CN106733137B - A kind of open-air pit Tailings Dam production technology - Google Patents
A kind of open-air pit Tailings Dam production technology Download PDFInfo
- Publication number
- CN106733137B CN106733137B CN201710023804.7A CN201710023804A CN106733137B CN 106733137 B CN106733137 B CN 106733137B CN 201710023804 A CN201710023804 A CN 201710023804A CN 106733137 B CN106733137 B CN 106733137B
- Authority
- CN
- China
- Prior art keywords
- tailing
- tailings dam
- open
- air pit
- ore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03B—SEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
- B03B7/00—Combinations of wet processes or apparatus with other processes or apparatus, e.g. for dressing ores or garbage
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
A kind of open-air pit Tailings Dam production technology belongs to Tailings Dam technical field of producing, including tailing magnetic separation process, tailing selectivity filling procedure, and Tailing thickening discharges the treatment processes such as process and Tailings Dam internal drainage process.The present invention passes through the improvement to open-air pit Tailings Dam production technology, it can effectively solve that ore discharge pipe network easily blocks, bottom storehouse space utilization rate is low, the high production problem of fault of water pump rate in library, this method process, small investment high efficiency, can extend open-air pit Tailings Dam Years Of Service and mineral resources comprehensive utilization rate height at clean and effective, suitable for copper-sulphide ores, nickel sulfide ore and vulcanize cupro-nickel associated minerals openpit change do Tailings Dam when, carry out the improvement of Tailings Dam production technology.
Description
Technical field
The invention belongs to Tailings Dam technical field of producing, especially relate to a kind of suitable for copper-sulphide ores, vulcanization
Nickel minerals and the openpit for vulcanizing cupro-nickel associated minerals change when doing Tailings Dam, improved Tailings Dam production technology.
Background technique
In bargh, tcrude ore enters useful mine of the dressing plant after broken, ore grinding and sorting operation, in ore
Object sorting is one or more concentrate products, and a large amount of useless mineral (tailing) are then with the discharge of ore pulp state.In order to comprehensively utilize
The pollution of mineral resources and elimination to environment, it is necessary to adopt an effective measure and tailing is handled.In general, the heap of mill tailings
The mode of depositing has dry piling and wet type to store up two kinds, and China's overwhelming majority mill tailings all use wet type stacked arrangement.
Tailings Dam be store up tailing place, mostly by dykes and dams and mountain valley enclose cut form.Conventional Tailings Dam is according to orographic condition
And construction method can be divided into mountain valley-type, hillside type, flat type;By model split of building a dam, type (including barren rock of once building a dam can be divided into
Build a dam) and two kinds of tailing heap dam type.The building and use of conventional Tailings Dam are the technologies of a comparative maturity, but land occupation is larger,
And it also will cause certain influence to environment, destroy vegetation and arable land.Use what surface mining left to adopt hole as Tailings Dam
It is a kind of novel stacked arrangement of conventional Tailings Dam, Tailings Dam construction cost is few, and does not generate secondary pollution to environment.
In terms of open-air pit Tailings Dam production technology, due to mining methods are different, open-air pit antiseepage and reinforcement means are different,
CHARACTERISTICS OF TAILINGS SAND discharge method is different, and each open-air pit Tailings Dam manufacturing technique method slightly has difference, and main flow is will be dewatered
Tailing is discharged into open-air pit Tailings Dam by pipeline pressurization.Currently, it is not yet found that cupro-nickel metal mine open-air pit Tailings Dam produces
The related ore dressing document of process modification method is recorded.
Summary of the invention
The technical problems to be solved by the present invention are: it is existing for solving to provide a kind of open-air pit Tailings Dam production technology
Open-air pit Tailings comprehensive resource utilization rate is low, ore discharge pipe network easily blocks, fault of water pump rate height, bottom storehouse space utilization in library
The low production problem of rate.
A kind of open-air pit Tailings Dam production technology, includes the following steps, and following steps sequentially carry out,
Step 1: tailing magnetic separation process
Tailing magnetic separation process is divided into roughing operation break-down and selected operation break-down two parts, the tail that floating separation technique in upstream generates
Mine ore pulp sequentially enters magnetic separator and carries out roughing operation break-down and selected operation break-down, and concentrate obtained by the selected operation break-down of magnetic separation enters concentrate
Pond individually stores draining, and tailing obtained by roughing operation break-down and selected operation break-down is combined into next procedure;
Step 2: tailing selectivity filling procedure
The tailing ore pulp generated in step 1 is flow automatically by the road into the pulp distribution box for having three-way device,
Mining technique has tailing-filled requirement, adjusts three-way device, and tailing ore pulp is introduced after pumping plant to be delivered to and is adopted
Mine filling process,
Mine does not fill demand, adjusts three-way device, and it is naturally heavy that tailing ore pulp is introduced Tailing thickening pond progress ore pulp
Drop concentration, the overflow water that concentration basin generates is delivered to tailing clarification of water library through pumping plant, under the concentration tailing that concentration basin generates enters
Procedure;
Step 3: Tailing thickening discharges process
It is arranged circumferentially about a circle at concentration basin bottom discharging mouth and rinses hydraulic giant, the concentration tailing in step 2 is adjusted through hydraulic giant
Mass concentration is to after 50%~60%, and gravity flow enters ore discharge pipe network in open-air pit Tailings Dam, and ore discharge pipe network is in open-air pit Tailings Dam
It is interior to be arranged in a ring along the library, gate valve is provided on ore discharge pipe network for ore discharge;
Step 4: Tailings Dam internal drainage process
Watershed is equipped with landing stage of swimming in open-air pit Tailings Dam, and fresh water pump, the clarification of watershed are equipped in ship
Water conservancy enters tailing water clarification library and recycles after being delivered to pumping plant with water pump.
The magnetic induction intensity of roughing operation break-down is 5000 Gausses~6000 Gausses, the magnetic of selected operation break-down in the step 1
Induction is in 4000 Gausses~5000 Gausses.
Ore discharge pipe network uses polyethylene material in open-air pit Tailings Dam in the step 3, and ore discharge pipe network is concentrated along Tailings Dam
After machine arranges that side is drawn, the library along open-air pit Tailings Dam is arranged circumferentially about downwards, and ore discharge pipe network angle of turn is not more than 50 degree.
The fresh water pump installed in landing stage that swims in the step 4 is 3 or more.
Through the above design, the present invention can be brought the following benefits:
The present invention by the improvement to open-air pit Tailings Dam production technology, can effectively solve ore discharge pipe network easily block, bottom storehouse
Space utilization rate is low, the high production problem of fault of water pump rate in library, this method process, clean and effective, small investment high efficiency,
Open-air pit Tailings Dam Years Of Service can be extended and mineral resources comprehensive utilization rate is high, be suitable for copper-sulphide ores, nickel sulfide ore and sulphur
The openpit for changing cupro-nickel associated minerals changes when doing Tailings Dam, carries out the improvement of Tailings Dam production technology.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated:
Fig. 1 is a kind of flow diagram of open-air pit Tailings Dam production technology of the present invention.
Specific embodiment
Below with drawings and concrete examples, the invention will be further described.
As shown, a kind of beneficiation method for recycling nickel metal from discarded copper-nickel sulfide successively comprises the steps of:
Step 1: tailing magnetic separation process
The process is made of " roughing operation break-down " and " selected operation break-down ", the tailing ore pulp that floating separation technique in upstream generates
The CTB1018 magnetic separator of roughing operation break-down and the CTB618 magnetic separator of selected operation break-down, magnetic separation are sequentially entered by tailing pipeline
Magnetic concentrate obtained by selected operation break-down enters concentrate pool and individually stores draining, and tailing obtained by roughing operation break-down and selected operation break-down closes
And enter next procedure;
Step 2: tailing selectivity filling procedure
The tailing ore pulp fed in step 1 flows automatically by the road into the pulp distribution box for having three-way device, when mine is adopted
When miner's skill has tailing-filled require, three-way device is adjusted, is delivered to mining filling process after tailing ore pulp is introduced pumping plant, when
When mine does not fill demand, three-way device is adjusted, tailing ore pulp is introduced into Tailing thickening pond and carries out the concentration of ore pulp natural subsidence,
The overflow water that concentration basin generates is delivered to tailing clarification of water library for dressing plant's reuse through pumping plant, the concentration tailing that concentration basin generates into
Enter next procedure;
Step 3: Tailing thickening discharges process
It is arranged circumferentially about a circle at concentration basin bottom discharging mouth and rinses hydraulic giant for concentration adjusting and pipeline dredging use, step
Tailing after being concentrated in two makes tailing gravity flow enter open-air pit after hydraulic giant adjusting mass concentration to 50%~60%, using from pressure
Tailings Dam ore discharge pipe network, ore discharge pipe network arrange that east, south, west, north all directions draw-point is equipped with lock in a ring in library along the library
Valve selects the uniform ore discharge of suitable ore discharge point according to tailings impoundment situation in library;
Step 4: Tailings Dam internal drainage process
Watershed is equipped with one, landing stage of swimming in open-air pit Tailings Dam, fresh water pump 3 is installed in ship, watershed
Primary water is delivered to after pumping plant using water pump enters tailing water clarification library for dressing plant's reuse, during normal production one, water pump unlatching
One is spare, flood season arrive or watershed water it is larger when increase work water pump quantity.
Claims (2)
1. a kind of open-air pit Tailings Dam production technology, it is characterized in that: include the following steps, and following steps sequentially carry out,
Step 1: tailing magnetic separation process
Tailing magnetic separation process is divided into roughing operation break-down and selected operation break-down two parts, the tailing mine that floating separation technique in upstream generates
Slurry sequentially enters magnetic separator and carries out roughing operation break-down and selected operation break-down, and concentrate obtained by the selected operation break-down of magnetic separation enters concentrate pool list
Tailing obtained by solely storage draining, roughing operation break-down and selected operation break-down is combined into next procedure;
Step 2: tailing selectivity filling procedure
The tailing ore pulp generated in step 1 is flow automatically by the road into the pulp distribution box for having three-way device,
Mining technique has tailing-filled requirement, adjusts three-way device, fills mining is delivered to after tailing ore pulp introducing pumping plant
Technique is filled out,
Mine does not fill demand, adjusts three-way device, and it is dense that tailing ore pulp is introduced Tailing thickening pond progress ore pulp natural subsidence
Contracting, the overflow water that concentration basin generates are delivered to tailing clarification of water library through pumping plant, and the concentration tailing that concentration basin generates enters lower road work
Sequence;
Step 3: Tailing thickening discharges process
It is arranged circumferentially about a circle at concentration basin bottom discharging mouth and rinses hydraulic giant, the concentration tailing in step 2 adjusts quality through hydraulic giant
For concentration to after 50%~60%, gravity flow enters ore discharge pipe network in open-air pit Tailings Dam, ore discharge pipe network edge in open-air pit Tailings Dam
The library is arranged in a ring, and gate valve is provided on ore discharge pipe network for ore discharge;
Step 4: Tailings Dam internal drainage process
Watershed is equipped with landing stage of swimming in open-air pit Tailings Dam, and fresh water pump, the clarification water conservancy of watershed are equipped in ship
Enter tailing water clarification library after being delivered to pumping plant with water pump to recycle;
Ore discharge pipe network uses polyethylene material in open-air pit Tailings Dam in the step 3, and ore discharge pipe network is along Tailings Dam thickener cloth
After setting side extraction, the library along open-air pit Tailings Dam is arranged circumferentially about downwards, and ore discharge pipe network angle of turn is not more than 50 degree;
The fresh water pump installed in landing stage that swims in the step 4 is 3 or more.
2. a kind of open-air pit Tailings Dam production technology according to claim 1, it is characterized in that: roughing point in the step 1
The magnetic induction intensity of process is 5000 Gausses~6000 Gausses, and the magnetic induction intensity of selected operation break-down is high in 4000 Gauss~5000
This.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710023804.7A CN106733137B (en) | 2017-01-13 | 2017-01-13 | A kind of open-air pit Tailings Dam production technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710023804.7A CN106733137B (en) | 2017-01-13 | 2017-01-13 | A kind of open-air pit Tailings Dam production technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106733137A CN106733137A (en) | 2017-05-31 |
CN106733137B true CN106733137B (en) | 2019-05-21 |
Family
ID=58948167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710023804.7A Active CN106733137B (en) | 2017-01-13 | 2017-01-13 | A kind of open-air pit Tailings Dam production technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106733137B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2190027C1 (en) * | 2001-09-03 | 2002-09-27 | Институт горного дела - научно-исследовательское учреждение СО РАН | Method of processing of iron-ore production wastes |
CN101708494A (en) * | 2008-10-31 | 2010-05-19 | 鞍钢集团矿业公司 | New method for recycling iron minerals in magnetic separated gangues |
CN104741212A (en) * | 2015-04-07 | 2015-07-01 | 马钢(集团)控股有限公司 | Full-scale comprehensive tailing utilization method |
CN104874472A (en) * | 2015-03-31 | 2015-09-02 | 马钢(集团)控股有限公司 | Automatic separating device for fine-sized slime in tailings conveying manifolds |
CN106088107A (en) * | 2016-06-20 | 2016-11-09 | 中钢集团马鞍山矿山研究院有限公司 | A kind of method that tailings impoundment produces surface subsidence hole, mine in Caving Method with Large Space |
CN106194257A (en) * | 2016-07-05 | 2016-12-07 | 东北大学秦皇岛分校 | A kind of in the method for tailing disposal mastic at the bottom of the open-air pit of activity sedimentation |
-
2017
- 2017-01-13 CN CN201710023804.7A patent/CN106733137B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2190027C1 (en) * | 2001-09-03 | 2002-09-27 | Институт горного дела - научно-исследовательское учреждение СО РАН | Method of processing of iron-ore production wastes |
CN101708494A (en) * | 2008-10-31 | 2010-05-19 | 鞍钢集团矿业公司 | New method for recycling iron minerals in magnetic separated gangues |
CN104874472A (en) * | 2015-03-31 | 2015-09-02 | 马钢(集团)控股有限公司 | Automatic separating device for fine-sized slime in tailings conveying manifolds |
CN104741212A (en) * | 2015-04-07 | 2015-07-01 | 马钢(集团)控股有限公司 | Full-scale comprehensive tailing utilization method |
CN106088107A (en) * | 2016-06-20 | 2016-11-09 | 中钢集团马鞍山矿山研究院有限公司 | A kind of method that tailings impoundment produces surface subsidence hole, mine in Caving Method with Large Space |
CN106194257A (en) * | 2016-07-05 | 2016-12-07 | 东北大学秦皇岛分校 | A kind of in the method for tailing disposal mastic at the bottom of the open-air pit of activity sedimentation |
Non-Patent Citations (3)
Title |
---|
某铜镍硫化矿石浮选尾矿综合回收试验;刘绪光;《矿冶工程》;20151231;第35卷(第6期);第61-63,67页 |
某露天坑膏体尾矿回填工艺探讨与实例;高峰等;《工程建设与设计》;20150420(第4期);第111-114页 |
露天采坑做尾矿库的研究与实践;王玉文等;《采矿技术》;20080531;第8卷(第3期);第81-83页 |
Also Published As
Publication number | Publication date |
---|---|
CN106733137A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103397645B (en) | A kind of dry heap arranges with wet the tailings pile discharge method combined | |
CN105350498B (en) | A kind of tailings discharging method of water saving | |
CN113874531B (en) | Tailing deposit | |
CN104912087B (en) | Center line type tailing damming method applying mold bags | |
CN104741212A (en) | Full-scale comprehensive tailing utilization method | |
CN110777813B (en) | Tailing pond modularized rotational flow grading damming system and implementation method | |
CN113477664B (en) | Remote pumping self-leveling field building method for dense tailing slurry | |
CN105776807B (en) | Removable construction slurry scene rapid dewatering system and method | |
CN112482313B (en) | Long-distance high-concentration tailing discharge process for damming by tailing center line method | |
CN102583449A (en) | Low-grade solid potassium chloride ore solid-to-liquid method | |
CN106733137B (en) | A kind of open-air pit Tailings Dam production technology | |
CN110616319B (en) | Secondary copper sulfide ore inflation infiltration heap leaching method | |
CN113123290A (en) | River channel dredging construction method | |
CN216477459U (en) | Open pit filling structure | |
CN108729407A (en) | Clear husky device is arrheaed in river double flute hardening riverbed exchange | |
CN114382068A (en) | Closed-warehouse construction method for target site mould bag block | |
CN110318369A (en) | The high tailings impoundment of microfine containing mud and technique of building a dam | |
CN107268761A (en) | A kind of surface mine partition type bench energy dissipating relay drainage system and method | |
CN210530845U (en) | Pebble layer earth pressure shield constructs continuous belt and goes out slag separation and utilizes processing apparatus | |
CN209679671U (en) | A kind of screening plant recycled suitable for discarded slurry | |
CN206139330U (en) | Scrape material formula iron mineral tailings reclaimation machine | |
CN101264396B (en) | Ore dressing industry solid-liquid quick disconnect device | |
CN114100844B (en) | Process for comprehensively recovering and concentrating tailings | |
CN216972357U (en) | Environment-friendly aggregate and machine-made sand joint production system | |
CN204626325U (en) | The dense device of a kind of silt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |