CN106223613A - The installation and positioning structure of mould bases vertical rod - Google Patents

The installation and positioning structure of mould bases vertical rod Download PDF

Info

Publication number
CN106223613A
CN106223613A CN201610584587.4A CN201610584587A CN106223613A CN 106223613 A CN106223613 A CN 106223613A CN 201610584587 A CN201610584587 A CN 201610584587A CN 106223613 A CN106223613 A CN 106223613A
Authority
CN
China
Prior art keywords
vertical rod
bar
cross
installation
mould bases
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610584587.4A
Other languages
Chinese (zh)
Other versions
CN106223613B (en
Inventor
李坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suntown Technology Group Co Ltd
Original Assignee
Suntown Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suntown Technology Group Co Ltd filed Critical Suntown Technology Group Co Ltd
Priority to CN201610584587.4A priority Critical patent/CN106223613B/en
Publication of CN106223613A publication Critical patent/CN106223613A/en
Application granted granted Critical
Publication of CN106223613B publication Critical patent/CN106223613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention provides the installation and positioning structure of a kind of mould bases vertical rod, including cross bar, vertical rod, connect high bar;Cross bar two ends are provided with plug, and cross bar includes the first cross-bar unit and the second cross-bar unit, and the first cross-bar unit is provided with hole, location;Vertical rod is provided with socket, and vertical rod includes positioning vertical rod and activity vertical rod, and activity vertical rod is provided with mounting hole;Between first cross-bar unit and location vertical rod, all realize being fixedly linked by socket adaptor plug between the second cross-bar unit and location vertical rod unit;Run through mounting hole by connecting elements between second cross-bar unit and activity vertical rod unit and hole, location realizes being fixedly linked;Connect high bar and be located at the bottom of activity vertical rod.Compared with correlation technique, the present invention has the beneficial effects that, offers hole, location in the installation and positioning structure of the mould bases vertical rod that the present invention provides on cross bar, offer waist-shaped hole in vertical rod, realize vertical rod location and installation by connecting elements, it is not necessary to fastener, simple in construction is convenient, and mounting or dismounting efficiency is high.

Description

The installation and positioning structure of mould bases vertical rod
[technical field]
The present invention relates to die carrier technology field for building, particularly relate to the installation and positioning structure of a kind of mould bases vertical rod.
[background technology]
The most at home, aluminum alloy mould plate has been widely applied at skyscraper, aluminum alloy mould plate from heavy and light, assemble and have enough to meet the need Convenient, concrete formation effective, there is the advantage that wooden model, punching block are incomparable.
Aluminum alloy mould plate is the shape according to building structure, the template system of size sizing configuration, it is adaptable to index bed is tied Structure construct, and basement, nonstandard Rotating fields change many, can the number of turnover few, use aluminum alloy mould plate cost put into height, be not suitable for In using aluminum alloy mould plate.The floor height of basement is under normal circumstances higher than index bed, and the support system of aluminum alloy mould plate is the most uncomfortable For basement construction, the mould bases type of common basement construction has fastener type steel pipe support system, dish button steel pipe support System, socket joint type key slot type support system, its mid-game button steel pipe supporting system, socket joint type key slot type support system have rod member Standardization, seriation, feature that assembly precision is high.
For solving above-mentioned technical problem, break through aluminum alloy mould plate in basement, the bottleneck of nonstandard layer construction, public affairs in the application Open one and first built mould bases, utilize the vertical rod of mould bases that the mentality of designing of aluminum alloy mould plate is installed after being accurately positioned.
Therefore, it is necessary that the installation and positioning structure providing a kind of new mould bases vertical rod is to overcome above-mentioned technical problem in fact.
[summary of the invention]
The installation of the mould bases vertical rod that the technical issues that need to address of the present invention are to provide a kind of simple in construction, mounting or dismounting efficiency is high Location structure.
The installation and positioning structure of the present invention a kind of mould bases vertical rod, including collectively forming some cross bars of frame structure, some If vertical rod stem grafting height bar;
The two ends of described cross bar are provided with the plug being fixedly linked with described cross bar, described cross bar include the first cross-bar unit and Second cross-bar unit, described first cross-bar unit is provided with and runs through hole, some location thereon;
Described vertical rod is provided with the socket being fixedly linked with described vertical rod, and described vertical rod includes positioning vertical rod and activity is stood Bar, described activity vertical rod is provided with mounting hole;
Accept described plug by described socket between described first cross-bar unit and the vertical rod of described location and realize fixing phase Even;
Accept described plug by described socket between described second cross-bar unit and described location vertical rod unit and realize solid Fixed connected;
Described mounting hole and institute is run through by connecting elements between described second cross-bar unit and described activity vertical rod unit State hole, location to realize being fixedly linked;
Described connect high bar and be located at the bottom of described activity vertical rod.
Preferably, the bottom welded sleeve of described activity vertical rod, described activity vertical rod is hollow cylindrical, described sleeve Interior circular diameter connects the outside diameter of high bar described in being more than or equal to.
Preferably, hole, described location is the round of some circular holes composition.
Preferably, described connecting elements is pin pin sheet, or threaded connector, or latch.
Preferably, described threaded connector is bolt and nut.
Preferably, described in connect high bar be hollow cylindrical steel pipe, described in connect the external diameter of high bar with described activity vertical rod outside Footpath is identical.
The present invention has the beneficial effects that, one disclosed herein first builds mould bases, and the vertical rod utilizing mould bases is accurately fixed The mentality of designing of aluminum alloy mould plate is installed after Wei.Break through aluminum alloy mould plate in basement, the bottleneck of nonstandard layer construction, and the present invention Hole, location is provided on cross bar in the installation and positioning structure of the mould bases vertical rod provided, vertical rod is offered waist-shaped hole, passes through connecting elements Realizing vertical rod location and installation, it is not necessary to fastener, simple in construction is convenient, and mounting or dismounting efficiency is high.
[accompanying drawing explanation]
Fig. 1 is the overall structure schematic diagram of the installation and positioning structure of mould bases vertical rod of the present invention;
Fig. 2 be mould bases vertical rod of the present invention installation and positioning structure in the first cross-bar unit and the structural representation of associated components Figure;
Fig. 3 be mould bases vertical rod of the present invention installation and positioning structure in activity vertical rod and the structural representation of associated components;
Fig. 4 be mould bases vertical rod of the present invention installation and positioning structure in the structure that is connected with the first cross-bar unit of activity vertical rod show It is intended to;
In figure: cross bar 1, vertical rod 2, connect high bar 3, plug 4, socket 5, connecting elements 6, sleeve 7, the first cross-bar unit 11, Second cross-bar unit 12, positions hole 111, positions vertical rod 21, activity vertical rod 22, mounting hole 221.
[detailed description of the invention]
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Seeing accompanying drawing 1-4, the installation and positioning structure of the present invention a kind of mould bases vertical rod, if including collectively forming frame structure If dry cross bar 1, some vertical rods 2 stem grafting height bar 3;Depending on the quantity of respective members is according to on-the-spot real space size.
The two ends of cross bar 1 are provided with the plug 4 being fixedly linked with cross bar 1, and cross bar 1 includes that the first cross-bar unit 11 and second is horizontal Bar unit 12, the first cross-bar unit 11 is provided with and runs through hole, some location thereon 111.
Vertical rod 2 is provided with the socket 5 being fixedly linked with vertical rod 2, and vertical rod 2 includes positioning vertical rod 21 and activity vertical rod 22, lives Dynamic vertical rod 22 is provided with mounting hole 221.
Realize being fixedly linked by socket 5 adaptor plug 4 between first cross-bar unit 11 and location vertical rod 21.
Realize being fixedly linked by socket 5 adaptor plug 4 between second cross-bar unit 12 and location vertical rod 21 unit.
Mounting hole 221 and hole, location is run through by connecting elements 6 between second cross-bar unit 12 and activity vertical rod 22 unit 111 realize being fixedly linked.
Connect high bar 3 and be located at the bottom of activity vertical rod 22.
The bottom welded sleeve 7 of activity vertical rod 22, activity vertical rod 22 is hollow cylindrical, and the interior circular diameter of sleeve 7 is more than Or equal to connecing the outside diameter of high bar 3.
Hole 111, location is the round of some circular holes composition.
Connecting elements 6 is pin pin sheet, or threaded connector, or latch.
Threaded connector is bolt and nut.
Connecing high bar 3 is hollow cylindrical steel pipe, and the external diameter connecing high bar 3 is identical with the external diameter of activity vertical rod 22.
The effect of mounting hole 221 is the vertical deviation for regulating in installation process.
Welding socket 5 in vertical rod 2, socket 5 is used for accepting cross bar 1.
Location vertical rod 21 and cross bar 1 pass through socket 5 plug 4 and be applied in combination, as the installation and positioning structure of mould bases vertical rod Main body frame.
Hole 111, location is the round of some circular holes composition, can realize activity vertical rod 22 and position in the installation of diverse location.
Waist-shaped hole can be used for regulating vertical deviation, adapts to the impact caused in ground injustice.
Connect high bar 3 for short steel pipes, connect high bar 3 diameter equal to mobile jib diameter, connect high bar 3 for raising activity vertical rod 22, rise The effect interfered to the socket 5 avoided in activity vertical rod 22 and the first cross-bar unit 11.
Connecting elements 6 is pin pin sheet, or threaded connector, or latch.Simple in construction is convenient, and mounting or dismounting efficiency is high.
The present invention has the beneficial effects that, one disclosed herein first builds mould bases, and the vertical rod utilizing mould bases is accurately fixed The mentality of designing of aluminum alloy mould plate is installed after Wei.Break through aluminum alloy mould plate in basement, the bottleneck of nonstandard layer construction, and the present invention Hole, location is provided on cross bar in the installation and positioning structure of the mould bases vertical rod provided, vertical rod is offered waist-shaped hole, passes through connecting elements Realizing vertical rod location and installation, it is not necessary to fastener, simple in construction is convenient, and mounting or dismounting efficiency is high.
Above-described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art For, without departing from the concept of the premise of the invention, it is also possible to make improvement, but these belong to the protection model of the present invention Enclose.

Claims (6)

1. the installation and positioning structure of a mould bases vertical rod, it is characterised in that if including the some cross bars collectively forming frame structure If dry vertical rod stem grafting height bar;
The two ends of described cross bar are provided with the plug being fixedly linked with described cross bar, and described cross bar includes the first cross-bar unit and second Cross-bar unit, described first cross-bar unit is provided with and runs through hole, some location thereon;
Described vertical rod is provided with the socket being fixedly linked with described vertical rod, and described vertical rod includes positioning vertical rod and activity vertical rod, institute The activity vertical rod of stating is provided with mounting hole;
Accept described plug by described socket between described first cross-bar unit and the vertical rod of described location to realize being fixedly linked;
Accept described plug by described socket between described second cross-bar unit with described location vertical rod unit and realize fixing phase Even;
Described mounting hole and described fixed is run through by connecting elements between described second cross-bar unit and described activity vertical rod unit Hole, position realizes being fixedly linked;
Described connect high bar and be located at the bottom of described activity vertical rod.
The installation and positioning structure of mould bases vertical rod the most according to claim 1, it is characterised in that the bottom of described activity vertical rod Welded sleeve, described activity vertical rod is hollow cylindrical, the interior circular diameter of described sleeve be more than or equal to described in connect outside high bar Circular diameter.
The installation and positioning structure of mould bases vertical rod the most according to claim 2, it is characterised in that hole, described location is some circles The round of hole composition.
The installation and positioning structure of mould bases vertical rod the most according to claim 3, it is characterised in that described connecting elements is pin Pin sheet, or threaded connector, or latch.
The installation and positioning structure of mould bases vertical rod the most according to claim 4, it is characterised in that described threaded connector is spiral shell Bolt nut.
The installation and positioning structure of mould bases vertical rod the most according to claim 5, it is characterised in that described in connect high bar be open circles Column steel pipe, described in connect the external diameter of high bar identical with the external diameter of described activity vertical rod.
CN201610584587.4A 2016-07-24 2016-07-24 The installation and positioning structure of mould bases upright bar Active CN106223613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610584587.4A CN106223613B (en) 2016-07-24 2016-07-24 The installation and positioning structure of mould bases upright bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610584587.4A CN106223613B (en) 2016-07-24 2016-07-24 The installation and positioning structure of mould bases upright bar

Publications (2)

Publication Number Publication Date
CN106223613A true CN106223613A (en) 2016-12-14
CN106223613B CN106223613B (en) 2019-01-29

Family

ID=57532511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610584587.4A Active CN106223613B (en) 2016-07-24 2016-07-24 The installation and positioning structure of mould bases upright bar

Country Status (1)

Country Link
CN (1) CN106223613B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309348A (en) * 2021-06-23 2021-08-27 高创建工股份有限公司 High-altitude structural beam formwork support

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB593308A (en) * 1945-06-11 1947-10-14 William Hamilton Improvements in or relating to formwork for moulding concrete columns and the like
GB1257463A (en) * 1967-12-09 1971-12-22
DE2725974A1 (en) * 1976-06-10 1977-12-22 Nils Arthur Christensson Scaffolding with square section posts and rails - having aligned apertures in opposing surfaces with those in adjacent surfaces staggered
FR2661208A1 (en) * 1990-04-23 1991-10-25 Arnault Francis Connection with key for scaffolding
CN103276893A (en) * 2013-06-04 2013-09-04 河南国基建设集团有限公司 Novel composite structure for supporting rigid building template and construction method
CN203654688U (en) * 2013-12-02 2014-06-18 中国建筑一局(集团)有限公司 Movable telescopic splicing type operation frame
CN104594628A (en) * 2015-01-07 2015-05-06 福建工程学院 Structure template supporting system for cast-in-place concrete beam plate and construction method for structure template supporting system
CN204357119U (en) * 2014-12-24 2015-05-27 黄�俊 Building operations scaffold fast mounting-dismounting support system
CN105421735A (en) * 2015-11-02 2016-03-23 中国建筑股份有限公司 Aluminum alloy supporting system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB593308A (en) * 1945-06-11 1947-10-14 William Hamilton Improvements in or relating to formwork for moulding concrete columns and the like
GB1257463A (en) * 1967-12-09 1971-12-22
DE2725974A1 (en) * 1976-06-10 1977-12-22 Nils Arthur Christensson Scaffolding with square section posts and rails - having aligned apertures in opposing surfaces with those in adjacent surfaces staggered
FR2661208A1 (en) * 1990-04-23 1991-10-25 Arnault Francis Connection with key for scaffolding
CN103276893A (en) * 2013-06-04 2013-09-04 河南国基建设集团有限公司 Novel composite structure for supporting rigid building template and construction method
CN203654688U (en) * 2013-12-02 2014-06-18 中国建筑一局(集团)有限公司 Movable telescopic splicing type operation frame
CN204357119U (en) * 2014-12-24 2015-05-27 黄�俊 Building operations scaffold fast mounting-dismounting support system
CN104594628A (en) * 2015-01-07 2015-05-06 福建工程学院 Structure template supporting system for cast-in-place concrete beam plate and construction method for structure template supporting system
CN105421735A (en) * 2015-11-02 2016-03-23 中国建筑股份有限公司 Aluminum alloy supporting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309348A (en) * 2021-06-23 2021-08-27 高创建工股份有限公司 High-altitude structural beam formwork support
CN113309348B (en) * 2021-06-23 2024-01-30 高创建工股份有限公司 High altitude construction roof beam formwork support

Also Published As

Publication number Publication date
CN106223613B (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN204781884U (en) Prop builder's jack of structure down
CN110306658A (en) Steel construction for assembled architecture assembles system and construction method
CN207582993U (en) A kind of assembled architecture wall panel assembly support device
CN104340843B (en) Reactor core hoisting tool
CN203684631U (en) Tripod construction platform structure for blast furnace shell
CN106223613A (en) The installation and positioning structure of mould bases vertical rod
CN203256899U (en) Demountable modularized combined house
CN203740906U (en) Portal crane
CN106276630A (en) A kind of internal-climbing tower crane supporting construction of band shearing frame
CN103486335A (en) Method for fixing super high-rise construction concrete pumping pipe
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN103255837A (en) Detachable modular combined room
CN106764075A (en) For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed
CN204667838U (en) Component truss and the advertisement truss adopting this component truss to install
CN103362315A (en) Hanger for integral hoisting of pipeline and construction method thereof
CN204435421U (en) A kind of assembling manhole
CN206203725U (en) Small-sized sustaining wall
CN202745351U (en) Bailey truss supporting structure
CN205118450U (en) Concrete pump pipe fixing device
CN206299900U (en) For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed
CN205712645U (en) A kind of avoid-dismantle floor bottom mould plate suspension member
CN204299207U (en) A kind of frame supported system
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN205242988U (en) Cantilever type steel with inclined support at bottom
CN204486514U (en) Flame forming plate platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant