CN103362315A - Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket - Google Patents

Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket Download PDF

Info

Publication number
CN103362315A
CN103362315A CN2013103401659A CN201310340165A CN103362315A CN 103362315 A CN103362315 A CN 103362315A CN 2013103401659 A CN2013103401659 A CN 2013103401659A CN 201310340165 A CN201310340165 A CN 201310340165A CN 103362315 A CN103362315 A CN 103362315A
Authority
CN
China
Prior art keywords
pipelines
support
cross
arm
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103401659A
Other languages
Chinese (zh)
Other versions
CN103362315B (en
Inventor
彭孟珍
王占东
张宏英
先建
张慧敏
丁伟
马永红
赵雪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201310340165.9A priority Critical patent/CN103362315B/en
Publication of CN103362315A publication Critical patent/CN103362315A/en
Application granted granted Critical
Publication of CN103362315B publication Critical patent/CN103362315B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a hanging bracket for hoisting a pipeline integrally and a construction method of the hanging bracket. The hanging bracket is composed of four pipeline supports, four chain blocks and two cross arms. The pipeline supports are fixed on a concrete floor slab. The upper ends of the pipeline supports are connected with one ends of the chain blocks. The other ends of the chain blocks are connected with one ends of the cross arms. Each pipeline support is composed of a steel plate and pipeline support angle bars, wherein the steel plate and the pipeline support angle bars are connected together in a welded mode. The hanging bracket has the advantages of being simple and reasonable in structure and high in security coefficient. Moreover, when the construction method of the hanging bracket is used for construction, not only can the safety of the construction be ensured, but also the construction efficiency can be improved enormously.

Description

Suspension bracket and job practices thereof that a kind of pipeline integral hoisting is used
Technical field
The present invention relates to technical field of building construction, relate in particular to suspension bracket and job practices thereof that a kind of pipeline integral hoisting is used.
Background technology
The pipeline integral hoisting is one of common work items of the realm of building construction, in the lifting pipeline work progress, not only there is very large risk, and manpower and materials that need to be a large amount of, in the engineering construction process, need to take a large amount of engineering times, so in the engineering construction process, will write independent special constructure scheme to the pipeline integral hoisting, after the person in charge of the technology aspect examines, could implement, therefore the pipeline integral hoisting occupies very important position in construction.
Existing pipeline integral hoisting mostly is to adopt suspension bracket to lift, but existing suspension bracket exists the problems such as danger coefficient is large, efficiency of construction is low in work progress.
Summary of the invention
The problem that danger coefficient is large, efficiency of construction is low for the suspension bracket that solves existing pipeline integral hoisting exists the invention provides suspension bracket and job practices thereof that a kind of pipeline integral hoisting is used.
The present invention adopts following technical scheme:
The suspension bracket that pipeline integral hoisting of the present invention is used is comprised of four supports of pipelines, four jacks and two cross-arms, support of pipelines is fixed on the concrete floor, the upper end of support of pipelines is connected with an end of jack, the other end of jack is connected with an end of cross-arm, wherein support of pipelines is comprised of steel plate and support of pipelines angle steel, and steel plate and support of pipelines angle steel are by being welded together.
Have the bolt hole that passes for the support of pipelines expansion bolt on the described steel plate, support of pipelines is fixed on the concrete floor by the support of pipelines expansion bolt.
It is 20 millimeters upper circular hole that the upper end of the support of pipelines angle steel of described support of pipelines has diameter, and jack is fixed on the support of pipelines by upper circular hole.
The lower end of the support of pipelines angle steel of described support of pipelines has for the lower circular hole that is connected with cross-arm, and the diameter of described lower circular hole is 10 millimeters.
Described cross-arm is to be made by the double flute steel, and the two ends of cross-arm respectively are welded with a cross-arm angle steel, has diameter on the cross-arm angle steel and be 10 millimeters circular hole.
Described cross-arm angle steel is of a size of 125 * 125 * 12 millimeters.
The job practices of the suspension bracket that a kind of pipeline integral hoisting is used, the method may further comprise the steps:
Step 1 is fixed on support of pipelines on the concrete floor with the support of pipelines expansion bolt;
Step 2, the pipeline that will lift is fixed on the cross-arm, and jack is connected on support of pipelines and the cross-arm;
Step 3, four jacks in diagonal angle lift simultaneously, and pipeline is winched to the support of pipelines position;
Step 4, by bolt that cross-arm and support of pipelines is locked, then process carrying out full weld between support of pipelines and the cross-arm, to be welded complete after, jack is unclamped fixed-piping.
Bolt is that circular hole on the cross-arm angle steel at two ends of lower circular hole by support of pipelines and cross-arm is fixed in the step 4.
After finishing, lifting between cross-arm middle part and concrete floor, adds a stabilising arrangement.
Described stabilising arrangement is comprised of round steel, steel plate and stabilising arrangement angle steel, and the lower end of round steel is fixed on the cross-arm middle part, and the upper end is fixed on the stabilising arrangement angle steel, and the stabilising arrangement expansion bolt is fixed on steel plate and stabilising arrangement angle steel on the concrete floor.
Good effect of the present invention is as follows:
Suspension bracket of the present invention has simple in structure, structure rationally, the characteristics that safety factor is high, utilize jack with Pipeline lift to the tram, by bolt cross-arm and support of pipelines are carried out interim locked fixing, weld again, cross-arm and support of pipelines are fixed, just jack can be unclamped afterwards and take off, carry out pipeline and fix, whole method is simply light, and is easy to use, time saving and energy saving, after the installation, layer frame stabilising arrangement between cross-arm and concrete floor again guaranteed the stability of total, the job practices of use suspension bracket of the present invention is constructed and can not only be ensured the safety of construction, and can also improve greatly efficiency of construction.
Description of drawings
Fig. 1 is the structural representation of suspension bracket of the present invention.
Fig. 2 is the left view behind the suspension bracket rigging out of the present invention.
Fig. 3 is the plan view of the steel plate of support of pipelines.
Fig. 4 be stabilising arrangement structural representation.
Fig. 5 is the schematic diagram of support of pipelines and cross-arm junction.
Fig. 6 is the left view of support of pipelines.
Circular hole under 1-support of pipelines, 2-jack, 3-cross-arm, 4-steel plate, 5-support of pipelines angle steel, 6-stabilising arrangement, 7-bolt hole, 8-round steel, 9-steel plate, 10-stabilising arrangement angle steel, 11-stabilising arrangement expansion bolt, 12-bolt, 13-cross-arm angle steel, 14-support of pipelines expansion bolt, the upper circular hole of 15-, the 16-.
The specific embodiment
The following examples are to describe in further detail of the present invention.
Embodiment is referring to shown in the accompanying drawing 1-6, and horizontal pipe is installed, and draws first comprehensive pipeline support figure, first support of pipelines is installed on request, opens 20 mm dia circular holes with bench drill in advance on the column of support of pipelines, is used for fixedly jack.The cross-arm of support of pipelines wouldn't weld with column, at basement bottom board four prefabricated pipelines are linked together first, then four jacks in diagonal angle lift simultaneously, after pipeline winched to backing positions, with nut that support cross-arm and column is locked first, then the welder carries out full weld to support and processes, to be welded complete after, jack is unclamped fixed-piping.After fixing, pipeline can between cross-arm middle part and concrete floor, add a stabilising arrangement, stabilising arrangement is comprised of round steel, steel plate and angle steel, the lower end of round steel is fixed on the cross-arm middle part, and the upper end is fixed on the angle steel, and expansion bolt is fixed on steel plate and angle steel on the concrete floor.Stabilising arrangement can disperse the weight of the pipeline that support of pipelines bears like this, has alleviated the burden of support of pipelines, has also improved safety.
Although illustrated and described embodiments of the invention, for the ordinary skill in the art, be appreciated that without departing from the principles and spirit of the present invention and can carry out multiple variation, modification, replacement and modification to these embodiment, scope of the present invention is limited by claims and equivalent thereof.

Claims (10)

1. suspension bracket that the pipeline integral hoisting is used, it is characterized in that: it is comprised of four supports of pipelines (1), four jacks (2) and two cross-arms (3), support of pipelines (1) is fixed on the concrete floor, the upper end of support of pipelines (1) is connected with an end of jack (2), the other end of jack (2) is connected with an end of cross-arm (3), wherein support of pipelines (1) is comprised of steel plate (4) and support of pipelines angle steel (5), and steel plate (4) and support of pipelines angle steel (5) are by being welded together.
2. suspension bracket as claimed in claim 1, it is characterized in that: have the bolt hole (7) that passes for support of pipelines expansion bolt (14) on the described steel plate (4), support of pipelines (1) is fixed on the concrete floor by support of pipelines expansion bolt (14).
3. suspension bracket as claimed in claim 1, it is characterized in that: it is 20 millimeters upper circular hole (15) that the upper end of the support of pipelines angle steel (5) of described support of pipelines (1) has diameter, and jack (2) is fixed on the support of pipelines (1) by upper circular hole (15).
4. suspension bracket as claimed in claim 1, it is characterized in that: the lower end of the support of pipelines angle steel (5) of described support of pipelines (1) has the lower circular hole (16) that is connected for cross-arm (3), and the diameter of described lower circular hole (16) is 10 millimeters.
5. suspension bracket as claimed in claim 1, it is characterized in that: described cross-arm (3) is to be made by the double flute steel, the two ends of cross-arm (3) respectively are welded with a cross-arm angle steel (13), have diameter on the cross-arm angle steel (13) and be 10 millimeters circular hole.
6. suspension bracket as claimed in claim 5, it is characterized in that: described cross-arm angle steel (13) is of a size of 125 * 125 * 12 millimeters.
7. the job practices of the suspension bracket that described pipeline integral hoisting is used such as each claim of claim 1-6, it is characterized in that: the method may further comprise the steps:
Step 1 is fixed on support of pipelines (1) on the concrete floor with support of pipelines expansion bolt (14);
Step 2, the pipeline that will lift are fixed on the cross-arm (3), and jack (2) is connected on support of pipelines (1) and the cross-arm (3);
Step 3, four jacks in diagonal angle (2) lift simultaneously, and pipeline is winched to support of pipelines (1) position;
Step 4, by bolt (12) that cross-arm (3) and support of pipelines (1) is locked, then process carrying out full weld between support of pipelines and the cross-arm, to be welded complete after, jack (2) is unclamped fixed-piping.
8. the job practices of suspension bracket as claimed in claim 7, it is characterized in that: bolt in the described step 4 (12) is to be fixed by the circular hole on the cross-arm angle steel at the two ends of the lower circular hole (16) of support of pipelines (1) and cross-arm (3).
9. the job practices of suspension bracket as claimed in claim 7 is characterized in that: add a stabilising arrangement (6) between cross-arm (3) middle part and concrete floor after lifting is finished.
10. the job practices of suspension bracket as claimed in claim 9, it is characterized in that: shown in stabilising arrangement (6) formed by round steel (8), steel plate (9) and stabilising arrangement angle steel (10), the lower end of round steel (8) is fixed on cross-arm (3) middle part, the upper end is fixed on the stabilising arrangement angle steel (10), and stabilising arrangement expansion bolt (11) is fixed on steel plate (9) and stabilising arrangement angle steel (10) on the concrete floor.
CN201310340165.9A 2013-08-07 2013-08-07 Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket Active CN103362315B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310340165.9A CN103362315B (en) 2013-08-07 2013-08-07 Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310340165.9A CN103362315B (en) 2013-08-07 2013-08-07 Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket

Publications (2)

Publication Number Publication Date
CN103362315A true CN103362315A (en) 2013-10-23
CN103362315B CN103362315B (en) 2015-07-15

Family

ID=49364506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310340165.9A Active CN103362315B (en) 2013-08-07 2013-08-07 Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket

Country Status (1)

Country Link
CN (1) CN103362315B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088442A (en) * 2014-07-16 2014-10-08 中国一冶集团有限公司 Air duct installation device and method
CN104150398A (en) * 2014-07-16 2014-11-19 中国一冶集团有限公司 Circular duct mounting device and circular duct mounting method
CN105443871A (en) * 2015-12-29 2016-03-30 中建三局机电工程有限公司 Novel support hanger and construction process for butting connection of horizontal multiple pipelines
CN109437010A (en) * 2018-12-12 2019-03-08 上海市安装工程集团有限公司 Pipeline jig, installation system and its operating method for pipeline assembling

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3735951A (en) * 1971-07-28 1973-05-29 P E Reed Suspended movable scaffold
CN2114008U (en) * 1991-11-19 1992-08-26 左羲 Light-type combination ceiling frame
JPH05125839A (en) * 1991-11-01 1993-05-21 Natl House Ind Co Ltd Balcony reinforcing jig
CN2420354Y (en) * 2000-04-11 2001-02-21 叶孙基 Adjustable quick suspension rod
CN201517284U (en) * 2009-10-13 2010-06-30 河南中建七局建筑装饰工程有限公司 High-altitude semiautomatic hanging double-suspension type steel structure slipping operating platform
CN101775896A (en) * 2010-02-11 2010-07-14 浙江大学 Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3735951A (en) * 1971-07-28 1973-05-29 P E Reed Suspended movable scaffold
JPH05125839A (en) * 1991-11-01 1993-05-21 Natl House Ind Co Ltd Balcony reinforcing jig
CN2114008U (en) * 1991-11-19 1992-08-26 左羲 Light-type combination ceiling frame
CN2420354Y (en) * 2000-04-11 2001-02-21 叶孙基 Adjustable quick suspension rod
CN201517284U (en) * 2009-10-13 2010-06-30 河南中建七局建筑装饰工程有限公司 High-altitude semiautomatic hanging double-suspension type steel structure slipping operating platform
CN101775896A (en) * 2010-02-11 2010-07-14 浙江大学 Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
LWX123456531: "《管道支架制作安装标准》", 《百度文库》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088442A (en) * 2014-07-16 2014-10-08 中国一冶集团有限公司 Air duct installation device and method
CN104150398A (en) * 2014-07-16 2014-11-19 中国一冶集团有限公司 Circular duct mounting device and circular duct mounting method
CN104088442B (en) * 2014-07-16 2016-06-15 中国一冶集团有限公司 Airduct erecting device and method
CN105443871A (en) * 2015-12-29 2016-03-30 中建三局机电工程有限公司 Novel support hanger and construction process for butting connection of horizontal multiple pipelines
CN105443871B (en) * 2015-12-29 2018-03-09 中建三局机电工程有限公司 A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN109437010A (en) * 2018-12-12 2019-03-08 上海市安装工程集团有限公司 Pipeline jig, installation system and its operating method for pipeline assembling

Also Published As

Publication number Publication date
CN103362315B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN202299464U (en) Steel column rapid hoisting and in-position correcting device
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN103362315B (en) Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN103993730B (en) Steel coal hopper abutting joint constructing operation platform
CN204938800U (en) Tower crane rood beam basis
CN204401628U (en) Large-span steel supports multidirectional connector
CN204804378U (en) Two layers of interim support frame of steel construction dome construction and installation
CN204940863U (en) External wall construction outside large form bracket
CN202899639U (en) Concrete column structure
CN203159027U (en) A prefabricated iron tower foundation spreader
CN202881957U (en) Support changing structure of reinforced concrete filling pile
CN205711974U (en) A kind of Retaining Wall
CN203393721U (en) Inner support main purlin component
CN203247703U (en) Steel structural plant frame
CN204456489U (en) A kind of novel B RB dissipative member
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN206438749U (en) Construction operation platform in turnover type elevator
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN204081525U (en) A kind of square steel column docking platform
CN205526991U (en) A device for liftable erects to be coiled
CN205743035U (en) Assembled anchorage joint structure for spherical steel net frame integral hoisting
CN103397641B (en) A kind of triangle for pattern foundation pit supporting structure inner support system encloses purlin
CN203667822U (en) Pipe truss for hoisting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant