CN204357119U - Building operations scaffold fast mounting-dismounting support system - Google Patents

Building operations scaffold fast mounting-dismounting support system Download PDF

Info

Publication number
CN204357119U
CN204357119U CN201420829131.6U CN201420829131U CN204357119U CN 204357119 U CN204357119 U CN 204357119U CN 201420829131 U CN201420829131 U CN 201420829131U CN 204357119 U CN204357119 U CN 204357119U
Authority
CN
China
Prior art keywords
quick detach
cross bar
socket
vertical rod
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420829131.6U
Other languages
Chinese (zh)
Inventor
黄�俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420829131.6U priority Critical patent/CN204357119U/en
Application granted granted Critical
Publication of CN204357119U publication Critical patent/CN204357119U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of can the shuttering supporting scaffold of Fast Installation and dismounting.Building operations scaffold fast mounting-dismounting support system is become with quick detach bracketing head group by quick detach support body, install fast, remove fast, simple and reasonable for structure, stability is good, laborsaving, it is that socket is welded in vertical rod, solder plug on cross bar, different diagonal members, cross bar and vertical rod connect to form quick detach support body, quick detach support body can be applied in separately in engineering, also can use in conjunction with quick detach bracketing head, and top uses quick detach bracketing head support shuttering, top cross bar can replace keel, by quick detach adjusting head, cross bar can be removed by fast dismantling, realize early tearing open.Be particularly useful for the input that novel customization aluminum alloy pattern plate can save a large amount of keel and manpower.

Description

Building operations scaffold fast mounting-dismounting support system
Technical field
The utility model relates to a kind of building operations support scaffolding, is especially applied in Fast Installation and dismantles superior function and effect that support shuttering engineering more can highlight its uniqueness.
Background technology
Apply the how easy loss of scaf folding fittings such as current bowl fastening type steel pipe scaffold, fastener type steel pipe scaffold, disc type steel pipe scaffold, gate type steel pipe scaffold, Bayenet type steel tube scaffold, complex operation, need a large amount of artificial assembling and disassembling, when there being multilayer floor building engineering construction, the formwork-support of traditional pin hand cradle at least full configuration three layers, also primary and secondary skeletal frame will be configured, to meet the needs of concrete structure, and can not premature removal part, Fast Installation cannot be provided and remove the solution of support shuttering engineering.
Summary of the invention
In order to overcome above problem, the technical scheme that this novel support system adopts is: building operations scaffold fast mounting-dismounting support system is divided into two parts, the quick detach support body of bottom and the quick detach bracketing head on top.
The quick detach support body of bottom: the connected mode of steel pipe scaffold cross bar vertical rod makes plug and socket type, be symmetrically welded convex in plug at different size cross bar two, vertical rod is welded recessed to socket, the connection of cross bar plug and vertical rod socket, triangle inclined strut, diagonal member form the quick detach breast piece of building operations scaffold fast mounting-dismounting support system.Be characterized as: the plug on cross bar is formed by casting technique, front elevation drawing is circular, outer warp is identical with cross bar, flute profile plug is taken turns to single for convex, wedge shape upper and lower side angle wide at the top and narrow at the bottom is 7.5 °, outer width is narrow, is then symmetrically welded at various sizes cross bar two, and it is corresponding with diagonal member two ends screw that screw hole is reserved at cross bar two ends, recessed in vertical rod is that external tooth wheel-type is formed by casting technique to socket, outside circle external diameter is 74MM, root circle external diameter 55MM, internal diameter is 48.5MM, thinnest part wall thickness is 3.5MM, with cross bar external diameter with high, recessed have 4 teeth groove sockets and 8 teeth groove sockets, two kinds of specifications to socket, teeth groove socket wedge shape upper and lower side wide at the top and narrow at the bottom angle is 7.5 °, in wide outer narrow, corresponding with the wheel flute profile plug of cross bar, during use convex snap in from top to bottom to plug recessed to socket, socket is welded in the vertical rod of various length size with 500MM spacing, the vertical rod butt joint of the long 120MM of vertical rod upper end welding internal diameter 48MM is used for connecing high vertical rod, triangle inclined strut is welded steel pipe composition triangle in vertical rod, provides the support of outer spy structure, diagonal member is that two ends flat structure has screw, corresponding with on cross bar of diagonal member two ends screw, need the plug on cross bar to be connected with the socket in vertical rod according to engineering size, diagonal member is connected with cross bar, and triangle inclined strut can be used to be combined into the quick detach breast piece of the building operations scaffold fast mounting-dismounting support system of different length and width and height.
Top quick detach bracketing head: be made up of four parts: bolt, quick detach adjusting head, quick detach socket, big nut, for adjustable-height, can Fast Installation and remove cross bar, premature removal cross bar, available cross bar can replace traditional main joist.Be characterized as: the long 600MM external diameter of bolt of central authorities is 36MM, and the steel plate that upper weld 10 square centimeters of 1CM are thick is used for shoring template, and it is the nut of 48MM that an external diameter is installed in bottom, to insert vertical rod butt joint strengthening stability; Middle quick detach adjusting head is one-body molded by casting technique, be adjusting nut, external gear steel pipe, steel pipe, bayonet socket four partial shape formation from bottom to up, quick detach adjusting head is that internal thread is corresponding with the bolt of central authorities, adjusting nut top 50MM is external gear shape steel tube, two gear teeth and two teeth groove are put along center of circle across corner, outside circle external diameter is 48MM root circle external diameter is 42MM internal diameter 36MM, quick detach adjusting head top 50MM is external diameter 42MM internal diameter 36MM steel pipe, and top is that the bayonet socket of internal diameter 36CM external diameter 49CM height 10MM prevents quick detach socket from upwards shifting out; Recessed in vertical rod of outer field quick detach socket changes inwall and come for gerotor type to socket, two gear teeth and two teeth groove are put along center of circle across corner, root circle internal diameter is 48MM outside circle internal diameter is 42MM, and external diameter is 74MM thinnest part wall thickness is 3.5MM, corresponding with the quick detach adjusting head of centre; Big nut has the evagination manual adjustments structure of a symmetry, and bottom has tapered opening can be enclosed within vertical rod, is then arranged on bolt and quick detach bracketing head can be stuck in vertical rod top, the overall height of adjustable quick detach bracketing head.Operating principle is that outer field quick detach jack sleeve is on the quick detach adjusting head of centre, middle quick detach adjusting head and the big nut of foot are arranged on the bolt of central authorities, for being stuck in quick detach adjusting head top when quick detach socket uses stressed, quick detach socket can be moved down fast by quick detach adjusting head 90-degree rotation during dismounting, the cross bar the being connected to quick detach socket 50MM fast dismantling that can move up is removed, realize quick detach, early tear open, the quick detach bracketing head part of composition building operations scaffold fast mounting-dismounting support system.
The utility model building operations scaffold fast mounting-dismounting support system operating principle is, the convex cross bar to plug of welding is snapped in from top to bottom and recessedly to couple together to socket, during dismounting, cross bar is released socket from the bottom up and is removed connection, Fast Installation dismounting can be realized, triangle inclined strut and diagonal member can also be configured according to requirement of engineering, vertical rod top is inserted in quick detach bracketing head bottom, by the height of big nut adjustment quick detach bracketing head, quick detach adjusting head adjustable on quick detach bracketing head is connected to the cross bar height on quick detach socket, between quick detach socket and quick detach socket be welded with the convex cross bar to plug snap in from top to bottom recessed to socket in succession, Fast Installation can be realized, the superiors' cross bar can replace traditional main joist, direct use keel are laid on cross bar, by rotating quick detach adjusting head, quick detach socket is declined when structure reaches some strength fast, cross bar just can release socket fast from the bottom up, remove the cross bar be connected on quick detach socket, now vertical rod and bolt still can meet structure needs roof supporting, the dismountable vertical rod of big nut is rotated when needs are all removed.
The beneficial effects of the utility model are, quick detach support body can provide support use separately, also in conjunction with in quick detach bracketing head application project, can provide the solution of Fast Installation and dismounting support shuttering engineering.Process simple and convenient, accessory is not easy to lose less, takes to tear open simple to operate, compares the assembling and disassembling of traditional pin hand cradle saved the artificial of several times without the need to turning round screw.Replace main joist with the superiors' cross bar, save the keel input amount of 50 percent.When there being multi-story building engineering construction, only need formwork-support and the keel of full configuration one deck, the needs of concrete structure can be met, can premature removal part scaffold and keel by quick detach bracketing head, reach energy-efficient object, be particularly useful for novel customization aluminum alloy pattern plate and can save a large amount of keel and human input.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and example, the utility model is further illustrated.
Fig. 1 building operations scaffold fast mounting-dismounting support system stereogram.
Fig. 2 building operations scaffold fast mounting-dismounting support system top view.
Fig. 3 building operations scaffold fast mounting-dismounting support system front elevation drawing.
Fig. 4 building operations scaffold fast mounting-dismounting support system quick detach support body stereogram.
Fig. 5 quick detach support body top view.
Fig. 6 quick detach support body front elevation drawing.
Fig. 7 building operations scaffold fast mounting-dismounting support system quick detach bracketing head stereogram.
Fig. 8 quick detach bracketing head top view.
Fig. 9 quick detach bracketing head front elevation drawing.
Figure 10 socket plug stereogram.
Figure 11 socket stereogram.
Figure 12 socket front elevation drawing.
Figure 13 socket top view.
Figure 14 plug stereogram.
Figure 15 plug front elevation drawing.
Figure 16 plug top view.
Figure 17 quick detach adjusting head stereogram.
Figure 18 Figure 17 A-B sectional view.
Figure 19 quick detach adjusting head right view.
Figure 20 quick detach adjusting head top view.
Figure 21 quick detach socket stereogram.
Figure 22 quick detach socket top view.
Figure 23 bolt stereogram.
Figure 24 big nut 3D view.
Figure 25 big nut top view.
Figure 26 triangle inclined strut stereogram.
Figure 27 triangle inclined strut top view.
Figure 28 triangle inclined strut front elevation drawing.
Figure 29 adds triangle inclined strut building operations scaffold fast mounting-dismounting support system quick detach support body stereogram.
1. bolts in figure, 2. quick detach socket, 3. quick detach adjusting head, 4. big nut, 5. nut, 6. vertical rod, 7. cross bar, 8. socket, 9. plug, 10. diagonal member, 11. cross bars, 12. triangle inclined struts.
Detailed description of the invention
In embodiment illustrated in fig. 29, the upper solder plug (9) of different cross bars (7,11) with vertical rod (6) is welded socket (8) and is connected, diagonal member (10) can be set as required and spreading vertical rod (6) also can arrange triangle inclined strut (12) in the engineering of needs.May be used in the present embodiment, without in the shuttering supporting engineering of early tearing open, being especially applied in novel customization aluminum alloy pattern plate, can labor and material saving.
In the embodiment shown in fig. 7, quick detach socket (2) is enclosed within quick detach adjusting head (3), then be arranged on bolt (1), multiple tracks quick detach socket (2) can be set as required, quick detach adjusting head (3), big nut (4) with nut (5) for internal thread is connected with bolt (1), it is bottom that nut (5) is arranged on bolt (1), external diameter is that vertical rod joint internal diameter inserts enhancing stability in vertical rod (6), the square plate on top is welded on bolt (1) topmost, directly shore in template, by rotating quick detach adjusting head (3), quick detach socket is declined when structure reaches some strength fast, just can fast dismantling except the cross bar be connected on quick detach socket (2), reach Fast Installation to remove.
In the embodiment shown in fig. 1, different cross bars (7, 11) on the socket (8) that upper solder plug (9) connecting upright pole (6) welds, diagonal member (10) and spreading vertical rod (6) can be set as required, quick detach socket (2) is enclosed within quick detach adjusting head (3), then be arranged on bolt (1), cross bar (7) is used to connect quick detach socket (2), multiple tracks quick detach socket (2) can be set as required, quick detach adjusting head (3), cross bar (7), big nut (4) with nut (5) for internal thread is connected with bolt (1), it is bottom that nut (5) is arranged on bolt (1), external diameter is that vertical rod joint internal diameter inserts enhancing stability in vertical rod (6), the square plate on top is welded on bolt (1), directly shore in template, the cross bar of the superiors (7) can be used in engineering to replace traditional keel, by rotating quick detach adjusting head (3), quick detach socket is declined when structure reaches some strength fast, just can fast dismantling except the cross bar (7) be connected on quick detach socket (2), realize early tearing open, now vertical rod (6) and bolt (1) still can meet structure needs roof supporting, big nut (4) dismountable vertical rod is rotated when needs are all removed.

Claims (14)

1. a building operations scaffold fast mounting-dismounting support system, it is characterized in that: become with quick detach bracketing head group by quick detach support body, it is that socket is welded in vertical rod, solder plug on cross bar, different diagonal members, cross bar and vertical rod connect to form quick detach support body, quick detach support body can be applied in separately in engineering, also can use in conjunction with quick detach bracketing head, top uses quick detach bracketing head support shuttering, the superiors' cross bar can replace keel, by quick detach adjusting head, cross bar can be removed by fast dismantling, realize early tearing open, be particularly useful for the input that novel customization aluminum alloy pattern plate can save a large amount of keel and manpower.
2. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that the connected mode of steel pipe scaffold cross bar vertical rod makes plug and socket type, be symmetrically welded convex in plug at different size cross bar two, vertical rod is welded recessed to socket, the connection of cross bar plug and vertical rod socket, triangle inclined strut, diagonal member form the quick detach breast piece of building operations scaffold fast mounting-dismounting support system.
3. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that the plug on cross bar is formed by casting technique, front elevation drawing is circular, outer warp is identical with cross bar, take turns flute profile plug for convex to single, wedge shape upper and lower side angle wide at the top and narrow at the bottom is 7.5 °, and outer width is narrow, then be symmetrically welded at various sizes cross bar two, it is corresponding with diagonal member two ends screw that screw hole is reserved at cross bar two ends.
4. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that in vertical rod recessed is that external tooth wheel-type is formed by casting technique to socket, outside circle external diameter is 74MM, root circle external diameter 55MM, internal diameter is 48.5MM, thinnest part wall thickness is 3.5MM, with cross bar external diameter with high, recessed have 4 teeth groove sockets and 8 teeth groove sockets, two kinds of specifications to socket, teeth groove socket wedge shape upper and lower side wide at the top and narrow at the bottom angle is 7.5 °, in wide outer narrow, corresponding with the wheel flute profile plug of cross bar, during use convex snap in from top to bottom to plug recessed to socket, socket is welded in the vertical rod of various length size with 500MM spacing, the vertical rod butt joint of the long 120MM of vertical rod upper end welding internal diameter 48MM is used for connecing high vertical rod.
5. building operations scaffold fast mounting-dismounting support system according to claim 1, is characterized in that triangle inclined strut is welded steel pipe composition triangle in vertical rod, provides the support of outer spy structure.
6. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that diagonal member is that two ends flat structure has screw, corresponding with on cross bar of diagonal member two ends screw, need the plug on cross bar to be connected with the socket in vertical rod according to engineering size, diagonal member is connected with cross bar, and triangle inclined strut can be used to be combined into the quick detach breast piece of the building operations scaffold fast mounting-dismounting support system of different length and width and height.
7. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that quick detach bracketing head: be made up of four parts: bolt, quick detach adjusting head, quick detach socket, big nut, for adjustable-height, can Fast Installation and remove cross bar, premature removal cross bar, available cross bar can replace traditional main joist.
8. building operations scaffold fast mounting-dismounting support system according to claim 1, the long 600MM external diameter of bolt that it is characterized in that quick detach bracketing head central authorities is 36MM, the steel plate that upper weld 10 square centimeters of 1CM are thick is used for shoring template, it is the nut of 48MM that an external diameter is installed in bottom, to insert vertical rod butt joint strengthening stability.
9. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that the quick detach adjusting head in the middle of quick detach bracketing head is one-body molded by casting technique, be adjusting nut from bottom to up, external gear steel pipe, steel pipe, bayonet socket four partial shape is formed, quick detach adjusting head is that internal thread is corresponding with the bolt of central authorities, adjusting nut top 50MM is external gear shape steel tube, two gear teeth and two teeth groove are put along center of circle across corner, outside circle external diameter is 48MM root circle external diameter is 42MM internal diameter 36MM, quick detach adjusting head top 50MM is external diameter 42MM internal diameter 36MM steel pipe, top is that the bayonet socket of internal diameter 36CM external diameter 49CM height 10MM prevents quick detach socket from upwards shifting out.
10. building operations scaffold fast mounting-dismounting support system according to claim 1, it is characterized in that recessed in vertical rod of quick detach bracketing head outer field quick detach socket changes inwall and come for gerotor type to socket, two gear teeth and two teeth groove are put along center of circle across corner, root circle internal diameter is 48MM outside circle internal diameter is 42MM, external diameter is 74MM thinnest part wall thickness is 3.5MM, corresponding with the quick detach adjusting head of centre.
11. building operations scaffold fast mounting-dismounting support systems according to claim 1, it is characterized in that big nut has the evagination manual adjustments structure of a symmetry, bottom has tapered opening can be enclosed within vertical rod, then be arranged on bolt and quick detach bracketing head can be stuck in vertical rod top, the overall height of adjustable quick detach bracketing head.
12. building operations scaffold fast mounting-dismounting support systems according to claim 1, it is characterized in that quick detach bracketing head operating principle is that outer field quick detach jack sleeve is on the quick detach adjusting head of centre, middle quick detach adjusting head and the big nut of foot are arranged on the bolt of central authorities, for being stuck in quick detach adjusting head top when quick detach socket uses stressed, quick detach socket can be moved down fast by quick detach adjusting head 90-degree rotation during dismounting, the cross bar the being connected to quick detach socket 50MM fast dismantling that can move up is removed, realize quick detach, early tear open, the quick detach bracketing head part of composition building operations scaffold fast mounting-dismounting support system.
13. building operations scaffold fast mounting-dismounting support systems according to claim 1, it is characterized in that building operations scaffold fast mounting-dismounting support system operating principle is, the convex cross bar to plug of welding is snapped in from top to bottom and recessedly to couple together to socket, during dismounting, cross bar is released socket from the bottom up and is removed connection, Fast Installation dismounting can be realized, triangle inclined strut and diagonal member can also be configured according to requirement of engineering, vertical rod top is inserted in quick detach bracketing head bottom, by the height of big nut adjustment quick detach bracketing head, quick detach adjusting head adjustable on quick detach bracketing head is connected to the cross bar height on quick detach socket, between quick detach socket and quick detach socket be welded with the convex cross bar to plug snap in from top to bottom recessed to socket in succession, Fast Installation can be realized, the superiors' cross bar can replace traditional main joist, direct use keel are laid on cross bar, by rotating quick detach adjusting head, quick detach socket is declined when structure reaches some strength fast, cross bar just can release socket fast from the bottom up, remove the cross bar be connected on quick detach socket, now vertical rod and bolt still can meet structure needs roof supporting, the dismountable vertical rod of big nut is rotated when needs are all removed.
14. building operations scaffold fast mounting-dismounting support systems according to claim 1, it is characterized in that quick detach support body can provide support use separately, also can in conjunction with in quick detach bracketing head application project, the solution of Fast Installation and dismounting support shuttering engineering can be provided, process simple and convenient, accessory is not easy to lose less, take tear open simple to operate, compare the assembling and disassembling of traditional pin hand cradle saved the artificial of several times without the need to turning round screw, main joist is replaced with the superiors' cross bar, save the keel input amount of 50 percent, when there being multi-story building engineering construction, only need formwork-support and the keel of full configuration one deck, the needs of concrete structure can be met, can premature removal part scaffold and keel by quick detach bracketing head, reach energy-efficient object, be particularly useful for novel customization aluminum alloy pattern plate and can save a large amount of keel and human input.
CN201420829131.6U 2014-12-24 2014-12-24 Building operations scaffold fast mounting-dismounting support system Expired - Fee Related CN204357119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420829131.6U CN204357119U (en) 2014-12-24 2014-12-24 Building operations scaffold fast mounting-dismounting support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420829131.6U CN204357119U (en) 2014-12-24 2014-12-24 Building operations scaffold fast mounting-dismounting support system

Publications (1)

Publication Number Publication Date
CN204357119U true CN204357119U (en) 2015-05-27

Family

ID=53258597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420829131.6U Expired - Fee Related CN204357119U (en) 2014-12-24 2014-12-24 Building operations scaffold fast mounting-dismounting support system

Country Status (1)

Country Link
CN (1) CN204357119U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223613A (en) * 2016-07-24 2016-12-14 晟通科技集团有限公司 The installation and positioning structure of mould bases vertical rod
CN106337559A (en) * 2016-10-13 2017-01-18 中国建筑股份有限公司 Early dismantling support system of mold plate support frame and application method of early dismantling support system
CN106703405A (en) * 2017-01-09 2017-05-24 杨秀峰 Socket-keyslot intelligent monitoring support frame
CN110439244A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 Scaffold for building
CN111677262A (en) * 2020-06-18 2020-09-18 扬州工业职业技术学院 Scaffold is detained from locking-type dish convenient to adjust support body height

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223613A (en) * 2016-07-24 2016-12-14 晟通科技集团有限公司 The installation and positioning structure of mould bases vertical rod
CN106223613B (en) * 2016-07-24 2019-01-29 晟通科技集团有限公司 The installation and positioning structure of mould bases upright bar
CN106337559A (en) * 2016-10-13 2017-01-18 中国建筑股份有限公司 Early dismantling support system of mold plate support frame and application method of early dismantling support system
CN106337559B (en) * 2016-10-13 2019-01-18 中国建筑股份有限公司 The morning of formwork-support tears support system and its application method open
CN106703405A (en) * 2017-01-09 2017-05-24 杨秀峰 Socket-keyslot intelligent monitoring support frame
CN110439244A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 Scaffold for building
CN111677262A (en) * 2020-06-18 2020-09-18 扬州工业职业技术学院 Scaffold is detained from locking-type dish convenient to adjust support body height
CN111677262B (en) * 2020-06-18 2021-10-29 扬州工业职业技术学院 Scaffold is detained from locking-type dish convenient to adjust support body height

Similar Documents

Publication Publication Date Title
CN204357119U (en) Building operations scaffold fast mounting-dismounting support system
CN207934433U (en) Thick bolt turnover type connects wall drawknot device
CN206903215U (en) Girder with rolled steel section en cased in concrete is without scaffold formwork
CN205804939U (en) template assembly for subway station side wall
CN207177255U (en) The detachable suspension scaffold of concrete wall
CN201406844Y (en) Support of middle flange plate construction formwork of concrete-steel beam
CN107989365A (en) Clear water hollow concrete column-form system and its construction method
CN210342692U (en) Single-point embedded part inclined strut device of aluminum alloy template system
CN103243900B (en) Wall connecting assembly of steel pipe scaffold
CN201334773Y (en) Self-supporting device for steel reinforced concrete composite girder
CN209099196U (en) A kind of reusable bridge assembled closure section rigid connection component
CN109914780A (en) It is a kind of for building the inclined pull type suspension supporting I-steel supporting element of external scaffolding
CN206607594U (en) The structure with oblique member of construction
CN103382768A (en) Multifunctional constructional engineering construction support assembly
TW201915280A (en) Temporary support for appropriately maintaining the relative positional relationship between vertical ends of a plurality of columns
CN209585609U (en) Late poured band support structure
CN208430763U (en) A kind of external scaffolding attachment device
CN210122816U (en) Be used for assembled coincide floor bottom plate board seam template reinforcing apparatus
CN210210806U (en) T beam mold board strutting arrangement
CN210529735U (en) Building steel structure platform base
CN204386139U (en) Detachable structural steel anchor device
CN204174900U (en) Building scaffold
CN206785404U (en) A kind of combining structure of half tunnel mobile formwork of underground pipe gallery storehouse construction
CN208633585U (en) A kind of support component for tearing U support open with morning of support building template
CN220203374U (en) Inclined support of scaffold is detained to dish

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20161224