A kind of method that tailings impoundment produces surface subsidence hole, mine in Caving Method with Large Space
Technical field
The method that the present invention relates to a kind of Collapse Pit heap row's solidification mine tailing, is particularly well-suited to Caving Method with Large Space production mine and carries out tail
The dry type heap row in ore deposit.
Background technology
At present, domestic most mine tailings still use wet type to discharge, and i.e. build Tailings Dam, use Tailings Dam to store tail
Ore deposit.According to statistics in 2012, there was Tailings Dam more than 12000 in China, and tailings impoundment total amount has surpassed more than 100 hundred million tons, increases tail every year newly
More than 10 hundred million tons of ore deposit, the most multiple rows of to tailings reservoir for piling.Although this treating method is convenient, but brings all drawbacks simultaneously.
First, Tailings Dam needs large-area place, and forms huge mine tailing Hydraulic Transportation System, its power, equipment with pump, pipeline
Material consumption is high, causes Tailings transportation and processing cost too high;Secondly as land resource is more and more nervous, the expense of expropriation of land
More and more higher, cause the capital construction expense of Tailings Dam to account for the ratio of whole selecting and purchasing establishment expense increasing, and Tailings Dam
Regular maintenance and operation also need to consume substantial amounts of fund.It addition, there is the biggest potential safety hazard, warp in Tailings Dam reservoir area in Tailings Dam
Often store a large amount of primary waters and flood, cause above mine tailing, forming Tailings Dam and hang lake.
On the other hand, China's many subways mine uses sublevel caving method without sill pillar mining, at a large amount of Ore of extraction
Cause earth's surface subsiding in various degree simultaneously, Rock Masses Fractures in subsidence area, broken, the most through earth's surface, some cracks.Subside
Surface environment is not only damaged by the existence in hole, and makes surface loess layer liquefaction shape in rainy season due to rainwater catchment
Becoming yellow mud, yellow mud easily induces the geological disasters such as downhole debris flow, to underground mining by crack, cavity seepage downwards in subsidence area
Ore deposit threatens safely.The surface collapse district that underground mining is formed, has not only damaged substantial amounts of land resource, and has existed huge
Potential safety hazard, if can bank up place as mine tailing in these places, and bank up safely with form, be possible not only to solve tailing heap
The problem of field, and openpit and the potential safety hazard of subsidence area existence and the environmental issue of wet type tailings impoundment can be eliminated,
There is huge Social benefit and economic benefit.
Using utilizing surface mining hole and subsidence area etc. to bank up as storeyard after Tailing thickening, save a large amount of land resource
With the substantial contribution needed for newly-built Tailings Dam, the high potential energy dangerous matter sources that high dam Tailings Dam is formed can be eliminated, greatly reduce tail
The environmental pollution that ore deposit is disposed, and, mine is adopted after the discarded places such as hole pile with mine tailing and is the most easily cultivated and utilized again, can be ore deposit
Mountain enterprise and society bring huge economic benefit and social benefit.
" Chinese Mining Industry " in August, 2014 publish volume 23 supplementary issue in publication " tails dry stores up state-of-the-art
With direction " in a literary composition, describe " subsidence area tailings dry type discharge technology technology ", the technological process of this technology is: tailings is first
Concentrating through high pressure deep wimble thickener, reaching weight concentration is about 50%;Then water isolation pump is used to be pumped to horizontal range about
2600m, the evaporation plant of the discrepancy in elevation about 200m;Again through the tailing cake of ceramic filter dehydration to aqueous 15%, last percutaneous
Band transporter is delivered to subsidence area and stores up, and uses scraper to have bad luck in subsidence area.But this technology the clearest and the most definite earth's surface Collapse Pit solidification tail
Store up thickness problem when ore deposit is stored up, and concentrate, filter plant investment is big, energy consumption is high, mastic preparation cost is high, efficiency is low,
The problems such as the bad adaptability in area of heavy rainfull, can only be investigative test application, be unsuitable for large-scale promotion application.
" the rainwater shadow to deep mining during Collapse Pit piling tails that " mining industry research and open " is delivered in July, 2015
Ring research " one the article pointed out: harm that mining area, Jinshandian Iron Mine Yu Hua temple is brought to solve surface subsidence hole and tailing heap
The problem deposited, determines to utilize surface subsidence hole to carry out tailing dry-heaping discharge, and has carried out piling tails character mould similar to indoor
Intend the research of test, but do not provide concrete, feasible tailing dry and arrange the tailing treatment technology flow process in Collapse Pit and technology ginseng
Number, it is difficult to implement in producing reality.
Summary of the invention
The purpose of the present invention, it is simply that the problems referred to above existed for prior art, and provide a kind of tailings glass cost relatively
Low, technological process simple, easy to implement the tailings impoundment method that produces mine surface subsidence hole in Caving Method with Large Space.
For realizing the above-mentioned purpose of the present invention, a kind of tailings impoundment of the present invention produces surface subsidence hole, mine in Caving Method with Large Space
The technical solution that method uses is to use following technique, step:
1) Tailings characteristis detection with analyze: the mine tailing producing ore dressing plant detects, analyzes, dense including mine tailing granularity, mine tailing
Degree, mineral composition, mineral content;
3) Tailing thickening: being fed by the mine tailing that ore dressing plant produces and being concentrated into concentration expressed in percentage by weight in deep cone thickener is 62% ~ 72%
High-concentration tailings slurry;
4) firming agent adds: the high-concentration tailings slurry after concentrating imports in mine tailing blender, according to Tailings characteristis analysis result
Suitable tailing solidifying agent is selected to join in mine tailing blender, through stirring;
Described tailing solidifying agent be mainly composed of cement, flyash, Calx, the weight ratio of three is 1.0:(3.0 ~ 5.0):
(1.5 ~ 2.5), with 1.0:(3.2 ~ 3.8): (1.8 ~ 2.2) are for optimum;Tailing solidifying agent addition is in every cubic metre of Tailings Slurry
Add 40 ~ 55 kilograms of tailing solidifying agent.
5) Tailings transportation, heap row: tailing solidifying agent the Tailings transportation that stirs will be added to Caving Method with Large Space production mine
Surface subsidence carries out heap row in hole, and the quantization method of its heap row's solidification mine tailing Rational Thickness determines according to techniques below scheme:
(1) it is formed without the empty heap pushed up row's maximum gauge based on solidification mine tailing during cover layer avalanche to determine
When solidification tailing heap drains in surface subsidence hole, if disposable heap row's intensity and thickness are relatively big, then solidification mine tailing can be with
The gap overlying strata agglomerate body forms prop, and forms vertebral model in Collapse Pit three-dimensional sense, in planar range
It is extended to like circular model, after forming intensity and scale, it is impossible to destroy with cover layer avalanche and form empty top, on the one hand
Optimum management to cover layer causes difficulty, and on the other hand, the tailing heap row crossing high intensity and thickness can increase tailings glass expense
With.For this it needs to be determined that heap row's thickness of solidification mine tailing, in conjunction with its strength characteristics, it is guaranteed and is formed without the single heap on empty top
Row's maximum gauge uses below equation to calculate:
①
In formula:D 1Solidification mine tailing single heap row's maximum gauge, m;
RSingle heap row's solidification mine tailing extension radius, m;
σSolidification mine tailing uniaxial compressive strength, MPa.
1. derive according to formula visible, for ensureing that the solidification mine tailing of its upper heap row occurs without empty top, list after cover layer avalanche
The maximum gauge of secondary heap row and extension radius and solidification mine tailing intensity have following variation relation: when solidification mine tailing intensity one timing,
Single heap row's maximum gauge increases along with the increase of solidification mine tailing extension radius;When extension radius one timing, single heap is arranged
Big thickness reduces with the increase of solidification mine tailing uniaxial compressive strength.
(2) flowing is merged to prevent fine tailings from flowing into heap row's minimum of work surface based on cover layer lumpiness and solidification mine tailing
Thickness determines
In the production mine forming surface subsidence hole, its cover layer substantially meets the requirement of the safe ore removal of down-hole route, therefore
Without considering cover layer general thickness problem.But the rock mass of cover layer different size lumpiness merges avalanche side with solidification mine tailing fragment
Formula can affect heap row's mode of route ore drawing mode and surface subsidence hole solidification mine tailing, if heap row's intensity and thickness are too small, Gu
Change mine tailing and can be refined into powdery during cover layer Rock Mass Caving, or its lumpiness is much smaller than cover layer Rockmass Block, is covering
In cap rock Caving process, its decrease speed is faster than cover layer rock mass, along with ore drawing process gradually arrives work surface, causes route to put
The dilution in ore deposit or argillization.Therefore, cover layer lumpiness, overlying strata Caving process, solidification tailing stream dynamic characteristic, solidification tail are being considered
On the basis of the factors such as ore deposit lumpiness after similar external force is destroyed, obtain solidifying the determination side of mine tailing single heap row's minimum thickness
Method, i.e. uses below equation to calculate:
②
In formula:D 2Solidification mine tailing single heap row's minimum thickness, m;
bNearly work surface overlying strata average lumpiness and the ratio solidifying mine tailing average lumpiness after similar external force is destroyed,
TSolidification mine tailing slump, cm;
σSolidification mine tailing uniaxial compressive strength, MPa;
aCover layer lumpiness uniformity coefficient.
Analyzing process according to numerical fitting, when solidification mine tailing intensity one timing, solidification mine tailing single heap row is minimum thick
Spend along with nearly work surface overlying strata average lumpiness collapses to the ratio solidifying mine tailing average lumpiness after similar external force is destroyed, solidification mine tailing
Degree of falling and the increase of cover layer lumpiness uniformity coefficient and increase;When nearly work surface overlying strata average lumpiness to solidification mine tailing through similar
The ratio of the average lumpiness after external force destruction, solidification mine tailing slump and the timing of cover layer lumpiness uniformity coefficient one, solidify mine tailing
Single heap row's minimum thickness reduces with the increase of solidification mine tailing intensity.
(3) solidification mine tailing single heap arranges finally determining of Rational Thickness
Solidify during the cover layer avalanche that comprehensively (1) calculates mine tailing be formed without heap row's maximum gauge on empty top and (2) calculate based on
Cover layer lumpiness and solidification mine tailing merge the heap row's minimum thickness flowed to prevent fine tailings inflow work surface, quantify to determine
The interval range of solidification mine tailing single heap row's thickness, carries out heap row in this interval range.
The method that a kind of tailings impoundment of the present invention produces surface subsidence hole, mine in Caving Method with Large Space, after using above technical scheme
There is good effect:
(1) direct for mine tailing heap is stored in surface subsidence hole, decreases the expense building Tailings Dam, decrease floor space, base
Build small investment, maintenance is simple, integrated cost is low;
(2) tailing treatment technology flow process is simple, feasible.
(3) present invention analyzes in terms of caved stopes process characteristic and back production safety requirements, is producing ore deposit for Caving Method with Large Space
Mountain carries out solidifying the THICKNESS CALCULATION of mine tailing Collapse Pit heap row and provides the control method of quantification;
(4) present invention combines solidification mine tailing intensity, solidification Tailings Slurry flowing extension radius, solidification mine tailing slump, closely works
Face overlying strata average lumpiness and the ratio solidifying mine tailing average lumpiness after similar external force is destroyed and cover layer lumpiness uniformity coefficient
Etc. factor, solidification mine tailing and cover layer characteristic and mixed regime of flow thereof are taken into full account, it is proposed that multifactor fusion calculation side
Method.
Accompanying drawing explanation
Fig. 1 is that a kind of tailings impoundment of the present invention produces, in Caving Method with Large Space, the tailings glass that the method in surface subsidence hole, mine uses
Process chart;
Fig. 2 is that the solidification mine tailing that a kind of tailings impoundment of the present invention produces, in Caving Method with Large Space, the method employing that mine surface subsidence is cheated subsides
Hole heap arranges each parameter schematic diagram;
Reference: 1-solidifies mine tailing, 2-Caving Method with Large Space back production cover layer, 3-ore body.
Detailed description of the invention
For further describing the present invention, solid with Nanjing Meishan Metallurgy Co., Ltd.'s surface subsidence hole below in conjunction with the accompanying drawings
Changing tailing heap row's embodiment, the method that tailings impoundment a kind of to the present invention produces surface subsidence hole, mine in Caving Method with Large Space is made in more detail
Description.
Nanjing Meishan Metallurgy Co., Ltd. uses bottom-column-free sectional caving stoping method exploitation, owing to production history is swung
For a long time, its earth's surface has occurred bigger Collapse Pit, so being drained in existing Collapse Pit by heap after tailing solidifying.
A kind of tailings impoundment of the present invention as shown in Figure 1 produces, in Caving Method with Large Space, the tail that the method in surface subsidence hole, mine uses
Ore deposit processing technological flow figure is found out, first detects Tailings characteristis and analyzes, findding out mine tailing granularity, tailings concentration, mineral
Composition, mineral content, for selecting suitable thickener and tailing solidifying agent to provide condition;The mine tailing that ore dressing plant produces is fed
Deep cone thickener is concentrated into the high-concentration tailings slurry that concentration expressed in percentage by weight is 62% ~ 72%, with 65 ~ 69% preferably, both can meet
Technology requirement, can reduce again Tailing thickening processing cost, improves disposal ability;Then the high-concentration tailings slurry after concentrating imports
In mine tailing blender, suitable tailing solidifying agent is selected to join in mine tailing blender according to Tailings characteristis analysis, through fully
Stir;Finally by adding tailing solidifying agent the Tailings transportation that stirs, to produce surface subsidence hole, mine to Caving Method with Large Space interior
Carry out heap row.
A kind of tailings impoundment of the present invention as shown in Figure 2 produces consolidating of the method employing in surface subsidence hole, mine in Caving Method with Large Space
Changing the mine tailing Collapse Pit heap each parameter schematic diagram of row to find out, the said firm uses bottom-column-free sectional caving stoping method exploitation, on ore body 3
Face is stayed and is set Caving Method with Large Space back production cover layer 2, dry type discharge solidification mine tailing 3 in the Collapse Pit on Caving Method with Large Space back production cover layer 2.
The method that a kind of tailings impoundment of the present invention produces surface subsidence hole, mine in Caving Method with Large Space, at Nanjing Mei Shan Metallurgical Industry Development
Company limited's underground mine uses dry type discharge solidification mine tailing 3 in the Collapse Pit that bottom-column-free sectional caving stoping method exploitation is formed,
Its rational heap row's thickness determines that method is as follows:
(1) being formed without the empty heap pushed up row's maximum gauge based on solidification mine tailing during cover layer avalanche uses below equation to determine:
①
In formula:D 1Solidification mine tailing single heap row's maximum gauge, m;
RSingle heap row's solidification mine tailing extension radius, for 10m;
σSolidification mine tailing uniaxial compressive strength, for 0.5MPa.
The solidification mine tailing single heap row's maximum gauge value calculated accordingly is 8.01m.
(2) flowing is merged to prevent fine tailings from flowing into heap row's minimum of work surface based on cover layer lumpiness and solidification mine tailing
Thickness uses below equation to determine:
②
In formula:D 2Solidification mine tailing single heap row's minimum thickness, m;
bNearly work surface overlying strata average lumpiness and the ratio solidifying mine tailing average lumpiness after similar external force is destroyed, be 6;
TSolidification mine tailing slump, for 25cm;
σSolidification mine tailing uniaxial compressive strength, for 0.5MPa.
aCover layer lumpiness uniformity coefficient, is 100.
The solidification mine tailing single heap row's minimum thickness calculated accordingly is 4.59m.
(3) solidification mine tailing single heap arranges finally determining of Rational Thickness
Solidify mine tailing during mixed mulch layer avalanche and be formed without heap row's maximum gauge on empty top and based on cover layer lumpiness and solidification tail
Ore deposit is merged the heap row's minimum thickness to prevent fine tailings from flowing into work surface that flows and is determined, Nanjing Meishan Metallurgy Co., Ltd.
The interval range of solidification mine tailing single heap row's thickness is 4.59m~8.01m.