CN205711974U - A kind of Retaining Wall - Google Patents
A kind of Retaining Wall Download PDFInfo
- Publication number
- CN205711974U CN205711974U CN201620374336.9U CN201620374336U CN205711974U CN 205711974 U CN205711974 U CN 205711974U CN 201620374336 U CN201620374336 U CN 201620374336U CN 205711974 U CN205711974 U CN 205711974U
- Authority
- CN
- China
- Prior art keywords
- retaining wall
- wall
- river
- inner layer
- barricade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000003205 muscle Anatomy 0.000 claims 2
- 239000000725 suspension Substances 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 8
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 238000009415 formwork Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000005034 decoration Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开一种装配式挡土墙,包括基础底板筋、挡墙和扶壁墙,所述挡墙为预制双面墙,分为外层和内层,内层和外层之间通过吊钩连接,所述内层上设有2个斜支撑杆,所述斜支撑杆底部与基础底板筋焊牢,上部与挡墙内层焊牢,所述挡墙外侧设有河底砼支撑,所述河底砼支撑与挡墙的夹角为45°,本实用新型通过装配式挡墙降低了综合成本,设计美观大方,节省了河道的景观的二次装饰投入,装配式挡土墙在现场安装中,直接吊装,免去了立面模板立模、支撑、对销钢筋、垫块等工序,节约施工用工人数显著,由于生产环节出货量较快,在基本不增加模板等投入下,还可以组织多班组同时安转,工程周期大大缩短。
The utility model discloses an assembled retaining wall, which comprises foundation floor reinforcement, a retaining wall and a buttress wall. The retaining wall is a prefabricated double-sided wall, which is divided into an outer layer and an inner layer. The hook is connected, and the inner layer is provided with two oblique support rods, the bottom of the oblique support rods is firmly welded to the reinforcement of the foundation floor, the upper part is firmly welded to the inner layer of the retaining wall, and the outer side of the retaining wall is provided with river bottom concrete support , the included angle between the concrete support at the bottom of the river and the retaining wall is 45°. The utility model reduces the comprehensive cost through the assembled retaining wall, the design is beautiful and elegant, and the secondary decoration investment for the river landscape is saved. The assembled retaining wall In the on-site installation, direct hoisting eliminates the process of façade formwork erection, support, counter steel bars, pads, etc., which saves a significant number of construction workers. Due to the faster shipments in the production process, there is basically no increase in formwork and other inputs. Under this condition, it is also possible to organize multiple teams to install at the same time, and the project cycle is greatly shortened.
Description
技术领域technical field
本实用新型涉及挡土墙领域,具体涉及一种装配式挡土墙。The utility model relates to the field of earth retaining walls, in particular to an assembled earth retaining wall.
背景技术Background technique
目前,在公路、铁路、市政工程、水利工程中,挡土墙这种常用挡土建筑物的应用极为广泛。传统的河道挡墙一般都采用石块堆垒、混凝土现浇等方式修筑,不仅施工比较麻烦,成本较高,我国当前多数挡土墙都采用浆砌块石挡土墙或混凝土各类挡土墙,与周边环境的协调度不佳,另外,工程量大,施工速度慢,需要大量的人工。At present, in highways, railways, municipal engineering, and water conservancy projects, retaining walls, a commonly used earth-retaining structure, are widely used. Traditional river retaining walls are generally built by stone piles and concrete cast-in-place. Not only is the construction more troublesome, but the cost is high. At present, most of the retaining walls in my country use mortar block stone retaining walls or various types of concrete retaining walls. The wall is not well coordinated with the surrounding environment. In addition, the project volume is large, the construction speed is slow, and a lot of labor is required.
实用新型内容Utility model content
针对上述问题,本实用新型提供了一种装配式挡土墙,其目的在于:缩小工程量,降低综合成本,提升生产效率。In view of the above problems, the utility model provides a prefabricated retaining wall, the purpose of which is to reduce the engineering quantity, reduce the overall cost and improve the production efficiency.
本实用新型的技术解决方案:The technical solution of the utility model:
一种装配式挡土墙,其特征在于:包括基础底板筋、挡墙和扶壁墙,所述挡墙为预制双面墙,分为外层和内层,内层和外层之间通过吊钩连接,所述内层上设有2个斜支撑杆,所述斜支撑杆底部与基础底板筋焊牢,上部与挡墙内层焊牢,所述挡墙外侧设有河底砼支撑,所述河底砼支撑与挡墙的夹角为45°。A prefabricated retaining wall, characterized in that it includes base slab reinforcement, a retaining wall and a buttress wall, the retaining wall is a prefabricated double-sided wall, and is divided into an outer layer and an inner layer, and the inner layer and the outer layer pass through The hook is connected, and the inner layer is provided with two oblique support rods, the bottom of the oblique support rods is firmly welded to the reinforcement of the foundation floor, the upper part is firmly welded to the inner layer of the retaining wall, and the outer side of the retaining wall is provided with river bottom concrete support , the angle between the concrete support at the bottom of the river and the retaining wall is 45°.
所述斜支撑杆与挡墙的角度为41°。The angle between the inclined support rod and the retaining wall is 41°.
所述斜支撑杆通过套筒式连接有2个丝杆固定。The oblique support rod is fixed by two screw rods connected through a sleeve.
本实用新型的有益效果:The beneficial effects of the utility model:
本实用新型通过装配式挡墙降低了综合成本,设计美观大方,节省了河道的景观的二次装饰投入,装配式挡土墙在现场安装中,直接吊装,免去了立面模板立模、支撑、对销钢筋、垫块等工序,节约施工用工人数显著,由于生产环节出货量较快,在基本不增加模板等投入下,还可以组织多班组同时安转,工程周期大大缩短。The utility model reduces the comprehensive cost through the assembled retaining wall, the design is beautiful and elegant, and saves the investment in the secondary decoration of the river landscape. The process of supporting, counter-selling steel bars, pads and other processes saves the number of construction workers significantly. Due to the faster shipments in the production process, it is possible to organize multiple teams to operate at the same time without increasing the investment in formwork, and the project cycle is greatly shortened.
附图说明Description of drawings
图1:本实用新型结构原理示意图。Fig. 1: schematic diagram of the structure principle of the utility model.
图2:本实用新型河底砼支撑示意图。Fig. 2: Schematic diagram of the concrete support at the bottom of the river of the utility model.
图3:本实用新型挡土墙平面布置图。Figure 3: Plane layout of the utility model retaining wall.
其中:1 基础底板筋 2 挡墙 2-1 外层 2-2 内层 3 扶壁墙 4 斜支撑杆 5 河底砼支撑。Among them: 1 Foundation floor reinforcement 2 Retaining wall 2-1 Outer layer 2-2 Inner layer 3 Buttress wall 4 Diagonal support rod 5 River bottom concrete support.
具体实施方式detailed description
下面结合附图和实施例来对本实用新型做进一步描述:The utility model will be further described below in conjunction with accompanying drawing and embodiment:
如图1至3所示,As shown in Figures 1 to 3,
一种装配式挡土墙,包括基础底板筋1、挡墙2和扶壁墙3,所述挡墙2为预制双面墙,分为外层2-1和内层2-2,内层2-2和外层2-1之间通过吊钩连接,所述内层2-2上设有2个斜支撑杆4,所述斜支撑杆4底部与基础底板筋1焊牢,上部与挡墙2内层焊牢,所述挡墙2外侧设有河底砼支撑5,所述河底砼支撑5与挡墙2的夹角为45°。A prefabricated retaining wall, comprising a foundation floor reinforcement 1, a retaining wall 2 and a buttress wall 3, the retaining wall 2 is a prefabricated double-sided wall, and is divided into an outer layer 2-1 and an inner layer 2-2, the inner layer 2-2 and the outer layer 2-1 are connected by hooks, the inner layer 2-2 is provided with two oblique support rods 4, the bottom of the oblique support rods 4 is firmly welded to the base plate reinforcement 1, and the upper part is connected to the The inner layer of the retaining wall 2 is welded firmly, and the outer side of the retaining wall 2 is provided with a river bottom concrete support 5, and the included angle between the river bottom concrete support 5 and the retaining wall 2 is 45°.
其中,所述斜支撑杆4与挡墙2的角度为41°,所述斜支撑杆4通过套筒式连接有2个丝杆固定。Wherein, the angle between the oblique support rod 4 and the retaining wall 2 is 41°, and the oblique support rod 4 is fixed by two screw rods connected through a sleeve.
具体安装过程:Specific installation process:
在挡墙2内侧,在底板上相应位置放置2个底部斜支撑杆4,底部斜支撑杆4底部与基础底板筋1焊牢,上部与挡墙2内层焊牢。On the inner side of the retaining wall 2, place two bottom slanting support rods 4 at the corresponding positions on the base plate, the bottom of the bottom slanting support rods 4 is firmly welded to the base plate reinforcement 1, and the upper part is firmly welded to the inner layer of the retaining wall 2.
在河道相应位置打1根与河道底成80度左右的工字钢或槽钢作为连接河底砼支撑5底部,用两根钢管人字焊接连接河底砼支撑5,如河底有原先的混凝土底板,把河底砼支撑5埋件固定在混凝土底板上,埋件与河底砼支撑5用丝杆连接。At the corresponding position of the river channel, one I-beam or channel steel with an angle of about 80 degrees to the bottom of the river channel is used to connect the bottom of the river bottom concrete support 5, and two steel pipes are used to connect the river bottom concrete support 5 by herringbone welding. If the river bottom has the original Concrete bottom plate, the river bottom concrete support 5 embedded parts are fixed on the concrete bottom plate, and the embedded parts are connected with the river bottom concrete support 5 with screw rods.
综上,本实用新型达到预期目的。In summary, the utility model achieves the intended purpose.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620374336.9U CN205711974U (en) | 2016-04-28 | 2016-04-28 | A kind of Retaining Wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620374336.9U CN205711974U (en) | 2016-04-28 | 2016-04-28 | A kind of Retaining Wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205711974U true CN205711974U (en) | 2016-11-23 |
Family
ID=57291890
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620374336.9U Expired - Fee Related CN205711974U (en) | 2016-04-28 | 2016-04-28 | A kind of Retaining Wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205711974U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110055999A (en) * | 2019-04-24 | 2019-07-26 | 兰州理工大学 | A kind of part assembled stake support counterfort wall |
| CN110520574A (en) * | 2017-07-18 | 2019-11-29 | 四万十混凝土株式会社 | Retaining wall stacking building block |
-
2016
- 2016-04-28 CN CN201620374336.9U patent/CN205711974U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110520574A (en) * | 2017-07-18 | 2019-11-29 | 四万十混凝土株式会社 | Retaining wall stacking building block |
| CN110055999A (en) * | 2019-04-24 | 2019-07-26 | 兰州理工大学 | A kind of part assembled stake support counterfort wall |
| CN110055999B (en) * | 2019-04-24 | 2020-11-27 | 兰州理工大学 | A partially assembled pile-supported buttressed retaining wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
| CN203808235U (en) | Integral special-shaped column structure of prefabricated assembly | |
| CN106193589B (en) | Concrete superelevation heavy type beam and overlapping board combining structure method for supporting | |
| CN202124862U (en) | Spiral-anchor plate type composite foundation | |
| CN102619286A (en) | Connecting joint of steel pipe concrete column and profile steel concrete beam | |
| CN205711974U (en) | A kind of Retaining Wall | |
| CN204357000U (en) | A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame | |
| CN205712565U (en) | A kind of prefabricated two-sided wall | |
| CN104074392B (en) | A kind of foundation-free plate column type assembling enclosure wall manufacture method | |
| CN207700746U (en) | The upper buttress of existing building base isolation reinforcement constructs | |
| CN205577187U (en) | Prefabricated steel pipe concrete constructional column rammed earth wall | |
| CN206308834U (en) | A kind of steel column with metal horse tooth trough for raw-soil wall and masonry wall | |
| CN203394019U (en) | Frame type template structure for placing of concrete | |
| CN105369814B (en) | A kind of prefabricated prestressing concrete support and its erection method | |
| CN203559505U (en) | Cast-in-place light steel bar truss wall | |
| CN100406652C (en) | Rigid steel structure tower crane foundation | |
| CN106065676A (en) | Novel external wallboard joint and construction method | |
| CN206815366U (en) | A kind of prefabricated assembled basis | |
| CN105604246A (en) | Construction method of steel-section-concrete T-shaped section column | |
| CN105544867A (en) | A steel-concrete composite special-shaped column | |
| CN204662493U (en) | A steel pipe concrete cantilever type barricade for high fill district | |
| CN204626451U (en) | Hollow steel pipe concrete cantilever type retaining wall for high fill area | |
| CN205421718U (en) | Semi -prefabricated circular steel tube regeneration mixes concrete column | |
| CN204551765U (en) | Buffer isolator between building structure | |
| CN111550045B (en) | Secondary grouting steel formwork for embedded steel column foot plate and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |