CN106276630A - A kind of internal-climbing tower crane supporting construction of band shearing frame - Google Patents
A kind of internal-climbing tower crane supporting construction of band shearing frame Download PDFInfo
- Publication number
- CN106276630A CN106276630A CN201610866598.1A CN201610866598A CN106276630A CN 106276630 A CN106276630 A CN 106276630A CN 201610866598 A CN201610866598 A CN 201610866598A CN 106276630 A CN106276630 A CN 106276630A
- Authority
- CN
- China
- Prior art keywords
- girder
- shearing frame
- tower crane
- frame
- supporting construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
- B66C23/202—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Abstract
The internal-climbing tower crane supporting construction of a kind of band shearing frame, belongs to building machinery technical field.Including shearing frame, bearing and connector between two girders, two girders, described shearing frame is two, it be arranged in parallel between two girders, symmetrical along two girder centrages, corresponding support position, girder upper surface at installation shearing frame is provided with the bearing supporting tower crane, and each girder two ends are separately installed with the connector being connected with wall body built-in fitting.The present invention uses two shearing framves, it is ensured that moment of torsion that girder born is greatly reduced under normal operating conditions, improves girder and the stress of beam-ends connector.Moment of torsion will be produced when girder is by tower crane horizontal force action, and there is torsional deflection, shearing frame oblique fulcrum bar has the effect keeping shearing frame shape invariance, after being connected with shearing frame, the two respective torsional deflections of girder suffer restraints, thus respective for girder torque axis is changed to the vertical load on beam end support, improve the stress of girder.
Description
Technical field
The invention belongs to building machinery technical field, particularly relate to the internal-climbing tower crane supporting of a kind of band shearing frame
Structure.
Background technology
Plug-in or inner climbing type two ways is generally used to be supported on and build for high-rise and high-rise building derrick crane
Build on thing, and raise along with the rising of building, plug-in or in climb be to determine according to the needs of architecture construction.
The internal-climbing tower crane supporting construction of presently used band shearing frame substantially has two kinds of versions.One is
The supporting construction being made up of parts such as two girders that climb, bearing, supporting legs, girder two ends and wall connecting.Inner climbing type tower crane is pacified
It is contained in elevator hoistways, due to installation constitution requirement, it is necessary on elevator shear wall, bury built-in fitting, four of two girders
Bearing is bolted with the built-in fitting bearing buried in advance, this in climb supporting construction fairly simple.But owing to tower crane is propped up
Seating is in girder upper surface, and tower crane is delivered to the horizontal force of girder and produces moment of torsion on girder, and is delivered on the bearing at two ends,
It is unfavorable for girder and the stress of two end bearings.Also have installs horizontal brace rod between two girders additional, but due to master
The torsion of beam does not has inhibitory action, can not improve the stress of girder, owing to there being tower crane support frame on girder bearing,
So the stress that level connection joint pole pair improves beam body does not has practical significance.
Climb supporting construction in another kind in the first, climb on the basis of structure the horizontal hound of side installation at girder,
Generally three horizontal hounds, the other end of bar is connected with body of wall, four ends of two girders respectively with left and right two face wall
Body be connected, connect by tower crane support frame between two girders, this in climb structure by horizontal hound by tower crane generation
Horizontal force be directly delivered on body of wall, it is possible to improve girder beam body and the stress of girder two ends body of wall.But need to increase
Support level hound with wall connecting at built-in fitting, installation process is the most more complicated, and add tower crane supporting become
This.
Climbing tower crane supporting construction of the present invention, including the shearing frame between two girders, two girders,
Bearing and connector, described shearing frame is two, be arranged in parallel between two girders, symmetrical along two girder normal direction centrages, often
Individual girder two ends are separately installed with the connector being connected with wall body built-in fitting.Inside climb supporting construction girder by the horizontal masterpiece of tower crane
Used time will produce moment of torsion, and torsional deflection occurs, and shearing frame oblique fulcrum bar has the effect keeping shearing frame shape invariance, with shearing
After frame connects, the two respective torsional deflections of girder suffer restraints, thus respective for girder torque axis changes to hanging down on beam end support
Straight load, improves the stress of girder, the stress of end of main beam junction, also improves support girder body of wall simultaneously
Stress, and this supporting construction installation process is simple, easily operates, it is possible to reduce support cost.
Summary of the invention
For the technical problem of above-mentioned existence, the present invention provides the internal-climbing tower crane supporting of a kind of band shearing frame to tie
Structure, it can effectively improve support girder and end of main beam and support the stress of body of wall, and structure fabrication is easy, installs letter
Single, working performance can be improved, reduce overall support cost.
It is an object of the invention to be achieved through the following technical solutions:
A kind of internal-climbing tower crane supporting construction of band shearing frame, including the shearing frame between two girders, two girders,
Bearing and connector, described shearing frame is two, be arranged in parallel between two girders, symmetrical along two girder centrages, corresponding
Seat is put, and is provided with supports the bearing of tower crane installing the girder upper surface at shearing frame, each girder two ends be separately installed with
The connector that wall body built-in fitting connects.
Further, described shearing frame is the triangular structure being made up of horizontal strut, vertical pole and inclined support bar,
At triangle point, it may be assumed that inclined support bar two ends and horizontal strut one end are all with pin shaft hole.
Further, described shearing frame is to constitute by being provided with inclined support bar in rectangular frame, its corner with girder ear
The pin shaft hole that plate connects.
Further, described inclined support bar is a diagonal of rectangular frame, and rectangular frame is configured to triangle knot
Structure.
Further, the rectangular frame of described shearing frame is welded by two horizontal struts, two vertical poles and inclined support bar
Connecing composition, horizontal strut one end has pin shaft hole, the other end to be welded on inclined support bar, and vertical pole two ends are respectively welded at level
On pole and inclined support bar, all there is pin shaft hole at inclined support bar two ends, by the pin shaft hole on horizontal strut and inclined support bar respectively
It is connected with the otic placode on the girder of both sides.
Further, under described shearing frame, horizontal strut is connected end and is provided with keeper with girder, and girder is connected
Otic placode be provided with location-plate, during installation, keeper is placed on location-plate, it is ensured that shearing rack-mounted enter after on each connecting hole and girder
The connecting hole of otic placode is the most identical, makes shearing frame easily install.
Further, described keeper is square tube, pipe or round steel.
Further, described pin shaft hole both sides are respectively provided with the first reinforcing plate, the second reinforcing plate is strengthened.
The invention have the benefit that
1. the present invention uses two shearing shelf structures, is respectively symmetrically and is connected with girder, and tower crane is acted on by horizontal force, inside climbs
To produce moment of torsion when supporting construction girder is by tower crane horizontal force action, and torsional deflection occurs, shearing frame oblique fulcrum bar has guarantor
Holding the effect of shearing frame shape invariance, after being connected with shearing frame, the two respective torsional deflections of girder suffer restraints, thus by girder
Respective torque axis changes to the vertical load on beam end support, improves the stress of girder, being subject to of end of main beam junction
Power state, also improves the stress of support girder body of wall simultaneously.
There is pin shaft hole at shearing shelf structure corner the most of the present invention, connected with being connected otic placode on girder by bearing pin, convenient peace
Assembly and disassembly work;The oblique fulcrum bar of shearing frame is a diagonal of rectangle frame, and rectangular configuration is configured to triangular structure, protects
The stability of card structure.
The pin shaft hole both sides of shearing shelf structure the most of the present invention arrange reinforcing plate, during installation, meet the requirement of strength in hole, it is possible to
Improve security reliability.Using bearing pin, split pin to connect, be easy for installation and removal work.
Shearing shelf structure the most of the present invention is provided with location square tube, coordinates with the location-plate being connected otic placode, plays the effect of location,
Facilitate the installation of shearing frame, improve installation effectiveness.
Accompanying drawing explanation
Fig. 1 is the use view of the present invention.
Fig. 2 is the structural representation of the present invention.
Fig. 3 is the floor map of Fig. 2.
Fig. 4 is the A-A sectional view in Fig. 3.
Fig. 5 is the B-B sectional view in Fig. 4.
Fig. 6 is the I portion enlarged diagram in Fig. 4.
Fig. 7 is the shearing shelf structure schematic diagram of the embodiment of the present invention 1.
Fig. 8 is the shearing shelf structure schematic diagram of the embodiment of the present invention 2.
In figure: 1. horizontal strut, 2. inclined support bar, 3. vertical pole, 4. the first reinforcing plate, 5. the second reinforcing plate, 6. fixed
Position square tube, 7. girder, 8. connector, 9. upper ear plate, 10. lower ear plate, 11. tower crane, 12. bodies of wall, 13. tower body supports, 14. pins
Axle, 15. split pins, 16. bearings, 17. first bolt groups, 18. location-plates, 19. second bolt groups, 20. shearing framves.
Detailed description of the invention
Describe the present invention with embodiment below in conjunction with the accompanying drawings.
Embodiment 1: as Figure 1-Figure 4, the internal-climbing tower crane supporting construction of a kind of band shearing frame, including two masters
Shearing frame 20, bearing 16 and connector 8 between 7, two girders 7 of beam, described shearing frame is two, parallel between two girders 7
Arranging, symmetrical along two girder centre line axis X, corresponding bearing 16 position, girder 7 upper surface at installation shearing frame 20 is provided with and props up
The bearing 16 of support tower crane, each girder 7 two ends are separately installed with the connector 8 being connected with wall body built-in fitting.
Described connector 8 and bearing 16 are existing structure.
As shown in Fig. 4, Fig. 7, described shearing frame 20 is to constitute by being provided with inclined support bar 2 in rectangular frame, its corner with
The pin shaft hole being connected with girder 7 otic placode.Described inclined support bar 2 is a diagonal of rectangular frame, is resolved into by rectangular frame
Triangular structure.
The rectangular frame of described shearing frame 20 is welded structure by 1, two vertical poles 3 of two horizontal struts and inclined support bar 2
Becoming, horizontal strut 1 one end has pin shaft hole, the other end to be welded on inclined support bar 2, and vertical pole 3 two ends are respectively welded at level
On pole 1 and inclined support bar 2, all there is pin shaft hole at inclined support bar 2 two ends, by the pin shaft hole on horizontal strut 1 and inclined support bar 2
It is connected with the otic placode on both sides girder 7 respectively.
20 times horizontal struts 1 of described shearing frame are connected end and are provided with keeper 6 with girder 7, and girder 7 is connected down
Otic placode is provided with location-plate 18, and during installation, keeper 6 is placed on location-plate 18, it is ensured that shearing frame 20 load after each connecting hole with
The connecting hole of girder upper ear plate is the most identical, makes shearing frame 20 easily install.Described keeper 6 is square tube, pipe or circle
Steel, this example uses square tube.
The pin shaft hole both sides that described shearing frame 20 is connected with girder 7 are respectively provided with first reinforcing plate the 4, second reinforcing plate 5 and add
By force.
The installation process when present invention uses:
As shown in Fig. 1-Fig. 7, after tower crane uses under independent operating mode, operating mode of climbing in needing to be converted into, first exist
Built-in fitting is buried in the body of wall 12 of building.By the horizontal strut 1 of preprepared atresia, inclined support bar 2, vertical pole 3
Being welded into an overall shearing frame 20 according to drawing requirement, corresponding diagram paper size welds the first reinforcing plate 4 He in the position in hole
Second reinforcing plate 5, reinforcing plate is bored the hole of shearing frame corner, is welded keeper at lower horizontal strut 1 correspondence position after having welded
6.The tower body 11 of derrick crane is seated on the tower body support 13 being connected with the interior bearing 16 climbed in support system structure, logical
Cross the second bolt group 19 to connect.Inside climb support system girder 7 to be connected with connector 8 (being commonly called as bracket) by the first bolt group 17
Connect, be connected with the built-in fitting buried in advance at body of wall 12 outside connector 8.When shearing frame 20 is installed, first that shearing frame 20 is left
Lower section keeper 8 is placed on the location-plate 18 of lower ear plate 10 bottom being welded in left beam 7, shearing frame 20 lower right oblique fulcrum bar 2
Pipe trimming is placed on the location-plate 18 being welded in right girder 7 lower ear plate 10 bottom, then utilizes bearing pin 14 He by small adjustment
Split pin 15 connects shearing frame 20 and girder 7.Inside climb integral installation to terminate, in mounted, climb supporting construction with in advance at wall
The internal built-in fitting profit buried is connected with, this completes a set of support system installation.Again tower crane tower body 11 is led to
Cross the second bolt group to be connected with the interior tower body support 13 climbing support system, complete whole in climb the installation process of structure and tower crane.
Embodiment 2: as shown in Figure 8, this example as different from Example 1: the shearing frame in this example be by horizontal strut 1,
The triangular structure that vertically pole 3 and inclined support bar 2 are constituted, at triangle point, it may be assumed that inclined support bar 2 two ends and horizontal strut 1
One end is all with pin shaft hole.Described in this example, keeper 6 uses pipe.
Claims (8)
1. the internal-climbing tower crane supporting construction of a band shearing frame, it is characterised in that: include between two girders, two girders
Shearing frame, bearing and connector, described shearing frame is two, be arranged in parallel between two girders, along two girder centrages pair
Claiming, corresponding support position, the girder upper surface at installation shearing frame is provided with the bearing supporting tower crane, and each girder two ends are respectively
The connector being connected with wall body built-in fitting is installed.
The internal-climbing tower crane supporting construction of band shearing frame the most according to claim 1, it is characterised in that: described shearing frame
It is the triangular structure being made up of horizontal strut, vertical pole and inclined support bar, at triangle point, it may be assumed that inclined support bar two ends
And horizontal strut one end is all with pin shaft hole.
The internal-climbing tower crane supporting construction of band shearing frame the most according to claim 1, it is characterised in that: described shearing frame
Being to constitute by being provided with inclined support bar in rectangular frame, its corner is with the pin shaft hole being connected with girder otic placode.
The internal-climbing tower crane supporting construction of band shearing frame the most according to claim 3, it is characterised in that: described bearing diagonal
Bar is a diagonal of rectangular frame, and rectangular frame is configured to triangular structure.
The internal-climbing tower crane supporting construction of band shearing frame the most according to claim 3, it is characterised in that: described shearing
The rectangular frame of frame is welded by two horizontal struts, two vertical poles and inclined support bar and constitutes, and there is bearing pin horizontal strut one end
Hole, the other end is welded on inclined support bar, and vertical pole two ends are respectively welded on horizontal strut and inclined support bar, inclined support bar
All there is pin shaft hole at two ends, are connected with the otic placode on the girder of both sides respectively by the pin shaft hole on horizontal strut and inclined support bar.
6. according to the internal-climbing tower crane supporting construction of band shearing frame described in Claims 2 or 3, it is characterised in that cut described in:
Under power frame, horizontal strut is connected end and is provided with keeper with girder, and the otic placode that girder is connected is provided with location-plate, installs
Time, keeper is placed on location-plate, it is ensured that shearing rack-mounted enter after the connecting hole in height phase of each connecting hole and girder upper ear plate
With, make shearing frame easily install.
The internal-climbing tower crane supporting construction of band shearing frame the most according to claim 6, it is characterised in that: described keeper
For square tube, pipe or round steel.
8. according to the internal-climbing tower crane supporting construction of band shearing frame described in Claims 2 or 3, it is characterised in that: described pin
Axis hole both sides are respectively provided with the first reinforcing plate, the second reinforcing plate is strengthened.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610866598.1A CN106276630A (en) | 2016-09-30 | 2016-09-30 | A kind of internal-climbing tower crane supporting construction of band shearing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610866598.1A CN106276630A (en) | 2016-09-30 | 2016-09-30 | A kind of internal-climbing tower crane supporting construction of band shearing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106276630A true CN106276630A (en) | 2017-01-04 |
Family
ID=57716724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610866598.1A Pending CN106276630A (en) | 2016-09-30 | 2016-09-30 | A kind of internal-climbing tower crane supporting construction of band shearing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106276630A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018196453A1 (en) * | 2017-04-28 | 2018-11-01 | 中国建筑股份有限公司 | Tower crane climbing frame and structural support beam integrated mechanical device and using method thereof |
CN111079259A (en) * | 2019-11-20 | 2020-04-28 | 湖南中联重科建筑起重机械有限责任公司 | Method and equipment for determining head load of tower crane |
CN113073677A (en) * | 2021-03-29 | 2021-07-06 | 四川省建筑科学研究院有限公司 | Tower crane suspended foundation device for reinforced concrete core barrel and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100788000B1 (en) * | 2007-05-08 | 2007-12-21 | 세일기계(주) | A construction method and structure for tower crane cross beam |
CN202245822U (en) * | 2011-07-19 | 2012-05-30 | 上海庞源机械租赁股份有限公司 | Structure for hinging and fixing inner climbing steel beam of tower crane |
CN202481960U (en) * | 2012-02-20 | 2012-10-10 | 中国建筑第八工程局有限公司 | Wall-attached frame of tower crane |
CN102815606A (en) * | 2012-08-24 | 2012-12-12 | 浙江精工钢结构有限公司 | Device for realizing operation of mobile tower crane on structural floor and construction method |
CN202864703U (en) * | 2012-08-24 | 2013-04-10 | 浙江精工钢结构有限公司 | Device for movable tower crane to work on structure floor |
CN103601081A (en) * | 2013-10-24 | 2014-02-26 | 沈阳建筑大学 | Tower crane internal-climbing support system |
-
2016
- 2016-09-30 CN CN201610866598.1A patent/CN106276630A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100788000B1 (en) * | 2007-05-08 | 2007-12-21 | 세일기계(주) | A construction method and structure for tower crane cross beam |
CN202245822U (en) * | 2011-07-19 | 2012-05-30 | 上海庞源机械租赁股份有限公司 | Structure for hinging and fixing inner climbing steel beam of tower crane |
CN202481960U (en) * | 2012-02-20 | 2012-10-10 | 中国建筑第八工程局有限公司 | Wall-attached frame of tower crane |
CN102815606A (en) * | 2012-08-24 | 2012-12-12 | 浙江精工钢结构有限公司 | Device for realizing operation of mobile tower crane on structural floor and construction method |
CN202864703U (en) * | 2012-08-24 | 2013-04-10 | 浙江精工钢结构有限公司 | Device for movable tower crane to work on structure floor |
CN103601081A (en) * | 2013-10-24 | 2014-02-26 | 沈阳建筑大学 | Tower crane internal-climbing support system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018196453A1 (en) * | 2017-04-28 | 2018-11-01 | 中国建筑股份有限公司 | Tower crane climbing frame and structural support beam integrated mechanical device and using method thereof |
CN111079259A (en) * | 2019-11-20 | 2020-04-28 | 湖南中联重科建筑起重机械有限责任公司 | Method and equipment for determining head load of tower crane |
CN113073677A (en) * | 2021-03-29 | 2021-07-06 | 四川省建筑科学研究院有限公司 | Tower crane suspended foundation device for reinforced concrete core barrel and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102079489B (en) | Suspended-rising support system of tower crane | |
CN103104092B (en) | Support composite structure of beam and slab | |
CN105544398A (en) | Horizontal force self-balancing type splayed heavy type upper air support system and installation method thereof | |
CN106276630A (en) | A kind of internal-climbing tower crane supporting construction of band shearing frame | |
CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
CN107299755A (en) | The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved | |
CN106759909B (en) | Bearing structure system and its construction method are hung up under one kind | |
CN203794504U (en) | Internal-climbing plug-in tower crane support structure | |
CN203173749U (en) | Assembled integral type vertical self-jacking device of hydraulic double-type crane tower | |
CN205531399U (en) | Interim support frame is installed in high -order steel truss segmentation | |
CN201953059U (en) | Supporting system for large-span assembly type cantilevered scaffold | |
CN208168317U (en) | A kind of lower extension platform of high-altitude construction | |
CN201110804Y (en) | Multifunctional experimental bench | |
CN203247717U (en) | Connecting node of concrete column and steel beam | |
CN110344332A (en) | Bracket is used in a kind of construction of bridge main tower upper beam | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN203112392U (en) | Deformation-resistant climbing frame of tower crane | |
CN215629471U (en) | Bridge cantilever structure does not have bracket articulated formula bracket strutting arrangement | |
CN202954553U (en) | Full assembly tool type attachment lifting scaffold | |
CN104018586A (en) | Connecting device for steel structure column and steel structure column | |
CN103601081B (en) | Support system is climbed in tower crane | |
CN107558607B (en) | Tower crane system arranged on existing concrete structure and construction method thereof | |
CN204531467U (en) | A kind of superposed beam, plate support bar tripod | |
CN210140988U (en) | Hydraulic climbing formwork bearing triangular frame lengthening device | |
CN205242981U (en) | Concrete construction operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |