the inner surface of the third framework is concentrated to consolidate
Fixed connection, there are two the upper surface for concentrating block is oblique, and the 4th spring is set, the 4th spring is in vertical shape,
The upper end of 4th spring is fixedly connected with the concentration block, and the lower end of the 4th spring is fixed with first transverse slat to be connected
It connects, first transverse slat is in cuboid and horizontal positioned, and first transverse slat is between the 6th through-hole, the 4th mistake
Strainer sets there are two and is located at the left and right sides of first transverse slat respectively, and the 4th filter screen is put in cuboid and level
Put, one end of the 4th filter screen is fixedly connected with the side of first transverse slat, the other end of the 4th filter screen with
The inner surface of the third framework is slidably connected, and the third idler wheel is in cylinder, the third idler wheel and the third framework
It is pivotally connected, the third idler wheel is located between the concentration block, and the bristle is equipped with several, and the bristle is evenly distributed on
On the third idler wheel, the bristle is fixedly connected with the third idler wheel.
It fifth hole described in the lower end aligned of the exhaust tube and is fixedly connected with the right surface of the third framework.
First fixed frame is L-shaped, and the lower end of first fixed frame is fixedly connected with the upper surface into bucket,
The upper end of first fixed frame is fixedly connected with the left surface of the watering frame, and the watering frame is in hollow cylinder, institute
State that watering frame is horizontal positioned, the upper surface of the watering frame is equipped with the 7th through-hole, there are two the 5th spring is set, the described 5th
Spring is in vertical shape, and the upper end of the 5th spring is fixedly connected with the inner surface of the watering frame, under the 5th spring
End is fixedly connected with the upper surface of second transverse slat, and second transverse slat is in cylinder and horizontal positioned, second transverse slat
Positioned at the lower section of the 7th through-hole, the 5th filter screen in cylinder and horizontal positioned, the lower surface of the watering frame with
The upper surface of 5th filter screen is fixedly connected, the upper end of the 5th pipeline be aligned the 7th through-hole and with the watering
The upper surface of frame is fixedly connected, the second through-hole described in the lower end aligned of the 5th pipeline and with the right surface of first framework
It is fixedly connected, second fixed frame is in zigzag, and the left end of second fixed frame is fixedly connected with the third framework, institute
The right end for stating the second fixed frame is fixedly connected with the water pump, and the fixed link is oblique, the lower end of the fixed link and institute
It states third framework to be fixedly connected, the upper end of the fixed link is fixedly connected with second fixed frame.
Compared with prior art, the present invention has the advantages that:The water-saving processing of stone dust collection of the present invention
Processing equipment can suck the dust generated in stone machining processing, then carry out thorough purified treatment to it, dispose
Dust in air prevents dust to be directly discharged to pollute the environment in air, and purification efficiency is high, and clean-up effect
It is good, it is ensured that the health of worker.And the water for being used to purify can be recycled, save water resource, reduced
The waste of resource.
Description of the drawings
Fig. 1 is the structure diagram of the water-saving processing of stone dust collection processing equipment of the present invention.
Specific embodiment
The water-saving processing of stone of the present invention is made with dust collection processing equipment below in conjunction with attached drawing clearly complete
Explanation.
As shown in Figure 1, the present invention water-saving processing of stone dust collection processing equipment includes bottom plate 1, positioned at the bottom
First frame device 2 of the top of plate 1, the electric cylinders device 3 being set on first frame device 2, positioned at first framework
The second framework device 4 of the top of device 2, the electric machine 5 being set on the second framework device 4, positioned at second frame
The third frame device 6 of the top of body device 4, the purifier 7 being set in the third frame device 6, positioned at the third
The air extractor 8 and the watering device 9 above the third frame device 6 on 6 right side of frame device.
As shown in Figure 1, the bottom plate 1, in cuboid and horizontal positioned, the bottom plate 1, which is equipped with, is disposed below left and right two
First supporting block 11 of side, positioned at first supporting block, 11 lower section the first idler wheel 12, be positioned above the of the left and right sides
One supporting rod 13, the first brace 14 positioned at 13 left side of the first support bar, the positioned at 13 right side of first support bar
One bent stick 15.The upper surface of first supporting block 11 is fixedly connected with the lower surface of the bottom plate 1, first supporting block
11 lower surface is equipped with the first groove 111.First idler wheel 12 is in cylinder, and first idler wheel 12 is contained in described first
It is pivotally connected in groove and with first supporting block 11 so that first idler wheel 12 can be in the first groove inward turning
Turn.There are two the first support bar 13 is set, the first support bar 11 is in cuboid and vertical placement, the first support bar
11 lower end is fixedly connected with the bottom plate 1.First brace 14 is oblique, the lower end of first brace 14 with it is described
Bottom plate 1 is fixedly connected, and the lower end of first brace 14 is fixedly connected with the bottom plate 1.First bent stick 15 is in bending
Shape, the lower end of first bent stick 15 are fixedly connected with the bottom plate 1.
As shown in Figure 1, first frame device 2 includes the first framework 21, is contained in first framework 21 up and down
First fixed block 22 of both sides, positioned at first filter screen 23 on first fixed block, 22 right side, positioned at first filter screen
First spring 24 on 23 right sides, is set in the first pipe 25 first pipe 25 below first framework 21
The first valve 26.In hollow cuboid and horizontal positioned, first framework 21 is equipped with to be located at first framework 21
The first through hole 211 of its upper surface, the second through-hole 212 positioned at its right surface and the third through-hole 213 positioned at its lower surface, institute
It states first through hole 211 to be square and communicate with the inside of first framework 21, second through-hole 212 and third through-hole 213
It is rounded and communicated with the inside of first framework 21, the upper end of the first support bar 13 under first framework 21
Surface is fixedly connected.There are two first fixed block 22 is set, first fixed block 22 is in cuboid, first fixed block
22 one end is fixedly connected with the inner surface of first framework 21.First filter screen 23 is in cuboid and places vertically,
The side of first filter screen 23 and the inner surface of first framework 21 are slidably connected so that first filter screen 21 can
To be moved left and right in first framework 21.There are two first spring 24 is set, first spring 24 is horizontal, institute
The left end for stating the first spring 24 is fixedly connected with first filter screen 23, the right end of first spring 24 and first frame
The inner surface of body 21 is fixedly connected.The upper end of the first pipe 25 be aligned the third through-hole 213 and with first framework
21 lower surface is fixedly connected so that and the inside of the first pipe 25 is communicated with the inside of first framework 21, and described
The upper end of one bent stick 15 is fixedly connected with the first pipe 25.First valve 26 is used to control the first pipe 25
The flow of interior water.
As shown in Figure 1, the electric cylinders device 3 include electric cylinders 31, positioned at electric cylinders both sides about 31 first support 32,
Catch bar 33 positioned at 31 right side of electric cylinders, the piston 34 positioned at 33 right side of catch bar.The electric cylinders 31 connect with power supply
It connecing so that it can which normal operation, the electric cylinders 31 are located at the left side of first framework 21, the electric cylinders 31 are equipped with switch,
It is facilitated to open or close.There are two the first support 32 is set, the first support 32 is in concave shape, the first support
32 one end is fixedly connected with the electric cylinders 31, and the other end of the first support 32 is fixedly connected with first framework 31,
The upper end of first brace 14 is fixedly connected with the first support 32.The catch bar 33 in cylinder and horizontal positioned,
The left end of the catch bar 33 is connect with the electric cylinders 31 so that the electric cylinders 31 can drive 33 or so the shifting of catch bar
Dynamic, the right end of the catch bar 33 is fixedly connected with the left surface of the piston 34, and the catch bar 33 runs through first frame
It the surfaces externally and internally of body 21 and is slidably connected with it so that the catch bar 33 can move left and right.The piston 34 is in cuboid
And vertical placement, the side of the piston 34 and the inner surface of first framework 21 are slidably connected, the piston 34 can push up
It leans against on first fixed block 22, first fixed block 22 can prevent the piston 34 to be excessively moved to the left.
As shown in Figure 1, the second framework device 4 includes second framework 41, the positioned at 41 left side of the second framework
Two pipelines 42, the second valve 43 being set on the second pipe 42, the first baffle being contained in the second framework 41
44th, the second spring 45 above the first baffle 44, positioned at the elastic plate 46 on 44 right side of the first baffle, positioned at institute
State the first sealing block 47 of 46 left end of elastic plate, positioned at the first connection ring 48 of first sealing block, 47 lower section, positioned at described
The third spring 49 of 46 top of elastic plate and the corner block 40 positioned at 49 right side of third spring.The second framework 41 is in sky
The cuboid of the heart and it is vertical place, the upper and lower surface of the second framework 41 communicates, the lower end aligned institute of the second framework 41
It states first through hole 211 and is fixedly connected with the upper surface of first framework 21 so that the inside of the second framework 41 and institute
The inside for stating the first framework 21 communicates, the second framework 41 be equipped with positioned at its left surface fourth hole 411, the described 4th
Through-hole 411 is rounded and is communicated with the inside of the second framework 41.Four-way described in the lower end aligned of the second pipe 42
It hole 411 and is fixedly connected with the left surface of the second framework 41 so that the inside of the second pipe 42 and second frame
The inside of body 41 communicates.Second valve 43 is used to control the flow of water in the second pipe 42.The first baffle 44
In cuboid and horizontal positioned, the left end of the first baffle 44 is fixedly connected with the inner surface of the second framework 41, described
The front and rear surfaces of first baffle 44 are fixedly connected with the inner surface of the second framework 41.The second spring 45 is in vertical shape,
The lower end of the second spring 45 is fixedly connected with the first baffle 44.The elastic plate 46 is in cuboid, the elastic plate
46 right end is fixedly connected with the inner surface of the second framework 41, front and rear surfaces and the second framework of the elastic plate 46
41 inner surface is slidably connected, and the elastic plate 46 is made using elastic material so that it can flexural deformation.First sealing
Block 47 is in cuboid, and the right surface of first sealing block 47 is fixedly connected with the left surface of the elastic plate 46, and described first
The left surface of sealing block 47 and the right surface of the first baffle 44 are slidably connected, the front and rear surfaces of first sealing block 47 with
The inner surface of the second framework 41 is slidably connected.First connection ring 48 is in semi-annular shape, first connection ring 48
Left end is fixedly connected with the lower surface of first sealing block 47, and the right end of first connection ring 48 is solid with the elastic plate 46
Fixed connection.The lower end of the third spring 49 is fixedly connected with the elastic plate 46.The cross section of the corner block 40 is rectangular
Triangle, the right surface of the corner block 40 are fixedly connected with the inner surface of the second framework 41, under the corner block 40
Surface is connect with the upper surface slide of the elastic plate 46, and the corner block 40 can prevent the elastic plate 46 to be bent upwards.
As shown in Figure 1, the electric machine 5 includes motor 51, the output shaft 52 being set on the motor 51, positioned at institute
The second brace 53 for stating 51 lower section of motor, is set to the output at the second idler wheel 54 for being set to 53 lower end of the second brace
The first bracing wire 55 on axis 52 and the third brace 56 positioned at 51 lower section of motor.The motor 51 is connect with power supply, makes it
Can be with normal operation, the motor 51 is equipped with switch, it is facilitated to open or close, the left surface of the motor 51 with it is described
The right surface of second framework 41 is fixedly connected.The output shaft 52 is in cylinder, one end of the output shaft 52 and the motor
51 connections so that the motor 51 drives the output shaft 52 to rotate.Second brace 53 is oblique, second brace
53 upper end is fixedly connected with the right surface of the second framework 41, and the lower end of second brace 53 is equipped with the second groove.Institute
The second idler wheel 54 is stated in cylinder, second idler wheel 54 be contained in second groove and with 53 pivot of the second brace
Connection so that second idler wheel 54 can rotate in second groove.The upper end of first bracing wire 55 with it is described defeated
Shaft 52 is fixedly connected, and the lower end of first bracing wire 55 is fixedly connected with first connection ring 48, first bracing wire 55
Through the second framework 41 surfaces externally and internally and be slidably connected with it so that first bracing wire 55 can move left and right.Institute
It is oblique to state third brace 56, the lower end of the third brace 56 is fixedly connected with the upper surface of first framework 21, institute
The upper end for stating third brace 56 is fixedly connected with the lower surface of the motor 51, and then is played a supporting role to the motor 51.
As shown in Figure 1, the third frame device 6 includes third framework 61, the positioned at 61 lower section of the third framework
Two filter screens 62, the third pipeline 63 above second filter screen 62, the second fixed block 64, positioned at the third framework
61 tops into bucket 65, positioned at it is described into the second bent stick 66 of the left and right sides of bucket 65, it is right positioned at the third framework 61
4th pipeline 67 of side, the third valve 68 being set on the 4th pipeline 67.The third framework 61 is in hollow rectangular
Body and it is vertical place, the lower end of the third framework 61 be contained in the second framework 41 and in the second framework 41
Surface is fixedly connected, and the third framework 61 is equipped with positioned at the fifth hole 611 on its right surface and positioned at the fifth hole
6th through-hole 612 of 611 tops, the fifth hole 611 is rounded and is communicated with the inside of the third framework 61, and described the
Six through-holes 612 set there are two and up and down place, the 6th through-hole 612 it is rounded and with the inside phase of the third framework 61
It is logical.Second filter screen 62 is in cuboid and horizontal positioned, the upper surface of second filter screen 62 and the third framework
61 lower surface is fixedly connected, and the side of second filter screen 62 is fixedly connected with the inner surface of the second framework 41, institute
The upper end for stating second spring 45 and third spring 49 is fixedly connected with second filter screen 62.The third pipeline 63 is in bending
Shape, the upper end of the third pipeline 63 are directed at the fifth hole 611 and are fixedly connected with the inner surface of the third framework 61,
The inside of the third pipeline 63 is communicated with the inside of the fifth hole 611, the lower end of the third pipeline 63 and described the
The upper surface of two filter screens 62 is fixedly connected.Second fixed block 64 be in cuboid, the left end of second fixed block 64 with
The inner surface of the third framework 61 is fixedly connected, and second fixed block 64 is in same with underlying 6th through-hole 612
One height.The upper and lower surface into bucket 65 communicates, and the cross section of the water inlet 65 is described into bucket 65 in isosceles trapezoid
Lower surface is fixedly connected with the upper surface of the third framework 61 so that the inside into bucket 65 and the third framework 61
Inside communicate.There are two second bent stick 66 is set, second bent stick 66 is in bending, second bent stick 66
Upper end be fixedly connected with described into bucket 65, the lower end of second bent stick 66 and the side of the third framework 61 are fixed
Connection.6th through-hole 612 described in the end alignment of 4th pipeline 67 and being fixed with the right surface of the third framework 61 connects
It connects, the inside of the 4th pipeline 67 is communicated with the inside of the third framework 61.The third valve 68 is described for controlling
The flow of water in 4th pipeline 67.
As shown in Figure 1, the purifier 7 includes third filter screen 71, positioned at the 71 lower section left and right of third filter screen
Concentrate block 72, the 4th spring 73 below the concentration block 72, first positioned at 73 lower section of the 4th spring in both sides
Transverse slat 74, the 4th filter screen 75 positioned at 74 left and right sides of the first transverse slat, the third rolling between the concentration block 72
Wheel 76, the bristle 77 being set on the third idler wheel 76.The third filter screen 71 is in bending, the third filtering
The side of net 71 is fixedly connected with the inner surface of the third framework 61.The concentration block 72, which is set there are two, and left and right is opposite puts
It puts, the rectangular triangle in cross section for concentrating block 72, the side of the concentration block 72 and the interior table of the third framework 71
Face is fixedly connected, and the upper surface for concentrating block 72 is oblique.There are two 4th spring 73 is set, the 4th spring 73
In vertical shape, the upper end of the 4th spring 73 is fixedly connected with the concentration block 72, the lower end of the 4th spring 73 and institute
The first transverse slat 74 is stated to be fixedly connected.First transverse slat 74 is in cuboid and horizontal positioned, the front and rear table of first transverse slat 74
Face and the inner surface of the third framework 61 are slidably connected, and first transverse slat 74 is between the 6th through-hole 612.It is described
4th filter screen 75 sets there are two and is located at the left and right sides of first transverse slat 74 respectively, and the 4th filter screen 75 is in rectangular
Body and horizontal positioned, one end of the 4th filter screen 75 is fixedly connected with the side of first transverse slat 74, the 4th mistake
The other end of strainer 75 and the inner surface of the third framework 61 are slidably connected.The third idler wheel 76 is in cylinder, and described the
Three idler wheels 76 are pivotally connected with the third framework 61 so that the third idler wheel 76 can be in 61 inward turning of third framework
Turn, the third idler wheel 76 is connect with motor, and the third idler wheel 76 is driven to rotate, and the third idler wheel 76 is located at the concentration
Between block 72.The bristle 77 is equipped with several, and the bristle 77 is evenly distributed on the third idler wheel 76, the bristle 77
It is fixedly connected with the third idler wheel 76, the bristle 77 can be contacted with the concentration block 72.
As shown in Figure 1, the air extractor 8 include exhaust tube 81, be set on the exhaust tube 81 the 4th valve 82,
Wind turbine 83.Fifth hole 611 described in the lower end aligned of the exhaust tube 81 and being fixed with the right surface of the third framework 61 connects
It connects so that the inside of the exhaust tube 81 is communicated with the inside of the third framework 61.4th valve 82 is used to control institute
State the flow of gas in exhaust tube 81.The wind turbine 83 is connect with power supply so that it can which normal operation, the wind turbine 83 are equipped with
Switch facilitates it to open or close.
As shown in Figure 1, the watering device 9 includes the first fixed frame 91, is set to spilling on first fixed frame 91
Water frame 92, the 5th spring 93 being contained in the watering frame 91, the second transverse slat 94 positioned at 93 lower section of the 5th spring, position
The 5th filter screen 95 in watering frame 92 lower section, the 5th pipeline 96 above the watering frame 92, be set to described in
Water pump 97 on 5th pipeline 96, positioned at second fixed frame 98 in 97 left side of water pump, under second fixed frame 98
The fixed link 99 of side and the 5th valve 90 being set on the 5th pipeline 96.First fixed frame 91 is L-shaped, and described
The lower end of one fixed frame 91 is fixedly connected with the upper surface into bucket 65, and the upper end of first fixed frame 91 is spilt with described
The left surface of water frame 92 is fixedly connected.For the watering frame 92 in hollow cylinder, the watering frame 92 is horizontal positioned, described to spill
The lower end of water frame 92 is equipped with opening, and the cross section of the watering frame 92 is in inverted concave shape, the upper surface of the watering frame 92
Equipped with the 7th through-hole 921, the 7th through-hole 921 is rounded and is communicated with the inside of the watering frame 92.5th spring
93 set there are two, the 5th spring 93 be in vertical shape, the upper end of the 5th spring 93 with it is described watering frame 92 inner surface
It is fixedly connected, the lower end of the 5th spring 93 is fixedly connected with the upper surface of second transverse slat 94.Second transverse slat 94
In cylinder and horizontal positioned, second transverse slat 94 is located at the lower section of the 7th through-hole 921.5th filter screen 95 is in
Cylinder and horizontal positioned, the lower surface of the watering frame 92 are fixedly connected with the upper surface of the 5th filter screen 95.It is described
The upper end of 5th pipeline 96 is directed at the 7th through-hole 921 and is fixedly connected with the upper surface of the watering frame 92 so that described
The inside of 5th pipeline 96 is communicated with the inside of the watering frame 92, the second through-hole described in the lower end aligned of the 5th pipeline 96
It 212 and is fixedly connected with the right surface of first framework 21 so that the inside of the 5th pipeline 96 and first framework
21 inside communicates.The water pump 97 is connect with power supply so that it can which normal operation, the water pump 97 is equipped with switch, convenient
It is opened or closes, and the water pump 97 can cause the water in first framework 21 to be drawn into the 5th pipeline 96
It is interior, then into the watering frame 92.Second fixed frame 98 be in zigzag, the left end of second fixed frame 98 with
The third framework 61 is fixedly connected, and the right end of second fixed frame 98 is fixedly connected with the water pump 97.The fixed link
99 is oblique, and the lower end of the fixed link 99 is fixedly connected with the third framework 61, the upper end of the fixed link 99 and institute
The second fixed frame 98 is stated to be fixedly connected.5th valve 90 is used to control the flow of water in the 5th pipeline 96.
As shown in Figure 1, the water-saving processing of stone dust collection processing equipment of the present invention is in use, be first turned on
Two valves 43 will pour into for the water of purification from the upper end of the second pipe 42, then into the second framework 41,
Water is entered from the first through hole 211 in first framework 21.Then institute is entered by the filtering of the first filter screen 23
State the right side of the first filter screen 23.The switch of water pump 97 is opened at this time so that water enters described the from first framework 21
In five pipelines 96, the 5th valve 90 is opened so that water is entered from the 5th pipeline 96 in the watering frame 92, is then slid over described
The upper surface of second transverse slat 94 disperses around, is then entered after the filtering of the 5th filter screen 95 described into bucket
In 65, water can be caused uniformly to be sprinkled at this time described into bucket 65, then into the third framework 61, Ran Houjing
It crosses after the filtering of the third filter screen 71 and enters the lower section of the third filter screen 71, at this time 71 quilt of third filter screen
It soaks so that the third filter screen 71 is more preferable to the clean-up effect of air.Then bristle 77 is wetted, and third described in Scirpus tabernaemontani
The lower section of the third idler wheel 76 is entered between idler wheel 76 and concentration block 72, is then slid over the upper surface of first transverse slat 74
It flows away, is then entered below after the filtering of the 4th filter screen 75 around, then by the described second filtering
It is entered after the filtering of net 62 in the second framework 41, and focuses on the first baffle 44, the sealing of elastic plate 46 and first
The top of block 47.It is moved down under first transverse slat 74 pressure effect overboard under so that the 4th filter screen 75 pushes up
Lean against on second fixed block 64, at this time 74 and the 4th filter screen 75 of the second transverse slat be in the 6th through-hole 612 it
Between.Then the switch of wind turbine 83 is opened at this time, and opens the 4th valve 82 so that the dust generated in processing of stone engineering is taken out
Enter into the exhaust tube 81, then into the third pipeline 63, then by the filtering of second filter screen 62
It is entered afterwards in the second framework 41 and positioned at the lower section of second filter screen 62, the second filter screen 62 at this time is immersed
It is wet so that its clean-up effect to dust is more preferable, and air at this time and first baffle 44,46 and first sealing block of elastic plate
The water contact that 47 tops are concentrated, and then most dust impurities in air can be disposed.Then air again passes by described
The top of second filter screen 62 is entered after the filtering of second filter screen 62, the second filter screen 62 soaked can be disposed
Most dust impurity in air, then air it is horizontal that described first is entered after the filtering of the 4th filter screen 75 soaked
The top of plate 74, then between the concentration block 72.The motor being connect with third idler wheel 76 is opened at this time so that described
Third idler wheel 76 rotates, so that the bristle 77 rotates with, the bristle 77 soaked rotates between the concentration block 72,
It is allow to adsorb most dust impurities in air, and since block 72 being concentrated to focus on air among it so that brush
The clean-up effect of 77 pairs of dust of hair is more preferable.Then air is into its top is entered after the filtering of excessively described third filter screen 71, so
It is discharged afterwards from described into bucket 65, the dust content in the air discharged at this time is extremely low, meets the request of discharge.When described first
When water on baffle 44,46 and first sealing block 47 of elastic plate is more, the switch of motor 51 is opened so that the output shaft 52 revolves
Turn, so that first bracing wire 55 is tightened up, so that first connection ring 48 moves down, so that described
The left end of elastic plate 46 and the first sealing block 47 move down so that water above it is from first sealing block 47 and elastic plate
46 upper surface be slipped to below that, then enter in first framework 21 by first through hole 211, then pass through
It enters in the 5th pipeline 96, is then re-introduced into the watering frame 92 after the filtering of first filter screen 23 so that
Water is sprinkled into described into bucket 65 again, then proceedes to be filtered only to entering the air in the third framework 61
Change.When the impurity in water is more, the first valve 26 is opened at this time so that the water in first framework 21 is managed from described first
Road 25 is discharged, and opens the switch of electric cylinders 31 so that the catch bar 33 moves right, so that the piston 34 is to the right
It is mobile, then the water in first framework 21 is pushed to the right, until by the water in the first framework 21 all from described first
Rack plating makes a noise and discharges in 25.When the water on the 4th filter screen 75 is more, and water surface elevation is less than the 6th through-hole 612 being located above
When, air below can not be entered from the 4th filter screen 75 above it, open third valve 68 at this time so that the 4th
The air of 75 lower section of filter screen enters the top of the 4th filter screen 75 from the 4th pipeline 67, accelerates the effect of its filtering
So far, the water-saving processing of stone of the present invention is finished rate with dust collection processing equipment using process description.
Claims (10)
1. a kind of water-saving processing of stone dust collection processing equipment, it is characterised in that:The water-saving processing of stone powder
Dirt collects processing equipment and includes bottom plate, the first frame device above the bottom plate, is set to first frame device
On electric cylinders device, the second framework device above first frame device, be set on the second framework device
Electric machine, the third frame device above the second framework device, be set in the third frame device
Purifier, the air extractor on the right side of the third frame device and the dress of the watering above the third frame device
It puts, the bottom plate is equipped with the first supporting block for being disposed below the left and right sides, first below first supporting block
Idler wheel, be positioned above the left and right sides first support bar, the first brace on the left of the first support bar, positioned at described
The first bent stick on the right side of first support bar, first frame device include the first framework, are contained in first framework
First fixed block of upper and lower both sides, the first filter screen on the right side of first fixed block, positioned at first filter screen right side
First spring of side, the first pipe below first framework, the first valve being set in the first pipe, institute
It states electric cylinders device and includes electric cylinders, positioned at the first support of both sides, the catch bar on the right side of the electric cylinders, position above and below the electric cylinders
Piston on the right side of the catch bar, the second framework device include second framework, the on the left of the second framework
Two pipelines, the second valve being set on the second pipe, the first baffle being contained in the second framework, positioned at described
Second spring above first baffle, the elastic plate on the right side of the first baffle, first positioned at the elastic plate left end
Sealing block, the first connection ring below first sealing block, the third spring above the elastic plate and it is located at
Corner block on the right side of the third spring, the electric machine include motor, the output shaft being set on the motor, positioned at institute
State the second brace below motor, the second idler wheel for being set to the second brace lower end, be set on the output shaft
One bracing wire and the third brace below the motor, the third frame device include third framework, positioned at the third
The second filter screen below framework, the third pipeline above second filter screen, the second fixed block, positioned at the third
Above framework into bucket, positioned at second bent stick at left and right sides of bucket, on the right side of the third framework
Four pipelines, the third valve being set on the 4th pipeline, the purifier include third filter screen, positioned at the third
The left and right sides concentrates block, the 4th spring below the concentration block, below the 4th spring below filter screen
The first transverse slat, the 4th filter screen at left and right sides of first transverse slat, positioned at it is described concentration block between third idler wheel,
The bristle being set on the third idler wheel, the air extractor include exhaust tube, the 4th valve being set on the exhaust tube
Door, wind turbine, the watering device include the first fixed frame, the watering frame being set on first fixed frame, be contained in it is described
The 5th spring in watering frame, the second transverse slat below the 5th spring, the 5th mistake below the watering frame
Strainer, the 5th pipeline above the watering frame, the water pump being set on the 5th pipeline, on the left of the water pump
The second fixed frame, the fixed link below second fixed frame and the 5th valve being set on the 5th pipeline.
2. water-saving processing of stone dust collection processing equipment as described in claim 1, it is characterised in that:Described first
The upper surface of bracer is fixedly connected with the lower surface of the bottom plate, and the lower surface of first supporting block is equipped with the first groove, institute
The first idler wheel is stated in cylinder, first idler wheel is contained in first groove and connects with the first supporting block pivot
Connect, there are two the first support bar is set, the first support bar in cuboid and it is vertical place, under the first support bar
End is fixedly connected with the bottom plate, and first brace is oblique, and the lower end of first brace is fixed with the bottom plate to be connected
It connects, the lower end of first brace is fixedly connected with the bottom plate, and first bent stick is in bending, first bent stick
Lower end be fixedly connected with the bottom plate.
3. water-saving processing of stone dust collection processing equipment as claimed in claim 2, it is characterised in that:First frame
For body in hollow cuboid and horizontal positioned, first framework is equipped with the first through hole on surface disposed thereon, positioned at its right side
Under second through-hole and the third through-hole positioned at its lower surface on surface, the upper end of the first support bar and first framework
Surface is fixedly connected, and there are two first fixed block is set, first fixed block is in cuboid, and the one of first fixed block
End is fixedly connected with the inner surface of first framework, and first filter screen is in cuboid and vertical placement, first mistake
The side of strainer and the inner surface of first framework are slidably connected, and there are two first spring is set, first spring is in
Horizontal, the left end of first spring is fixedly connected with first filter screen, the right end of first spring and described the
The inner surface of one framework is fixedly connected, the upper end of the first pipe be aligned the third through-hole and under first framework
Surface is fixedly connected, and the upper end of first bent stick is fixedly connected with the first pipe.
4. water-saving processing of stone dust collection processing equipment as claimed in claim 3, it is characterised in that:The electric cylinders position
In the left side of first framework, there are two the first support is set, the first support is in concave shape, the first support
One end is fixedly connected with the electric cylinders, and the other end of the first support is fixedly connected with first framework, and described first tiltedly
The upper end of bar is fixedly connected with the first support, and the catch bar is in cylinder and horizontal positioned, the left end of the catch bar
It is connect with the electric cylinders, the right end of the catch bar is fixedly connected with the left surface of the piston, and the catch bar is through described
The surfaces externally and internally of first framework and be slidably connected with it, the piston in cuboid and it is vertical place, the side of the piston with
The inner surface of first framework is slidably connected.
5. water-saving processing of stone dust collection processing equipment as claimed in claim 4, it is characterised in that:Second frame
Body in hollow cuboid and it is vertical place, first through hole described in the lower end aligned of the second framework and with first framework
Upper surface be fixedly connected, the second framework be equipped with positioned at its left surface fourth hole, the lower end of the second pipe
It is directed at the fourth hole and is fixedly connected with the left surface of the second framework, the first baffle is put in cuboid and level
It puts, the left end of the first baffle is fixedly connected with the inner surface of the second framework, and the second spring is in vertical shape, described
The lower end of second spring is fixedly connected with the first baffle, and the elastic plate is in cuboid, the right end of the elastic plate and institute
The inner surface for stating second framework is fixedly connected, and first sealing block is in cuboid, the right surface of first sealing block and institute
The left surface for stating elastic plate is fixedly connected, and the left surface of first sealing block is slided with the right surface of the first baffle to be connected
It connects, first connection ring is in semi-annular shape, and the left end of first connection ring and the lower surface of first sealing block are fixed
Connection, the right end of first connection ring are fixedly connected with the elastic plate, lower end and the elastic plate of the third spring
It is fixedly connected, the rectangular triangle in cross section of the corner block, the right surface of the corner block is interior with the second framework
Surface is fixedly connected, and the lower surface of the corner block is connect with the upper surface slide of the elastic plate.
6. water-saving processing of stone dust collection processing equipment as claimed in claim 5, it is characterised in that:The motor
Left surface is fixedly connected with the right surface of the second framework, and the output shaft is in cylinder, one end of the output shaft and institute
Motor connection is stated, second brace is oblique, and the upper end of second brace is fixed with the right surface of the second framework
Connection, the lower end of second brace are equipped with the second groove, and second idler wheel is in cylinder, and second idler wheel is contained in institute
It states in the second groove and is pivotally connected with second brace, the upper end of first bracing wire is fixedly connected with the output shaft,
The lower end of first bracing wire is fixedly connected with first connection ring, and first bracing wire is inside and outside through the second framework
It surface and is slidably connected with it, the third brace is oblique, and the lower end of the third brace is upper with first framework
Surface is fixedly connected, and the upper end of the third brace is fixedly connected with the lower surface of the motor.
7. water-saving processing of stone dust collection processing equipment as claimed in claim 6, it is characterised in that:The third frame
Body in hollow cuboid and it is vertical place, the lower end of the third framework is contained in the second framework and with described second
The inner surface of framework is fixedly connected, and the third framework is equipped with positioned at the fifth hole on its right surface and leads to positioned at the described 5th
The 6th through-hole above hole, second filter screen are in cuboid and horizontal positioned, the upper surface of second filter screen and institute
The lower surface for stating third framework is fixedly connected, and the side of second filter screen is fixed with the inner surface of the second framework to be connected
It connecing, the upper end of the second spring and third spring is fixedly connected with second filter screen, and the third pipeline is in bending,
The upper end of the third pipeline is directed at the fifth hole and is fixedly connected with the inner surface of the third framework, the third pipe
The lower end in road is fixedly connected with the upper surface of second filter screen, and second fixed block is in cuboid, and described second fixes
The left end of block is fixedly connected with the inner surface of the third framework, the lower surface into bucket and the upper table of the third framework
Face is fixedly connected, and there are two second bent stick is set, second bent stick is in bending, the upper end of second bent stick
It being fixedly connected with described into bucket, the lower end of second bent stick is fixedly connected with the side of the third framework, and described
It 6th through-hole described in the end alignment of four pipelines and is fixedly connected with the right surface of the third framework.
8. water-saving processing of stone dust collection processing equipment as claimed in claim 7, it is characterised in that:The third mistake
Strainer is in bending, and the side of the third filter screen is fixedly connected with the inner surface of the third framework, the concentration block
The rectangular triangle in cross section, the side for concentrating block are fixedly connected with the inner surface of the third framework, the concentration block
Upper surface it is oblique, there are two the 4th spring is set, the 4th spring is in vertical shape, the upper end of the 4th spring
It is fixedly connected with the concentration block, the lower end of the 4th spring is fixedly connected with first transverse slat, and first transverse slat is in
Cuboid and horizontal positioned, first transverse slat between the 6th through-hole, the 4th filter screen set there are two and point
Not Wei Yu first transverse slat the left and right sides, the 4th filter screen be in cuboid and horizontal positioned, the 4th filter screen
One end be fixedly connected with the side of first transverse slat, the other end of the 4th filter screen and the interior table of the third framework
Face is slidably connected, and the third idler wheel is in cylinder, and the third idler wheel is pivotally connected with the third framework, the third rolling
Wheel is located between the concentration block, and the bristle is equipped with several, and the bristle is evenly distributed on the third idler wheel, described
Bristle is fixedly connected with the third idler wheel.
9. water-saving processing of stone dust collection processing equipment as claimed in claim 8, it is characterised in that:The exhaust tube
Lower end aligned described in fifth hole and be fixedly connected with the right surface of the third framework.
10. water-saving processing of stone dust collection processing equipment as claimed in claim 9, it is characterised in that:Described first
Fixed frame is L-shaped, and the lower end of first fixed frame is fixedly connected with the upper surface into bucket, first fixed frame
Upper end is fixedly connected with the left surface of the watering frame, and the watering frame is in hollow cylinder, and the watering frame is horizontal positioned,
The upper surface of the watering frame is equipped with the 7th through-hole, and there are two the 5th spring is set, the 5th spring is in vertical shape, described
The upper end of 5th spring is fixedly connected with the inner surface of the watering frame, lower end and second transverse slat of the 5th spring
Upper surface is fixedly connected, and for second transverse slat in cylinder and horizontal positioned, second transverse slat is located at the 7th through-hole
Lower section, for the 5th filter screen in cylinder and horizontal positioned, the lower surface of the watering frame is upper with the 5th filter screen
Surface is fixedly connected, and the upper end of the 5th pipeline is directed at the 7th through-hole and fixes company with the upper surface of the watering frame
It connects, the second through-hole described in the lower end aligned of the 5th pipeline and is fixedly connected with the right surface of first framework, described
Two fixed frames are in zigzag, and the left end of second fixed frame is fixedly connected with the third framework, the right side of second fixed frame
End is fixedly connected with the water pump, and the fixed link is oblique, and the lower end of the fixed link is fixed with the third framework to be connected
It connects, the upper end of the fixed link is fixedly connected with second fixed frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611165138.2A CN106582173B (en) | 2016-12-16 | 2016-12-16 | A kind of water-saving processing of stone dust collection processing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611165138.2A CN106582173B (en) | 2016-12-16 | 2016-12-16 | A kind of water-saving processing of stone dust collection processing equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106582173A CN106582173A (en) | 2017-04-26 |
CN106582173B true CN106582173B (en) | 2018-06-26 |
Family
ID=58801873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611165138.2A Active CN106582173B (en) | 2016-12-16 | 2016-12-16 | A kind of water-saving processing of stone dust collection processing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106582173B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107309190A (en) * | 2017-06-30 | 2017-11-03 | 深圳市贝优通新能源技术开发有限公司 | A kind of biological particles processing equipment of the high-efficiency environment friendly of new energy field |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107413710B (en) * | 2017-06-19 | 2020-03-20 | 周舜 | Dust collecting equipment of lithium battery |
CN107081314B (en) * | 2017-06-29 | 2019-05-07 | 新昌县澄潭镇艺林机械厂 | A kind of building stones dust-extraction unit |
CN107376538B (en) * | 2017-07-31 | 2019-04-26 | 内乡县万鑫化冶有限公司 | A kind of mineral engineering of environment protection field mining site dry type iron powders reclaimer |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105854440B (en) * | 2016-06-12 | 2018-03-23 | 盐城远东化工有限公司 | A kind of industrial waste gas filtration purifier |
-
2016
- 2016-12-16 CN CN201611165138.2A patent/CN106582173B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107309190A (en) * | 2017-06-30 | 2017-11-03 | 深圳市贝优通新能源技术开发有限公司 | A kind of biological particles processing equipment of the high-efficiency environment friendly of new energy field |
Also Published As
Publication number | Publication date |
---|---|
CN106582173A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106582173B (en) | A kind of water-saving processing of stone dust collection processing equipment | |
CN210786692U (en) | Air purification device for machining workshop | |
CN107441863A (en) | A kind of air cleaning unit of high-efficiency environment friendly | |
CN107376561B (en) | The working method of dust treatment device in a kind of ore processing | |
CN105688504B (en) | A kind of water purification installation that can increase the service life | |
CN105771444B (en) | A kind of efficient flue gas dust collecting system | |
CN105854487A (en) | Chemical plant waste gas purification treatment device | |
CN106890527A (en) | A kind of air cleaning facility of handware atelier environmental protection | |
CN106731393B (en) | A kind of environment friendly dedusting device | |
CN208599283U (en) | A kind of sewage-treatment plant convenient for collecting chemical industry dirt | |
CN206970326U (en) | A kind of small-scale sewage clears up filter | |
CN208660539U (en) | A kind of environment protection sewage processing equipment that vibrating effect is good | |
CN207591524U (en) | A kind of air purification cleaner in the construction site of environmental protection | |
CN207295674U (en) | A kind of environmentally friendly sewage impurity removing equipment in hydraulic engineering field | |
CN107854913A (en) | A kind of environmentally friendly waste gas purification impurity removing equipment | |
CN106606913A (en) | Dust purification equipment for furniture and building material production | |
CN206008289U (en) | A kind of industrial dedusting device | |
CN106621676A (en) | Environment-friendly dust removing equipment for mechanical automation processing workshop | |
CN208757219U (en) | A kind of industrial waste gas treatment equipment convenient to use | |
CN106957114A (en) | A kind of wastewater purification equipment of field of machining | |
CN106731394A (en) | A kind of Environmental-protecting dust-removing equipment of building engineering construction | |
CN208762265U (en) | A kind of centrifugal type efficient sewage impurity treatment device | |
CN106582174A (en) | Efficient indoor environment-friendly air filter | |
CN207708740U (en) | A kind of air-filtering equipment used for air compressor | |
CN206454444U (en) | A kind of environmentally friendly flue-gas purification treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ye Sulian Inventor before: Zhang Ping |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180323 Address after: 516700 Guangdong city of Shanwei province Luhe County Town Village No. 33 Nan Wan shrimp Applicant after: Ye Sulian Address before: 518000 Guangdong Province, Shenzhen city Longgang District cloth Road Park four building 12 unit 1805 A Applicant before: Zhang Ping |
|
GR01 | Patent grant | ||
GR01 | Patent grant |