CN208168317U - A kind of lower extension platform of high-altitude construction - Google Patents

A kind of lower extension platform of high-altitude construction Download PDF

Info

Publication number
CN208168317U
CN208168317U CN201820141805.1U CN201820141805U CN208168317U CN 208168317 U CN208168317 U CN 208168317U CN 201820141805 U CN201820141805 U CN 201820141805U CN 208168317 U CN208168317 U CN 208168317U
Authority
CN
China
Prior art keywords
support
support bar
buried
altitude
constructed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820141805.1U
Other languages
Chinese (zh)
Inventor
张业
梁思龙
蒋启诚
李月强
陈福
李维军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201820141805.1U priority Critical patent/CN208168317U/en
Application granted granted Critical
Publication of CN208168317U publication Critical patent/CN208168317U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Extension platform under a kind of high-altitude provided by the utility model is constructed, including lower platform structure, pre-buried support, first support bar and connector, multiple pre-buried supports are connected to load bearing wall, it is connected between adjacent pre-buried support by first support bar, lower platform structure hangs on pre-buried support by connector.The pre-buried support of the utility model is embedded in load bearing wall in advance, lower platform structure hangs on pre-buried support by connector, it is connected between pre-buried support by first support bar, construction loads above first support bar can be transferred to load bearing wall by pre-buried support, improve the safety of device, staff can walking in lower platform structure carry out spring layer concrete structure construction, the utility model production is simple, easy to use, universality is high and safe and convenient, solves due to the stability and safety issue that scaffold building is excessively high and occurs.

Description

A kind of lower extension platform of high-altitude construction
Technical field
The utility model relates to building fields, and in particular to a kind of lower extension platform of high-altitude construction.
Background technique
Now with society, expanding economy, super high-rise building springs up like bamboo shoots after a spring rain, rises sheer from level ground, however in Super High In the work progress of building, it often will appear the case where needing jump layer construction concrete structure (leading accessory structure of such as Core Walls Structure Excessively, jump layer construction horizontal structure is needed to guarantee the stability of Core Walls Structure), and problems are faced, normal need relies on one Setting up for scaffold just can be carried out jump layer construction layer by layer, but when scaffold sets up excessively high, stability can inevitably occurs And safety issue.
Utility model content
In order to solve in jump layer construction since scaffold sets up stability and safety issue excessively high and occur, this reality A kind of lower extension platform of high-altitude construction is provided with novel.
Extension platform under a kind of high-altitude provided by the utility model is constructed, including lower platform structure, pre-buried support, the first support Bar and connector, multiple pre-buried supports are connected to load bearing wall, pass through described first between the adjacent pre-buried support Strut is connected, and the lower platform structure hangs on the pre-buried support by the connector.
The pre-buried support of the utility model is embedded in load bearing wall in advance, and lower platform structure is hung on pre-buried by connector Support is connected by first support bar between pre-buried support, and the construction loads above first support bar can be passed by pre-buried support Be handed to load bearing wall, improve the safety of device, staff can walking in carrying out spring layer concrete structure in lower platform structure Construction, simple, the easy to use, universality of the utility model production is high and safe and convenient, solves due to scaffold building mistake High and appearance stability and safety issue.
The utility model high-altitude construct lower extension platform further improvement lies in that, be connected with above the first support bar Second support bar.
The further improvement of extension platform is that multiple second support bars are set to institute under the utility model high-altitude is constructed It states the top of first support bar and forms lattice support with the first support bar.
The utility model high-altitude construct lower extension platform further improvement lies in that, on two opposite load bearing walls respectively It is connected with the pre-buried support of identical quantity, the pre-buried support on two load bearing walls is aligned two-by-two and by described First support bar is connected, and more second support bars, the second support bar and institute are connected with above the first support bar It states and intersects between first support bar and form lattice support.
The utility model high-altitude construct lower extension platform further improvement lies in that, the pre-buried support include anchor bolt, end plate, Otic placode and the first lifting lug, the first side of the end plate are connected to the anchor bolt, and second side of the end plate is connected to described first Lifting lug and the otic placode, the anchor bolt are also attached to the load bearing wall, and first lifting lug is connected to the connector, the ear Plate is bolted to the first support bar.
The further improvement of extension platform is that the pre-buried support is equipped with six roots of sensation institute under the utility model high-altitude is constructed Anchor bolt is stated, anchor bolt described in the six roots of sensation is arranged in " day " font.
The utility model high-altitude construct lower extension platform further improvement lies in that, the lower platform structure include bracket and under Platform, the bracket are formed with the second lifting lug, and second lifting lug is connected to the pre-buried support by the connector, described Lower platform is connected to the top of the bracket.
The utility model high-altitude construct lower extension platform further improvement lies in that, the connector is cable wire.
The utility model high-altitude construct lower extension platform further improvement lies in that, lower extension platforms are constructed simultaneously in multiple high-altitudes Row is arranged and is connected by I-steel.
The utility model high-altitude construct lower extension platform further improvement lies in that, the top of the second support bar is equipped with mould Plate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of extension platform under the high-altitude of the utility model embodiment is constructed.
Fig. 2 is the partial structural diagram of lower platform structure in the utility model.
Fig. 3 is the partial structural diagram of Fig. 1.
Fig. 4 is the structural schematic diagram of pre-buried support in the utility model.
Fig. 5 is the attachment structure schematic diagram of pre-buried support and first support bar in the utility model.
Fig. 6 is the attachment structure schematic diagram of first support bar and second support bar in the utility model.
Status diagram when Fig. 7 is arranged side by side for the utility model.
Specific embodiment
In order to solve in jump layer construction due to scaffold building is excessively high and occurs stability and safety issue, this reality A kind of lower extension platform of high-altitude construction is provided with novel.
The embodiment of extension platform is made further under constructing in the following with reference to the drawings and specific embodiments to the utility model high-altitude Explanation.Those skilled in the art can be understood easily other advantages and function of the utility model by content disclosed by this specification Effect.
In conjunction with shown in Fig. 1 to Fig. 3, a kind of lower extension platform of high-altitude construction provided by the utility model, including lower platform structure 10, pre-buried support 20, first support bar 30 and connector 50, multiple pre-buried supports 20 are connected to load bearing wall (not shown), It is connected between adjacent pre-buried support 20 by first support bar 30, lower platform structure 10 is hung on pre-buried by connector 50 Support 20.
Simple, the easy to use, universality of the utility model production is high and safe and convenient, staff can walking in lower platform The construction that spring layer concrete structure is carried out in structure 10, be able to solve in super high-rise building that jump layer construction is difficult and risk factor compared with Big problem.
The pre-buried support 20 of the utility model is embedded in load bearing wall in advance, and lower platform structure 10 is hung by connector 50 It is connected between pre-buried support 20, pre-buried support 20 by first support bar 30, the construction loads of 30 top of first support bar can Be transferred to load bearing wall by pre-buried support 20, improve the safety of device, staff can walking in lower platform structure 10 The construction for carrying out spring layer concrete structure is solved due to the stability and safety issue that scaffold building is excessively high and occurs.
Further, lower platform structure 10 includes bracket and platform board 15, and bracket is formed with the second lifting lug 14, the second lifting lug 14 are connected to pre-buried support 20 by connector 50, and lower platform is connected to the top of bracket.Specifically, master is used in the present embodiment Stress I-steel 11, channel steel 12, rectangular tube 13 form bracket;With main stress I-steel 11 for main force structure, then in master It is laid with channel steel 12 on stress I-steel 11 and is attached the two by welding;Rectangular tube 13 is laid with simultaneously on channel steel 12 immediately Welding, and in being laid with platform board 15 on rectangular tube 13 and bolting, so far entire lower platform structure 10 is assembled completes;In addition, it is main by The second lifting lug 14 for connecting connector 50 is also welded on power I-steel 11.
Further, connector 50 is cable wire.
In conjunction with shown in fig. 4 to fig. 6, further, pre-buried support 20 is hung including anchor bolt 21, end plate 22, otic placode 23 and first Ear 24, the first side of end plate 22 are connected to anchor bolt 21, and second side of end plate 22 is connected to the first lifting lug 24 and otic placode 23, anchor bolt 21 It is also attached to load bearing wall, the first lifting lug 24 is connected to connector 50, and otic placode 23 is bolted to first support bar 30.
Further, pre-buried support 20 is equipped with six roots of sensation anchor bolt 21 in the present embodiment, and six roots of sensation anchor bolt 21 is in " day " font Arrangement.Number, arrangement, length, material of anchor bolt etc. should be adjusted correspondingly according to actual design load, to ensure it Stress is sufficient to undertake entire high-altitude and constructs lower extension platform (including lower platform structure 10, cable wire, first support bar 30 and second Support rod 40).
It is connected between adjacent pre-buried support 20 by first support bar 30.Further, in this embodiment first Strut 30 is preferably I-steel.First support bar 30 is connected on the otic placode 23 of pre-buried support 20 by high-strength anchor bolt.More into One step, the top of first support bar 30 is connected with second support bar 40, and multiple second support bars 40 are set to first support bar 30 Top and form lattice support with the first support bar 30, the top of second support bar 40 is equipped with template 60.Specifically, two The pre-buried support 20 of identical quantity is connected separately on a opposite load bearing wall, the pre-buried support 20 on two load bearing walls is right two-by-two It is connected together and by first support bar 30, the top of first support bar 30 is connected with more second support bars 40, the second support It intersects between bar 40 and first support bar 30 and forms lattice support, preferably, second support bar 40 and first support bar It is mutually perpendicular between 30.
20 quantity of pre-buried support of extension platform is four under the present embodiment high and medium is constructed, and four pre-buried supports 20 are in square The quantity of shape distribution, first support bar 30 is two and two first support bars 30 are parallel to each other;First support bar 30 is preferably I-steel, second support bar 40 preferably reinforce I-steel;Between second support bar 40 and first support bar 30 by anchor bolt or It is welded to connect;After first support bar 30 and second support bar 40 form lattice support, template 60 is laid on reinforcing I-steel, if Side mode is set to casting concrete.Construction personnel operates in lower platform structure 10, so that it may construct to template 60, no Excessively high scaffold need to be set up.
When the design load that site requirement is calculated is larger, pre-buried support 20 and the first support can be accordingly increased The quantity of bar 30, second support bar 40 is provided with four supports in the present embodiment and two masters as first support bar 30 holds Power I-steel can accordingly increase such as:Six supports, three primary load bearing I-steel;Eight supports, four primary load bearing I-steel Deng.When the design load that site requirement is calculated is smaller, the quantity of pre-buried support 20 and first support bar 30 can basis Actual conditions are reduced, and second support bar 40 can be changed to channel steel and reduce quantity accordingly, and such change should be in the utility model Within scope of the claims.
Lower platform structure 10 can be lifted into high-altitude predetermined position after the completion of installation on ground by tower crane;Operator system Good safety rope, is walked on platform board 15, is passed through the second lifting lug 14 and the first lifting lug 24 using cable wire, has been hung lower platform structure 10, and the connection of lower platform structure 10 and tower crane is released, so far lower platform structure 10 completes lifting.
In the utility model, the construction loads of concrete structure is directly transmitted by first support bar 30, second support bar 40 It to pre-buried support 20, and is undertaken by Core Walls Structure, load pressure will not be caused to lower platform structure 10, ensure that safety, also give Operator in lower platform structure 10 leaves enough bearing capacities and is used to set up scaffold, place tool etc., convenient for construction.
As shown in connection with fig. 7, further, extension platform 1 is arranged side by side and is connected by I-steel under multiple high-altitudes are constructed. Multiple high-altitudes are constructed after lower extension platform 1 is hoisted to high-altitude hanging side by side, by I-steel by multiple platforms company of being fixed to each other again It connects to form an entirety, greatly improves its stability.In the present embodiment, the both ends of I-steel are respectively welded in adjacent two Under high-altitude is constructed in the second support bar 40 of extension platform 1, make I-steel across two lower extension platforms 1 of high-altitudes construction, to realize phase Adjacent two high-altitudes lower extension platform 1 of construction is fixedly connected, this is not limited thereto for preferred embodiment, as long as can be realized Extension platform 1 is capable of fixing connection under two adjacent high-altitudes are constructed.
Using the utility model, can be free in Super High construction with jump layer construction higher floor, operator It walks, work in lower platform structure 10, and the concrete structure for top of constructing, so as to avoid needing from lowrise layer from level to level Set up scaffold just can jump layer construction the problem of, unstable, unsafe when also having avoided scaffold building excessive height asks Topic.Concrete construction load is directly passed to load bearing wall by superstructure, so that lower platform structure has high safety.This reality Simple with new structure, Path of Force Transfer is clear, and dimensional standard is easily operated, convenient for promoting the use in building site.
The above is only the preferred embodiment of the present utility model, not does limit in any form to the utility model System, although the utility model has been disclosed with preferred embodiment as above, is not intended to limit the utility model, any to be familiar with sheet Technical professional, in the range of not departing from technical solutions of the utility model, when the technology contents using the disclosure above It makes a little change or is modified to the equivalent embodiment of equivalent variations, but is all without departing from technical solutions of the utility model Hold, any simple modification, equivalent change and modification made by the above technical examples according to the technical essence of the present invention, still It is within the scope of the technical solutions of the present invention.
It should be noted that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate The bright revealed content of book is not intended to limit the utility model implementable so that those skilled in the art understands and reads Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influencing the effect of the utility model can be generated and the purpose that can reach, should all still fall in disclosed in the utility model Technology contents obtain and can cover in the range of.

Claims (10)

  1. The lower extension platform 1. a kind of high-altitude is constructed, it is characterised in that:Including lower platform structure, pre-buried support, first support bar and company Fitting, multiple pre-buried supports are connected to load bearing wall, pass through the first support bar phase between the adjacent pre-buried support Connection, the lower platform structure hang on the pre-buried support by the connector.
  2. The lower extension platform 2. high-altitude as described in claim 1 is constructed, it is characterised in that:It is connected with above the first support bar Second support bar.
  3. The lower extension platform 3. high-altitude as claimed in claim 2 is constructed, it is characterised in that:Multiple second support bars are set to described The top of first support bar simultaneously forms lattice support with the first support bar.
  4. The lower extension platform 4. high-altitude as described in claim 1 is constructed, it is characterised in that:On two opposite load bearing walls respectively It is connected with the pre-buried support of identical quantity, the pre-buried support on two load bearing walls is aligned two-by-two and by described First support bar is connected, and more second support bars, the second support bar and institute are connected with above the first support bar It states and intersects between first support bar and form lattice support.
  5. The lower extension platform 5. high-altitude as described in claim 1 is constructed, it is characterised in that:The pre-buried support include anchor bolt, end plate, Otic placode and the first lifting lug, the first side of the end plate are connected to the anchor bolt, and second side of the end plate is connected to described first Lifting lug and the otic placode, the anchor bolt are also attached to the load bearing wall, and first lifting lug is connected to the connector, the ear Plate is connected to the first support bar.
  6. The lower extension platform 6. high-altitude as claimed in claim 5 is constructed, it is characterised in that:The pre-buried support is equipped with described in the six roots of sensation Anchor bolt, anchor bolt described in the six roots of sensation are arranged in day font.
  7. The lower extension platform 7. high-altitude as described in claim 1 is constructed, it is characterised in that:The lower platform structure includes bracket under Platform, the bracket are formed with the second lifting lug, and second lifting lug is connected to the pre-buried support by the connector, described Lower platform is connected to the top of the bracket.
  8. The lower extension platform 8. high-altitude as described in claim 1 is constructed, it is characterised in that:The connector is cable wire.
  9. The lower extension platform 9. high-altitude as described in claim 1 is constructed, it is characterised in that:Lower extension platform construct simultaneously in multiple high-altitudes Row is arranged and is connected by I-steel.
  10. The lower extension platform 10. high-altitude as claimed in claim 2 is constructed, it is characterised in that:The top of the second support bar is equipped with Template.
CN201820141805.1U 2018-01-29 2018-01-29 A kind of lower extension platform of high-altitude construction Active CN208168317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820141805.1U CN208168317U (en) 2018-01-29 2018-01-29 A kind of lower extension platform of high-altitude construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820141805.1U CN208168317U (en) 2018-01-29 2018-01-29 A kind of lower extension platform of high-altitude construction

Publications (1)

Publication Number Publication Date
CN208168317U true CN208168317U (en) 2018-11-30

Family

ID=64383695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820141805.1U Active CN208168317U (en) 2018-01-29 2018-01-29 A kind of lower extension platform of high-altitude construction

Country Status (1)

Country Link
CN (1) CN208168317U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778094A (en) * 2019-11-06 2020-02-11 江苏中南建筑产业集团有限责任公司 High-altitude large-span dragline net operating platform and construction method
CN113931313A (en) * 2021-10-22 2022-01-14 中国土木工程集团有限公司 Super high-rise core tube horizontal structure construction method
CN114033223A (en) * 2021-12-09 2022-02-11 中建四局第一建设有限公司 Steel hanging platform under overhanging steel truss of ultrahigh air swimming pool and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778094A (en) * 2019-11-06 2020-02-11 江苏中南建筑产业集团有限责任公司 High-altitude large-span dragline net operating platform and construction method
CN113931313A (en) * 2021-10-22 2022-01-14 中国土木工程集团有限公司 Super high-rise core tube horizontal structure construction method
CN113931313B (en) * 2021-10-22 2023-11-17 中国土木工程集团有限公司 Construction method of super high-rise core tube horizontal structure
CN114033223A (en) * 2021-12-09 2022-02-11 中建四局第一建设有限公司 Steel hanging platform under overhanging steel truss of ultrahigh air swimming pool and construction method thereof
CN114033223B (en) * 2021-12-09 2023-02-03 中建四局第一建设有限公司 Steel hanging platform under overhanging steel truss of ultrahigh air swimming pool and construction method thereof

Similar Documents

Publication Publication Date Title
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN208168317U (en) A kind of lower extension platform of high-altitude construction
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN202706503U (en) Electric lifting discharging platform for main building construction
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN107299755A (en) The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved
CN205429566U (en) Crossing structure
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN205444975U (en) Large -scale room lid steel construction construction braced system with view platform
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN107419665B (en) Large-span steel beam hoisting sling and steel beam hoisting method thereof
CN203021207U (en) Large-load multifunctional gantry crane capable of being flexibly spliced
CN209780193U (en) Suspension type scaffold
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN207618901U (en) A kind of vertical hanging apparatus of steel column
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN204754150U (en) Dish -type node formula scaffold
CN204940916U (en) A kind of Super High Core Walls Structure emergency escape passage
CN209686833U (en) Operating platform support frame and operating platform
CN209742334U (en) Steel construction vestibule bottom curtain construction platform
CN202081639U (en) Steel truss tool type supporting structure for concrete framework industrial building templates
CN205955150U (en) Instrument formula windrow operation integration platform
CN204199271U (en) A kind of filling pile cage of reinforcement hangs fastening devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant