CN106246183B - A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing - Google Patents

A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing Download PDF

Info

Publication number
CN106246183B
CN106246183B CN201610589818.0A CN201610589818A CN106246183B CN 106246183 B CN106246183 B CN 106246183B CN 201610589818 A CN201610589818 A CN 201610589818A CN 106246183 B CN106246183 B CN 106246183B
Authority
CN
China
Prior art keywords
ore
caved
ore body
ellipsoid
formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610589818.0A
Other languages
Chinese (zh)
Other versions
CN106246183A (en
Inventor
张国建
李广辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Liaoning USTL
Original Assignee
University of Science and Technology Liaoning USTL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Liaoning USTL filed Critical University of Science and Technology Liaoning USTL
Priority to CN201610589818.0A priority Critical patent/CN106246183B/en
Publication of CN106246183A publication Critical patent/CN106246183A/en
Application granted granted Critical
Publication of CN106246183B publication Critical patent/CN106246183B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor

Abstract

The present invention relates to a kind of method for determining sublevel caving method without sill pillar avalanche volume morphing, according to draw theory and least energy consumption principle, show that Caved ore body is similar with Loose rock, its form lacks for ellipsoid, and three's eccentricity is identical, the mathematical modeling of Caved ore body is established on this basis;Caved ore body volume is determined by a coefficient of volumetric expansion and Stope Parameters, the scarce volume calculation formula of export avalanche ellipsoid is changed by mathematics and determines the shaft length of Caved ore body three with reference to Caved ore body volume, the final height for determining Caved ore body, along the thickness in extracting drift direction and the width in vertical extracting drift direction.The present invention is significant to further studying avalanche volume morphing, optimum structural parameter, the loss and dilution for reducing ore, raising mine economic profit.

Description

A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing
Technical field
The present invention relates to underground metal mine sublevel caving method without sill pillar mining technique field, more particularly to a kind of determination nothing The method of foundation sublevel caving method avalanche volume morphing.
Background technology
Bottom-column-free sectional caving stoping method is because mining rate is big, many merits such as production safety, at present at home and abroad metal Iron ore mine extensive use.But the problem of mining methods are in overlying strata whereabouts ore deposit and ore removal, and loss and dilution is big, does not obtain always To solving well.
Caved ore body is the Pilling body of ore formed after quick-fried ore body explosion in loose covering layer, is the object of ore drawing, its Form has a significant impact to the loss and dilution of ore.But because Caved ore body preservation is in covering layer, form is difficult to observe, and does not also have There is the method for determining its form.Determine avalanche volume morphing to stope structure parameter optimization, the loss and dilution for reducing ore, raising ore deposit Mountain economic benefit has important theory significance and real value.
The content of the invention
The invention provides a kind of method for determining sublevel caving method without sill pillar avalanche volume morphing, according to draw theory and most Small power consumption principle, show that Caved ore body is similar with Loose rock, and its form lacks for ellipsoid, establishes the mathematical modeling of Caved ore body;By once The coefficient of volumetric expansion and Stope Parameters determine Caved ore body volume, change the scarce volume calculation formula of export avalanche ellipsoid by mathematics and tie Close Caved ore body volume and determine the shaft length of Caved ore body three, the final height for determining Caved ore body, along extracting drift direction thickness and hang down Straight gyrus adopts the width of entry direction;The present invention is to further studying avalanche volume morphing, optimum structural parameter, the damage for reducing ore Mistake dilution, raising mine economic profit are significant.
In order to achieve the above object, the present invention is realized using following technical scheme:
A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing, based on Ore Flows, Caved ore body and Loose rock three Person is that similar ellipsoid lacks, and three's eccentricity is identical, final to determine to collapse by calculating Caved ore body volume and the shaft length of Caved ore body three The height of falling bodies, the width of vertical entry direction and the thickness along entry direction;Comprise the following steps that:
The first step, calculate by the volume Q of quick-fried ore bodyOre deposit
If Stope Parameters height of lift is H, route spacing is L, ore caving interval B, a width of m in tunnel section, tunnel section A height of n;It is by the volume of quick-fried ore body then:
QOre deposit=B (HL-mn) formula 1
Second step, calculating limit coefficient of volumetric expansion KJX
In formula:QDissipate--- broken ore volume, m3
GDissipate--- broken ore gravity, N;
γDissipate--- broken ore unit weight, N/m3
GOre deposit--- ore gravity, N;
γOre deposit--- by quick-fried ore body unit weight, N/m3
The simultaneous of formula 2,3,4, then have:
Scene is bored sample and broken ore, in the unit weight γ of experimental determination broken oreDissipateAnd the appearance by explosion ore body Weight γOre deposit, the limit coefficient of volumetric expansion K for releasing ore granular media is obtained by formula 5JX
3rd step, calculate Caved ore body volume QCollapse
QCollapse=Ks·QOre depositFormula 7
In formula:Ks--- the secondary coefficient of volumetric expansion;
Kss--- the second loosening coefficient, take empirical value Kss=1.060~1.100;
4th step, solve three shaft lengths of Caved ore body:
Obtain that Caved ore body is similar with Loose rock by least energy consumption principle, be that the ellipsoid cut off by end wall lacks, according to ore drawing Theory understands that Ore Flows are similar with Loose rock, and the ellipsoid to be cut off by end wall lacks, therefore Caved ore body, Loose rock and Ore Flows three Person is that similar ellipsoid lacks, and eccentricity is identical;Released when bottom-column-free sectional caving stoping method uses Side ore drawing ellipsoid lack, avalanche Ellipsoid lacks and loosened the scarce central axis of ellipsoid and bias angle theta, i.e. axle drift angle be present with end wall surface, and value is 2 °~5 °;It is ellipse to calculate avalanche Segment geometric volume QCollapseIt is as follows:
In formula:QCollapse--- Caved ore body volume, m3
aCollapse--- the major axis of Caved ore body, m;
bCollapse--- the vertical extracting drift direction short axle of Caved ore body, m;
cCollapse--- Caved ore body is along extracting drift direction short axle, m;
Avalanche ellipsoid is lacked, it is known that its major axis is aCollapse, then
In formula:εb--- the vertical entry direction eccentricity of Caved ore body, 0<εb<1;
εc--- Caved ore body is along entry direction eccentricity, and 0<εc<1;
Formula 7,9 is substituted into formula 8, obtained
Simultaneous formula 9,10, it is as follows to obtain the shaft length of Caved ore body three:
5th step:Determine the height of Caved ore body, the width in vertical extracting drift direction and the thickness along extracting drift direction;
Avalanche ellipsoid lacks central axis and axle bias angle theta be present with end wall surface, is converted to three shaft lengths of Caved ore body by θ and collapses The height Z of falling bodies, the width X in vertical extracting drift direction and the thickness Y along extracting drift direction, such as following formula:
Avalanche volume morphing is by the height Z of Caved ore body, the width X in vertical extracting drift direction and the thickness along extracting drift direction Degree Y is described.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of method for determining non-pillar sublevel caving mining avalanche volume morphing is provided, to further enriching Caved ore body reason By, optimum structural parameter, to reduce Ore loss and dilution rates, abundant Resource recovery significant.
Brief description of the drawings
Fig. 1 is Ore Flows of the present invention, Caved ore body and the graph of a relation of Loose rock three.(along extracting drift direction)
Fig. 2 is non-pillar sublevel caving face schematic diagram of the present invention.(vertical extracting drift direction)
In figure:1. the covering layer of 5. extracting drift of Caved ore body 2. Ore Flows, 3. Loose rock, 4. ore body 6.
Embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
As shown in figure 1, it is Ore Flows of the present invention, Caved ore body and the graph of a relation of Loose rock three.As shown in Fig. 2 it is Non-pillar sublevel caving face schematic diagram of the present invention.A kind of determination sublevel caving method without sill pillar of the present invention collapses The method of falling bodies form, it is that similar ellipsoid lacks based on Ore Flows 2, Caved ore body 1 and the three of Loose rock 3, and three's eccentricity is identical, By calculating the volume of Caved ore body 1 and the shaft length of Caved ore body 1 three, the final height for determining Caved ore body 1, vertical route (i.e. return in Fig. 1 Adopt route 5) width in direction and the thickness along entry direction;Comprise the following steps that:
The first step, calculate by the volume Q of quick-fried ore bodyOre deposit
If Stope Parameters height of lift is H, route spacing is L, ore caving interval B, a width of m in tunnel section, tunnel section A height of n;It is by the volume of quick-fried ore body then:
QOre deposit=B (HL-mn) formula 1
Second step, calculating limit coefficient of volumetric expansion KJX
In formula:QDissipate--- broken ore volume, m3
GDissipate--- broken ore gravity, N;
γDissipate--- broken ore unit weight, N/m3
GOre deposit--- ore gravity, N;
γOre deposit--- by quick-fried ore body unit weight, N/m3
The simultaneous of formula 2,3,4, then have:
Scene is bored sample and broken ore, in the unit weight γ of experimental determination broken oreDissipateAnd the appearance by explosion ore body Weight γOre deposit, the limit coefficient of volumetric expansion K for releasing ore granular media is obtained by formula 5JX
3rd step, calculate Caved ore body volume QCollapse
QCollapse=Ks·QOre depositFormula 7
In formula:Ks--- the secondary coefficient of volumetric expansion;
Kss--- the second loosening coefficient, take empirical value Kss=1.060~1.100;
4th step, solve three shaft lengths of Caved ore body 1:
Caved ore body 1 is obtained by least energy consumption principle and Loose rock 3 is similar, is that the ellipsoid cut off by end wall lacks, according to putting Ore deposit is theoretical to understand that Ore Flows 2 and Loose rock 3 are similar, and the ellipsoid to be cut off by end wall lacks, therefore Caved ore body 1, Loose rock 3 and puts Go out the three of body 2 to lack for similar ellipsoid, and eccentricity is identical;Bottom-column-free sectional caving stoping method releases ellipsoid when using Side ore drawing Scarce, avalanche ellipsoid lacks and loosened the scarce central axis of ellipsoid and end wall surface has bias angle theta, i.e. axle drift angle, and value is 2 °~5 °;Calculate Avalanche ellipsoid lacks geometric volume QCollapseIt is as follows:
In formula:QCollapse--- Caved ore body volume, m3
aCollapse--- the major axis of Caved ore body, m;
bCollapse--- the vertical extracting drift direction short axle of Caved ore body, m;
cCollapse--- Caved ore body is along extracting drift direction short axle, m;
Avalanche ellipsoid is lacked, it is known that its major axis is aCollapse, then
In formula:εb--- the vertical entry direction eccentricity of Caved ore body, 0<εb<1;
εc--- Caved ore body is along entry direction eccentricity, and 0<εc<1;
Formula 7,9 is substituted into formula 8, obtained
Simultaneous formula 9,10, it is as follows to obtain the shaft length of Caved ore body three:
5th step:Determine the height of Caved ore body 1, the width in vertical extracting drift direction and the thickness along extracting drift direction Degree;
Avalanche ellipsoid lacks central axis and axle bias angle theta be present with end wall surface, is converted to three shaft lengths of Caved ore body by θ and collapses The height Z of falling bodies, the width X in vertical extracting drift direction and the thickness Y along extracting drift direction, such as following formula:
The form of Caved ore body 1 is by the height Z of Caved ore body, the width X in vertical extracting drift direction and along extracting drift direction Thickness Y is described.
Caved ore body is the Pilling body of ore that is formed in loose covering layer 6 under blast action, is the object of ore drawing.Root " any power consumption process, it will all be carried out according to least energy consumption principle under its corresponding constraints in a manner of minimum energy dissipation ", When being dug up mine using non-pillar sublevel caving, the forming process of Caved ore body 1 is a power consumption process, and it, which is developed, follows minimum energy dissipation original Reason, Caved ore body 1 occur loosening in spheroid, and for this, we can regard Caved ore body 1 as similar to Loose rock 3, be put in end In ore deposit, the ellipsoid to be cut off by end wall lacks.Understand that Ore Flows 2 and Loose rock 3 are similar according to draw theory, to be cut by end wall The ellipsoid cut lacks, therefore Ore Flows 2, Caved ore body 1 and the three of Loose rock 3 are that similar ellipsoid lacks, and eccentricity is identical.Oper cylinler point Section caved stopes, which use, releases that ellipsoid is lacked, avalanche ellipsoid lacks and loosens the scarce central axis of ellipsoid and end wall surface is deposited during Side ore drawing In drift angle, i.e. axle drift angle.
The present invention general principle be:On the basis of being determined that Caved ore body 1 lacks form for ellipsoid, joined by stope structure Number is obtained by the volume of quick-fried ore body, and laboratory measurement calculates the limit coefficient of volumetric expansion;Further according to draw theory, by the second loosening system Number takes an empirical value, and a coefficient of volumetric expansion is calculated with reference to the limit coefficient of volumetric expansion, by required by quick-fried ore body volume and once loose Scattered coefficient determines Caved ore body volume.Avalanche ellipsoid is lacked, is changed by mathematics and exports its volume calculation formula, will be hung down by eccentricity Straight gyrus adopts entry direction minor axis length and the function of the scarce long axis length of avalanche ellipsoid is expressed as along extracting drift direction minor axis length, Substitute into cubature formula and simultaneously combine the Caved ore body volume obtained, calculate the major axis of Caved ore body, vertical extracting drift direction short axle and Along extracting drift direction short axle, referred to as three axles, the final height for determining Caved ore body, the width in vertical extracting drift direction and edge are returned Adopt the thickness of entry direction.
Following examples are implemented under premised on technical solution of the present invention, give detailed embodiment and tool The operating process of body, but protection scope of the present invention is not limited to following embodiments.Method therefor is such as without spy in following embodiments It is conventional method not mentionlet alone bright.
【Embodiment】
Certain iron ore application sublevel caving method without sill pillar is dug up mine, and stope structure parameter is as shown in table 1:
Certain the iron ore stope structure parameter table of table 1
By the derivation of each step of the present invention, the form of Caved ore body is described with reference to mine design parameter value, i.e., Seek Caved ore body height, the width in vertical extracting drift direction and the thickness along extracting drift direction for calculating this mine relevant work face Degree.
The first step:Determined by formula 1 by the volume Q of quick-fried ore bodyOre deposit
QOre deposit=B (HL-mn)
=1.5 × (12 × 12-4 × 3.5)=195.000m3
Second step:Limit coefficient of volumetric expansion K is determined by formula 5JX
Scene is bored sample and broken ore, in the unit weight γ of experimental determination broken oreDissipate=33640.301N/m3And By the unit weight γ of explosion ore bodyOre deposit=40704.764N/m3
The limit coefficient of volumetric expansion is obtained by formula 5:
3rd step:Caved ore body volume Q is calculated by formula 7Collapse
4th step:The shaft length of Caved ore body three is solved by formula 11, takes εb=0.386, εc=0.982.
5th step:The height Z of Caved ore body is determined by formula 12, the width X in vertical extracting drift direction and along extracting drift The thickness Y in direction, takes θ=5 °;
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (1)

1. it is a kind of determine sublevel caving method without sill pillar avalanche volume morphing method, it is characterised in that based on Ore Flows, Caved ore body and Loose rock three is that similar ellipsoid lacks, and three's eccentricity is identical, by calculating Caved ore body volume and the shaft length of Caved ore body three, most The height of Caved ore body, the width of vertical entry direction and the thickness along entry direction are determined eventually;Comprise the following steps that:
The first step, calculate by the volume Q of quick-fried ore bodyOre deposit
If Stope Parameters height of lift is H, route spacing is L, ore caving interval B, a width of m in tunnel section, tunnel section are a height of n;It is by the volume of quick-fried ore body then:
QOre deposit=B (HL-mn) formula 1
Second step, calculating limit coefficient of volumetric expansion KJX
In formula:QDissipate--- broken ore volume, m3
GDissipate--- broken ore gravity, N;
γDissipate--- broken ore unit weight, N/m3
GOre deposit--- ore gravity, N;
γOre deposit--- by quick-fried ore body unit weight, N/m3
The simultaneous of formula 2,3,4, then have:
Scene is bored sample and broken ore, in the unit weight γ of experimental determination broken oreDissipateAnd the unit weight by explosion ore body γOre deposit, the limit coefficient of volumetric expansion K for releasing ore granular media is obtained by formula 5JX
3rd step, calculate Caved ore body volume QCollapse
QCollapse=Ks·QOre depositFormula 7
In formula:Ks--- the secondary coefficient of volumetric expansion;
Kss--- the second loosening coefficient, take empirical value Kss=1.060~1.100;
4th step, solve three shaft lengths of Caved ore body:
Obtain that Caved ore body is similar with Loose rock by least energy consumption principle, be that the ellipsoid cut off by end wall lacks, according to draw theory Understand that Ore Flows are similar with Loose rock, the ellipsoid to be cut off by end wall lacks, therefore Caved ore body, Loose rock and Ore Flows three are Similar ellipsoid lacks, and eccentricity is identical;Released when bottom-column-free sectional caving stoping method uses Side ore drawing ellipsoid lack, avalanche ellipsoid Lack and loosen the scarce central axis of ellipsoid and bias angle theta, i.e. axle drift angle be present with end wall surface, value is 2 °~5 °;Avalanche ellipsoid is calculated to lack Geometric volume QCollapseIt is as follows:
In formula:QCollapse--- Caved ore body volume, m3
aCollapse--- the major axis of Caved ore body, m;
bCollapse--- the vertical extracting drift direction short axle of Caved ore body, m;
cCollapse--- Caved ore body is along extracting drift direction short axle, m;
Avalanche ellipsoid is lacked, it is known that its major axis is aCollapse, then
In formula:εb--- the vertical entry direction eccentricity of Caved ore body, 0<εb<1;
εc--- Caved ore body is along entry direction eccentricity, and 0<εc<1;
Formula 7,9 is substituted into formula 8, obtained
Simultaneous formula 9,10, it is as follows to obtain the shaft length of Caved ore body three:
5th step:Determine the height of Caved ore body, the width in vertical extracting drift direction and the thickness along extracting drift direction;
Avalanche ellipsoid lacks central axis and axle bias angle theta be present with end wall surface, and three shaft lengths of Caved ore body are converted into Caved ore body by θ Height Z, the width X and the thickness Y along extracting drift direction in vertical extracting drift direction, such as following formula:
Avalanche volume morphing is by the height Z of Caved ore body, the width X in vertical extracting drift direction and the thickness Y along extracting drift direction It is described.
CN201610589818.0A 2016-07-25 2016-07-25 A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing Active CN106246183B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610589818.0A CN106246183B (en) 2016-07-25 2016-07-25 A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610589818.0A CN106246183B (en) 2016-07-25 2016-07-25 A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing

Publications (2)

Publication Number Publication Date
CN106246183A CN106246183A (en) 2016-12-21
CN106246183B true CN106246183B (en) 2018-03-30

Family

ID=57603807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610589818.0A Active CN106246183B (en) 2016-07-25 2016-07-25 A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing

Country Status (1)

Country Link
CN (1) CN106246183B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122542B (en) * 2017-04-26 2019-07-09 北京科技大学 The analogy method of Loose rock, Ore Flows based on ore-rock rupture and Mine-rock in Caving Method shape
CN108397194A (en) * 2018-02-23 2018-08-14 河北钢铁集团矿业有限公司 The last stage casing ore body mining smooth transition method of sublevel caving method without sill pillar
CN110080772B (en) * 2019-04-28 2020-10-20 抚顺罕王傲牛矿业股份有限公司 Stoping route arrangement method of gently inclined medium-thickness ore body sill-pillar-free sublevel caving method
CN110410078B (en) * 2019-07-22 2020-09-22 武汉科技大学 Mine low dilution mining method for sill pillar-free sublevel caving method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1492055A1 (en) * 1987-11-23 1989-07-07 Норильский горно-металлургический комбинат им.А.П.Завенягина Method of mining thick gently-sloping ore bodies
CN102261248B (en) * 2011-08-15 2013-04-03 辽宁科技大学 Sill-pillar-free stage caving stopping method based on creasing-type structure
CN102635357A (en) * 2012-04-26 2012-08-15 辽宁科技大学 Pillarless phased caving method with top tailing crushed stone filling and sectional water injection binding
CN102619517A (en) * 2012-04-26 2012-08-01 辽宁科技大学 Overlaying rock cemented pillarless sublevel caving method
CN103471537B (en) * 2013-09-17 2015-11-25 辽宁科技大学 A kind of assay method of non-pillar sublevel caving mining Caved ore body volume

Also Published As

Publication number Publication date
CN106246183A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN106246183B (en) A kind of method for determining sublevel caving method without sill pillar avalanche volume morphing
CN104389606B (en) A kind of mine reduction-type based on environmental protection many well connection mining method
WO2018171255A1 (en) Networked preferential gas migration passage construction and gas diversion drainage method
CN103902780B (en) Solid filling coal mining earth&#39;s surface Deformation prediction method
CN106247877B (en) A kind of hypervelocity symmetrically forces kerve method without cutting hole deviation line
CN106014473B (en) A kind of cross borehole constrained expansion explosion network permeability-increasing gas drainage method
CN104790918B (en) Cluster well combines ground method for exploiting coal bed methane with horizontal well under MODEL OVER COMPLEX TOPOGRAPHY
CN106761757A (en) A kind of full stage combination chisel it is quick-fried fall the efficient mining methods of ore deposit
CN106223956B (en) Medium-length hole courtyard mining afterwards filling method
CN101812988A (en) Method for mining gently dipping to steep dipping thick and large ore bodies
CN206860155U (en) Coal-series gas U-shaped well drilling and fracturing structure
CN104533416A (en) Large-scale mechanized non-sill-pillar sub-level caving mining method for extremely thick ore body
CN105464700A (en) Method for determining length of filling segment of fully mechanized mining and filling mixed mining working face
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN102777185A (en) Inclined well shaft construction technology
CN106761902A (en) A kind of stereo synthesis pressure relief gas pumping mining method suitable for soft rock protective coat extracted
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN105134286A (en) Method for extracting gas of gob of L-shaped well
CN113216967A (en) Opposite safe mining method for adjacent working faces under shallow-buried short-distance room-and-pillar type goaf
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN104594943A (en) Ground composite L-shaped drilling well for gas control and gas control method
CN106089207A (en) Super high seam work surface gob side entry driving thin coal pillar stays equipment, method
CN105240017B (en) A kind of very thin jade nugget shape cutting pushing tow ore removal mining methods of bilayer
CN103470298A (en) Design method of hole-drilling and hole-forming process scheme for drainage of outburst coal seam
CN103471537B (en) A kind of assay method of non-pillar sublevel caving mining Caved ore body volume

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant