CN108729407A - Clear husky device is arrheaed in river double flute hardening riverbed exchange - Google Patents

Clear husky device is arrheaed in river double flute hardening riverbed exchange Download PDF

Info

Publication number
CN108729407A
CN108729407A CN201810369541.XA CN201810369541A CN108729407A CN 108729407 A CN108729407 A CN 108729407A CN 201810369541 A CN201810369541 A CN 201810369541A CN 108729407 A CN108729407 A CN 108729407A
Authority
CN
China
Prior art keywords
river
riverbed
hardening
husky
clear husky
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810369541.XA
Other languages
Chinese (zh)
Inventor
吴彦民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN108729407A publication Critical patent/CN108729407A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • E02B3/023Removing sediments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/02Sediment base gates; Sand sluices; Structures for retaining arresting waterborne material
    • E02B8/023Arresting devices for waterborne materials

Abstract

The present invention relates to the clear husky river double flute hardening riverbed exchanges in a kind of river dredging, especially the Yellow River to arrhea clear husky device.Now illustrate as an example:" change its course the Yellow River " along existing river or at all times in Xiaolangdi Project On The Yellow River downstream and builds up double flute paralleling or branch's steel reinforced concrete hardening riverbed, each riverbed inlet is equipped with control sluice gate, riverbed is equipped with settling pit every suitable distance and bottom is equipped with the Multi-functional ink storage dam of scouring sluice, and channel is equipped with logical ship, water transfer gate between two riverbeds;When necessary clear husky, dam bottom scouring sluice is opened one by one from husky destination storage dam upstream is transported, and silt is suppressed flow with river bed and rushed to the husky destination in downstream, and the Zhi Heliu is shut down after washing down, and river water imports other hardening riverbeds, and being allowed to dry water can clear husky shield river;Such same method exchange is arrheaed, remaining riverbed also can be clear husky, convenient and practical.

Description

Clear husky device is arrheaed in river double flute hardening riverbed exchange
The present invention relates to a kind of river double flute hardening riverbed exchanges to arrhea clear husky device for technical field.
The large and medium-sized river of background technology and reservoir, especially the Yellow River, the big stream of water is anxious, and silt content is high, and sedimentation is serious, It removes difficulties, the security risks such as " hanging river " phenomenon even occur in middle and lower reaches.
To solve this problem, it is common practice to largely build reservoir in Upper-middle Reaches of The Yellow River, with water storage sediment trapping, flood control is cut Stream, truly has huge produce effects.But long-term a large amount of sedimentation bottom storehouses, increase year by year, and storage capacity is reduced, and seriously affect reservoir and use the longevity Life.If bottom storehouse desilting can be agitated and be stired and make muddy by effective means (such as boat-carrying giant, vibrating head, vibration rake etc.), or set Scouring sluice is set, silt is made to be discharged downstream with river water, can effectively extend reservoir normal service life, but lower spoil disposal sand should be such as where It sets?Recently it learns, inland river, outer river exchange the clear sand that shuts off when Gu repaiies Dujiang weir annual repairs, that is, block Wai Jiang, and water walks inland river, cleaning Outer river sand mud;Vice versa blocks interior river and walks outer river, the practicable old method such as cleaning inland river silt, new to the present invention The feasibility of technical solution, novelty, creativeness, practicability provide strong support and foundation.Refer in April, 2018 distribution Total 445th phase modern ancient legend China Super Engineering revealed secrets, related Dujiang weir inland river, outer river exchange shut off clear husky page 25 and Page totally 8 of the attached drawing of page 23 and full text.
Invention content arrheas clear husky device the task of the present invention is to provide a kind of river double flute hardening riverbed exchange, it It effectively far can send the silt that upstream is discharged into the place needed to downstream, be benefited for society.
The object of the present invention is achieved like this:Now illustrate as an example.Such as in the Yellow River sections Yi Xuan Xiaolangdi Project On The Yellow River Downstream, along existing river, (or the practical circuit that " changes its course the Yellow River " at all times is one as entered Huaihe River circuit along areas formerly flooded by the Huanghe River at the fried mouth of Huayuankou River) using deep naughty beach, the low scientific methods such as dam of making increase reservoir storage, desilting amount, the amount of drainning off floodwaters, build up two slots (or more) reinforcing bar is mixed Xtah Crude Clay structure hardens riverbed parallel or branch, each irrigation channel water enter sea;Each riverbed inlet connects and controls sluice gate on dam body, in riverbed Firm firm Multi-functional ink storage dam is had every suitable distance;Bed bottom is equipped with settling pit before dam and behind dam;Dam body lower part is equipped with row Husky aperture and scouring sluice (dam body waist both sides can be provided with discharge water power generation or the dewatering orifice irrigated by lifting water to a higher level with a water pump, etc. and gate, above dam body in Between baltimore groove can lead to special amphibious trackless electricity ship), dam crest bridge formation be two sides channel;Riverbank leads to the appropriate water level of lateral surface Place connects equipped with the remote defeated pipeline of appropriate water supply of drainning off floodwaters and nearby drains river;Two channels between riverbed are equipped with logical ship, water transfer gate.
When the suitable drain time husky clearly in riverbed, upper pond or hardening riverbed need clear beach volleyball to become silted up, it is optional downstream along the river Nearby need reinforce river levee, fill out hole build up fields or at river sand building materials etc. be short distance point of delivery, herein, storage dam scouring sluice should not It opens, opens its upstream dam body scouring sluice successively, silt will suppress flow by river bed and rush at downstream;Wait for silt water transport to mesh Ground, after completing upstream sand discharge task, close hardening river inlet and control sluice gate, river water imports other hardening riverbeds, is allowed to dry Clear Shahe bed river water, will can not wash down silt and remove disembarkation in destination silt and its upstream settling pit.Riverbed or equipment dimension After shield maintenance, you can open control sluice gate and discharge water, restore normal river and supply water.
If you need to clear up other riverbed silts, same method can also see exchange and arrhea clear husky work in fact, convenient and practical.
If you need to logical ship or adjustment water between adjacent two riverbed, you can open channel gate between two riverbeds, complete to lead to ship or tune The tasks such as water.
Description of the drawings:The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is according to specific device schematic diagram proposed by the present invention.
Specific implementation mode:The device installs at least two control sluice gates [1], each gate on main river reservoir dam [1] hardening riverbed [2] is had after, two adjacent riverbed [2] intermediate channels are equipped with logical ship, water transfer gate [3], and each riverbed [2] is interior Equipped with settling pit [4] and Multi-functional ink storage dam [5], dam [5] bottom is equipped with sand discharge hole, and gate is housed.
Riverbed [2] control sluice gate [1] is opened, river water flows to river emptying into the sea, two rivers along riverbed [2], settling pit [4], dam [5] Channel gate [3] can be opened and closed according to need between bed [2].
When upper pond or hardening riverbed [2] need clear husky, downstream sediment conveying ground is first selected, dam [5] should not open herein Scouring sluice, opens fill scouring sluice under its upstream dam [5] successively, and silt will be suppressed flow and rush at downstream;Wait for that silt rushes Only to after destination settling pit [4], you can shut down gate [1], river water imports other riverbeds [2], can will be transported after being allowed to dry water Residual silt removes disembarkation in ground silt and its upstream settling pit [4], and can safeguard riverbed and facility;Throttle valve after completion task [1] it discharges water, river can normal use.When remaining riverbed [2] also needs clear sand, clear husky shield river can be also realized with same method, it is high Effect is reliable.
If you need to logical ship or adjustment water, channel gate [3] is removed, you can use.

Claims (4)

1. one kind arrheaing clear husky device, the dress for the clear husky river double flute hardening riverbed exchange in river dredging, especially the Yellow River Set is to be connected into Hai Hedao in each hardening riverbed [2] inlet equipped with sluice gate [1], each riverbed [2] is controlled;It is characterized in that will River, which is divided to, builds up two slots or multiple-grooved hardening riverbed [2], and channel is equipped with logical ship, water transfer gate [3], each riverbed between two adjacent riverbeds [2] storage dam [5] and settling pit [4] of scouring sluice are provided in.
2. the apparatus according to claim 1, it is characterised in that river is divided to and builds up two slots or multiple-grooved hardening riverbed [2], two Gate [3] is equipped between adjacent riverbed [2].
3. the apparatus according to claim 1, it is characterised in that be equipped with storage dam [5] and settling pit [4] in riverbed [2].
4. the apparatus according to claim 1, it is characterised in that storage dam [5] lower part is equipped with silt orifice, and gate is housed.
CN201810369541.XA 2017-04-17 2018-04-15 Clear husky device is arrheaed in river double flute hardening riverbed exchange Pending CN108729407A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201720429785 2017-04-17
CN2017204297853 2017-04-17

Publications (1)

Publication Number Publication Date
CN108729407A true CN108729407A (en) 2018-11-02

Family

ID=63939174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810369541.XA Pending CN108729407A (en) 2017-04-17 2018-04-15 Clear husky device is arrheaed in river double flute hardening riverbed exchange

Country Status (1)

Country Link
CN (1) CN108729407A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110624280A (en) * 2019-09-28 2019-12-31 兰州理工大学 Sediment basin that hierarchical sediment was used in turn
CN113684784A (en) * 2020-05-18 2021-11-23 吴彦民 Multifunctional hardened riverbed canal network vein with one main river and multiple alternate flow stopping and sand cleaning functions

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1182817A (en) * 1996-11-19 1998-05-27 冯灿周 Method for quick harnessing wide river course silted by mud and sand
CN1648347A (en) * 2005-02-18 2005-08-03 林步东 Method for cleaning channel silt using variable tide control gate
CN103215931A (en) * 2013-04-25 2013-07-24 彭伟 Dredging and pollution discharge method of lake wetland based on river in lake assembled through components
CN203370338U (en) * 2013-06-26 2014-01-01 中国轻工业西安设计工程有限责任公司 Hydraulic conveying fruit-vegetable raw material de-silting basin
CN106245478A (en) * 2016-07-29 2016-12-21 任建龙 Appoint formula multifunctional sealing floodway

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1182817A (en) * 1996-11-19 1998-05-27 冯灿周 Method for quick harnessing wide river course silted by mud and sand
CN1648347A (en) * 2005-02-18 2005-08-03 林步东 Method for cleaning channel silt using variable tide control gate
CN103215931A (en) * 2013-04-25 2013-07-24 彭伟 Dredging and pollution discharge method of lake wetland based on river in lake assembled through components
CN203370338U (en) * 2013-06-26 2014-01-01 中国轻工业西安设计工程有限责任公司 Hydraulic conveying fruit-vegetable raw material de-silting basin
CN106245478A (en) * 2016-07-29 2016-12-21 任建龙 Appoint formula multifunctional sealing floodway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110624280A (en) * 2019-09-28 2019-12-31 兰州理工大学 Sediment basin that hierarchical sediment was used in turn
CN113684784A (en) * 2020-05-18 2021-11-23 吴彦民 Multifunctional hardened riverbed canal network vein with one main river and multiple alternate flow stopping and sand cleaning functions

Similar Documents

Publication Publication Date Title
CN205116250U (en) Sediment removal device of reservoir among hydraulic engineering
CN103938591A (en) Method for reducing heavily silt-carrying river reservoir deposition
Zhang et al. Hydraulic principles of the 2,268-year-old Dujiangyan Project in China
CN108842716B (en) Device for continuously removing sediment in water storage area in all-dimensional and permanent manner
Sumi et al. Retrofitting and change in operation of cascade dams to facilitate sediment sluicing in the Mimikawa River Basin
CN107620285B (en) Suspended river treatment system and method
CN206408667U (en) A kind of backwater gate bottom Accrete clearing device
CN108729407A (en) Clear husky device is arrheaed in river double flute hardening riverbed exchange
JPH10266171A (en) Method of sand and sludge discharge system for reservoir and basin, and sand and sludge discharge system equipment for reservoir and basin
CN206706699U (en) Ramp type sand surfing structure
CN109083091A (en) It is a kind of to guarantee that the construction method that do not stop navigation during shutting off is led in cofferdam
CN1793516A (en) Mould bag line curtain and method for preventing falldown of river bank
CN103925142A (en) Self-suction-type reservoir desilting and electricity generating pipeline system
KR100807404B1 (en) Method to generate power continuously and to purify folluted water by means of constructing reservoir water space having big capacity higher than bank of river
CN105064291A (en) Step sand-blocking dam ecosystem for reservoir desilting and sand prevention
CN212983755U (en) Water and soil conservation system suitable for river crossing of directional drilling of oil and gas conveying pipeline
CN104762922A (en) Water-force-based method for treating debris flow by removing sediment source
CN107975010A (en) Beach volleyball sand structures are divided in head works annular special section automatically
CN203904907U (en) A silt reduction system for a reservoir
CN206607543U (en) A kind of river course antisilting up structure
CN103114565A (en) River-closure water-diversion system suitable for slope torrent watercourse water-diversion generation and hydropower stations
CN108086264B (en) Intensive flooded channel
CN105421288A (en) Large reservoir basin reservoir silt beach sand sluicing structure and construction method thereof
CN115030265B (en) Ecological overflow dam for rapid water intake
CN208039157U (en) A kind of flood control stability dam that can be removed contamination

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181102