CN206128292U - Prefabricated node and prefabricated fabricated frame structure - Google Patents

Prefabricated node and prefabricated fabricated frame structure Download PDF

Info

Publication number
CN206128292U
CN206128292U CN201621011055.3U CN201621011055U CN206128292U CN 206128292 U CN206128292 U CN 206128292U CN 201621011055 U CN201621011055 U CN 201621011055U CN 206128292 U CN206128292 U CN 206128292U
Authority
CN
China
Prior art keywords
node
prefabricated
overhanging
column
nodes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621011055.3U
Other languages
Chinese (zh)
Inventor
赵挺生
王敬洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621011055.3U priority Critical patent/CN206128292U/en
Application granted granted Critical
Publication of CN206128292U publication Critical patent/CN206128292U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a prefabricated node and prefabricated fabricated frame structure, but be somebody's turn to do prefabricated node according to its structure batch production prefabrication. The core of this prefabrication fabricated frame structure is the prefabricated prefabricated node of taking node extensional beam section, the overhanging shell of column of node, according to the various types of prefabricated nodes of layout design to all kinds of prefabricated nodes of accurate installation, the roof beam of the prefabricated node of field connection or the mode of post found whole prefabricated assembly monolithic structure. The utility model discloses provide a new structure mode to prefabricated fabricated frame structure novelty ground, provided to take the node prefabrication method of beam column, helped improving tradition node durability, the poor unfavorable situation of reliability brought of beam manufacturing post, cast in situs reinforced concrete node in advance, saving structure time, sparingly construction cost.

Description

A kind of prefabricated node and a kind of prefabricated assembled frame structure
Technical field
This utility model belongs to fabricated assembly overall technical field of structures, and in particular to a kind of prefabricated node and one kind are pre- Assembling frame structure processed and its construction method.
Background technology
In recent years, fabricated assembly overall structural development is rapid, and especially country proposes building work in 13 planning The developing goal of industry, prefabricated assembled technology is the core of building industrialization, is promoting resource, energy conservation type and environment friend The development of good type building, serves key effect.Common precast construction system includes:Prefabricated concrete structure system, dress With various shapes such as integral concrete system, fabricated assembly overall shear wall structure system, fabricated shear wall structural systems The structural system of formula.
The characteristics of prefabricated construction has transformation construction mode, improves efficiency, ensure quality, be conducive to management, in advance Assembled technology processed changes building industry traditional mode of production mode.
At present, the enforcement of prefabricated assembled frame structure concentrates on the batch production making of the components such as precast beam, post, and scene is fixed Position, lifting, the cast in situs for correcting fixed and beam-to-column joint node.The prefabricated assembled component of tradition, subject matter is concentrated on At the node link position of prefabricated components, the reinforcing bar that the node of cast in situs is limited by node location is intensive, and node size is limited Etc. unfavorable factor, it is difficult to ensure the quality problems of cast in situs node, and the maintenance problem in later stage, and then bring the resistance to of sternness Long property and integrity problem.
The content of the invention
To solve the problems, such as above-mentioned prior art, this utility model provides a kind of prefabricated node and a kind of prefabricated dress With formula frame structure, the prefabricated node is the prefabricated component of batch production, in being applied to prefabricated assembled frame structure, contributes to improving The cast in situs of the node point connection in the prefabricated assembled frame structure of tradition is of poor quality, late maintaining is difficult, durability reliability Poor the problems such as, realize prefabricated assembled frame structure quickly and efficiently constructing.
The prior batch production of node of the prefabricated assembled frame structure is prefabricated, and prefabricated node good endurance, reliability are high, So that whole prefabricated assembled frame structure good endurance, reliability is high, safe and construction cost is low.
Realize technical scheme that this utility model above-mentioned purpose adopted for:
A kind of prefabricated node, the prefabricated node include prefabricated bean column node, the overhanging beam section of the node of more than 1 and 1 with On the overhanging shell of column of node, prefabricated bean column node, the overhanging beam section of each node and the overhanging shell of column of each node be integral type precast construction, The central authorities of each overhanging beam section of node and the overhanging shell of column of each node reserve respectively it is fluted, each overhanging beam section of node and each node it is overhanging Shell of column end is reserved with reserved long reinforcing bar, and each overhanging beam section of node and the overhanging shell of column end of each node are reserved with reserved short steel Muscle, reserves long reinforcing bar and reserved bar dowel cross arrangement.
The prefabricated node includes prefabricated node A, prefabricated node B, prefabricated node C, prefabricated node D, prefabricated node E, prefabricated Node F, prefabricated node G and prefabricated node H;Described prefabricated node A includes the overhanging beam section of prefabricated bean column node, 2 nodes and 2 The overhanging shell of column of individual node, the overhanging beam section of 2 nodes is mutually perpendicular to, and the overhanging shell of column of 2 nodes is on same vertical curve;Described Prefabricated node B includes the overhanging beam section of prefabricated bean column node, 4 nodes and the overhanging shell of column of 2 nodes, in the overhanging beam section of 4 nodes It is mutually perpendicular to two-by-two, the overhanging shell of column of 2 nodes is on same vertical curve;Described prefabricated node C include prefabricated bean column node, The overhanging beam section of 3 nodes and the overhanging shell of column of 2 nodes, are mutually perpendicular to two-by-two in the overhanging beam section of 3 nodes, the overhanging post of 2 nodes Section is on same vertical curve;Described prefabricated node D is included outside prefabricated bean column node, 2 overhanging beam sections of node and 1 node Stretch shell of column, the overhanging beam section of 2 nodes is mutually perpendicular to;Described prefabricated node E includes prefabricated bean column node, 4 node overhanging beams Section and the overhanging shell of column of 1 node, are mutually perpendicular to two-by-two in the overhanging beam section of 4 nodes;Described prefabricated node F includes prefabricated beam column The overhanging beam section of node, 3 nodes and the overhanging shell of column of 1 node, are mutually perpendicular to two-by-two in the overhanging beam section of 3 nodes;Described is pre- Node G processed is in cross, including the overhanging beam section of prefabricated bean column node, 2 nodes and the overhanging shell of column of 2 nodes, 2 node overhanging beams On section same vertical curve, the overhanging shell of column of 2 nodes is on same vertical curve;Described prefabricated node H is in T fonts, including The overhanging beam section of prefabricated bean column node, 2 nodes and the overhanging shell of column of 1 node, on the overhanging beam section same vertical curve of 2 nodes.
When the overhanging beam section of each node on the prefabricated node is separate structure with connected precoated plate, outside each node It is reserved with 2 holes for hoist on beam section beam-ends, the overhanging shell of column styletable of each node is provided with 2 holes for hoist;It is each on the prefabricated node When the overhanging beam section of node is cast-type combinative structure with connected Bars In Poured Concrete Slab, on the overhanging beam section beam-ends of each node 4 are reserved with Individual hole for hoist, the overhanging shell of column styletable of each node is provided with 2 holes for hoist.
A kind of prefabricated assembled frame structure, including prefabricated node, prefabricated styletable tenon, prefabricated beam-ends tenon, scene pour Beam coupling part, the post coupling part of cast in situs, prefabricated post bottom susceptor, post bracing members bar, joist steel support bar, the styletable steel built Screw rod and beam-ends steel screw rod, the center of top of prefabricated post bottom susceptor is reserved fluted, is reserved with the top of prefabricated post bottom susceptor pre- Stay long reinforcing bar and reserved bar dowel, the two ends of the prefabricated styletable tenon of each bottom are respectively with corresponding prefabricated post bottom susceptor and the bottom of positioned at The fit depressions of the overhanging shell of column of node of the prefabricated node of layer, the two ends of remaining each prefabricated styletable tenon respectively with it is corresponding The fit depressions of the overhanging shell of column of two adjacent sections point of adjacent two prefabricated node, each prefabricated styletable tenon is interspersed in corresponding post and connects In socket part point, the reserved long reinforcing bar on the overhanging shell of column of two adjacent sections point, reserved bar dowel correspondence on adjacent two prefabricated node connects Connect, and the reserved long reinforcing bar on the overhanging shell of column of two adjacent sections point, reserved bar dowel are interspersed in corresponding post coupling part, phase At least 1 pair post bracing members bar, each post steel are symmetrically installed between the overhanging shell of column lateral wall of two adjacent sections point on adjacent two prefabricated nodes The two ends of support bar are fixed by two styletable steel screw rods, two styletable steel screw rods respectively with the overhanging post of corresponding two adjacent sections point In section hole for hoist connection, each prefabricated beam-ends tenon respectively with the overhanging beam section of two adjacent sections point of corresponding adjacent two prefabricated node Fit depressions, each prefabricated beam-ends tenon is interspersed in corresponding beam coupling part, adjacent two on adjacent two prefabricated node Reserved long reinforcing bar, reserved bar dowel correspondence in the overhanging beam section of node connects, and the reserved length in the overhanging beam section of two adjacent sections point Reinforcing bar is interspersed in beam coupling part, is symmetrically pacified between the overhanging beam section lateral wall of two adjacent sections point on adjacent two prefabricated node Few 1 pair of joist steel support bar is filled to, the two ends of each joist steel support bar are fixed by two beam-ends steel screw rods, two beam-ends steel screw rods point Do not connect with the hole for hoist in the overhanging beam section of corresponding two adjacent sections point.
Prefabricated styletable tenon and prefabricated beam-ends tenon are in strip, pre- on prefabricated styletable tenon and prefabricated beam-ends tenon Leave hole for hoist.
Compared with prior art, advantage of the present utility model and beneficial effect are:
1) the utility model proposes prefabricated node can realize factorial praluction, improve construction speed.
2) the utility model proposes based on the prefabricated assembled frame structure of prefabricated node contribute to improve tradition it is prefabricated Need cast-in-place concrete and produce the problem of durability and poor reliability at node at assembling frame structure interior joint.
In a word, this utility model for prefabricated assembled frame structure is innovatively proposed a kind of new forming types, For the problem that node durability, reliability present in traditional prefabricated assembled frame structure are poor, the section with beam column is proposed Point method for prefabricating, contributes to improving traditional prefabricated beam column, node durability, reliability that cast in situs armored concrete node brings Property difference unfavorable situation, and node installation it is in place can undertake load, thus can save the structure time of whole frame structure, save Construction cost is saved, while improving the durability and reliability of integral frame structure.As can be seen here, this utility model is prefabricated to promoting The development of cast in place and precast construction has great meaning.
Description of the drawings
Fig. 1 is the structure diagram of various types of prefabricated nodes of the present utility model.
Fig. 2 is the structural representation of cross prefabricated node.
Fig. 3 is prefabricated node and the structural representation that precoated plate is separate structure.
Fig. 4 is prefabricated node and the structural representation that Bars In Poured Concrete Slab is cast-type combinative structure.
Fig. 5 is the structural representation of prefabricated post bottom susceptor.
Fig. 6 is the structural representation of prefabricated beam-ends tenon.
Fig. 7 is the structural representation after adjacent two prefabricated overhanging beam section connections on adjacent two prefabricated nodes.
Fig. 8 is the structural representation after adjacent two prefabricated overhanging shell of column connections on adjacent two prefabricated nodes.
Fig. 9 is the structure diagram of prefabricated assembled frame structure of the present utility model.
Wherein, 1- prefabricated node A, 2- prefabricated node B, 3- prefabricated node C, 4- prefabricated node G, 5- prefabricated node D, 6- is pre- Node E, 7- processed prefabricated node F, 8- prefabricated node H, 9- reserve long reinforcing bar, 10- grooves, 11- holes for hoist, 12- node overhanging beams Section, 13- reserved bar dowel, the prefabricated bean column nodes of 14-, the overhanging shell of column of 15- nodes, the prefabricated beam-ends tenons of 16- or prefabricated styletable tenon Head, 17- prefabricated post bottom susceptors, 18- post bracing members bars, 19- joist steel support bars, 20- styletable steel screw rods, 21- beam-ends steel screw rods, 22- joist steel support shutterings, 23- post bracing members templates, 24- beams coupling part, 25- posts coupling part.
Specific embodiment
Prefabricated node of the present utility model and prefabricated assembled frame structure are described in detail below in conjunction with the accompanying drawings.
The type of the prefabricated node that this utility model is provided is relatively more, is now given using eight kinds of more prefabricated nodes, point Wei not prefabricated node A 1, prefabricated node B 2, prefabricated node C 3, prefabricated node D 5, prefabricated node E6, prefabricated node F7, pre- Node G4 processed, prefabricated node H8, its structure diagram is as shown in Figure 1.
It is that the structure to prefabricated node is described in detail, the present embodiment is described in detail with prefabricated node G, prefabricated section Point G includes the overhanging beam section 12 of 14,2 nodes of prefabricated bean column node and the overhanging shell of column 15 of 2 nodes, prefabricated bean column node 14,2 The overhanging beam section 12 of node and the overhanging shell of column 15 of 2 nodes are integral type precast construction, and the structure of prefabricated node G is in integrally cross Type, as shown in Figure 2.The length of the overhanging beam section 12 of each node is L0/ 2-250mm (notes:L0It is the clear length of beam edge longitudinal direction), The overhanging shell of column of node on prefabricated bean column node top is 500mm, in the length of the overhanging shell of column of node of prefabricated bean column node bottom For (h0-1000)mm(h0For the vertical computed altitude of post).
The overhanging beam section 12 of each node of prefabricated node G and the central authorities of the overhanging shell of column 15 of each node are reserved with respectively square groove 10, square groove width is 100mm, and length is 100mm, and depth is 50mm.Each overhanging beam section 12 of node and the overhanging post of each node Short steel is reserved in the reserved long reinforcing bar 9 in 15 ends of section, each overhanging beam section 15 of node and the overhanging end of shell of column 9 of each node Muscle 13, reserves long reinforcing bar 9 and the cross arrangement of reserved bar dowel 13.The length for reserving long reinforcing bar is 500mm, reserves the length of bar dowel Spend for 100mm, and reserve long splice area no more than the 50% of the reinforcing bar gross area of place cross section place.
As shown in figure 3, when the overhanging beam section of each node and connected precoated plate on prefabricated node G is separate structure When, be reserved with 2 holes for hoist 11 (a diameter of 48mm) in the central authorities of the overhanging beam section beam-ends of each node, two holes for hoist with its institute The overhanging beam section beam-ends end face of node distance be 200mm, underlying hole for hoist and the overhanging beam section of the node that it is located Bottom apart from 150mm, adjacent two liftings the distance between central point of hole is 200-300mm.
As shown in figure 4, when the overhanging beam section of each node on prefabricated node G is that cast-type is combined with connected Bars In Poured Concrete Slab During structure, on the overhanging beam section beam-ends of each node the node overhanging beam that 4 holes for hoist, 11,4 holes for hoist are located with it is reserved with The distance at the top of Bars In Poured Concrete Slab in section be the cast-in-place plate thickness+220mm of twice, the node overhanging beam that first hole for hoist is located with it The distance of section beam-ends end face is 200mm, and its excess-three hole for hoist is configured on the basis of first hole for hoist, adjacent two lifting The distance between hole is 500-1000mm.The overhanging shell of column styletable of each node on prefabricated node G is provided with 2 holes for hoist 11, and two hang The distance of the bottom portion of groove in dress Kong Junyu its overhanging beam section of node for being located is 300mm, and the distance between two holes for hoist are 200-300mm。
According to prefabricated node G, remaining all kinds of node are carried out with simple illustration, described prefabricated node A includes prefabricated The overhanging beam section of bean column node, 2 nodes and the overhanging shell of column of 2 nodes, the overhanging beam section of 2 nodes is mutually perpendicular to, the overhanging post of 2 nodes Section is on same vertical curve;Described prefabricated node B is included outside prefabricated bean column node, 4 overhanging beam sections of node and 2 nodes Stretch shell of column, be mutually perpendicular to two-by-two in the overhanging beam section of 4 nodes, the overhanging shell of column of 2 nodes is on same vertical curve;Described is pre- Node C processed includes the overhanging beam section of prefabricated bean column node, 3 nodes and the overhanging shell of column of 2 nodes, two in the overhanging beam section of 3 nodes Two are mutually perpendicular to, and the overhanging shell of column of 2 nodes is on same vertical curve;Described prefabricated node D include prefabricated bean column node, 2 The overhanging beam section of individual node and the overhanging shell of column of 1 node, the overhanging beam section of 2 nodes is mutually perpendicular to;Described prefabricated node E includes pre- The overhanging beam section of bean column node processed, 4 nodes and the overhanging shell of column of 1 node, are mutually perpendicular to two-by-two in the overhanging beam section of 4 nodes;Institute The prefabricated node F for stating includes the overhanging beam section of prefabricated bean column node, 3 nodes and the overhanging shell of column of 1 node, 3 node overhanging beams It is mutually perpendicular to two-by-two in section, described prefabricated node H is in T fonts, including the overhanging beam section of prefabricated bean column node, 2 nodes and 1 section The overhanging shell of column of point, on the overhanging beam section same vertical curve of 2 nodes.
The prefabricated assembled frame structure that this utility model is provided includes prefabricated node, prefabricated styletable tenon 16, precast beam The post coupling part 25 of the beam coupling part 24, cast in situs of end tenon 16, cast in situs, prefabricated post bottom susceptor 17, post steel Strut 19, joist steel support bar 18, styletable steel screw rod 20 and beam-ends steel screw rod 21.
As shown in figure 5, the center of top of prefabricated post bottom susceptor 17 reserves fluted 10, the top of prefabricated post bottom susceptor 17 is pre- Stay reserved long reinforcing bar 9 and reserved bar dowel 13.
As shown in fig. 6, prefabricated styletable tenon 16 and prefabricated beam-ends tenon 16 are in strip, prefabricated styletable tenon and prefabricated The length of beam-ends tenon is 600mm, and width is 100mm, is highly 100mm.Prefabricated styletable tenon and prefabricated beam-ends tenon Head as beam, post internal core pressure-containing parts, using C40Armored concrete.On prefabricated styletable tenon 16 and prefabricated beam-ends tenon 16 It is reserved with hole for hoist, convenient lifting.
As shown in fig. 7, each prefabricated beam-ends tenon 16 is overhanging with the two adjacent sections point of corresponding adjacent two prefabricated node respectively The groove 10 of beam section is engaged, and each prefabricated beam-ends tenon 16 is interspersed in corresponding beam coupling part 24, adjacent two prefabricated node On the overhanging beam section of two adjacent sections point on reserved long reinforcing bar 9, reserved bar dowel 13 correspondence connect, i.e., one of node is overhanging Reserved long reinforcing bar in beam section is fixedly connected with corresponding reserved bar dowel in the overhanging beam section of another node, and two adjacent sections Reserved long reinforcing bar 9, reserved bar dowel 13 in the overhanging beam section 12 of point is interspersed in beam coupling part 24, adjacent two prefabricated node On the overhanging lateral wall of beam section 12 of two adjacent sections point between be symmetrically installed 2 pairs of joist steel support bars 18, the two of each joist steel support bar 18 End is fixed by two beam-ends steel screw rods 21, two beam-ends steel screw rods 21 respectively with the overhanging beam section 12 of corresponding two adjacent sections point Hole for hoist connection.
As shown in figure 8, the two ends of the prefabricated styletable tenon 16 of each bottom respectively with corresponding prefabricated post bottom susceptor 17 and be located at The fit depressions of the overhanging shell of column 15 of node of the prefabricated node of bottom, the two ends of remaining each prefabricated styletable tenon 16 respectively with The fit depressions of the overhanging shell of column 15 of two adjacent sections point of corresponding adjacent two prefabricated node, each prefabricated styletable tenon 16 is interspersed in It is the reserved long reinforcing bar 9 on the overhanging shell of column 15 of two adjacent sections point on adjacent two prefabricated node, pre- in corresponding post coupling part 25 The correspondence of bar dowel 13 is stayed to connect, i.e., the reserved long reinforcing bar and the overhanging shell of column of another node on the overhanging shell of column of one of node Upper corresponding reserved bar dowel is fixedly connected, and the reserved long reinforcing bar 9 on the overhanging shell of column 15 of two adjacent sections point, reserved bar dowel 13 In being interspersed in corresponding post coupling part 25, between the overhanging lateral wall of shell of column 15 of two adjacent sections point on adjacent two prefabricated node 2 pairs of post bracing members bars 18 are symmetrically installed, the two ends of each post bracing members bar 18 are fixed by two styletable steel screw rods 20, two styletables Steel screw rod 20 connects respectively with the hole for hoist on the overhanging shell of column of corresponding two adjacent sections point.
The structure diagram of whole prefabricated assembled frame structure is as shown in figure 9, from fig. 9, it can be seen that whole prefabrication and assembly construction Formula frame structure applies six kinds of prefabricated nodes, and this six kinds of prefabricated nodes are respectively prefabricated node A, prefabricated node B, prefabricated node C, prefabricated node D, prefabricated node E and prefabricated node F, this six kinds of prefabricated nodes are respectively applied to beam-ends and beam at different places The connection of end, styletable and styletable.Prefabricated node G and prefabricated node H are generally used in brick mix structure.
The construction method of above-mentioned prefabricated assembled frame structure, its step is:
1) after laying a solid foundation, cast in situs prefabricated post bottom susceptor;
2) after prefabricated post bottom susceptor is conserved, scene determines axis of a cylinder line position, installs each prefabricated styletable tenon of fixed bottom Head and prefabricated beam-ends tenon;
3) the prefabricated node of bottom is lifted in place, the prefabricated node of correction bottom, installs fixed column bracing members bar and joist steel is supported Bar, fixed styletable steel screw rod and beam-ends steel screw rod;
4) reserved long reinforcing bar, the reserved short steel on the overhanging shell of column of two adjacent sections point on the adjacent two prefabricated node of correspondence connection Muscle, that is, connect corresponding reserved long reinforcing bar and reserved bar dowel (such as welding, mechanical connection), installs fixed column bracing members template, Post bracing members template is fixed on styletable steel screw rod;
5) reserved long reinforcing bar, the reserved bar dowel in the overhanging beam section of two adjacent sections point on adjacent two prefabricated node is connected, Connect corresponding reserved long reinforcing bar and reserved bar dowel (such as welding, mechanical connection), fixed beam bracing members template is installed, by beam Bracing members template is fixed on beam-ends steel screw rod;
6) check whether this layer of prefabricated node all installs in place, if it is, into step 7), if not, into step 3), until the prefabricated node of bottom frame structure all installs in place;
7) with the part between the overhanging shell of column of two adjacent sections point on the adjacent two prefabricated node of concrete cast in situs, as The post coupling part 25 of cast in situs;
8) with the part between the overhanging beam section of two adjacent sections point on the adjacent two prefabricated node of concrete cast in situs, as The existing beam coupling part 24 for pouring;
9) the post coupling part of bottom frame structure is checked, whether beam coupling part all pours completes, if it is, into Step 10), if it is not, into step 7) and/or step 8);
10) post coupling part, beam coupling part are conserved, after maintenance terminates, by post bracing members template and joist steel Hold mode plate is disassembled;
11) check whether bottom frame structure all builds to complete, if it is not, continue to build bottom frame structure, such as Fruit is, with reference to step 2)-step 10), into the structure of last layer frame structure, until whole prefabricated assembled frame structure structure Build and complete, as shown in Figure 9.

Claims (5)

1. a kind of prefabricated node, it is characterised in that:The prefabricated node includes prefabricated bean column node, the node overhanging beam of more than 1 Section and the overhanging shell of column of node of more than 1, prefabricated bean column node, the overhanging beam section of each node and the overhanging shell of column of each node are integral type The central authorities of precast construction, each overhanging beam section of node and the overhanging shell of column of each node reserve respectively it is fluted, the overhanging beam section of each node and The overhanging shell of column end of each node is reserved with reserved long reinforcing bar, and each overhanging beam section of node and the overhanging shell of column end of each node are reserved There is reserved bar dowel, reserve long reinforcing bar and reserved bar dowel cross arrangement.
2. prefabricated node according to claim 1, it is characterised in that:The prefabricated node includes prefabricated node A, prefabricated node B, prefabricated node C, prefabricated node D, prefabricated node E, prefabricated node F, prefabricated node G and prefabricated node H;Described prefabricated node A includes the overhanging beam section of prefabricated bean column node, 2 nodes and the overhanging shell of column of 2 nodes, and the overhanging beam section of 2 nodes is mutually perpendicular to, 2 The overhanging shell of column of individual node is on same vertical curve;Described prefabricated node B includes prefabricated bean column node, 4 node overhanging beams Section and the overhanging shell of column of 2 nodes, are mutually perpendicular to two-by-two in the overhanging beam section of 4 nodes, and the overhanging shell of column of 2 nodes is vertical in same On line;Described prefabricated node C includes the overhanging beam section of prefabricated bean column node, 3 nodes and the overhanging shell of column of 2 nodes, 3 nodes It is mutually perpendicular to two-by-two in overhanging beam section, the overhanging shell of column of 2 nodes is on same vertical curve;Described prefabricated node D includes pre- The overhanging beam section of bean column node processed, 2 nodes and the overhanging shell of column of 1 node, the overhanging beam section of 2 nodes is mutually perpendicular to;Described is pre- Node E processed includes the overhanging beam section of prefabricated bean column node, 4 nodes and the overhanging shell of column of 1 node, two in the overhanging beam section of 4 nodes Two are mutually perpendicular to;Described prefabricated node F includes the overhanging beam section of prefabricated bean column node, 3 nodes and the overhanging shell of column of 1 node, 3 It is mutually perpendicular to two-by-two in the overhanging beam section of individual node;Described prefabricated node G is in cross, including prefabricated bean column node, 2 nodes Overhanging beam section and the overhanging shell of column of 2 nodes, on the overhanging beam section same vertical curve of 2 nodes, the overhanging shell of column of 2 nodes is in same On vertical curve;Described prefabricated node H is in T fonts, including the overhanging beam section of prefabricated bean column node, 2 nodes and the overhanging post of 1 node Section, on the overhanging beam section same vertical curve of 2 nodes.
3. prefabricated node according to claim 1, it is characterised in that:The overhanging beam section of each node on the prefabricated node with Precoated plate of its connection is when being separate structure, is reserved with 2 holes for hoist on the overhanging beam section beam-ends of each node, the overhanging post of each node Duan Zhuduan is provided with 2 holes for hoist;The overhanging beam section of each node on the prefabricated node and connected Bars In Poured Concrete Slab are cast-type groups When closing structure, 4 holes for hoist are reserved with the overhanging beam section beam-ends of each node, the overhanging shell of column styletable of each node is provided with 2 holes for hoist.
4. a kind of prefabricated assembled frame structure based on the arbitrary described prefabricated node of claim 1-3, it is characterised in that:Bag Include prefabricated node, prefabricated styletable tenon, prefabricated beam-ends tenon, the beam coupling part of cast in situs, the post connecting portion of cast in situs Point, prefabricated post bottom susceptor, post bracing members bar, joist steel support bar, styletable steel screw rod and beam-ends steel screw rod, the top of prefabricated post bottom susceptor Central authorities of portion are reserved fluted, and reserved long reinforcing bar and reserved bar dowel, each bottom prefabricated post are reserved with the top of prefabricated post bottom susceptor End tenon two ends respectively with corresponding prefabricated post bottom susceptor and positioned at bottom prefabricated node the overhanging shell of column of node groove Be engaged, the two ends of remaining each prefabricated styletable tenon respectively with the overhanging post of two adjacent sections point of corresponding adjacent two prefabricated node The fit depressions of section, each prefabricated styletable tenon is interspersed in corresponding post coupling part, adjacent on adjacent two prefabricated node Reserved long reinforcing bar, reserved bar dowel correspondence on the overhanging shell of column of two nodes connects, and reserved on the overhanging shell of column of two adjacent sections point Long reinforcing bar, reserved bar dowel are interspersed in corresponding post coupling part, and the two adjacent sections point on adjacent two prefabricated node is overhanging At least 1 pair post bracing members bar is symmetrically installed between shell of column lateral wall, the two ends of each post bracing members bar pass through two styletable steel screw rods Fixed, two styletable steel screw rods connect respectively with the hole for hoist on the overhanging shell of column of corresponding two adjacent sections point, each prefabricated beam-ends tenon Head respectively with the fit depressions of the overhanging beam section of two adjacent sections point of corresponding adjacent two prefabricated node, each prefabricated beam-ends tenon wears It is the reserved long reinforcing bar in the overhanging beam section of two adjacent sections point on adjacent two prefabricated node, pre- in inserting in corresponding beam coupling part Bar dowel correspondence is stayed to connect, and the reserved long reinforcing bar in the overhanging beam section of two adjacent sections point, reserved bar dowel are interspersed in beam connection In part, at least 1 pair joist steel is symmetrically installed between the overhanging beam section lateral wall of two adjacent sections point on adjacent two prefabricated node and is supported Bar, the two ends of each joist steel support bar are fixed by two beam-ends steel screw rods, and two beam-ends steel screw rods are respectively with corresponding adjacent two Hole for hoist connection in the overhanging beam section of node.
5. prefabricated assembled frame structure according to claim 4, it is characterised in that:Prefabricated styletable tenon and prefabricated beam-ends Tenon is in strip, and on prefabricated styletable tenon and prefabricated beam-ends tenon hole for hoist is reserved with.
CN201621011055.3U 2016-08-30 2016-08-30 Prefabricated node and prefabricated fabricated frame structure Withdrawn - After Issue CN206128292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621011055.3U CN206128292U (en) 2016-08-30 2016-08-30 Prefabricated node and prefabricated fabricated frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621011055.3U CN206128292U (en) 2016-08-30 2016-08-30 Prefabricated node and prefabricated fabricated frame structure

Publications (1)

Publication Number Publication Date
CN206128292U true CN206128292U (en) 2017-04-26

Family

ID=58567624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621011055.3U Withdrawn - After Issue CN206128292U (en) 2016-08-30 2016-08-30 Prefabricated node and prefabricated fabricated frame structure

Country Status (1)

Country Link
CN (1) CN206128292U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223463A (en) * 2016-08-30 2016-12-14 赵挺生 A kind of prefabricated node and the prefabricated assembled frame structure of one and construction method thereof
CN109372108A (en) * 2018-12-16 2019-02-22 北京工业大学 The prefabricated assembled beam column L shape node of soap-free emulsion polymeization
CN109372107A (en) * 2018-12-16 2019-02-22 北京工业大学 The prefabricated assembled beam column crisscross joint of soap-free emulsion polymeization
CN109386054A (en) * 2018-12-16 2019-02-26 北京工业大学 The prefabricated assembled beam column T-section point of soap-free emulsion polymeization
CN109610637A (en) * 2019-01-02 2019-04-12 中国建筑第八工程局有限公司 Assembled coal gangue haydite steel tube concrete beam and column node structure and its construction method
CN109837985A (en) * 2018-09-19 2019-06-04 内蒙古蒙西建设集团有限公司 The prefabricated node component of armored concrete

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223463A (en) * 2016-08-30 2016-12-14 赵挺生 A kind of prefabricated node and the prefabricated assembled frame structure of one and construction method thereof
CN106223463B (en) * 2016-08-30 2019-08-30 赵挺生 A kind of prefabricated node and a kind of prefabricated assembled frame structure and its construction method
CN109837985A (en) * 2018-09-19 2019-06-04 内蒙古蒙西建设集团有限公司 The prefabricated node component of armored concrete
CN109372108A (en) * 2018-12-16 2019-02-22 北京工业大学 The prefabricated assembled beam column L shape node of soap-free emulsion polymeization
CN109372107A (en) * 2018-12-16 2019-02-22 北京工业大学 The prefabricated assembled beam column crisscross joint of soap-free emulsion polymeization
CN109386054A (en) * 2018-12-16 2019-02-26 北京工业大学 The prefabricated assembled beam column T-section point of soap-free emulsion polymeization
CN109610637A (en) * 2019-01-02 2019-04-12 中国建筑第八工程局有限公司 Assembled coal gangue haydite steel tube concrete beam and column node structure and its construction method

Similar Documents

Publication Publication Date Title
CN106223463B (en) A kind of prefabricated node and a kind of prefabricated assembled frame structure and its construction method
CN206128292U (en) Prefabricated node and prefabricated fabricated frame structure
CN103669559B (en) Assembled integral shear wall building structure and construction method
CN202767230U (en) Assembly integrated shear wall construction structure
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN105649360A (en) Integral assembling type building system and installing method
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN102127930A (en) Net die member for steel-concrete building and method for constructing enclosure by combining net die members and filling into a frame shear wall
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN105143570A (en) Building structure and construction method for same
CN104532983A (en) Steel pipe concrete composite system of building and masonry construction method thereof
CN211114425U (en) Prefabricated steel pipe concrete column
CN109779114A (en) A kind of monoblock type folding plate combined beam
CN112502714B (en) Assembled shaft barrel structure and design and construction method
CN102383590A (en) Combined system of split building template
CN111734018A (en) Formwork structure, disassembly-free mold and concrete wall construction method
CN112681612A (en) High-strength steel concrete cross-shaped column partially prefabricated and assembled
CN204266400U (en) A kind of concrete filled steel tube combined system of building
CN209686711U (en) Prefabricated laminated superposed column, reinforced column and assembled architecture body
CN209011399U (en) Reinforced concrete hollow overlaps two-way ribbed slab floor
CN213978596U (en) Thin-wall steel box concrete combined bridge tower
CN112593632A (en) Fabricated beam-slab structure suitable for large-span high-clearance building and construction method thereof
CN112853983A (en) Manufacturing and on-site assembling process of light segment prefabricated bridge pier
CN104005476B (en) Be easy to fabrication and installation precast frame system and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhao Tingsheng

Inventor after: Chen Yugun

Inventor after: Wang Jingyang

Inventor after: Xu Shuming

Inventor after: Jiang Ling

Inventor after: Liu Wen

Inventor after: Zhou Wei

Inventor after: Zhang Yajing

Inventor after: Zhang Yuhui

Inventor after: Ren Lingling

Inventor before: Zhao Tingsheng

Inventor before: Wang Jingyang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170427

Address after: 430074 Hubei city of Wuhan province Wuchang Luo Yu Road, No. 1037

Patentee after: Huazhong University of Science and Technology

Address before: 430074 Hongshan, Wuhan Province, Huazhong University of Science and Technology,, building 214, room two

Patentee before: Zhao Tingsheng

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhao Tingsheng

Inventor after: Chen Yugun

Inventor after: Wang Jingyang

Inventor after: Xu Shuming

Inventor after: Jiang Ling

Inventor after: Liu Wen

Inventor after: Zhou Wei

Inventor after: Zhang Yajing

Inventor after: Zhang Yuhui

Inventor after: Ren Lingling

Inventor before: Zhao Tingsheng

Inventor before: Wang Jingyang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170502

Address after: 430074 Hubei city of Wuhan province Wuchang Luo Yu Road, No. 1037

Patentee after: Huazhong University of Science and Technology

Address before: 430074 Hongshan, Wuhan Province, Huazhong University of Science and Technology,, building 214, room two

Patentee before: Zhao Tingsheng

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170426

Effective date of abandoning: 20190830