CN1182817A - Method for quick harnessing wide river course silted by mud and sand - Google Patents

Method for quick harnessing wide river course silted by mud and sand Download PDF

Info

Publication number
CN1182817A
CN1182817A CN 96120568 CN96120568A CN1182817A CN 1182817 A CN1182817 A CN 1182817A CN 96120568 CN96120568 CN 96120568 CN 96120568 A CN96120568 A CN 96120568A CN 1182817 A CN1182817 A CN 1182817A
Authority
CN
China
Prior art keywords
river course
mud
sand
river
silted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 96120568
Other languages
Chinese (zh)
Inventor
冯灿周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 96120568 priority Critical patent/CN1182817A/en
Publication of CN1182817A publication Critical patent/CN1182817A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The present invention discloses a method for rapid-correction of serious board channel sediment accumulation. Said invented method is applicable to correction of serious channel sedimentation, in particular it is specially suitable for correction of board channel sedimentation of midstream of the Yellow River. Said invention is characterized by building low-head debris dam on the board channel having need of correction, so that it can save investment, quickly obtain result, and its building time is rapid, effect is good, and can solve the sediment control problem of the Sanmenxia Water Reservoir, also is applicable to other similar board river channel.

Description

A kind of method of quick harnessing wide river course silted by mud and sand
The invention discloses a kind of method of quick harnessing wide river course silted by mud and sand, this method is applicable to administers the serious river course of alluvial, the silt of the middle reaches wide river course that is particularly suitable for bringing the Yellow River under control.
At present, the silted by mud and sand that many river courses are arranged both at home and abroad, but up to now, still there is not a kind of method that can administer silt fast to occur, promptly do not find a kind of can making to contain the Shahe water clear method of change fast so far, for example:, do not find to make Sanmenxia Reservoir come water to become clear method through the research in 32 years yet, so that have to allow silt pass reservoir input downstream, flood season can not reservoir impoundment power generation.Because river has a large amount of silts, the downstream, the Yellow River has to utilize the water of 200 billion cubic meters to come sand surfing to go into the sea.Because it is husky that the downstream is used for row to the water of 200 billion cubic meters, causes the downstream serious water shortage, and arid takes place, and drought occurs, make the Yellow River cutout, all these problems all are to come sand many owing to the Sanmenxia Reservoir upstream, river is unclear to be caused.
The method that the purpose of this invention is to provide a kind of quick harnessing wide river course silted by mud and sand.
The object of the present invention is achieved like this: a kind of method of quick harnessing wide river course silted by mud and sand, it is to build the low water head check dam on the wide river course that needs are administered.
Advantage of the present invention is:
1, because the present invention has adopted the low water head check dam, reduced investment, building time be fast, overcome that investment is gone up, on the duration, the many difficulties on the dam site condition;
2, because technical scheme of the present invention has sediment trapping of beach, Zhong Shui river course secondary sediment trapping, twice sediment trapping can make river become clear;
Though 3, the beach ridge in the technical scheme of the present invention is long, it is built with riverbed mud, gathers materials on the spot, and has saved a large amount of expenses of building;
4, because technical scheme of the present invention is to adopt the directional blasting method of building a dam at the dry river groove, blow the river course fill of building a dam of fetching earth, the saving of labor, material-saving, the duration is fast; But 5000 cubic metres of soil of explosive explosion per ton are saved a large amount of manpowers;
5, the water that uses technical scheme of the present invention that the Sanmenxia Reservoir of China is entered all is clear water, can solve the silt alluvial problem that China fails to separate inferior Sanmenxia Reservoir for a long time, builds up then, takes effect then;
In case 6, have only clear water to enter Sanmenxia Reservoir then the huge of economic benefit that obtained will be unable to estimate, because the area that is benefited will exceed the Yellow River and Huai He River sea alluvial fan, all industries all are benefited, and the offspring gets rich, solved the problem of harnessing the Yellow River in thousand, all be a quantum jump in history, in the world, big contribution;
1. after using technical scheme of the present invention to build up the step check dam, one time sedimentation reservoir can progressively deposit the beach that can plant crops.
Fig. 1 is a technical scheme schematic diagram of the present invention.
The present invention is further illustrated below in conjunction with accompanying drawing:
Embodiment 1:
A kind of method of quick harnessing wide river course silted by mud and sand, it is to build the low water head check dam on the river course that needs are administered.The low water head check dam is made up of part flow arrangement 1, suitable dike 2, beach dam 3, barrage 4, fish mouth type part flow arrangement 1 places river course central authorities, the opening that corresponding fish chews formula part flow arrangement 1 has suitable dike 2, and barrage 4 will be blocked along the downstream of dike 3, and barrage 4 both sides have been beach dams.
The suitable dike 2 that river course central authorities build is divided into three strands with the wide river course of original silted by mud and sand, and one is secondary sedimentation reservoir 5 for the centre, and two strands of both sides is a sedimentation reservoir 6.
Can accomplish with riverbed sludge along dike 2, the length of suitable dike 2 can be decided according to the actual requirements; Downstream along a desilting zone outside the dike 2 builds up beach dam 3 with mud; The downstream of secondary desilting zone builds up barrage 4 with concrete, and barrage 4 is provided with ship lock, flood spillway and power station.
Operating principle and the fish on the Dujiang weir, China Sichuan that fish chews formula part flow arrangement 1 chew the branch water together, and the upper reaches comes water through the effect that fish chews formula part flow arrangement 1, and river is divided into two strands, flows to a sedimentation reservoir 6 of both sides respectively; Fish chews the herringbone splitter wall that formula part flow arrangement 2 constitutes with the wire basket of filling stone.
The river that the upstream is come is chewed formula part flow arrangement 2 places to fish and is divided into two strands, about respectively one, all to sedimentation reservoir 6 diffluences, be obstructed during to beach dam 3, flow velocity reduces to zero, loses the husky ability of being with, silt satisfies promptly, and this is a desilting, at this moment, river is hindered, and water level gushes height, when water level reaches with same when high along dike 2, promptly flow into secondary sedimentation reservoir 5 automatically along 2 on dike, carried out the secondary desilting here, become substantially clearly, let out the downstream 4 times through barrage through the river after the above-mentioned desilting process.
Technical solutions according to the invention can be set up a plurality of on the wide river course that need are administered, and form the step check dam, constitute step reservoir, and clear water sediment trapping effect and effect will be more remarkable.

Claims (1)

1, a kind of method of quick harnessing wide river course silted by mud and sand is characterized in that: it is to build the low water head check dam on the wide river course that needs are administered.
CN 96120568 1996-11-19 1996-11-19 Method for quick harnessing wide river course silted by mud and sand Pending CN1182817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96120568 CN1182817A (en) 1996-11-19 1996-11-19 Method for quick harnessing wide river course silted by mud and sand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96120568 CN1182817A (en) 1996-11-19 1996-11-19 Method for quick harnessing wide river course silted by mud and sand

Publications (1)

Publication Number Publication Date
CN1182817A true CN1182817A (en) 1998-05-27

Family

ID=5126422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96120568 Pending CN1182817A (en) 1996-11-19 1996-11-19 Method for quick harnessing wide river course silted by mud and sand

Country Status (1)

Country Link
CN (1) CN1182817A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101165277B (en) * 2006-10-16 2011-04-06 杨琪翔 Reservoir dredging method
CN101736717B (en) * 2009-11-10 2011-06-29 浙江科技学院 Method for dredging silt and harnessing river
CN102733351A (en) * 2011-03-30 2012-10-17 浙江科技学院 Method for treating river entrance
CN102828494A (en) * 2012-09-10 2012-12-19 乔海洲 Flood discharging tunnel grit chamber design and method for fast cleaning deposited sand
CN103276689A (en) * 2013-05-24 2013-09-04 重庆交通大学 Method for identifying pebble sand waves on upper reach channels of Yangtze River
CN103276690A (en) * 2013-05-24 2013-09-04 重庆交通大学 Method for governing pebble sand wave beaches on upper reaches of Yangtze River
CN103382716A (en) * 2013-08-05 2013-11-06 青岛恒生源生态农业有限公司 Water intake and distribution wall of holothurian aquaculture pond
CN103938591A (en) * 2014-02-27 2014-07-23 黄河水利委员会河南黄河河务局 Method for reducing heavily silt-carrying river reservoir deposition
CN105064291A (en) * 2015-08-18 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 Step sand-blocking dam ecosystem for reservoir desilting and sand prevention
CN105089006A (en) * 2014-05-21 2015-11-25 天津虹炎科技有限公司 Siltation reduction system for reservoir
CN105089020A (en) * 2014-05-21 2015-11-25 天津虹炎科技有限公司 Siltation reduction method for reservoir
CN105839595A (en) * 2016-03-08 2016-08-10 华北水利水电大学 Silt removal device for water flow in channel
CN106149622A (en) * 2016-08-30 2016-11-23 程铖 Forfend flow guide system and the method for mud-rock flow
CN106284196A (en) * 2016-09-09 2017-01-04 济南舜景医药科技有限公司 Water transferring canal
CN108374390A (en) * 2018-03-26 2018-08-07 张鹏 A kind of protective device and its method of river torrent dangerous shoal neutralizing impact failure power
CN108729407A (en) * 2017-04-17 2018-11-02 吴彦民 Clear husky device is arrheaed in river double flute hardening riverbed exchange
CN108842716A (en) * 2018-07-11 2018-11-20 李建英 A kind of comprehensive permanent device for persistently removing water storage reservoir area silt sediment
CN111456151A (en) * 2020-04-24 2020-07-28 河南云睿工程咨询有限公司 Artificial lake system in yellow river levee and method for carrying out sand sedimentation, water supply, emergency water storage and flood discharge by using artificial lake system

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101165277B (en) * 2006-10-16 2011-04-06 杨琪翔 Reservoir dredging method
CN101736717B (en) * 2009-11-10 2011-06-29 浙江科技学院 Method for dredging silt and harnessing river
CN102733351A (en) * 2011-03-30 2012-10-17 浙江科技学院 Method for treating river entrance
CN102733351B (en) * 2011-03-30 2014-08-20 浙江科技学院 Method for treating river entrance
CN102828494A (en) * 2012-09-10 2012-12-19 乔海洲 Flood discharging tunnel grit chamber design and method for fast cleaning deposited sand
CN103276689A (en) * 2013-05-24 2013-09-04 重庆交通大学 Method for identifying pebble sand waves on upper reach channels of Yangtze River
CN103276690A (en) * 2013-05-24 2013-09-04 重庆交通大学 Method for governing pebble sand wave beaches on upper reaches of Yangtze River
CN103382716A (en) * 2013-08-05 2013-11-06 青岛恒生源生态农业有限公司 Water intake and distribution wall of holothurian aquaculture pond
CN103938591A (en) * 2014-02-27 2014-07-23 黄河水利委员会河南黄河河务局 Method for reducing heavily silt-carrying river reservoir deposition
CN103938591B (en) * 2014-02-27 2015-12-02 黄河水利委员会河南黄河河务局 A kind of method reducing reservoir on hyperconcentration river alluvial
CN105089006A (en) * 2014-05-21 2015-11-25 天津虹炎科技有限公司 Siltation reduction system for reservoir
CN105089020A (en) * 2014-05-21 2015-11-25 天津虹炎科技有限公司 Siltation reduction method for reservoir
CN105064291A (en) * 2015-08-18 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 Step sand-blocking dam ecosystem for reservoir desilting and sand prevention
CN105839595A (en) * 2016-03-08 2016-08-10 华北水利水电大学 Silt removal device for water flow in channel
CN106149622A (en) * 2016-08-30 2016-11-23 程铖 Forfend flow guide system and the method for mud-rock flow
CN106284196A (en) * 2016-09-09 2017-01-04 济南舜景医药科技有限公司 Water transferring canal
CN106284196B (en) * 2016-09-09 2019-08-20 新沂经济开发区建设发展有限公司 Water transferring canal
CN108729407A (en) * 2017-04-17 2018-11-02 吴彦民 Clear husky device is arrheaed in river double flute hardening riverbed exchange
CN108374390A (en) * 2018-03-26 2018-08-07 张鹏 A kind of protective device and its method of river torrent dangerous shoal neutralizing impact failure power
CN108842716A (en) * 2018-07-11 2018-11-20 李建英 A kind of comprehensive permanent device for persistently removing water storage reservoir area silt sediment
CN111456151A (en) * 2020-04-24 2020-07-28 河南云睿工程咨询有限公司 Artificial lake system in yellow river levee and method for carrying out sand sedimentation, water supply, emergency water storage and flood discharge by using artificial lake system

Similar Documents

Publication Publication Date Title
CN1182817A (en) Method for quick harnessing wide river course silted by mud and sand
CN102061677B (en) Full-section water wetland purification system suitable for normal water level of river
CN109778798B (en) Multistage hole pipe weir flow dividing and silt discharging method
CN1318702C (en) Installation for trapping sediment from riverbed and seabed promoting siltation and erosion protection
CN102926362B (en) Pollution control and emission reduction method for farmland drainage
CN103011497A (en) Backwash combination type farmland non-point source pollution cut-off purification system
CN202936287U (en) Back-washing combined farmland non-point source pollution intercepting and purifying system
CN215367094U (en) Slope protection device for hydraulic engineering
CN218810791U (en) Cut-to-turn and get straight river course aquatic attitude clean system
CN110055925B (en) Water storage and sand discharge separation system for large and medium reservoir in flood season of sandy river
CN110965519B (en) Method for solving unsmooth flow of urban mass water body
CN87100533A (en) Prevent that silt from entering the method for reservoir
CN209194485U (en) Diversion tunnel structure
CN108658208B (en) In-situ purification treatment device for tailing water riverway
CN207484433U (en) Compound fish channel structure on Narrow Valleys landform dam
CN112726772A (en) Wet pond system for sponge city and method for purifying rainwater by using wet pond system
CN206245322U (en) Landscape ecology slope processing system
CN210597186U (en) Side edge type multifunctional reservoir
CN1209487A (en) Method for preventing and controlling soil erosion
CN1041008C (en) Method for controlling rivers' silt based on rotary planing principle
CN210712736U (en) Ecological supporting construction of hydraulic engineering
CN217480066U (en) Ecological weir pool of multistage valley brook
CN113642078B (en) Beach diversion regulation and control method for water environment treatment
CN210439250U (en) Water storage and sand discharge separation system for sand-rich river reservoir in flood season
CN218466470U (en) Sand blocking weir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication