CN106223463A CN201610779274.4A CN201610779274A CN106223463A CN 106223463 A CN106223463 A CN 106223463A CN 201610779274 A CN201610779274 A CN 201610779274A CN 106223463 A CN106223463 A CN 106223463A
Authority
CN
China
Prior art keywords
node
prefabricated
overhanging
column
reserved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610779274.4A
Other languages
Chinese (zh)
Other versions
CN106223463B (en
Inventor
赵挺生
王敬洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610779274.4A priority Critical patent/CN106223463B/en
Publication of CN106223463A publication Critical patent/CN106223463A/en
Application granted granted Critical
Publication of CN106223463B publication Critical patent/CN106223463B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of prefabricated node and the prefabricated assembled frame structure of one and construction method thereof, this prefabricated node according to its structure can batch production prefabricated.The core of this prefabricated assembled frame structure is the overhanging beam section of prefabricated band node, the prefabricated node of the overhanging shell of column of node, according to the various types of prefabricated node of layout design, and all kinds of prefabricated node is precisely installed, the beam of the prefabricated node of joint connection in site or the mode of post, build whole fabricated assembly overall structure.This construction method comprises the steps: 1) the on-the-spot location of prefabricated node, lift and correct;2) prefabricated node is fixedly mounted;3) cast in situs beam coupling part and post coupling part.The present invention proposes a kind of new forming types innovatively for prefabricated assembled frame structure, the node method for prefabricating of band beam column is proposed, contribute to node durability, the unfavorable situation of poor reliability improving traditional prefabricated beam column, cast in situs armored concrete node brings, save the structure time, save construction cost.

Description

A kind of prefabricated node and the prefabricated assembled frame structure of one and construction method thereof
Technical field
The invention belongs to fabricated assembly overall technical field of structures, be specifically related to a kind of prefabricated node and the prefabricated dress of one Join formula frame structure and construction method thereof.
Background technology
In recent years, fabricated assembly overall structural development is rapid, and especially country proposes building work in 13 planning The developing goal of industry, prefabricated assembled technology is the core of building industrialization, is promoting resource, energy conservation type and environment friend The development of good type building, serves key effect.Common precast construction system includes: prefabricated concrete structure system, dress Join the multiple shapes such as integral concrete system, fabricated assembly overall shear wall structure system, fabricated shear wall structural system The structural system of formula.
Prefabricated construction has construction mode, raising efficiency, the quality that ensures, the feature of beneficially management of changing, in advance Assembled technology processed changes building industry traditional mode of production mode.
At present, the enforcement of prefabricated assembled frame structure concentrates on the batch production of the component such as precast beam, post and makes, on-the-spot fixed Position, lift, correct the fixing and cast in situs of beam-to-column joint node.The prefabricated assembled component of tradition, subject matter concentrates on At the node link position of prefabricated components, the reinforcing bar that the node of cast in situs is limited by node location is intensive, and node size limits Etc. unfavorable factor, it is difficult to ensure the quality problems of cast in situs node, and the maintenance problem in later stage, and then bring the resistance to of sternness Property and integrity problem for a long time.
Summary of the invention
For solving the problem that above-mentioned prior art exists, the invention provides a kind of prefabricated node and one is prefabricated assembled Frame structure and construction method thereof, this prefabricated node is the prefabricated component of batch production, is applied in prefabricated assembled frame structure, has The cast in situs helping improve the node point connection in traditional prefabricated assembled frame structure is of poor quality, late maintaining is difficult, durable The problem such as property reliability is poor, it is achieved prefabricated assembled frame structure quickly and efficiently constructing.
The prior batch production of node of this prefabricated assembled frame structure is prefabricated, and prefabricated node good endurance, reliability are high, Make whole prefabricated assembled frame structure good endurance, reliability height, safety is high and construction cost is low.
This construction method is owing to employing prefabricated node, so that whole prefabricated assembled frame structure does not exist node Connect, only beam-ends and the connection of beam-ends, styletable and styletable, and then the structure of whole prefabricated assembled frame structure is become Simple to operation.
Realizing the technical scheme that above-mentioned purpose of the present invention used is:
A kind of prefabricated node, this prefabricated node include precast beam Column border node, the overhanging beam section of node of more than 1 and 1 with On the overhanging shell of column of node, precast beam Column border node, the overhanging beam section of each node and the overhanging shell of column of each node are integral type precast construction, The central authorities of the overhanging beam section of each node and the overhanging shell of column of each node are reserved with groove respectively, and the overhanging beam section of each node and each node are overhanging Shell of column end is all reserved with reserved long reinforcing bar, the overhanging beam section of each node and each node overhanging shell of column end and is all reserved with reserved short steel Muscle, reserved long reinforcing bar and reserved bar dowel cross arrangement.
This prefabricated node includes prefabricated node A, prefabricated node B, prefabricated node C, prefabricated node D, prefabricated node E, prefabricated Node F, prefabricated node G and prefabricated node H;Described prefabricated node A includes precast beam Column border node, 2 overhanging beam section of node and 2 The overhanging shell of column of individual node, 2 overhanging beam section of node are mutually perpendicular to, and 2 overhanging shell of columns of node are on same vertical curve;Described Prefabricated node B includes precast beam Column border node, 4 overhanging beam section of node and 2 overhanging shell of columns of node, in 4 overhanging beam section of node Being mutually perpendicular to two-by-two, 2 overhanging shell of columns of node are on same vertical curve;Described prefabricated node C include precast beam Column border node, 3 overhanging beam section of node and 2 overhanging shell of columns of node, be mutually perpendicular in 3 overhanging beam section of node two-by-two, 2 overhanging posts of node Section is on same vertical curve;Described prefabricated node D includes outside precast beam Column border node, 2 overhanging beam section of node and 1 node Stretching shell of column, 2 overhanging beam section of node are mutually perpendicular to;Described prefabricated node E includes precast beam Column border node, 4 node overhanging beams Section and 1 overhanging shell of column of node, be mutually perpendicular in 4 overhanging beam section of node two-by-two;Described prefabricated node F includes prefabricated beam column Node, 3 overhanging beam section of node and 1 overhanging shell of column of node, be mutually perpendicular in 3 overhanging beam section of node two-by-two;Described is pre- Node G processed is cross, including precast beam Column border node, 2 overhanging beam section of node and the overhanging shell of column of 2 nodes, 2 node overhanging beams On section same vertical curve, 2 overhanging shell of columns of node are on same vertical curve;Described prefabricated node H is T font, including Precast beam Column border node, 2 overhanging beam section of node and the overhanging shell of column of 1 node, on 2 node overhanging beam section same vertical curves.
When the overhanging beam section of each node on this prefabricated node and connected precoated plate are separate type structures, outside each node Being reserved with 2 holes for hoist on beam section beam-ends, each node overhanging shell of column styletable is provided with 2 holes for hoist;Each on this prefabricated node When the overhanging beam section of node and connected Bars In Poured Concrete Slab are cast-type combinative structurees, each node overhanging beam section beam-ends is reserved with 4 Individual hole for hoist, each node overhanging shell of column styletable is provided with 2 holes for hoist.
A kind of prefabricated assembled frame structure, waters including prefabricated node, prefabricated styletable tenon, prefabricated beam-ends tenon, scene The beam coupling part built, the post coupling part of cast in situs, prefabricated post bottom susceptor, post bracing members bar, joist steel support bar, styletable steel Screw rod and beam-ends steel screw rod, the center of top of prefabricated post bottom susceptor is reserved with groove, and the top of prefabricated post bottom susceptor is reserved with pre- Stay long reinforcing bar and reserved bar dowel, the two ends of each bottom prefabricated styletable tenon respectively with corresponding prefabricated post bottom susceptor and be positioned at the end The fit depressions of the overhanging shell of column of node of the prefabricated node of layer, the two ends of remaining each prefabricated styletable tenon are respectively with corresponding The fit depressions of the two adjacent sections overhanging shell of column of point of adjacent two prefabricated nodes, each prefabricated styletable tenon is interspersed in the post of correspondence even Connecing in part, the reserved long reinforcing bar on the two adjacent sections overhanging shell of column of point on adjacent two prefabricated nodes, reserved bar dowel correspondence are even Connect, and reserved long reinforcing bar, the reserved bar dowel on the overhanging shell of column of two adjacent sections point is all interspersed in the post coupling part of correspondence, phase It is symmetrically installed at least 1 coupled columns bracing members bar, each post steel between two adjacent sections point overhanging shell of column lateral wall on adjacent two prefabricated nodes The two ends of support bar are fixed by two styletable steel screw rods, two styletable steel screw rods respectively with the corresponding two adjacent sections overhanging post of point Hole for hoist in section connects, each prefabricated beam-ends tenon respectively with the two adjacent sections overhanging beam section of point of corresponding adjacent two prefabricated nodes Fit depressions, each prefabricated beam-ends tenon be interspersed in correspondence beam coupling part in, adjacent two on adjacent two prefabricated nodes Reserved long reinforcing bar, reserved bar dowel correspondence in the overhanging beam section of node connect, and the reserved length in the overhanging beam section of two adjacent sections point Reinforcing bar is all interspersed in beam coupling part, symmetrical peace between the two adjacent sections point overhanging beam section lateral wall on adjacent two prefabricated nodes Being filled to few 1 pair of joist steel support bar, the two ends of each joist steel support bar are fixed by two beam-ends steel screw rods, and two beam-ends steel screw rods divide Do not connect with the hole for hoist in the corresponding two adjacent sections overhanging beam section of point.
Prefabricated styletable tenon and prefabricated beam-ends tenon are all in strip, the most pre-on prefabricated styletable tenon and prefabricated beam-ends tenon Leave hole for hoist.
The building method of a kind of prefabricated assembled frame structure, comprises the steps:
1) after laying a solid foundation, cast in situs prefabricated post bottom susceptor;
2) after prefabricated post bottom susceptor maintenance is good, scene determines mast axis position, installs the fixing each prefabricated styletable tenon of bottom Head and prefabricated beam-ends tenon;
3) the lifting prefabricated node of bottom is in place, corrects the prefabricated node of bottom, installs fixing post bracing members bar and joist steel supports Bar, fixing styletable steel screw rod and beam-ends steel screw rod;
4) the reserved long reinforcing bar on the corresponding two adjacent sections overhanging shell of column of point connected on adjacent two prefabricated nodes, reserved short steel Muscle, installs fixing post bracing members template;
5) the reserved long reinforcing bar in the corresponding two adjacent sections overhanging beam section of point connected on adjacent two prefabricated nodes, reserved short steel Muscle, installs fixing joist steel support shuttering;
6) check that this layer of prefabricated node is the most all installed in place, if it is, enter step 7), if it does not, enter step 3), until the prefabricated node of bottom frame structure is all installed in place;
7) part between the prefabricated overhanging shell of column of two adjacent sections point on the adjacent two prefabricated nodes of concrete cast in situs is used, It is the post coupling part of cast in situs;
8) part between the prefabricated overhanging beam section of two adjacent sections point on the adjacent two prefabricated nodes of concrete cast in situs is used, It is the beam coupling part of cast in situs;
9) check that the post coupling part of bottom frame structure, beam coupling part have the most all poured, if it is, enter Step 10), if it is not, enter step 7) and/or step 8);
10) coupled columns coupling part, beam coupling part carry out maintenance;
11) check that bottom frame structure has the most all built, if it is not, continue to build bottom frame structure, as Fruit is, with reference to step 2)-step 10), enter the structure of last layer frame structure.
Compared with prior art, advantages of the present invention and having the beneficial effects that:
1) the prefabricated node that the present invention proposes is capable of factorial praluction, improves construction speed.
2) based on prefabricated node the prefabricated assembled frame structure that the present invention proposes contributes to improving tradition prefabrication and assembly construction Cast-in-place concrete is needed to produce durability and the problem of poor reliability at node at formula frame structure interior joint.
3) construction method of the prefabricated assembled frame structure that the present invention proposes, the prefabricated assembled thinking mould broken traditions Formula, centered by setting up, node installation prefabricated by node, breaks through conventional node cast in situs and connects the cast in situs being changed into component Connect, by the accurate overhanging beam section of prefabricated node and cylindrical length, reserving installation hole, prefabricated tenon, accomplish accurately to manufacture, accurately Install, it is achieved first node truly, rear part.
4) construction method of the prefabricated assembled frame structure that the present invention proposes can realize plant produced, on-site hoisting even Connect, the integrated function such as cast in situs.
In a word, the present invention proposes a kind of new forming types innovatively for prefabricated assembled frame structure, for The problem that present in the prefabricated assembled frame structure of tradition, node durability, reliability are poor, the node proposing band beam column is pre- Method processed, contributes to improving traditional prefabricated beam column, node durability that cast in situs armored concrete node brings, poor reliability Unfavorable situation, and the node installation load that can undertake in place, thus can save the structure time of whole frame structure, saving is executed Work cost, improves durability and the reliability of general frame structure simultaneously.As can be seen here, the present invention is to promoting that prefabrication and assembly construction is overall The development of formula structure has great meaning.
Accompanying drawing explanation
Fig. 1 is the structure diagram of the various types of prefabricated node of the present invention.
Fig. 2 is the structural representation of cross prefabricated node.
Fig. 3 is prefabricated node and the structural representation that precoated plate is separate type structure.
Fig. 4 is prefabricated node and the structural representation that Bars In Poured Concrete Slab is cast-type combinative structure.
Fig. 5 is the structural representation of prefabricated post bottom susceptor.
Fig. 6 is the structural representation of prefabricated beam-ends tenon.
Fig. 7 is the structural representation after the adjacent two prefabricated overhanging beam section on adjacent two prefabricated nodes connect.
Fig. 8 is the structural representation after the adjacent two prefabricated overhanging shell of columns on adjacent two prefabricated nodes connect.
Fig. 9 is the structure diagram of the prefabricated assembled frame structure of the present invention.
Wherein, 1-prefabricated node A, 2-prefabricated node B, 3-prefabricated node C, 4-prefabricated node G, 5-prefabricated node D, 6-is pre- Node E, 7-processed prefabricated node F, 8-prefabricated node H, 9-reserve long reinforcing bar, 10-groove, 11-hole for hoist, 12-node overhanging beam Section, 13-reserve bar dowel, 14-precast beam Column border node, the overhanging shell of column of 15-node, 16-prefabricated beam-ends tenon or prefabricated styletable tenon Head, 17-prefabricated post bottom susceptor, 18-post bracing members bar, 19-joist steel support bar, 20-styletable steel screw rod, 21-beam-ends steel screw rod, 22-joist steel support shuttering, 23-post bracing members template, 24-beam coupling part, 25-post coupling part.
Detailed description of the invention
Prefabricated node and prefabricated assembled frame structure to the present invention are described in detail below in conjunction with the accompanying drawings.
The type of the prefabricated node that the present invention provides is the most, now provides eight kinds of prefabricated nodes that application is more, is respectively Prefabricated node A 1, prefabricated node B 2, prefabricated node C 3, prefabricated node D 5, prefabricated node E6, prefabricated node F7, prefabricated joint Point G4, prefabricated node H8, its structure diagram is as shown in Figure 1.
For being described in detail the structure of prefabricated node, the present embodiment is described in detail with prefabricated node G, prefabricated joint Point G includes 14,2 overhanging beam section of node 12 of precast beam Column border node and 2 overhanging shell of columns of node 15, precast beam Column border node 14,2 The overhanging beam section of node 12 and 2 overhanging shell of columns of node 15 are integral type precast construction, and the structure of prefabricated node G is overall in cross Type, as shown in Figure 2.The a length of L of the overhanging beam section of each node 120/ 2 250mm (note: L0For beam along longitudinal clear length), The overhanging shell of column of node on precast beam Column border node top is 500mm, in the length of the overhanging shell of column of node of precast beam Column border node bottom For (h0-1000)mm(h0For the vertical computed altitude of post).
The overhanging beam section of each node 12 of prefabricated node G and the central authorities of the overhanging shell of column of each node 15 are reserved with square groove respectively 10, square groove width is 100mm, a length of 100mm, and the degree of depth is 50mm.The overhanging beam section of each node 12 and the overhanging post of each node The all reserved long reinforcing bar 9 in section 15 ends, all reserved short steel in the overhanging beam section of each node 15 and each node overhanging shell of column 9 end Muscle 13, reserved long reinforcing bar 9 and reserved bar dowel 13 cross arrangement.The a length of 500mm of reserved long reinforcing bar, the length of reserved bar dowel Degree for 100mm, and reserved long splice area no more than place cross section place the reinforcing bar gross area 50%.
As it is shown on figure 3, when the overhanging beam section of each node on prefabricated node G and connected precoated plate are separate type structures Time, the central authorities of each node overhanging beam section beam-ends are reserved with 2 holes for hoist 11 (a diameter of 48mm), two holes for hoist all with its institute The distance of node overhanging beam section beam-ends end face be 200mm, be positioned at the hole for hoist of lower section and the overhanging beam section of node at its place Distance 150mm of bottom, the distance between adjacent two hole for hoist central points is 200-300mm.
As shown in Figure 4, it is cast-type combination when the overhanging beam section of each node on prefabricated node G and connected Bars In Poured Concrete Slab During structure, each node overhanging beam section beam-ends is reserved with 11,4 holes for hoist of 4 holes for hoist all with the node overhanging beam at its place The distance at the Bars In Poured Concrete Slab top in section is twice Bars In Poured Concrete Slab thickness+220mm, first hole for hoist and the node overhanging beam at its place The distance of section beam-ends end face is 200mm, and its excess-three hole for hoist is configured on the basis of first hole for hoist, adjacent two liftings Distance between hole is 500-1000mm.Each node overhanging shell of column styletable on prefabricated node G is provided with 2 holes for hoist 11, and two hang The distance of the bottom portion of groove in the overhanging beam section of node at dress its place of Kong Junyu is 300mm, and the distance between two holes for hoist is 200-300mm。
According to prefabricated node G, remaining each category node carrying out simple illustration, described prefabricated node A includes prefabricated Bean column node, 2 overhanging beam section of node and the overhanging shell of column of 2 nodes, 2 overhanging beam section of node are mutually perpendicular to, 2 overhanging posts of node Section is on same vertical curve;Described prefabricated node B includes outside precast beam Column border node, 4 overhanging beam section of node and 2 nodes Stretching shell of column, be mutually perpendicular to two-by-two in 4 overhanging beam section of node, 2 overhanging shell of columns of node are on same vertical curve;Described is pre- Node C processed includes precast beam Column border node, 3 overhanging beam section of node and 2 overhanging shell of columns of node, in 3 overhanging beam section of node two Two are mutually perpendicular to, and 2 overhanging shell of columns of node are on same vertical curve;Described prefabricated node D include precast beam Column border node, 2 The overhanging beam section of individual node and 1 overhanging shell of column of node, 2 overhanging beam section of node are mutually perpendicular to;Described prefabricated node E includes pre- Bean column node processed, 4 overhanging beam section of node and 1 overhanging shell of column of node, be mutually perpendicular in 4 overhanging beam section of node two-by-two;Institute The prefabricated node F stated includes precast beam Column border node, 3 overhanging beam section of node and 1 overhanging shell of column of node, 3 node overhanging beams Being mutually perpendicular to two-by-two in Duan, described prefabricated node H is T font, including precast beam Column border node, 2 overhanging beam section of node and 1 joint The overhanging shell of column of point, on 2 node overhanging beam section same vertical curves.
The prefabricated assembled frame structure that the present invention provides includes prefabricated node, prefabricated styletable tenon 16, prefabricated beam-ends tenon 16, the beam coupling part 24 of cast in situs, the post coupling part 25 of cast in situs, prefabricated post bottom susceptor 17, post bracing members bar 19, joist steel support bar 18, styletable steel screw rod 20 and beam-ends steel screw rod 21.
As it is shown in figure 5, the center of top of prefabricated post bottom susceptor 17 is reserved with groove 10, the top of prefabricated post bottom susceptor 17 is pre- Stay reserved long reinforcing bar 9 and reserved bar dowel 13.
As shown in Figure 6, prefabricated styletable tenon 16 and prefabricated beam-ends tenon 16 all in strip, prefabricated styletable tenon and prefabricated The length of beam-ends tenon is 600mm, and width is 100mm, is highly 100mm.Prefabricated styletable tenon and prefabricated beam-ends tenon Head, as beam, post internal core pressure-containing parts, uses C40Armored concrete.On prefabricated styletable tenon 16 and prefabricated beam-ends tenon 16 All it is reserved with hole for hoist, convenient lifting.
As it is shown in fig. 7, each prefabricated beam-ends tenon 16 is overhanging with the two adjacent sections point of corresponding adjacent two prefabricated nodes respectively The groove 10 of beam section matches, and each prefabricated beam-ends tenon 16 is interspersed in the beam coupling part 24 of correspondence, adjacent two prefabricated nodes On the two adjacent sections overhanging beam section of point on reserved long reinforcing bar 9, reserved bar dowel 13 is corresponding connects, i.e. one of them node is overhanging Reserved bar dowel corresponding in reserved long reinforcing bar beam section overhanging with another one node in beam section is fixing to be connected, and two adjacent sections Reserved long reinforcing bar 9, reserved bar dowel 13 in the overhanging beam section 12 of point are all interspersed in beam coupling part 24, adjacent two prefabricated nodes On two adjacent sections point overhanging beam section 12 lateral wall between be symmetrically installed 2 pairs of joist steel support bars 18, the two of each joist steel support bar 18 Hold and fixed by two beam-ends steel screw rods 21, two beam-ends steel screw rods 21 respectively with in the corresponding two adjacent sections overhanging beam section of point 12 Hole for hoist connect.
As shown in Figure 8, the two ends of each bottom prefabricated styletable tenon 16 respectively with corresponding prefabricated post bottom susceptor 17 and being positioned at The fit depressions of the overhanging shell of column of node 15 of the prefabricated node of bottom, the two ends of remaining each prefabricated styletable tenon 16 respectively with The fit depressions of the two adjacent sections overhanging shell of column of point 15 of corresponding adjacent two prefabricated nodes, each prefabricated styletable tenon 16 is interspersed in In corresponding post coupling part 25, the reserved long reinforcing bar 9 on the two adjacent sections overhanging shell of column of point 15 on adjacent two prefabricated nodes, in advance Stay the corresponding connection of bar dowel 13, i.e. reserved long reinforcing bar on the overhanging shell of column of one of them node and the overhanging shell of column of another one node The reserved bar dowel of upper correspondence is fixing to be connected, and reserved long reinforcing bar 9 on the overhanging shell of column of two adjacent sections point 15, reserves bar dowel 13 All it is interspersed in the post coupling part 25 of correspondence, between two adjacent sections point overhanging shell of column 15 lateral wall on adjacent two prefabricated nodes Being symmetrically installed 2 coupled columns bracing members bars 18, the two ends of each post bracing members bar 18 are fixed by two styletable steel screw rods 20, two styletables Steel screw rod 20 connects with the hole for hoist on the corresponding two adjacent sections overhanging shell of column of point respectively.
The structure diagram of whole prefabricated assembled frame structure is as it is shown in figure 9, from fig. 9, it can be seen that whole prefabrication and assembly construction Formula frame structure applies six kinds of prefabricated nodes, and these six kinds of prefabricated nodes are respectively prefabricated node A, prefabricated node B, prefabricated node C, prefabricated node D, prefabricated node E and prefabricated node F, these six kinds of prefabricated nodes are respectively applied to the beam-ends at different place and beam The connection of end, styletable and styletable.Prefabricated node G and prefabricated node H is generally used in brick mix structure.
Below in conjunction with above-mentioned prefabricated node and prefabricated assembled frame structure, the prefabricated assembled framework of the present invention is tied The construction method of structure illustrates.
The construction method of above-mentioned prefabricated assembled frame structure, the steps include:
1) after laying a solid foundation, cast in situs prefabricated post bottom susceptor;
2) after prefabricated post bottom susceptor maintenance is good, scene determines mast axis position, installs the fixing each prefabricated styletable tenon of bottom Head and prefabricated beam-ends tenon;
3) the lifting prefabricated node of bottom is in place, corrects the prefabricated node of bottom, installs fixing post bracing members bar and joist steel supports Bar, fixing styletable steel screw rod and beam-ends steel screw rod;
4) the reserved long reinforcing bar on the corresponding two adjacent sections overhanging shell of column of point connected on adjacent two prefabricated nodes, reserved short steel Muscle, i.e. connects corresponding reserved long reinforcing bar and reserved bar dowel (such as welding, being mechanically connected), installs fixing post bracing members template, Post bracing members template is fixed on styletable steel screw rod;
5) the reserved long reinforcing bar in the two adjacent sections overhanging beam section of point on adjacent two prefabricated nodes, reserved bar dowel are connected, I.e. connect corresponding reserved long reinforcing bar and reserved bar dowel (such as welding, being mechanically connected), fixing joist steel support shuttering is installed, by beam Bracing members template is fixed on beam-ends steel screw rod;
6) check that this layer of prefabricated node is the most all installed in place, if it is, enter step 7), if it does not, enter step 3), until the prefabricated node of bottom frame structure is all installed in place;
7) use the part between the two adjacent sections overhanging shell of column of point on the adjacent two prefabricated nodes of concrete cast in situs, be The post coupling part 25 of cast in situs;
8) use the part between the two adjacent sections overhanging beam section of point on the adjacent two prefabricated nodes of concrete cast in situs, be The existing beam coupling part 24 poured;
9) check that the post coupling part of bottom frame structure, beam coupling part have the most all poured, if it is, enter Step 10), if it is not, enter step 7) and/or step 8);
10) coupled columns coupling part, beam coupling part carry out maintenance, after maintenance terminates, post bracing members template and joist steel are propped up Hold mode plate disassembles;
11) check that bottom frame structure has the most all built, if it is not, continue to build bottom frame structure, as Fruit is, with reference to step 2)-step 10), enter the structure of last layer frame structure, until whole prefabricated assembled frame structure structure Build, as shown in Figure 9.

Claims (6)

1. a prefabricated node, it is characterised in that: this prefabricated node includes precast beam Column border node, the node overhanging beam of more than 1 Section and the overhanging shell of column of node of more than 1, precast beam Column border node, the overhanging beam section of each node and the overhanging shell of column of each node are integral type Precast construction, the central authorities of the overhanging beam section of each node and the overhanging shell of column of each node are reserved with groove respectively, the overhanging beam section of each node and It is the most reserved that each node overhanging shell of column end is all reserved with reserved long reinforcing bar, the overhanging beam section of each node and each node overhanging shell of column end There is reserved bar dowel, reserved long reinforcing bar and reserved bar dowel cross arrangement.
Prefabricated node the most according to claim 1, it is characterised in that: this prefabricated node includes prefabricated node A, prefabricated node B, prefabricated node C, prefabricated node D, prefabricated node E, prefabricated node F, prefabricated node G and prefabricated node H;Described prefabricated node A includes precast beam Column border node, 2 overhanging beam section of node and 2 overhanging shell of columns of node, and 2 overhanging beam section of node are mutually perpendicular to, 2 The overhanging shell of column of individual node is on same vertical curve;Described prefabricated node B includes precast beam Column border node, 4 node overhanging beams Section and 2 overhanging shell of columns of node, be mutually perpendicular in 4 overhanging beam section of node two-by-two, and 2 overhanging shell of columns of node are vertical at same On line;Described prefabricated node C includes precast beam Column border node, 3 overhanging beam section of node and 2 overhanging shell of columns of node, 3 nodes Being mutually perpendicular to two-by-two in overhanging beam section, 2 overhanging shell of columns of node are on same vertical curve;Described prefabricated node D includes pre- Bean column node processed, 2 overhanging beam section of node and 1 overhanging shell of column of node, 2 overhanging beam section of node are mutually perpendicular to;Described is pre- Node E processed includes precast beam Column border node, 4 overhanging beam section of node and 1 overhanging shell of column of node, in 4 overhanging beam section of node two Two are mutually perpendicular to;Described prefabricated node F includes precast beam Column border node, 3 overhanging beam section of node and 1 overhanging shell of column of node, 3 The overhanging beam section of individual node is mutually perpendicular to two-by-two;Described prefabricated node G is cross, including precast beam Column border node, 2 nodes Overhanging beam section and the overhanging shell of column of 2 nodes, on 2 node overhanging beam section same vertical curves, 2 overhanging shell of columns of node are at same On vertical curve;Described prefabricated node H is T font, including precast beam Column border node, 2 overhanging beam section of node and the overhanging post of 1 node Section, on 2 node overhanging beam section same vertical curves.
Prefabricated node the most according to claim 1, it is characterised in that: the overhanging beam section of each node on this prefabricated node with When its precoated plate connected is separate type structure, each node overhanging beam section beam-ends is reserved with 2 holes for hoist, the overhanging post of each node Duan Zhuduan is provided with 2 holes for hoist;The overhanging beam section of each node on this prefabricated node and connected Bars In Poured Concrete Slab are cast-type groups When closing structure, each node overhanging beam section beam-ends being reserved with 4 holes for hoist, each node overhanging shell of column styletable is provided with 2 holes for hoist.
4. a prefabricated assembled frame structure based on the arbitrary described prefabricated node of claim 1-3, it is characterised in that: bag Include prefabricated node, prefabricated styletable tenon, prefabricated beam-ends tenon, the beam coupling part of cast in situs, the post connecting portion of cast in situs Point, prefabricated post bottom susceptor, post bracing members bar, joist steel support bar, styletable steel screw rod and beam-ends steel screw rod, the top of prefabricated post bottom susceptor Central authorities of portion are reserved with groove, and the top of prefabricated post bottom susceptor is reserved with reserved long reinforcing bar and reserved bar dowel, each bottom prefabricated post The two ends of end tenon respectively with the groove of the overhanging shell of column of node of corresponding prefabricated post bottom susceptor and the prefabricated node being positioned at bottom Match, the two ends of remaining each prefabricated styletable tenon respectively with the two adjacent sections overhanging post of point of corresponding adjacent two prefabricated nodes The fit depressions of section, each prefabricated styletable tenon is interspersed in the post coupling part of correspondence, adjacent on adjacent two prefabricated nodes Reserved long reinforcing bar, reserved bar dowel correspondence on the two overhanging shell of columns of node connect, and reserving on the overhanging shell of column of two adjacent sections point Long reinforcing bar, reserved bar dowel are all interspersed in the post coupling part of correspondence, and the two adjacent sections point on adjacent two prefabricated nodes is overhanging Being symmetrically installed at least 1 coupled columns bracing members bar between shell of column lateral wall, two styletable steel screw rods are passed through at the two ends of each post bracing members bar Fixing, two styletable steel screw rods connect with the hole for hoist on the corresponding two adjacent sections overhanging shell of column of point respectively, each prefabricated beam-ends tenon Head respectively with the fit depressions of the two adjacent sections overhanging beam section of point of corresponding adjacent two prefabricated nodes, each prefabricated beam-ends tenon is worn Insert in the beam coupling part of correspondence, the reserved long reinforcing bar in the two adjacent sections overhanging beam section of point on adjacent two prefabricated nodes, in advance Stay bar dowel correspondence to connect, and reserved long reinforcing bar, the reserved bar dowel in the overhanging beam section of two adjacent sections point is all interspersed in beam and connects In part, it is symmetrically installed at least 1 pair of joist steel between the two adjacent sections point overhanging beam section lateral wall on adjacent two prefabricated nodes and supports Bar, the two ends of each joist steel support bar are fixed by two beam-ends steel screw rods, and two beam-ends steel screw rods are respectively with corresponding adjacent two Hole for hoist in the overhanging beam section of node connects.
Prefabricated assembled frame structure the most according to claim 4, it is characterised in that: prefabricated styletable tenon and prefabricated beam-ends Tenon, all in strip, prefabricated styletable tenon and prefabricated beam-ends tenon is all reserved with hole for hoist.
6. the building method of the prefabricated assembled frame structure described in a claim 4, it is characterised in that comprise the steps:
1) after laying a solid foundation, cast in situs prefabricated post bottom susceptor;
2) after prefabricated post bottom susceptor maintenance is good, scene determines mast axis position, install the fixing each prefabricated styletable tenon of bottom and Prefabricated beam-ends tenon;
3) the lifting prefabricated node of bottom is in place, corrects the prefabricated node of bottom, installs fixing post bracing members bar and joist steel support bar, Gu Fixed column end steel screw rod and beam-ends steel screw rod;
4) the reserved long reinforcing bar in the corresponding two adjacent sections overhanging beam section of point connected on adjacent two prefabricated nodes, reserved bar dowel peace The fixing post bracing members template of dress;
5) the reserved long reinforcing bar in the corresponding two adjacent sections overhanging beam section of point connected on adjacent two prefabricated nodes, reserved bar dowel, Fixing joist steel support shuttering is installed;
6) check that this layer of prefabricated node is the most all installed in place, if it is, enter step 7), if it does not, enter step 3), directly Prefabricated node to bottom frame structure is all installed in place;
7) use the part between the prefabricated overhanging shell of column of two adjacent sections point on the adjacent two prefabricated nodes of concrete cast in situs, be The post coupling part of cast in situs;
8) use the part between the prefabricated overhanging beam section of two adjacent sections point on the adjacent two prefabricated nodes of concrete cast in situs, be The beam coupling part of cast in situs;
9) check that the post coupling part of bottom frame structure, beam coupling part have the most all poured, if it is, enter step 10), if it is not, enter step 7) and/or step 8);
10) coupled columns coupling part, beam coupling part carry out maintenance;
11) check that bottom frame structure has the most all built, if it is not, continue to build bottom frame structure, if it is, With reference to step 2)-step 10), enter the structure of last layer frame structure.
CN201610779274.4A 2016-08-30 2016-08-30 A kind of prefabricated node and a kind of prefabricated assembled frame structure and its construction method Active CN106223463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610779274.4A CN106223463B (en) 2016-08-30 2016-08-30 A kind of prefabricated node and a kind of prefabricated assembled frame structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610779274.4A CN106223463B (en) 2016-08-30 2016-08-30 A kind of prefabricated node and a kind of prefabricated assembled frame structure and its construction method

Publications (2)

Publication Number Publication Date
CN106223463A true CN106223463A (en) 2016-12-14
CN106223463B CN106223463B (en) 2019-08-30

Family

ID=58072086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610779274.4A Active CN106223463B (en) 2016-08-30 2016-08-30 A kind of prefabricated node and a kind of prefabricated assembled frame structure and its construction method

Country Status (1)

Country Link
CN (1) CN106223463B (en)

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869321A (en) * 2017-03-16 2017-06-20 南昌大学 The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN106948480A (en) * 2017-03-02 2017-07-14 广州大学 A kind of beam-column node structure and fabricated house
CN107300723A (en) * 2017-08-01 2017-10-27 贺州学院 Assembled architecture assembling detection device and method
CN107859166A (en) * 2017-10-13 2018-03-30 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107882172A (en) * 2017-10-13 2018-04-06 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107882173A (en) * 2017-10-13 2018-04-06 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107893495A (en) * 2017-10-13 2018-04-10 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905422A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905366A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905360A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905361A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905359A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905365A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905364A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905367A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905362A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905419A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107956251A (en) * 2017-10-13 2018-04-24 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107956252A (en) * 2017-10-13 2018-04-24 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975143A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975142A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975140A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975141A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989179A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989176A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989177A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989175A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989174A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989178A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN108755938A (en) * 2018-04-28 2018-11-06 南昌工程学院 A kind of steel core space node of assembly concrete frame
CN108867880A (en) * 2018-09-12 2018-11-23 江西嘉致建设有限公司 A kind of assembled steel Reinforced Concrete Buildings
CN109518802A (en) * 2018-12-03 2019-03-26 上海建工二建集团有限公司 Assembled beam-column structure and construction method thereof
CN109853954A (en) * 2019-03-04 2019-06-07 吉林建筑大学 A kind of assembly concrete frame structure is split and construction method
CN110042927A (en) * 2019-05-20 2019-07-23 北京市轨道交通建设管理有限公司 Prefabricated concrete structure, subway ground port structure and its construction method
CN110258581A (en) * 2019-06-19 2019-09-20 北京城建北方集团有限公司 A kind of foundation pit support beam structure and construction method
CN111456229A (en) * 2019-01-22 2020-07-28 润弘精密工程事业股份有限公司 Beam-column joint structure, beam-column joint method, and building structure using the beam-column joint structure
CN113279423A (en) * 2021-06-29 2021-08-20 南华大学 Prefabricated column pier and post-cast strip foundation beam assembly integral construction method
CN113389272A (en) * 2021-07-21 2021-09-14 曾侃衎 Modular prefabricated combined type space connection masonry and structure building method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704624A (en) * 2012-05-31 2012-10-03 中国十七冶集团有限公司 Engineered cementitious composite (ECC)-reinforced concrete (RC) combination column and novel connection mode thereof
CN103061517A (en) * 2013-01-15 2013-04-24 中南大学 Novel sub-structure modular prefabricated assembly node type frame structure assembly method
CN103774754A (en) * 2014-01-07 2014-05-07 同济大学 Prefabricated ECC-RC combination beam column joint component
CN104912190A (en) * 2015-06-17 2015-09-16 淮海工学院 Dry type joggle frame structure
CN105155773A (en) * 2015-08-18 2015-12-16 同济大学 Detachable concrete component constructing method
CN205000554U (en) * 2015-09-25 2016-01-27 赵洪波 A concrete column for assembling overall structure
CN105804241A (en) * 2016-03-22 2016-07-27 哈尔滨工业大学 Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN206128292U (en) * 2016-08-30 2017-04-26 赵挺生 Prefabricated node and prefabricated fabricated frame structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704624A (en) * 2012-05-31 2012-10-03 中国十七冶集团有限公司 Engineered cementitious composite (ECC)-reinforced concrete (RC) combination column and novel connection mode thereof
CN103061517A (en) * 2013-01-15 2013-04-24 中南大学 Novel sub-structure modular prefabricated assembly node type frame structure assembly method
CN103774754A (en) * 2014-01-07 2014-05-07 同济大学 Prefabricated ECC-RC combination beam column joint component
CN104912190A (en) * 2015-06-17 2015-09-16 淮海工学院 Dry type joggle frame structure
CN105155773A (en) * 2015-08-18 2015-12-16 同济大学 Detachable concrete component constructing method
CN205000554U (en) * 2015-09-25 2016-01-27 赵洪波 A concrete column for assembling overall structure
CN105804241A (en) * 2016-03-22 2016-07-27 哈尔滨工业大学 Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN206128292U (en) * 2016-08-30 2017-04-26 赵挺生 Prefabricated node and prefabricated fabricated frame structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王毅: "《怎样进行混凝土结构工程施工》", 31 December 2008 *
闫明朱: "《施工图结构构造识读纵合训练》", 29 February 2016 *

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948480A (en) * 2017-03-02 2017-07-14 广州大学 A kind of beam-column node structure and fabricated house
CN106948480B (en) * 2017-03-02 2023-02-21 广州大学 Beam column node structure and assembled house
CN106869321A (en) * 2017-03-16 2017-06-20 南昌大学 The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN107300723A (en) * 2017-08-01 2017-10-27 贺州学院 Assembled architecture assembling detection device and method
CN107300723B (en) * 2017-08-01 2023-09-26 贺州学院 Assembly type building assembly detection device and method
CN107975141A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989175A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905422A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905366A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905360A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905361A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905359A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905365A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905364A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905367A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905362A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905419A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107956251A (en) * 2017-10-13 2018-04-24 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107956252A (en) * 2017-10-13 2018-04-24 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975143A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975142A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975140A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107882173A (en) * 2017-10-13 2018-04-06 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989179A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989176A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989177A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107893495A (en) * 2017-10-13 2018-04-10 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989174A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989178A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107859166A (en) * 2017-10-13 2018-03-30 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107882172A (en) * 2017-10-13 2018-04-06 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN108755938A (en) * 2018-04-28 2018-11-06 南昌工程学院 A kind of steel core space node of assembly concrete frame
CN108867880A (en) * 2018-09-12 2018-11-23 江西嘉致建设有限公司 A kind of assembled steel Reinforced Concrete Buildings
CN108867880B (en) * 2018-09-12 2023-11-14 江西嘉致建设有限公司 Assembled reinforced concrete building
CN109518802A (en) * 2018-12-03 2019-03-26 上海建工二建集团有限公司 Assembled beam-column structure and construction method thereof
CN111456229A (en) * 2019-01-22 2020-07-28 润弘精密工程事业股份有限公司 Beam-column joint structure, beam-column joint method, and building structure using the beam-column joint structure
CN111456229B (en) * 2019-01-22 2022-06-07 润弘精密工程事业股份有限公司 Beam-column joint structure, beam-column joint method, and building structure
CN109853954A (en) * 2019-03-04 2019-06-07 吉林建筑大学 A kind of assembly concrete frame structure is split and construction method
CN109853954B (en) * 2019-03-04 2021-06-01 吉林建筑大学 Disassembling and constructing method for assembly type concrete frame structure
CN110042927A (en) * 2019-05-20 2019-07-23 北京市轨道交通建设管理有限公司 Prefabricated concrete structure, subway ground port structure and its construction method
CN110042927B (en) * 2019-05-20 2023-11-10 北京市轨道交通建设管理有限公司 Assembled concrete structure, subway ground entrance and exit structure and construction method thereof
CN110258581A (en) * 2019-06-19 2019-09-20 北京城建北方集团有限公司 A kind of foundation pit support beam structure and construction method
CN110258581B (en) * 2019-06-19 2024-03-15 北京城建北方集团有限公司 Foundation pit supporting beam structure and construction method
CN113279423B (en) * 2021-06-29 2022-05-24 南华大学 Prefabricated column pier and post-cast strip foundation beam assembly integral construction method
CN113279423A (en) * 2021-06-29 2021-08-20 南华大学 Prefabricated column pier and post-cast strip foundation beam assembly integral construction method
CN113389272A (en) * 2021-07-21 2021-09-14 曾侃衎 Modular prefabricated combined type space connection masonry and structure building method

Also Published As

Publication number Publication date
CN106223463B (en) 2019-08-30

Similar Documents

Publication Publication Date Title
CN106223463A (en) A kind of prefabricated node and the prefabricated assembled frame structure of one and construction method thereof
CN206128292U (en) Prefabricated node and prefabricated fabricated frame structure
CN108331158B (en) On-site connection method of prefabricated reinforced concrete beam column
CN103669559B (en) Assembled integral shear wall building structure and construction method
CN107587603B (en) Assembly type light steel structure and mounting method thereof
CN202767230U (en) Assembly integrated shear wall construction structure
CN102605858B (en) Building structure and construction method
CN105649360A (en) Integral assembling type building system and installing method
CN202706198U (en) Building structure
CN105143570A (en) Building structure and construction method for same
CN108360678A (en) A kind of assembled beam-column node tenon connection structure
CN103850363A (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN104532983A (en) Steel pipe concrete composite system of building and masonry construction method thereof
CN112502714B (en) Assembled shaft barrel structure and design and construction method
CN111364681A (en) Prefabricated section steel concrete end column-beam node prestressed tendon staggered tensioning anchoring structure for assembly building and construction method
CN102383590A (en) Combined system of split building template
WO2012065534A1 (en) Prefabricated reinforced concrete formwork and manufacturing method thereof, as well as building and construction method thereof
CN113718753B (en) Anchor underground continuous wall foundation assembled type intermediate wall and construction method
CN206396892U (en) Building block and building structure
KR102197994B1 (en) Construction method using beam-reinforced deck plate
CN110206347B (en) Side span structure of assembled electronic factory building and construction method thereof
CN109356285B (en) Assembled prefabricated column component, assembled combined prefabricated column and assembling method thereof
CN111335485B (en) Prefabricated section steel concrete intermediate column beam node prestressed tendon staggered tensioning anchoring structure for assembly building and construction method
CN108999335B (en) Light steel grating concrete house system
CN108571065A (en) The assembled steel tendon concrete frame structure of connector is connected to based on steel plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant